Loading...
HomeMy WebLinkAboutFOSSIL CREEK OFFICE PARK EAST PUD PRELIMINARY AND FINAL - 52 91B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommi ty Planning and Environmental rvices Current Planning S� �ey�s;orS 6,xa- rEcic January 21, 1996 John Prouty Lagunitas Company 3307 South College Avenue, Suite 200 Fort Collins, CO 80525 Dear John, Staff has reviewed your documents for the Fossil Creek Office Park P.U.D., Preliminary and Final that were submitted December 26, 1995, and would like to offer the following comments: The Zoning Department offers the following comments: Lots 9, 10 and 15 are zoned B-L, Limited Business. Lots 11, 12, 13 and 14 are zoned B-P with a P.U.D. condition. Please revise General Note #4 accordingly. b. The Site Plan which was submitted is actually a grading plan. Please submit a Site Plan which clearly shows dimensioned building envelopes, distances of building envelopes from the property lines, parking layout, size of parking stalls, travel lane dimensions, etc. Please either remove topographical contours or use a lighter line weight. C. Please submit a separate Landscape Plan for the property. The landscape plan must have a plant list as well as water usage requirements. to/ Please add a Note to the Landscape Plan which states: "Landscaping of common open space areas shall be installed or secured with an irrevocable letter of credit, escrow, or performance bond for 125% of the valuation of materials and installation prior to the issuance of the first Certificate of Occupancy." 2. The Building Inspections Department offers the following comments: a. The proposed buildings exceed 5,000 square feet in area. An automatic fire suppression system or compartmentalization by fire -resistive construction is required in accordance with Sections 3802, UBC as amended by the City of Fort Collins. Please add a note to the Site Plan regarding this comments. 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 TDD (970) 224-6002 Avenue." However, TRANSFORT has indicated that the nearest bus stops are at the northeast comer of S. College Avenue at Harmony (northbound); at the southwest corner of W. Harmony and Mason (eastbound); and at the northwest comer of W. Harmony and Mason (westbound). Each of these stops is more than half -mile away, with no direct access. 8 The Natural Resources Department stated that they have met with the applicant on site and expressed concerns regarding building locations, landscaping, grading and architecture on the lots adjacent to the ponds and steep terrain to the west of this site. The applicant agreed to have the consulting engineers stake lot lines, building elevations, and some of the proposed grading for field review by Rob Wilkinson. Ongoing discussions and negotiations are needed with the applicant as well as strong coordination between the Natural Resources Department, Stormwater Utility, and City Engineering. 9. Comments from the Engineering Department are attached. 10. Comments from the Stormwater Utility are attached. 11. The Planning Department offers the following comments: POINT CHART: a. Criterion 2b of the Business Service Uses Point Chart asks: "Is the project located outside of the South College Avenue Corridor?" The LDGS defines the South College Avenue Corridor as "that area within the Fort Collins municipal boundaries and urban growth area which lies east of the Colorado and Southern Railroad tracks, south of Laurel Street, and west of a line one thousand (1,000) feet east and parallel to the centerline of College Avenue." The proposed property is located within the South College Avenue Corridor. Therefore, no points will be awarded for Criterion 2b. b. Criterion 2e of the Business Service Uses Point Chart asks: 'Does the project contain two (2) or more significant uses?" The Planning Objectives which were submitted only reference this as an office park which would constitute only a single use. Therefore, no points will be awarded for Criterion 2e. C. Criterion 2f of the Business Service Uses Point Chart asks: "Is there direct vehicular and pedestrian access between on -site parking areas and adjacent existing or future off -site parking areas which contain more than ten (10) spaces?" Please provide documentation which shows the location of the existing or future off -site parking areas and agreements which allow direct access to and use of off -site parking areas. d. Based upon the information that was submitted, Staff is only able to justify 22 points on the Business Service Uses Point Chart. The applicant must either provide documentation to justify 6 points for joint parking; or gain a minimum of 2 points for Energy Conservation (and thus claim that joint parking is not -applicable) to achieve 50% of the maximum applicable points of the Business Service Uses Point Chart. g. Please delete the title "Site Plan Notes" and re -label the title as 'Project Land Use Data". h. Please delete the "Density" data from the Project Land Use Data. I. Please delete the "Estimated Ratio of Floor Area to Lot Size" data from the Land Use Data. j. The Parcel Size indicates a total of 3.90 gross acres (169,884 acres) for the site. However, the Project Coverage data totals 178,644 square feet. Please clarify and verify all square footage and percentage calculations. k. Are there a total of 133 parking spaces proposed (including 8 handicap spaces) or 141 total parking spaces? Please clarify. 1. Please add a General Note regarding the height and type of lighting proposed for the office park. M. Please show all bike rack locations. n. Please revise General Note #10 to state: "This property is located in the Residential Neighborhood Sign District. The location of all flush wall signs is to be reviewed by the Planning and Zoning Board. All other aspects of signage for the development must comply with the requirements of Chapter 29, Article IV of the City Code (the Sign Code)." LANDSCAPE PLAN: a. 6% interior parking lot landscaping must be provided as well as landscaping adequate to screen parked cars from the public right of way. Foundation plantings are also needed. b. Please provide a plant list which shows the common and botanical names, sizes, and quantities of all proposed landscaping. C. Please add data regarding water usage categories and percentage calculations. d. Please add a note to the Landscape Plan which states: "The developer shall ensure that the landscape plan is coordinated with the plans done by other consultants so that the proposed grading, storm drainage, or other construction does not conflict nor preclude installation and maintenance of landscape elements on this plan." e. Attached is a copy of typical landscape plan notes. Please add the circled notes (1, 5, 6, 7, 8, 11, 12, 13, 14, 24) to the Landscape Plan. ,d��,,:ab. City of Fort Collins Current Planning PROJECT COMMENT SHEET DATE: RG l min 1995 DEPARTMENT: EN(= PROJECT: # 52-9I B , m\l n; naN �i gal PLANNER: Mike U�aw► 8 Ail comments must be received by: FEIDAY, 5 �an,�ca�,.� l99( ❑ No Problems ��JJ Problems or Concerns (see below or attached) ❖ Street improvements must be completed to the north property line prior to the issuance of a building permit for Lot 10. The design must be completed with this P.U.D. and the development agreement will address the obligation to complete the construction of the improvements. ❖ The developer is required to enter into a development agreement prior to recording the final P.U.D. ❖ The utility plans for Phase One need to be organized into a complete set and include a title sheet, index, general notes, and any details for current standards needed to complete the project (water and sewer services if there are any changes to what may be existing, curb and gutter, sidewalk,...) In addition, the design for the frontage road to the north property line must be included. ❖ Sidewalk is required on both sides of the street. Any existing damaged sidewalk, curb and gutter, and pavement will be required to be repaired/replaced. Utility cuts may require an overlay of the existing streets. Date: I I --I 4�- 1 �' Signature: CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE 0 UTILITY PROJECT COMMENT S BEET Citv of Fort Collins Current Planning DATE: 2,ro n'beer 199 5 DEPART-,VlENT: SrMMWAIZPZ. " PROJECT: # S2- Q1 B . �St.1�min2M * final PLANNER: Mike U, 6w; 8 All comments roust be received by: ProEerns U Problems or Concerns (see below or attached) Prior to the release of the individual building permits for Phase 1, an erosion control plan and report must be submitted for approval. An erosion control escrow for each lot will be required. Phase 2 of Cameron Park will require a separate drainage report and plan: Date: ` Signature �P CHECK IF YOU WISH TO RECEIVE ❑ PLAT CG COPIES OF REVISIONS ❑ SITE Ke/ rye �5 h hP�r ❑ LANDSCAPE 0 UTII= /-"LAh­NDSCAPE NC rEs 0 A+ii -'ara cared lawns, plancer3 and bed i C Q 3u=amatiC i^igactaa system. S 'J--- ---a_ re a fully _crst=uccion plans =or = he irrigation system Will --e submitted and approved by - :e :late= --epax=ment L%4 i tv Ji Issuance of the =-rst building ;er-titrec-=: aricr to . Said plan rill be Sub fi.'i=e kt=ed in accordance =o the rent id Cads _9-_2o'ig)(i)(d) and the :---cation Oesign�4uidelines. -ef=re any excavation the •.tilities are .3 be marxea an site. �. Ca»=act the 7til_t;/ .oeaca Set-r_ae 48 hours prior O ?xC -72a . �C�� _ .. s� =A any �2C"Sre 3 a � ; ermz 8't�" ps��V'i�1�e, i1� , ►w �.�-W. from the C_=y Q _ll landscape wOr:c an Site • reeds ae Protormed _r 3 Of .icen3ed lansdcape z=nt=aczCr. L_ - ar-scaze "atartai3 and _:s_= c•re=3 ara =o be ,;,.v r .;rode. ill u.uZhled areas are =a Za =rcvt=e' •rl-• : deed _a—:ar --_or . --•• •• _ .. _ __., ^ :0 diameter waSred -aver .:3r-=_ :g aed3 !Or _rear :u'a13 And 3r=:rah _-4 ;a-ae-mul »ed +its »e-:c=_ _ =r a e____ Blanca ara iu_az� reef^_s . �- is =O =e Ac�c a f +-_ -ees and 3rr -- 'es wee^ 'et egcec. and -t . :ec �. - are _ oe a-= - --_ _ :e 3cd, :13»tar3 and .lets ar? :a -a==_- - _-_ l- free$ and Srr »s are -ec- -- - afar -r=t_attan _ - -''r` lac e=::ara -- `= = a=za 3prtnk_z- :eats _�e _e -laced _ =eac lead _=ve=ace . =- _ -a r_da A - leer __ 3_dz•Jal:c »a ral gas _ao==-:ate final ==ee - aca^err vt= .art_t_lAr gara ac:!cant n-a_=3. ==ctstal -=t sy =ac g J. street A:.- -~ ration - :..ea and _ __- ' '.!t Y:e5 =a•re„ie n- areas ar_ -tea sleeved Yt - __ ==3t :ass .nder net=er. =-=3cbeda:a 3C ?*; -foezr v=3p a__ frees _o a »i=t-t `-etc -- _:r =sec :-'-a --a =_r3t •:zawi-c season =r_c .�^.cvg =tee vrsn __ -e =a'_lawt- ?0. ?^avtde tIl ae g•Sv wires far _aca :zee and rar'c =he*t 3o =h ara en viz. "le Ira vtda_ 3'1iC:C z--um-a 3ur_ace system far i - _ze , rrtcac_an _ rt»c the st_ _shiag czar =er:ad .a_ toe Wetlands area. Wacer =hese are aft: :ar-__e area e =:rp tFact reads . rater as 3 -ague ar ae°cl!r schedule during =he estabi=sr---,ent period and =emcve System a.'tar =he spr-1- : -h eGc 22. ?=cvice aintai»enc_ of '.''. -he 1=areas 'ro �rcle. 1'^iT"1T of o0 a!/S slier J1anC»ng. _ ". a 23. Guarantee all wOr:C and matartals gar a mi»imum .,a --ei grow-'»g reason from le ^ime of i :scallation :crud g 1e lea:-ouc the fallow-»g sari»c. " mecal edging to be steel 2/3"Ica" --• apscil 4-3 to be excavated and st---t--.1ed for redistr:4uticn. 26. cpsial in the Wec_ands area may be signi2igant=y deeper. these areas are to be excavated and stockpiled seperately. 27. Rediscrtbude topsoil in planting areas to a mimimum depth of six =ches. areas chat recieve sod areco be held dews from finish grades 2" because of the thickness of the sod. ?inislr" gradi.•ig is defined as being within an eighth on an inch of the grading plan contours. 28. -Provide soil amendments for all sod areas by tilling in a iris that Provides the 6" topsoil with 10% peat and 10% manure. Manure is to be non -feed lot and from dairy, farms. 29. Redistribute wetlands topsoil to the depths repor-ed in the wetlands study. Provide no amendments to these soils. tilling is required. Turf cover is to be drill seeded. the plan are general location. Final placement needs to epnaider groupings, spacing, height and colors that Only field observation can provide. r31. Prune trees to encourage ideal growth and trees with the lowest branch at foot above grade. shade i T,A I\MgC A pT7 Cn=r-Nr rr T7