SITE ACCESS STUDY
FORT.COLLINS,. COLORADO
JANUARY 1996
Prepared for:
Lagunitas Fort Collins, Inc.
3307 South College Avenue, Suite 200
Fort Collins, CO 80525
...Prepared by:
MATTHEW J. DELICH, P.E.
3413 Banyan Avenue
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
AM / PM..
9/42
NOM.
3/14
w
Q
FOSSIL
CREEK
Nom. PKWY.
SHORT RANGE PHASE 1
SITE GENERATED PEAK HOUR TRAFFIC Figure 4
40-
N
0
-CD la
FOSSIL
CREEK
NOM. PKWY.
12/57
NOM.
AM PM 4/20
SHORT RANGE PHASE 2 PLUS VACANT LOT
SITE GENERATED PEAK HOUR TRAFFIC Figure 5
- -----------
N
AM / PM
to
C'4
04
+j
20193 )
2/10 c"
6/30
LONG RANGE FULL DEVELOPMENT
SITE GENERATED. PEAK HOUR TRAFFIC
FOSSIL
CREEK
PKWY.
Figure 6
w
.
J No
CD L
�'�
p
U
�- 135/85
C7' C' o
^� - NOM. FOSSIL
/--30/25 CREEK
PKWY.
30/75
AM / PM
NOM. -
15/30
� Ln
��
Rounded to the Nearest
o�
N
5 Vehicles.
SHORT RANGE TOTAL PEAK HOUR TRAFFIC
WITH PHASE 1 OF FOSSIL CREEK OFFICE PARK Figure 7
AM / PM
Rounded to
5 Vehicles.
the Nearest
w
N
0
��U,)
o
U
�
R- 135/85
NOM.
FOSSIL
30/25
CREEK
PKWY.
45/130
NOM. -; o Ln o
20/50 --, 'c-", t
�oM
a-
N
SHORT RANGE TOTAL PEAK HOUR TRAFFIC
WITH PHASE 1 & 2 OF FOSSIL CREEK OFFICE PARK Figure 8
w
14
0
o
N
oS�4 o
\o N
U
200/130
N
�-10/5 FOSSIL
55/50 PREEK
KWY.
40/125 -1
� } r
5/10 —
o o Ln
AM / PM
20/45 -
o N o
Rounded to the Nearest
,
LnoLo
5 Vehicles.
o
LONG RANGE PEAK HOUR TRAFFIC Figure 9
TABLE 3
Short Range Peak Hour Intersection Operation
With Fossil Creek Business Park Phase I Only
Level of Service
Intersection AM PM
College/Fossil Creek B B
TABLE 4
Short Range Peak Hour Intersection Operation
With Fossil Creek Business Park Phase I+II and Other Parcel
Level of Service
Intersection AM PM
College/Fossil Creek B B
TABLE 5
Long Range Peak Hour Intersection Operation
,Level of Service
Intersection AM PM
College/Fossil Creek C D
1)
c
levels of service. It should be noted, that as mentioned earlier,
it was assumed that left -turn phases would be in place on College
Avenue.
Using the traffic volumes shown in Figure 8, the College/
Fossil Creek intersection operates in the short range future, with
Phase I and II and other adjacent development, as indicated in
Table 4. Calculation forms for these analyses are provided in
Appendix E.. The results of the traffic analysis indicate that this
intersection would operate at acceptable levels during both the
morning and evening peak hours.
Using the traffic volumes shown in Figure 9, the College/
Fossil Creek intersection operates in the long range future as
indicated in Table 5. Calculation forms are provided in Appendix
F. As indicated .in Table 5, it is expected that this intersection
would continue to operate at acceptable levels of service during
the peak hours.
V. CONCLUSIONS
This study assessed the traffic impacts of the development of
the Fossil Creek Business Park PUD and other uses on the short
range (1997) and long range (2015) street system in the vicinity
of the proposed development. As a result of this analysis, the
following is concluded:
- The completion of the Fossil Creek Business Park and
neighboring land uses is feasible from a traffic engineering
standpoint. The Fossil Creek Business Park Phase I will generate
approximately 700 trip ends daily, and Phase II will generate
approximately 880 daily trip ends. The adjacent other parcel will
generate 90 trip ends daily.
- Based upon current traffic volumes and existing.-g.eome.tr-y-/---
control, the College/Fossil Creek intersection generally operates
acceptably, except for southbound left -turns from College to Fossil
Creek. These movements operate at levels of service F during the
afternoon peak hour. It was assumed that this signal would be
modified to include left -turn phasing for College Avenue.
- By 1997, given development of Phases I and II of the
proposed Fossil Creek Business Park and the other adjacent parcel,
the College/Fossil Creek intersection is expected to operate at
acceptable levels of service.
By 2015, with the projected traffic volumes, the
intersection of College/Fossil Creek will operate acceptably.
5
APPENDIX A
MATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 805M
TABULAR SUMMARY OF VEHICLE COUNTS
Ot»erver Date ! O! 3 9 3Day l J�clri E0 2'f CO L L I E R x Right tum
INTERSECTION OF O L- �- 1 CL L -- -AND �O SS (L�Je Fi E• < L LettUlmUlm
TIME
BEGINS
e.0Li,GGE
oc` EGL
North
South
Fossm CeE�k
(!'o3S[t. CZE&g-
��
Eatt
Wept
TOTAL
ALL
from NORTH
from SOUTH
trom EAST
ttom WEST
A
S
L
7oa►
A
S
L
I 7otat
R S
L I
Total
I R
S
L
Total
7 04
117.2.1IS
q/
9 1320
3
1 3 2.
5,13
351 o
y 1
31
/
6
s 45
674S 1/
o sOo 1 /.i,
,z/o
/5q
1 /z.
rt
239
1 ! 75
1 4
1 6
37s
as s
1
z I
38sB
z 3
6a4 I
1 q o g 11901
3q1 0
o
q o
a F
l o
1 3
0
o 13
6
1
b
A
46 1 8
3 q I
ogls I 1
1.3
3;-1
17
/9
`(I
_Is 11
393 11441
0 1
9
33
1 0 1
0
1 .T
I
I I
I
1
7 3o -q3o I No
1 675
g
783
3S
//1
/ 31
/16S
I
13 0
l a 71
/ bo
o
I
R
43 I 3
L
I
i
I
i
I
I
1
I
II
i
I
I
I
I
I
I I
II
I
I
I
I
o
13r3
Azq
l 33
aL l i o
z7z.11
r
IS 1 0
1-3
1
o
1 y
14zS
I (036
K�S
I
40
3Y F
11 1
a5-1111
aeo
11 &0
-�01 0
1 3
1 Q
I s
1 0
11ol
1s
I 3P
I 447
6-00
11 q
-Lad
1 370
z
40
319
1
13a 7
II .z
1 / 1 0
1
1 .20
11 Y
1 _o
I r 1
31
'75
5'11y
1 Jp7j.371
348119
1 -33q
113
1 3qL
it 0
1,,271 0
1
1 33
11
1 o
S
1 /o
q3
11 737
I
1
I
II
I
I�
I
I
I
1
I
I
I
I
8/
42 7
II 3 3/
r 471I
s
I /z O S
N ,2 6Y Z.
91
o
I.� g
14 O
1 37
II a'77 9
I
_J
1:4 06; Sam Malmo, nlftw�
N r."• 13milL
":=mmjclL,S.
It", : iww me 11CS126kr fr-
leas ar M am "W-S MR ot -
qs a .........
un el
J0,C!
4 Is 13C x SO
4
WC
a I M • 3 m
Il,
Ul 3 s la i :�-f
ca 4 1 ---•0
1 it
It" 1 1. in
hK
CIA I
t"
u: I It 1.46
9
711
CA a ?I 13 0
0 a
cmim AM
.4
.......
..........
............
43 Iw ;o ..............
a Ipm I
—3110
f3l
131
Pmm CL./ Camm OIL
1p
29
a 19 905111 c31•f COMM M.
...........
..........
130 . . ..............
I...
EPED
..................
•
I ............ 25 t
2:m 7
:.. 173 ...
............
............
............
ozAvr
-
04 VCCCC: XM AM nm 3w-1
9411":PIVMLIr,tK
iNC,k, :INW IRS to: Ormw 3C 101M
rAMM likills 12.11 RIM. a - VA m
liw:x
spa VINCI ......... ILM ........... . .... . ctam .......
INS
ran AM R3 I It :1" kt- uui ri lio 31n UP.
U.1
-A 1XI
;L9 :
a04
0.0 1 1 J 3 12 1 n
=4411 1.5 ) I I 1p
Mi. oavor34&
me 1 4.4 4 2 CA 1 91,
VX. i
$dId
Cl I
CA
.4%F.
............
............
.............
.. ..:
M3 .
pm.3
ilea -3 ............ (PEL.
..................
..................
2),—
..........
FOWUL Ma CIIWAM W. to 0
a 41 MSIL tat./ CAPIIMa M.
..................
..................
IPM
I i ............ 3 .-S 32 910 (PM I
M 9w.1: a= IR.
W.L. Off:
M2......... am ........... ......
rUl
" SIR I" mt W 'm T i&. an
lba
to a
ir
I 1 ".4% LIS' I*
1, 1 Y. :s
txw
U)
3p Li
3
ft
ka a
ts
I r Cit
Saw in
1 1 X3 :2
to
IV
& 3 W I
IA
j a r 4
C7j-= .4n.
0
............
............
............
:.. 3,32 ...
10 iss ............
..................
..................
:
— 16"
34 24-
..........
..................
7
Fmm GL/ Cmum, M.
1-
31
a
44
YMIL CR. =hmom Cit.
...... ......
Il
iNz . . .....
..................
I ............
I:m
I C ..........
t:t� 26
IPM I
............
...
........
1107:
I ZI:
—1
C.
c
r
v
c
60IiFJGEa�:
NORIII-vr-.
COI1=..AIZ, SGUi+at _
FOSSIL CREEK
FOSSIL CREEK
SOQIfl BOUND
NORTHBOUND
i%-R
---
QUA= HOUR --
HOUR
EACH • REPRESENTS 59 VEHICIIS
BOAR
---
QDARIER HOUR ---
HOUR
EACH r RIPIUM2 8 51 NMIC:F
3F DAY
13t
2nd
3rd
4th
TOTAL
A DASH MEANS HOUR VOLUME < 30
OF DAY
13t
god
3rd
4th
TOTAL
A DASH MEADS HOUR VOIA1Qi < 26
----
2 AN
28
46
28
11
113
• • ------
12 AM
is
6
7
9
37
•
I AN
21
20
15
21
77
•
1 AM
6
8
8
6
28
•
2 AN
13
10
9
6
38
•
2 AM
5
9
9
8
31
s
3 AM
15
4
3
7
29
-
3 AM
3
7
2
8
20
-
4 AM
8
14
17
i5
54
•
4 A4
9
7
20
12
48
•
5 AM
17
38
64
62
131
us
5 AM
21
47
87
90
245
•sass
5 AM
81,
113
174
L89
557
asssasets
6 AM
93
113
i99
189
594
sarasassasra
3 AM
188
2?3,
325
311
1097
ssssasaasaa-assasas
7 AM
214
361
348
316
1239
sassaaasasaessssasasaass
3 A4
251
273
261
266
1051
raauasuasassssaa
8 AM
214
267
229
256
966
rsassss•r_aeassssas
9 AM
225
2-04
237
263
979
•saaassuuxssasa
9 AM
260
241
235
257
993
staaa•essaerassssssa
:0 AN
210
254
260
234
958
aassss+,•sassaau
10 AN
235
261
230
218
944
suss:asaaautuass
It AM
297
294
262
274
1127
sassassssuusssss:
11 AN
230
251
266
276
1023
aatussstss•saastsss
12 PN
289
308
287
320
1204
ssssasastasssassssss
12 PM
250
2I8
257
255
980
ass »aasesa»aaraasa»
1 P4
264
276
_44
274
1058
•as»sasssssa uusa
1 PM
234
229.
241
L92
8%
suaaussauuss•
2 P4
253
304
256
305
iL18
assasasasaasasssua
2 P4
214
227
266
265
972
asssstasssaasasuas
3 PH
301
304
332
33i
1268
assssseaa...asasassasa
3 PM
242
293
271
297
:093
asaaasasastaussuaaa
4 P9
300
336
405
381
1422
assraaatasesastsasasasss
4 P.H
3E3
308
5i0
314
1245
sas•ssssussss•ss»arias
5 PM
431
427
9!9
-°?9
1456
assuauss»ssass-assusss
5 P4
359
359
335
249
1352
ssuasssasuus:•s»suasaa
6 PN
2:
250
240
202
976
sussassaaaaasx•
6 PM
232
216
232
240
920
•ssauaaasasaut+s
7 P.M
197
137
167
133
634
saaaasasa•
7 PN
176
'_SS
115
98
574
essatasassa
8 PM'
152
157
154
140
603
assss»sass
8 PM
99
102
86
97
384
s•asasss
9 ?A
1S3
137
103
85
478
asauass
9 PM
95
120
67
60
342
•auua
.0 PM
67
50
46
28
191
esa
10 PM
47
74
53
30
204
ass•
:1 P4
43
34
26
29
133
r
1 ?1
22
17
15
19
73
•
'OTAL VOLCHE
IS 16.801 CF3iiCLES.
TOTAL VM12e
IS 15,203 VIZICLES.
OW SOURS:
PEAK HOIdiS:
_
NORYING FEW HOGR
VOLUME OF 1.160
B``3INS
AT 7: 30 AM ( 7 x1
MOBN1NG F..AK HOUR VOLUME OF 1.239
BEGINS Ar 7:15 AN 1 8 zJ
DMN M, PaAK HOGR
VOLUME OF 1,644
BEGINS AT 4:30 PM ( 10
EVENING PEAK HOUR VOLUME OF 1,417
BEGINS AT 4:45 PM ( 9 AJ
'.ATA COUWrICli BMW AT 12
AN ON TUESDAY. .LARCH 23,I 1993.
DATA CDLLEC7ION
BMW AT
12 AM ON
TSIES7AY, NARCH 23. 199J.
APPENDIX B
r�<
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-02-1996
Center For Microcomputers In Transportation
Streets: (E-W) FOSSIL CREEL; PARKWAY (N-S) COLLEGE AVENUE
Analyst: DRC File Name: 95AM.HC9
Area Type: Other 1-2-96 AM .
Comment: EXISTING CONDITIONS
Eastbound Westbound Northbound 1 Southbound
L T R L T k 1 L T P. L T P.
No. Lanes 1 1 1< 1 1< : 1 2 1: 1 2 .I
Volumes 20 1 10: 30 1 135: 15 1170 35: 70 900 45
Lane Width :12.0 12.0 :12.0 12.0 :12.0 12.0 12.0112.0 12.0 12.0
'RTOR Vols 0: 0: OI0
Lost Time :3.00 3.00 3.0013.00 3.00 3.00:3.00 3.00 3.00:2.00 3.00 3.00
Signal Operations
Phase Combination 1 2 3 4: 5 6 7 8
EB Left * INB Left
Thru j Thru
-Right i Right
Peds Peds
WB Left * ISB Left
Thru i Thru
Right * Right
Peds Peds
NB Right :EB Right
SB Right :WB Right
Green 20.OP .:Green 60.OP
Yellow/AP. 5.0 :Yellow/AP. 5.0
Cycle Length: 90 secs Phase combination order: #1 #5
Intersection Performance
Summary
Lane
Group:
Adj Sat
V/c
g/C
Mvmts
Cap
Flow
Ratio
Ratio
Delay
EB
_____
L
____
261
--- ___
1069
__-_
0.080
_____
0.244
-----
19.9
TR
393
1606
0.031
0.244
19.7
WB
L
418
1711
0.077
0.244
19.9
TF.'
388
1586
0.369
0.244
21.7
NB
L
163
266
0.087
0.689
3.5
T
2566
3725
0.504
0. 689
5.2
R
1091
1583
0.034
0.689
3.4
SB
L
98
142
0.756
0.689
25.2
T
2566
3725
0.387
0.689
4.6
R
1091
1583
0.043
0.689
3.4
Intersection
Delay =
6.7 sec/veh In1
Lost
Time/Cycle, L
= 6.0
sec Critical v/c(x)
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-02-1996
Center For Microcomputers In Transportation
Streets: (E-W) FOSSIL CREEL: PARKWAY (N-S) COLLEGE AVENUE
Analyst: DRC File Name: 95PM.HC9
Area Type: Other 1-2-96 PM
Comment: EXISTING CONDITIONS
Eastbound Westbound Northbound 1 Southbound
' L T R I L T P. I L T R : L T R
--- ____ ____---- ____ ___ ----
No. Lanes : 1 1 < : 1 1 < 1 2 1 I I 2 1
Volumes 30 1 15: 25 1 85: 10 1390 301 155 1530 15
Lane Width :12.0 12.0 :12.0 12.0 :12.0 12.0 12.0:12.0 12.0 12.0
RTOR Vols O: 0: 0: O
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.0013.00 3.00 3.00
Signal Operations
Phase Combination 1 2 3 4: 5 6 7 8
EB Left * :NB Left
Thru * Thru
Right * Right
Peds Peds
WB Left * :SB Left _
Thru i Thru •
Right i Right
Peds Peds
NB Right :EB Right
SB Right :WB Right
Green 15.OP :Green 65.OP
Yellow/AR 5.0 :Yellow/AR 5.0
Cycle Length: 90 secs Phase combination order: #1 #5
Approach:
LOS
Delay
LOS
Lane
---
-----
---
Mvmts
C
19.8
C
-----
C
EB
L
C
21.4
C
TR
WB
NB
SE
Intersection Performance Summary '
Group: Adj Sat v/c g/C Approach:
Cap Flow Ratio Ratio Delay LOS Delay LOS
249 1319 0.128 0.189 23.1 C 23.0 C
302 1600 0.056 0.189 22.7 C
318 1685 0.082 0.189 22.9 C 23.8 C
300 1586 0.300 0.189 24.0 C
99 133 0.111 0.744 2.5 A 3.9 A
2773 3725 0.550 0.744 4.0 A
1178 1583 0.027 0.744 2.3 A
106 142 1.542 0.744 * * * *
2773 3725 0.610 0.744 4.4 A
1178 1583 0.014 0.744 2.3 A
Intersection Delay * (sec/veh) Intersection LOS = *
is greater than one. Calculation of DI is infeasabl e.
I. INTRODUCTION
This traffic impact study addresses the capacity, geometric,
and control requirements at and near the proposed Fossil Creek
Office Park PUD (Cameron Office Park). It is proposed to be
located west of South College Avenue across from Fossil Creek
Parkway in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made
with the project owner (Lagunitas Fort Collins Inc.). Due to
timing of this project, the Fort Collins Transportation Division
could not be contacted. This study conforms with tppical traffic
impact study guidelines. The study involved the following steps:
- Collect physical, traffic, and development data.
- Perform trip generation, trip distribution, and trip
assignment.
- Determine peak hour traffic volumes.
- Conduct capacity and operational level of service analyses on
key intersections.
The "G.T. Sanders Store PUD, Site Access Study," July 1995, and the
"Huntington Hills Site Access Study," March 1994, were also
reviewed as part of this analysis.
II. EXISTING CONDITIONS
The location of the Fossil Creek Office Park PUD site is shown
in Figure 1. Since the impact in the short range, as well as, the
long range is of concern, it is important that a thorough
understanding of the existing conditions be presented.
Land Use
In the recent past, the City of Fort Collins has tended to
grow predominantly to the south. Development along South College
Avenue is expected to continue. This.is evidenced by a number of
retail developments (e.g. Webergs Furniture and Tynan Nissan) and
residential developments (e.g. Huntington Hills and Ridgewood
Hills). The center of Fort Collins lies to the north of the Fossil
Creek Office Park PUD site.
The adjacent land uses near the Fossil Creek Office Park PUD
site are as follows: 1) to the west is the Burlington Northern
Railroad track; 2) to the north is the Mill Brothers Landscape and
Nursery; 3) to the east are commercial uses along College Avenue
or vacant land; and 4) to the south is the existing Cameron Park
Office Park.
1
Hi_M: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-02-1996
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 OI-02-1556
Center For
Microcomputers In Transportation
Center For
Microcomputers In Transportation
Streets: (E-W) FOSSIL CREEK PARKWAY (N-S) COLLEGE AVENUE
---
Streets: (E-W) FOSSIL CREEK PARKWAY (N-S) COLLEGE AVENUE
Analyst: DRC
File Name: 95AMLT.HC9
Analyst: DRC
File Name: 95PMLT.HC9
Area Type: Other
1-2-96 AM
Area Type: Other
1-2-96 PM
Comment: EXISTING CONDITIONS - WITH N/S LT
Comment: EXISTING CONDITIONS
- WITH N/S LT
' Eastbound
; Westbound Northbound I Southbound
Eastbound Westbound Northbound Southbound
I L T
R I L T P. I L T P. ; L
T R
-_- ___- _---
---- -----_------ ---- ___-----
---- ----
I L T.
R I L T R I L T R: L
T R
No. Lanes I I 1 <
I I I < 1 2 1 ; 1
2 1
1
Volumes 20 1
10: 30 1 135: 15 1170 35: 70
900 45
No. Lanes 1 1 <
I 1 1 < : 1 2 1 : 1
2
Lane Width :12.0 12.0
:12.0 12.0 :12.0 12.0 12.0:12.0
12.0 12.0
Volumes 30 1
15: 25 1 85: 10 1380 30: 155
1530 15
RTOR Vols i
OI 0! 0:
0
Lane Width :12.0 1.2.0
:12.0 12.0 :12.0 12.0 12.0:12.0
12.0 12.0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.06 3.00 3.06:3.00
3.00 3.00
P.TOR Vols I
OI' OI O:
0
---------- -----------------
--------------------------------------------
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00:3.00
3.00 3.00
. Signal Operations
-----------------------------------------------------------------------
Phase Combination 1
2 3 4 I 5 6
7 8
Sianal Operations
EB. Left *
:NB Left * *
Phase Combination 1
2 3 4 5 6
7 8
Thru
i Thru *
EB Left *
:NB Left
Right *
Right *
Thru *
Thru
Reds
Peds
Right *
Right
WB Left *
:SB Left * *
Peds
i Peds
Thru *
Thru *
WB Left *
:SB Left
Right *
Right *
Thru *
1 Thru
Peds
Peds
Right *
Right
NB Right
IEB Right
Peds
Peds
SB Right
:WB Right
NB Right
:EB Right
Green 20.OP
:Green 6.OP 50.OP
SB Right
!WB Right
Yellow/AR 5.0
:Yellow/AP. 4.0 5.0
Green 15.0P
:Green 6.OP 55.OP
Cycle Length: 90 secs
Phase combination order: #1 #5 #6
Yellow/AP 5.0
!Yellow/AP. 4.0 5.0
-----------------------------------------------------------------------
Cycle Length: 90 secs
Phase combination order: #1 #5 #6
Intersection Performance
Summary
Lane
Group:
Adj Sat
v/c
g/C
Mvmts
_____
Cap
____
Flow
_______
Ratio
_____
Ratio
_____
Delay
-----
EB
L
250
1021
0.084
0.244
19.9
TR
393
1606
0.631
0.244
19.7
WB
L
416
1701
0.077
0.244
19.9
TR
388
1586
0.369
0.244
21.7
NB
L
241
1770
0.066
0.189
4.3
T
2152
3725
0.601
0.578
9.7
R
915
1583
0.040
0.578
6.2
SB
L
223
1770
0.332
0.189
6.6
T
2152
3725
0.462
0.578
8.4
R
915
1583
0.051
0.578
6.3
Intersection
Delay =
9.9 sec/veh Ii
Lost
Time/Cycle, L
= 9.0
sec Critical v/c(x)
Approach:
Intersection Performance
Summary
LOS
Delay
LOS
Lane
Group:
Adj Sat
v/c
g/C
Approach:
-_-
_____
___
Mvmts
Cap
Flow
Ratio
Ratio
Delay
LOS
Delay
LOS
C15.8
C
-----
----
-------
----
-----
-----
---
-----
---
C
EB
L
241
1276
0.133
0.189
23.1
C
23.0
C
C
21.4
C
TR
302
1600
0.056
0.189
22.7
C
C
WB
L
316
1672
0.082
0.189
22.9
C
23.8
C
A
9.5
B
TR
300
1586
0.300
0.189
24.0
C
B
NB
L
220.
1770
0.050
0.189
6.0
B
8.1
B
B
T
2359
3725
0.647
0.633
8.2
B
B
8.2
B
P
1003
1583
0.032
0.633
4.7
A
B
SB
L
228
1770
0.715
0.189
19.3
C
10.0
B
B
T
2359
3725
0.717
0.633
9.2
B
rsection LOS
= B
P.
1003
1583
0.016
0.633
4.6
A
0.533
Intersection
Delay =
9.8 sec/veh Intersection LOS
= B
-----------------
Lost
Time/Cycle, L
= 9.0
sec Critical v/c(x)
= 0.654
Is
APPENDIX C
Level of Service for Signalized Intersections
Level of service for signalized intersections is defined in terms
of delay, which is a measure of driver discomfort and frustration,
fuel consumption, and lost travel time. Specifically, level -of -
service (LOS) criteria are stated in terms of the average stopped
delay per vehicle for a 15-min analysis period. The criteria are
given in Table 9-1. Delay may be measured in the field or estimated
using procedures presented later in this chapter. Delay is a complex
measure and is dependent upon a number of variables, including
the quality of progression, the cycle length, the green ratio, and
[lie v/c ratio for the lane group in question.
LOSA describes operations with very low delay, tip to 5 sec per
vehicle. This level of service occurs when progression is extremely
favorable and most vehicles arrive during the green phase. Most
vehicles do not stop at all. Short cycle lengths may also contribute
to low delay.
LOS B describes operations with delay greater than 5 and up to
15 sec per vehicle. This level generally occurs with good progres-
sion, short cycle lengths, or both. More vehicles stop than with
LOS A, causing higher levels of average delay.
LOS C describes operations with delay greater than 15 and up
to 25 sec per vehicle. These higher delays may result from fair
progression, longer cycle lengths, or both. Individual cycle failures
may begin to appear at this level. The number of vehicles slopping
Is significant at this level, though many still pass through the
intersection without stopping.
LOS D describes operations with delay greater than 25 and up
to 40 sec per vehicle. At level D, the influence of congestion
becomes more noticeable. Longer delays may result from some
combination of unfavorable progression, long cycle lengths, or
high v/c ratios. Many vehicles stop, and the proportion of vehicles
not stopping declines. Individual cycle failures are noticeable.
LOS E describes operations with delay greater than 40 and up
to 60 sec per vehicle. This level is considered by many agencies to
be the limit of acceptable delay. These high delay values generally
indicate poor progression, long cycle lengths, and high v/c ratios.
Individual cycle failures are frequent occurrences.
LOS F describes operations with delay in excess of 60 sec per
vehicle. This level, considered to be unacceptable to niost-drivers,
often occurs with oversaturation, that is, when arrival flow rates
exceed the capacity of the intersection. It may also occur at high
t/c ratios below 1.0 with many individual cycle failures. Poor
progression and long cycle lengths may also be major contributing
causes to such delay levels.
TABLE 9-1. LEVEL -OF -SERVICE CRITERIA FOR SIGNALIZED
INTERSECTIONS
LEVEL OF SERVICE STOPPED DELAY PER VEHICLE (SEC)
A
55.0
B
>5.0 and 5 15.0
C
>15.0 and 5 25.0
D
>25.0 and 5 40.0
E
>40.0 and 5 60.0
F
>60.0
I
N
APPENDIX D
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-02-1996
Center For Microcomputers In Transportation
Streets: (E-W) FOSSIL CREEK PARKWAY (N-S) COLLEGE AVENUE
Analyst: DRC File Name: 97AMLAG.HC9
Area Type: Other 1-2-96 AM
Comment: SHORT RANGE - WITH LAGUNITAS PUD ONLY
Eastbound 1 Westbound Northbound Southbound
1 L T P. 1 L T R ; L T P. 1 L T R
;__-- -___ _-- -___ __- ___ ____ ____
No. Lanes 1 1 1 < 1 1 I < : 1 2 1 1 1 2 1
Volumes 30 1 15: 30 1 135: 35 1240 351 70 925 95
Lane Width ;12.0 12.0 ;12.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.0
RTOP, Vols 01 0; 0; .0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7
EB Left :NB Left
Thru +F Thru
Right _ +E Right
Peds Peds
WB Left' + :SB Left • w
Thru + Thru
Right i Right +
Peds Peds
NB Right ;EB Right
SB Right ;WB Right
Green 20.OP :Green 5.OP 55.OP
Yellow/AR 5.0 :Yellow/AP. 5.0 5.0
Cycle Length: 95 secs Phase combination order: p1 #5 M6
Intersection Performance
Summary
Lane
Group:
Adj Sat
v/c
a/C
Mvmts
_____
Cap
_--
Flow
_______
Ratio
_____
Ratio
__-
Delay
--
EB
L
'al
998
0.138
0.232
--
TR
371
1600
0.046
0.232
21.5
WB
L
387
1672
0.083
0.232
21.7
TP,
367
1586
0.389
0.232
20.8
NB
L
23e
1770
0.155
0.179
4.3
T
2235
=950
3725
0.613
0.600
9.5
R
1583
0.039
0.600
5.9
SB
L
218
1770
0.339
0.179
6.9
T
2235
3725
0.458
0.600
8.1
R
950
15e3
0.105
0.600
6.2
Intersection
Delay =
9.6 sec/veh Ii
Lost
Time/Cycle. L
= 9.0
sec Critical v/c(x)
l
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-02-1996
Center For Microcomputers In Transportation
Streets: (E-W1 FOSSIL CREEK PARKWAY (N-S) COLLEGE AVENUE
Analyst: DRC File Name: 97PMLAG.HC9
Area Type: Other 1 96 PM
Comment: SHORT RANGE - WITH LAGUNITAS PUD ONLY
Eastbound Westbound Northbound Southbound
L T R 1 L T R .: L T P. : L T R
____ ____---- ____ ____ ____---- ____ _i__
No. Lanes 1 1 1 < 1 1 1 < ; 1 2 I 2
Volumes 75 .1 30: 25 1 85: 15 1505 30: 155 1600 30
Lane Width :12.0 12.0 112.0 12.0 112.0 12.0 12.0112.0 12.0 12.0
RTOR Vols 01 01 0: O
Lest Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.0013.00 3.00 3.00
8 Phase Combination 1
EB Left
Thru
Right
Peds
WB Left
Thru
Right
Peds
NB Right
SB Right
Green
20.OP
Yellow/AR
5.0
Cycle Length:
95 secs
Approach:
LOS Delay LOS
C 21.9 C
C
C 23.4 C
C
A 9.3 B
B
B
B 7.8 B
B
B
rsection LOS = B
0.552
Signal 'Operations '
2 3 4; 5 6 7 8
;NB Left +�
Thru +
Right +.
Peds
:SB Left r s
Thru +
Right
Peds
;EB Right
;WB Right
:Green 5.OP 55.OP
!Yellow/AR 5.0 5.0
Phase combination order: NI #5 k6
Intersection Performance
Summary
Lane
Group:
Adj Sat
v/c
a/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio
Delay
LOS
Delay
LOS
EB
_____
L
_
299
_______
1291
--_-
0.264
_-__
0.232
_____
22.e
___
C
_____
22.5
---
C
TP,
369
1592
0.090
0.232
21.8
C
WB
L
368
1587
0.071
0.232
21.7
C
22.4
C
TP.
367
1586
0.245
0.232
22.7
C
NB
L
209
1770
0.077
0.179
8.8
B
11.3
B
T
2235
3725
0.744
0.600
11.4
B
R
950
1583
0.034
0.600
5.9
B
SB
L
209
1770
0.780
0.179
27.9
D
13.6
B
T
2235
3725
0.791
0.600
12.4
B
R
950
1583
0.034
0.600
5.9
B
Intersection
Delay =
13.1 sec/veh Intersection LOS
= B
Lost
Time/Cycle, L
= 9.0
sec Critical
v/c(x)
= 0.673
J I ' a
L
APPENDIX E
e
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4 01-02-199E
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4
01-02-1996
Center For Microcomputers In Transportation
Center For Microcomputers
In Transportation
Streets: (E-Wi FOSSIL
CREEL:
PARKWAY
(N-S) COLLEGE AVENUE
Streets: (E-W) FOSSIL
CREEL:
PARKWAY
(N-S) COLLEGE
AVENUE
Analyst: DRC
File Name: 97AMTOT.HC9
Analyst: DRC
File Name: 97PMTOT.HC9
Area Type:
Other
1-2-96 AM
Area Type:
Other
1-2-96 PM
Comment: SHORT RANGE -
WITH
LAGUNITAS
PUD AND OTHER PARCELS DEVELOPED
Comment: SHORT RANGE
- WITH
LAGUNITAS
PUD AND OTHER.
PARCELS DEVELOPED
Eastbound
Westbound Northbound Southbound
Eastbound 1
Westbound
Northbound
Southbound
L T
R ;
L T
R ; L T P. ; L T R
L T
P, ;
L T
P. ; L T
____
R ; L T R
____,____ ____ ----
No. Lanes
;____ __-_
1 1 <
____
;
---- ____
1 1 <
_____-__ __-_ ____;____ ____ _
1 2 1 ; 1 2 1
No. Lanes
1 1
____,____
<
____
1 1 <
____,____
; 1 2
1 1 2 1
Volumes
45 1
20;
30 1
135; 55 1240 35; 70 925 .165
Volumes
130 1
50;
25 1
85; 20 1505
30; 155 1600 45
Lane Width
112.0 12.0
;12.0
12.0
;12.0 12.0 12.0;12.0 12.0 12.0
Lane Width
;12.0 12.0
;12.0
12.0
:12.0 12.0
12.0;12.0 12.0 12.0
RTOP. Vols
0;
0; 0; 0
RTOR Vols
0;
0;
0; 0
Lost Time
;3.00 3.00
3.00:3.00'3. 00 3.00:3.00 3.00 3.00:3.00 3.00 3.00
Lost Time
.3.'00 3.00
-------------------
3.00:3.00
3.00
-----------
3.00:3.00 3.00
__---------------------
3.00:3.00'3.00 3.00-
-_
--- -------------------------------------------------------------------
Signal Operations
----------
Signal Operations
Phase Combination
1
2
3 4;
5 6 7 8
Phase Combination 1
2
3 4;
5
6 7 8
EB Left,
*
;NB Left * *
ES Left
+
;NB Left
Thru
*
Thru *
Thru
*
Thru
Right
•
Right *
Right
*
Right
Peds
Peds
Peds
Peds
WB Left
*
;SB Left * *
WB Left
+
;SB Left +
Thru
*
Thru *
Thru
*
Thru
Right
•
Right +
Right
*
Right
Peds
Peds
Peds
Peds
NB Right
;EB Right
NB Right
;EB Right
SB Right
;WB Right
SB Right
;WB Right
Green
20.OP
;Green S.OP 55.OP
Green
20.OP
;Green S.OP 55.OP
Yellow/AR
5.0
;Yellow/AP, 5.0 5.0
Yellow/AP.
5.0
;Yellow/AP, 5.0
5.0
Cycle Length: 95 secs
Phase
combination order: pi M5 #6
Cycle Length: 95 secs
Phase
combination order: kl
p5 #6
_______________________�___________�_�______
___�______-___�_
Intersection Performance Summary
_______________________-______-_________-_--______-____________-
Intersection
Performance
Summary
Lane
Group: Ad,i Sat
v/c
g/C Approach:
Lane
Group: Ad,i
Sat
v/c
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay LOS Delay LOS
___
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS Delay LOS
___ _____ ---
_____
EB L
____ _______
231
998
_____
0.203
_____ _____ ___ _____
0.232 22.4 C 22.2 C
_____
EB L
-_- _______
299
1291
_____
0.458
_____ _____
0.232 24.7
C 23.9 C
TR
370
1597
0.059
0.232 21.6 C
TR
368
1589
0.147
0.232 22.1
C
WB L
381
1645
0.084
0.232 21.7 C 23.4 C
WB L
344
1487
0.076
0.232 21.7
C 22.5 C
TP.
367
1586
0.389
0.232 23.8 C
TP,
367
1586
0.245
0.232 22.7
C:
NB L
238
1770
0.244
0.179 4.6 A 9.2 B
NB L
209
1770
0.100
0.179 8.9
B 11.3 B
T
2235
3725
0.613
0.600 9.5 B
T
2235
3725
0.744
0.600 11.4
B
R
950
15e3
0.039
0.600 5.9 I B
P,
950
1583
0.034
0.600 5.9
B
SB L
216
1770
0.339
0.179 6.9
87.8 B
SB L
209
1770
0.780
0.179 27.9
D 13.5 B
T
2235
3725
0.458
0.600 8.1 I
B
T
2235
3725
0.791
0.600 12.4
B
R
950
1583
0.183
0.600 6.5
B
P.
950
1583
0.049
0.600 6.0
8
Intersection
Delay =
9.7 sec/veh Intersection
LOS = S
Intersection
Delay =
12.3 sec/veh Intersection LOS = B
Lost Time/Cycle, L =
9.0
sec Critical v/c(x)
. 0. 552
Lost Time/Cycle, L =
9.0
sec Critical
v/c(x)
= 0.723
APPENDIX F
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 0I-02-1996
Center For Microcomputers In Transportation
Streets: (E-W) FOSSIL CREEK PARKWAY (N-S) COLLEGE'AVENUE
Analyst: DP.0 File Name: 15AM.HC9
Area Type: Other 1-2-96 AM
Comment: LONG RANGE - TOTAL TRAFFIC
Eastbound Westbound Northbound Southbound
L T R I L T R L T R : L T P.
No. Lanes 1 1 1 < 11 1 < 1 1 2 1 1 1 _ 1
Volumes 40 5 20: 55 10 200: 50 1700 SO: 95 1220 1EO
Lane Width :12.0 12.0 :12.0 12.0 :12.0 12.0 12.0:12.C) 12.0 12.0
RTOR Vols 01 0: 01 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.0013..00 3.00 3..00
Signal Operations
Phase Combination 1 2 3 4: 5 6 7
EB Left • :NB Left
Thru • Thru
Riaht • Right
Peds Peds
WB Left • :S8 Left • +
Thru • Thru
Right Riaht +
Peds Peds
NB Right :EB Right
SB Right :WB Right
Green 24.OP :Green S.OP 46.OP
Yellow/AR 5.0 :Yellow/AR 5.0 5.0
Cycle Length: 90 secs Phase combination order: #1 #5 #6
Intersection Performance
Summary
Lane
Group:
Adj Sat
v/c
g/C
Mvmts
____
Cap
____
Flow
_______
Ratio
_____
Ratio
_____
Delay
-----
EB
L
211
729
0.199
0.289
18.4
TP,
473
1636
0.055
0.289
17.6
WB
L
469
1623
0.124
0.289
17.9
TR
461
1597
0.481
0.289
20.7
NB
L
220
1770
0.241
0.189
7.8
T
1987
3725
0.945
0.533
L2.5
P.
844
1583
0.063
0.533
7.7
SB
L
220
1770
0.455
0.le9
15.2
T
1987
3725
0.679
0.533
12.3
R
844
1583
0.199
0.533
8.3
Intersection
Delay =
17.6 see=/veh I
Lost
Time/Cycle, L
= 9.0
sec Critical
v/c(x)
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-02-1996
Center For Microcomputers In Transportation
Streets: (E-W) FOSSIL CREEK PARKWAY tN-S) COLLEGE AVENUE
Analvst: DRC File Name: 15PM.HC9
Area Type: Other 1-2-96 PM
Comment: LONG RANGE - TOTAL TRAFFIC
Eastbound Westbound Northbound Southbound
I L T P. : L T R I L T P. L T P.
____ _-__---- __-_ ____ ____---- ____ ----
No. Lanes 1 1 1- < 1 I < 11 2 1 : 1 2 1
Volumes 125 10 45: 50 5 130: 20 2070 55: 210 2150 40
Lane Width 112.0 12.0 :12.0 12.0 :12.0 12.0 12.0112.0 12.0 12.0
RTOR Vols 01 01 0: 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.0013.00 3.00 3.0013.00 3.00 3.00
Sia_nal Operations
e Phase Combination 1 2 3 4: 5 6 7 8
EB Left + :NB Left ■ <
Thru + Thru
Riaht Right
Peds Peds
WB Left • :SB Left • ■
Thru • Thru
Riaht • Right <
Peds Peds
NB Right :EB Right
SB Right :WB Right
Green 16.OP :Green . 7.OP 53.OP
Yellow/AR 5.0 :Yellow/AP. 4.0 5.0
Cycle Length: 90 secs Phase combination order: #1 #5 #6
Approach:
LOS Delay LOS
C 18.1 C
C
C 20.1 C
C
B 21.7 C
C
B
C 12.1 B
B
B
rsection LOS = C
0.777
Intersection Performance
Summary
Lane
Group:
Adj Sat
v/c
a/C
Approach:
Mvmts
Cap
Flow
Ratio
_____
Ratio
_____
Delay
LOS
Delay
LOS
---
EB
_____
L
____
194
_______
970
0.680
0.200
_____
31.6
___
D
_____
26.9
D
TR
327
1636
0.177
0. 200
22.7
C
WB
L
294
1470
0.180
0.200
22.7
C
24.2
C
TR
319
1595
0.445
0.200
24.7
C
NB
L
240
1770
0.087
0.211
14.9
B
28.2
D
T
2276
3725
1.005
0.611
28.9
D
P.
967
1583
0.060
0.611
5.4
B
SB
L
240
1770
0.921
0.211
49.0
E
39.9
D
T
2276
3725
1.044
0.611
39.7
D
P.
967
1583
0.043
0.611
5.3
B
Intersection
Delay =
33.8 sec/veh Intersection LOS
= D
Lost
Time/Cycle, L
= 9.0
sec Critical
v/c (x)
= 0.958
Ll
N
NO SCALE
HOR5ETOOTH ROAD
SITE LOCATION Figure 1
Roads
The primary streets near the Fossil Creek Office Park PUD are
College Avenue and Fossil Creek Parkway. College Avenue is a
north -south street designated as a major arterial on the Fort
Collins Master Street Plan. Its existing cross section in this
area has two 12 foot lanes in each direction. There are designated
left -turn lanes at appropriate locations or two way continuous
left -turn lanes. There are shoulder areas between the right
through lane and the curb and gutter that serves as a right -turn
auxiliary lane. The posted speed limit is 50 mph on College Avenue
in this area. Sight distance is generally not a problem.
Currently, intersections along South College Avenue are signalized
at Harmony Road to the north and Skyway Drive to the south.
According to the "South College Avenue Access Control Plan," a
signal is expected at Fairway Lane in the future.
Fossil Creek Parkway is an east -west street that serves
commercial and residential uses on the east side of College Avenue
and office/commercial uses on the west side of College Avenue. To
the west of College Avenue, Fossil Creek Parkway leads directly
into the Cameron Park Office Park. This is a two-lane roadway.
East of College Avenue, Fossil Creek Parkway provides access to the
residential area known as Fossil Creek Meadows. Fossil Creek
Parkway is a two-lane roadway with a landscaped median. The speed
limit is posted at 25 mph.
Coronado Court is a two lane local street, which will provide
direct access to Phase I of the proposed project. This roadway
connects to the north/south Frontage Road, which parallels College
Avenue. The Frontage Road currently exists north to Coronado Court
and south, just past Cameron Drive. Cameron Drive is a two-lane
local street, which currently serves Cameron Park and would provide
access to Phase II of the proposed project.
Existing Traffic
Weekday morning and afternoon peak hour traffic data was
synthesized based upon traffic count data from 1993. The 1993
through traffic on College Avenue was factored upward by 2 percent
to reflect growth in the last two years. The peak hour turning
movements are shown in Figure 2. All raw traffic data is presented
in Appendix A.
Existing Operation
Using the traffic volumes shown in Figure 2, the College/
Fossil Creek intersection operates as indicated in Table 1.
Calculation forms for these analyses are provided in Appendix S.
Appendix C describes level of service for signalized intersections,
2
n
1
O
M
I17 1Y)
N
o CD135/85
--30/25 FOSSIL CREEK PKWY.
20/30
0 0- �-
D
10/5 -4�
z
C M
W
CD
W
J
J
O
U
AM / PM
Rounded to the Nearest
5 Vehicles.
4,
N
NO SCALE
SYNTHESIZED 1995 PEAK HOUR TRAFFIC
Figure 2
Ak
TABLE 1
1995 Peak Hour Intersection Operation
Level of Service
Intersection AM PM
College/Fossil Creek
Existing phasing B F
With N/S left -turn phasing B B
TABLE 2
Trip Generation
Daily
A.M.
Peak
P.M.
Peak
Land Use
Trips
Trips
Trips
Trips
Trips
in
out
in
out
Fossil Creek Office Park
Phase I -.48.8 KSF
700
67
12
16
56
Phase II - 61.1 KSF.
860
85
15
20
70
TOTAL
1580
152
27
36
126
Additional undeveloped
parcel - 6.1 KSF
90
8
1
2
7
as provided in the 1994 Highway Capacity .Manual. As indicated in
Table 1, the intersection is currently operating at acceptable
levels of service during most of the day. Acceptable level of
service is defined as level of service D or better. However, the
intersection operational analysis indicated that, during the
evening peak hour, the southbound left -turn is approaching the need
for a separate left -turn phase. For the future traffic scenarios,
it was assumed that left -turn phasing on College Avenue would be
in place.
III. PROPOSED DEVELOPMENT
The Fossil Creek Office Park PUD is an office park
development, proposed to be located at the west of South College
Avenue across from Fossil Creek Parkway in Fort Collins. Figure
3 shows a schematic of the site plan of the Fossil Creek Office
Park and some adjacent properties. The proposed project would be
completed in two phases: Phase I would consist of 46,800 square
feet of office park use, and Phase II would consist of 61,000
square feet of office park use. As shown on Figure 3, Phase I
would have access from Coronado Court and Phase II from Cameron
Drive.
The potential for growth on another parcel near the project
site was also accounted for. There is currently a vacant parcel
off of the Frontage Road to the south of Phase I. It was assumed
that this could potentially develop as 6,100 square feet of office.
Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street
system. A compill-tion of trip generation information was prepared
by the Institute of Transportation Engineers and is presented in
Trip Generation, 5th Edition. This document was used to project
trips that would be generated by the proposed uses at this site.
Table 2 shows the expected trip generation on a weekday and a
weekday peak hour basis. The Business Park Code (770)`was used to
estimate the trip generation for the Fossil Creek Office Park.
Trip Distribution
Directional distributions were determined for the land uses
considered in thin study. This distribution considered trip
attractions and productions in the Fort Collins area, and existing
travel patterns in the area. The trip distribution used in the
short range analyses was 75% to/from the north and 25% to/from the
south. The trip distribution used in the long range analyses was
3
N
h
0
14
N
NO SCALE
iiI'.f . . . . . . . . ...
Q r ♦,•; ;:,� �/, CORONADO COURTS a
Z .............'I I A WI I
I�. 1 . . , • . ♦ . ♦ . . . ,
_ �•�•:♦:•.♦ .. ;'•Ii's..• , Y x�// / Developed Q
..
�+ i
zz�-$ .`♦ ..'• , '``•' •.;+�..'.,.• ,.;.,♦.��, ♦ mow _ � k/ !i�• Vacant
�Ia
>
za
x o
..••...•f♦
♦ •%,•a •., ,,.
G (3
..f,f...,, .....,. w
..♦,,.....ace......
............. ♦ ..� Curren IYY -� I
.......... Dev d "Q. o
t.♦.•..••..p .......� P U FOSSIL
.,.....♦ p ♦..♦.... >.
�.♦..♦..... ....... CREEK
3+ _ .•.•...♦♦.♦♦.•♦♦♦.♦,♦•♦,♦♦:•:.p
.♦1♦ �, \
\ �;'.�. •
pKWY.
♦•♦ . C
♦♦4 ..♦♦ ♦♦':•••:
_I.
,. . . . ♦ . . . . . ♦ . . . . . . .
�.♦.♦.♦.♦.. ..r ........� I
. .1i•iL•ii•ii•If
SITE PLAN
Figure 3
70% to/from the north, 25% to/from the south, and 5% to/from the
east.
Trip Assignment
Trip assignment is how the generated and distributed trips are
expected to be loaded on the street system. The assigned trips are
the resultant of the trip distribution process. Figures 4 and 5
show the assignment of the generated trips from Phase I and Phase
II, respectively. Figure 6 shows the long range assignment of the
site generated traffic with full development of all the parcels
considered in this study, given the change in trip distribution
discussed earlier.
Figure 7 shows the morning and afternoon weekday peak hour
traffic from Phase I plus background traffic in the short range
future (1997). Background traffic on College Avenue for 1997 was
determined by factoring the 1995 traffic by 1.7 percent per year.
This factor was determined based upon historic traffic growth and
information contained in the "North Front Range Regional
Transportation Plan," October 1994. Figure a shows the short range
future (1997) morning and afternoon weekday peak hour traffic from
the proposed project, both Phase I and II, plus background traffic,
and estimated traffic from the adjacent vacant parcel mentioned
earlier.
Figure 9 shows the morning and afternoon weekday peak hour
traffic in the long range future (2015). Background traffic for
the year 2015 was determined using other traffic studies for
projects in .this area and the "North Front Range Regional
Transportation Plan." The forecasts shown in Figure 9 give a
reasonable representation of nearby development. When actual
development proposals are put forth for other properties,
additional traffic studies should be performed.
IV. TRAFFIC IMPACTS AND ANALYSIS
Operation Analysis
Capacity analyses were performed on the College/Fossil Creek
intersection, which provides access to the proposed Fossil Creek
Office Park for both the short range (1997) and long range (2015)
traffic conditions.
Using the traffic volumes shown in Figure 7, the College/
Fossil Creek intersection operates in the short range future, with
Phase I, as indicated in Table 3. Calculation forms for these
analyses are provided in Appendix D. As indicated in the table,
it is anticipated that this intersection will operate at acceptable
4