HomeMy WebLinkAboutTIMBERLINE INTERNATIONAL MIXED USE - PDP200007 - SUBMITTAL DOCUMENTS - ROUND 1 - DESIGN NARRATIVETIMBERLINE - INTERNATIONAL PROJECT INFORMATION AND DESIGN NARRATIVE MAY 26, 2020 1) Project title: TIMBERLINE — INTERNATIONAL 2) Past Meeting Dates. CONCEPTUAL REVIEW - 3.2.2018, NEIGHBORHOOD MEETING - 8.30.2019 3) General Information. THE PROJECT IS LOCATED AT THE NWC OF S. TIMBERLINE AND INTERNATIONAL BLVD. . THE SITE SIZE IS APPROX. 1.25 AC. . THE SITE HAS BEEN ANNEXED AND ZONED I – INDUSTRIAL. IN ADDITION, THE PROJECT IS REQUESTING WIRELESS COMMUNICATIONS EQUIPMENT & SHORT-TERM (VRBO) PRIMARY RENTALS USES. THIS PROJECT REQUESTS TO BUILD A 1, 2 & PARTIAL 3-STORY 12,000 SF. MIXED USE BUILDING INCLUDING COMMERCIAL, INDUSTRIAL USES ON THE MAIN/FIRST FLOOR LEVEL WITH 4 RESIDENTIAL UNITS ABOVE AND A SINGLE DETACHED 900 SF. COMMERCIAL BUILDING WITH ROOF TERRACE USES. THERE ARE 24# PROPOSED OFF STREET PARKING SPACES (INCLUDING ONE VAN ACCESSIBLE HC STALL) PROVIDED WITH 6# ADDITIONAL ENCLOSED GARAGE PARKING FOR THE RESIDENTIAL UNITS. THE PROPOSED MIXED-USE BUILDING EXTERIOR ELEVATIONS REFLECT A CONTEMPORARY ARCHITECTURAL THEME WITH RESIDENTIAL, COMMERCIAL AND INDUSTRIAL MATERIALS AND DETAILING. THE BUILDING WILL BE FULLY SPRINKLERED. THE SITE INCLUDES INTERNAL SITE LANDSCAPING, LAWN AND STREET FRONTAGE TREE DESIGN WITH EXTENSIVE DITCH / WILDLIFE CORRIDOR BUFFER SCREENING IN THE REAR, WEST SIDE OF THE SITE. THERE ARE 3 LUC MODIFICATONS REQUESTED; PARKING SETBACK ALONG TIMBERLINE, REAR WEST IRRIGATION DITCH BUFFER-YARD DEPTH AVERAGING AND ROAD WIDENING TAPER LENGTH. 4) Proposed Owners. FR HOLDINGS, LTD. 5) Existing Owners. FR HOLDINGS, LTD. 125 S. Howes St., Fort Collins, CO 80521 Optional items: 6) Transportation Improvements: S. TIMBERLINE ROAD WILL BE WIDENED WITH AN ADDITIONAL WEST SIDE FRONTAGE LANE, ADDITIONALLY A RIGHT-TURN LANE ONTO INTERNATIONAL WILL BE PROVIDED, STRIPED IN THE INTERIM WITH ASSOCIATED SIDEWALK CONNECTIONS, BOTH NORTH AND SOUTH. A TRAFFIC TIS MEMO. IS PROVIDED. 7) Neighborhood Meeting. THIS PROJECT IS A SITE PLAN TYPE 1 REVIEW. A NEIGHBORHOOD MEETING WAS REQUIRED FOR A SITE PLAN REVIEW BUT THE DEVELOPER CHOSE TO COMPLETE ONE, WITH A PENDING ANNEXATION. THERE WERE NO SIGNIFICANT PUBLIC COMMENTS OTHER THAN THE INTERNATIONAL INTERSECTION WAS ALREADY OPERATING AT SLOWER PEAK AM. & PM. PEAK PERIODS THAN DESIRABLE, SOME COINCIDING WITH THE WEST SCHOOL PEAK TRIP-ENDS, STUDENT DROP-OFF & PICK-UPS. STAFF DISCUSSED SOME POSSIBLE / ALTERNATE FUTURE SOLUTIONS THAT COULD INCLUDE WEST END INTERNATIONAL CONNECTIONS AND POSSIBLE SIGNALIZATION AT TIMBERLINE BUT WITH NO TIMELINES CONFIRMED. THE PUBLIC COMPLEMENTED THE BUILDING DESIGN AND GENERALLY SUPPORTED THE INFILL PROJECT, USES. 8) Site design. THE BUILDINGS WILL FRONT THE S. TIMBERLINE FRONTAGE ALONG WITH CONNECTING PUBLIC SIDEWALKS AND PUBLIC OPEN SPACES, PLAZA AREAS. COMMERCIAL PARKING AND VISIBILITY WILL BE FROM THE EAST SIDE FRONTAGE, THE REAR / WEST PARKING PRIMARILY FOR THE RESIDENTIAL USERS. APPROXIMANTELY 40% OF THE TIMBERLINE FRONTAGE IS DEDICATED TO OPEN SPACE. STREET TREES ENHANCE THE TIMBERLINE FRONTAGE AND BUFFER TO THE PARKING AREAS. SIGNIFICANT LANDSCAPE BUFFERING WAS INCORPORATED ALONG THE WEST / DITCH SIDE FOR WILDLIFE CORRIDOR SETBACKS. LANDSCAPE PLANTINGS WERE CAREFULLY SELECTED FOR COMPATABILITY AND TO COMPLEMENT WILDLIFE COVER / MOVEMENT / FOOD. 9) Natural habitats and/or wildlife. AN EXTENSIVE NATIVE AND WILDLIFE ENHANCED LANDSCAPE/VEGETATION BUFFER AREA HAS BEEN PROVIDED ALONG THE WEST DITCH PERIMETER. THE BUFFER AREA HAS SEPARATIONS UP TO 95' WITH AN OVERALL AVERAGE OF 45’ DEPTH. THERE WILL BE VERY LIMITED VEHICULAR PARKING ACTIVITY AND NO PEDESTRIAN ACCESS IN THE WEST / REAR DITCH-SIDE OF THE SITE. ADDITIONALLY, TREE MITIGATION COUNTS HAVE INCREASED THE OVERALL PLANTING DENSITIES AND EXCEEDS ALL MINIMUM REQUIREMENTS. 10) Transition techniques. INDUSTRIAL ZONING IS ON ALL SIDES OF THE DEVELOPMENT. AS SUCH, THE PROPOSED MIXED-USE DEVELOPMENT WOULD NOT HAVE ANY COMPATABILITY ISSUES, IN FACT WILL SET THE TONE FOR FUTURE RE- DEVELOPMENT, CONNECTIVITY AND IMPROVEMENTS TO TIMBERLINE WHILE LOCALIZING SOME NEEDED COMMERCIAL SERVICES TO THE AREA. 11) Architectural Design. THE PROPOSED MIXED-USE DEVELOPMENT WILL INCLUDE TWO BUILDINGS WITH A VARYING SCALE OF 1, 2 & PARTIAL 3-STORY HEIGHTS. THE SOUTH SINGLE-STORY STAND-ALONE BUILDING WITH ROOF TERRACE WOULD OFFER THE POTENTIAL FOR A COFFEE SHOP, RESTAURANT AND/OR TAVERN USES. THE MULTIPLE MAIN FLOOR PUBLIC PLAZAS AND WALK CONNECTIONS WILL ENCOURGE AN 'INVITING' PEDESTRIAN SCALE, USE. THE REMAINING FIRST FLOOR LEVEL SPACE WILL INCLUDE ADDITIONAL POTENTIAL COMMERCIAL AND INDUSTRIAL USES. THE RESIDENTIAL COMPONENT ON THE UPPER 2ND & 3RD FLOORS WILL INCLUDE DECK EXTENSIONS AND UPPER ROOF TERRACES TO FURTHER SOFTEN THE SCALE AND FORMS OF THE BUILDING. THE DESIGN INCORPPORATES A BLEND OF RESIDENTIAL AND INDUSTRIAL MATERIALS SUCH AS PRE-FINISHED ARCHITECTURAL WOODS & METALS, HARD-COAT STUCCO AND STOREFRONT WINDOWS. ADDITONAL DETAILS INCLUDE FACADE ARTICULATION WITH EXTENDED DECKS, OFFSET ROOF TERRACES, TRELLIS' AND SLOPING ROOF FORMS, IN ADDITION TO APPROPRIATE PROPORTIONS AND DETAILS. THERE IS NO HISTORICAL COMPONENT TO THIS PROJECT. Development Phasing Schedule (if applicable). PENDING PROJECT APPROVAL, THE PROJECT COULD POTENTIALLY START CONSTRUCTION IN THE SUMMER 2020, COMPLETING SPRING 2021. IT IS THE INTENTION OF THE DEVELOPER TO COMPLETE THE MAIN 3-STORY, 12 KSF MIXED- USE STRUCTURE AND ALL SITE DEVELOPMENT IN THE FIRST PHASE. ALL PUBLIC IMPROVEMENTS INCLUDING THE TIMBERLINE SIDEWALK, THRU-LANE, ADDITIONAL S BW TURN-LANE AND FUTURE PUBLIC AND TIMBERLINE STORMWATER PIPING WOULD BE COMPLETED IN A SINGLE PHASE. POTENTIALLY, THE ONLY PHASING FOR THE PROJECT COULD BE THE LATER CONSTRUCTION SEQUENCE FOR THE STANDALONE SINGLE-STORY COMMERCIAL BUILDING TO THE SOUTH, PENDING CONFIRMATION OF A USER/TENANT. ALL SITE IMPROVEMENTS, PARKING, LANDSCAPING, BUFFER AREAS WOULD BE CONSTRUCTED WITH THE FIRST PHASE.