HomeMy WebLinkAboutKINGSTON WOODS PUD FINAL - 58 91A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 8
MEETINGDATE 4/27/92
STAFF Kirsten Whetstone
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Kingston Woods PUD Final- #58-91A
APPLICANT: Kingston Associates
c/o Northern Engineering Services
420 S. Howes Suite 106
Fort Collins, CO 80521
OWNER: Kingston Associates
1125 W. Drake
Fort Collins, CO 80526
PROJECT DESCRIPTION:
A request for a final PUD for 52 single family lots on 16.09 acres,
located approximately 1/4 mile west of South Shields Street and
north of Horsetooth Road at Seneca Street. The site is zoned R-P,
Planned Residential.
RECOMMENDATION: Approval with condition
EXECUTIVE SUMMARY:
The applicant proposes 52 single family lots on this 16.09 acre
site. The project has three entry points, the main entry being
from Horsetooth Road at Seneca with secondary access from Seneca to
the north and Patterson to the east. This proposal is compatible
with existing surrounding development and is in substantial
conformance with the approved preliminary PUD. Conditions of
preliminary approval, concerning street tree locations along Seneca
Street and Horsetooth Road and concerning the location of the
entrance pillar features, have been met. A condition concerning
the signing and execution of the Development Agreement and/or
utility plans is being recommended.
DEVELOPMENT SERVICES 300 LaPorte Ave. P.O. Box 580 Fort Collins. CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
FENCE STANDARDS
BARRIER 1
BARRIER 2
v..o imp 3'•°�=n
o�-. . v> >i m.�
. I� �njSLI �J� OLD wnb dz a L
SIGN DETAIL at ENTRY STONE WALL
tw.w.tad.w
N A%w
ELEVATION at ENTRY STONE WALL
Kingston Woods
P.L:Q
FINAL
LANDSCAPE
PLAN at ENTRY
l f t
1 .& txodocls /RJ
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion appliCable?
Will the Criterion
be satisfied?
If no, please explain
`� �,�,a
,e:,F �.� �
Yes No
NEIGHBORHOOD COMPATABILITY
1. Social Compatability
✓
2. Neighborhood Character
3. Land Use Conflicts
4. Adverse Traffic Impact
PLANS AND POLICIES
5. Comprehensive Plan
PUBLIC FACILITIES & SAFETY
6. Street Capacity
7. Utility Capacity
8. Design Standards
9. Emergency Access
10. Security Lighting
11. Water Hazards
RESOURCE PROTECTION
12. Soils & Slope Hazard
13. Significant Vegetation
v/
14. Wildlife Habitat
15. Historical Landmark
ov
16. Mineral Deposit
17. Eco-Sensitive Areas
18. Agricultural Lands
ENVIRONMENTAL STANDARDS
19, Air Quality
✓
20. Water Quality
21. Noise
22. Glare & Heat
23. Vibrations
24. Exterior Lighting
✓
25. Sewages & Wastes
SITE DESIGN
26. Community Organization
27. Site Organization
v
28. Natural Features
29. Energy Conservation
V
30. Shadows
v
31. Solar Access
32. Privacy
33.Open Space Arrangement
34. Building Height
✓
35. Vehicular Movement
�/
V
36. Vehicular Design
37. Parking
✓
38. Active Recreational Areas
✓
39. Private Outdoor Areas
✓
l/
40. Pedestrian Convenience
77
41. Pedestrian Conflicts
42. Landscaping/Open Areas
✓
✓
43. Landscaping/Buildings
I ✓
44. Landscaping/Screening
✓
45. Public Access
I
46. Signs
-12-
Northern Engineering Services, Inc.
June 15, 1992
Mr. Bernie Strom and members of the Planning and Zoning Board
City of Fort Collins Development Department
281 North College Avenue
P.O. Box 580
Fort Collins, Colorado 80522-0580
re: Kingston Woods P.U.D.
Extension of P&Z Board Approval
Mr. Strom and Members of the Board:
Kingston Woods P.U.D. received final approval as part of the
consent agenda of the April Planning and Zoning Board meeting. At
that time, a condition was accepted that the Plat be recorded
within sixty days. The time limit on this approval expires on the
22nd of this month.
All on -site design work has been approved by city staff and
the project is ready to proceed to construction. A problem has
come up, however, regarding off -site drainage and additional time
is requested in order to resolve the issue.
In brief, some residents of the Casa Grande P.U.D. have
expressed dissatisfaction with the existing drainage within their
development. These improvements were designed, approved and
constructed to meet the drainage standards which were current at
the time that project was built. These improvements were also
designed and approved to accommodate developed runoff from the area
which is now Kingston Woods and to convey it into the City's storm
drainage system.
420 S. Howes • Suite 106 • Fort Collins, Colorado 80521 • (303) 221-4158
Fort Collins Plani g and Zoning Board
June 15, 1992
page 2
Since there may be an existing down -stream condition which
would be acerbated by the additional stormwater runoff from
Kingston Woods, we are requesting that the Planning and Zoning
Board approval of the project be extended for up to a maximum of
six months to allow time to work out a mutually satisfactory method
of releasing runoff from Kingston Woods.
We appreciate your consideration of this matter.
Sin erely,� j
Mich el F. Jo,P.E.
cc: Ms. Kirsten Whetstone, City Development Department
Mr. William L. Neal, Kingston Associates
Kingston Woods PUD - Final, #58-91A
April 27, 1992 P & Z Meeting
Page 2
COMMENTS: .
1. Background
The surrounding zoning and land uses are as follows:
N: R-P; multi -family residential (Casa Grande PUD) and
R-L-P, single family residential (Wagonwheel PUD)
S: r-1-p; single family residence and vacant, (proposed
church site and single family residential as shown on the
Seneca ODP) and
R-E; single family residential (Skyline Acres)
E: R-P; vacant (proposed single family residential- The
Residences at Horsetooth Commons) and proposed multi-
family residential (Tract C- Horsetooth Commons ODP)
W: R-P; rural single family residence, Horsetooth Stables,
and Pleasant Valley and Lake Canal
There is currently a single family residence with scattered out
buildings located at the south end of this property. The remainder
of the property is undeveloped. The property was annexed into the
City of Fort Collins in April of 1980 as part of the Werner
Annexation and zoned R-P, Planned Residential. In May of 1981 a
proposal, known as Kingstowne PUD, was given final approval for 123
condominiums. The Kingstowne PUD has since expired. In January of
1992, a preliminary PUD for 52 single family lots was approved on
this site with conditions concerning street tree locations along
Seneca Street and Horsetooth Road and concerning the location of
the entrance pillar features.
2. Land Use
The proposed use of this site is for 52 single family lots on 16.09
acres. The gross density is 3.23 dwelling units per acre. Lots
range in size from 6,000 to 19,904 square feet. The final PUD is
in substantial conformance with the approved preliminary PUD plans.
3. Design
The entry design feature for this proposal highlights the
prominent mature stands of trees found on this 16 acre farmstead.
The applicant proposes to retain the majority of existing mature
trees on site. The applicant is proposing a low entrance wall
feature with stone pillars on either side of the street to create
a stately entrance to the property at the main entrance on
Horsetooth Road. The stone pillars will not encroach in the right-
of-way and the condition of preliminary approval, that the pillar
issue be resolved prior to final approval, has been met.
Kingston Woods PUD - Final, #58-91A
April 27, 1992 P & Z Meeting
Page 3
The greenbelt area along Horsetooth Road will be landscaped with a
variety of coniferous and deciduous trees to provide a buffer for
the lots backing onto Horsetooth Road.
Street trees will be provided along both Horsetooth Road and Seneca
Street. The condition that a final landscape plan be submitted
showing the location and type of street trees being proposed for
Horsetooth Road and Seneca Street has been met. Additional
information on the grass mix for the greenbelt areas along
Horsetooth and for the detention pond have been included in the
final landscape plan, as well as all standard requirements for a
final landscape plan.
The eastern most lots, south of Patterson Drive, are adjacent to
a master planned multi -family area (Tract C of Horsetooth Commons
Master Plan). The applicant has indicated that he will provide a
6' wood fence at the time of building construction. Fencing
details have been included on the site plan.
A 20' access and utility easement is located along the eastern side
of the Pleasant Valley and Lake Canal. A pedestrian/bike trail has
been master planned in this area according to the Parks and
Recreation Department and a future trail easement has been clearly
designated on the plat and site and landscape plans to provide
advance notice to all future home buyers that a City trail will
someday run along the backs of those lots.
4. Neighborhood Compatibility
A neighborhood meeting was not held for this project. Single
family lots as proposed are compatible withthe existing
residential development to the north and planned residential uses
to the east. The property to the west is vacant. To the south is
primarily vacant land with a single family homestead.
5. Storm Drainage
Runoff flows for a majority of the site will be routed to a
detention pond in the northeast corner of the property. The
overall flow pattern is from southwest to northeast. Final
drainage, grading, and erosion control plans have been reviewed and
accepted by the Stormwater Utility.
RECOMMENDATION
Staff finds that the proposed project is in substantial conformance
with the approved Preliminary PUD and that the conditions of
preliminary approval have been met. Therefore staff recommends
approval of Kingston Woods PUD- Final, #58-91A, with the following
condition:
Kingston Woods PUD°- Final, #58-91A
April 27; 1992 P & Z Meeting
Page 4
That the Development Agreement for the planned unit development be
negotiated between the developer and City staff and executed by the
developer, and that the utility plans be fully executed and
approved by the City prior to the next monthly meeting of the
Planning and Zoning Board; or, if not so executed, that the
developer, at said next monthly meeting, apply to the Board for an
extension of time. If the staff and the developer disagree over
the provisions to be included in the Development Agreement and/or
utility plans, the developer may present such dispute to the Board
for resolution if such presentation is made at the next succeeding
monthly meeting of the Board. The Board may table any such
decision, until both the staff and the developer have had
reasonable time to present sufficient information to the Board to
enable it to make its decision. (If the Board elects to table the
decision, it shall also extend the term of this condition until the
date such decision is made.)
If this condition is not met within the time established herein (or
as extended, if applicable), then the final approval of this
planned unit development shall become null and void and of no
effect. The date of final approval for this planned unit
development shall be deemed to be the date that the condition is
met, for purposes of determining the vesting of rights.
City of Fort Collins
DeveloF nt Services
Planning Department
MEMORANDUM
TO: Planning and Zoning Board
FROM: Kirsten Whetstone, Project Planner
DATE: April 24, 1992
RE: Revisions to Items on the April 27, 1992 Planning and
Zoning Board Hearing Agenda.
Please note the following additions or changes to the following
Staff reports:
1. For Items #2 and.#6 on the Agenda, (Blevins Court PUD #42-91B
and Oakridge PUD loth Filing #13-82AZ), please add the
following condition to the recommendations for approval:
That the Development Agreement for the planned unit
development be negotiated between the developer and City staff
and executed by the developer, and that the utility plans be
fully executed and approved by the City prior to the next
monthly meeting of the Planning and Zoning Board; or, if not
so executed, that the developer, at said next monthly meeting,
apply to the Board for an extension of time. If the staff and
the developer disagree over the provisions to be included in
the Development Agreement and/or utility plans, the developer
may present such dispute to the Board for resolution if such
presentation is made at the next succeeding monthly meeting of
the Board. The Board may table any such decision, until both
the staff and the developer have had reasonable time to
present sufficient information to the Board to enable -it -to --
make its decision. (If the Board elects to table the
decision, it shall also extend the term of this condition
until the date such decision is made.)
If this condition is not met within the time established
herein (or as extended, if applicable),, then the final
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for
this planned unit development shall be deemed to be the date
that the condition is met, for purposes of determining the
vesting of rights.
This condition has been added to the staff reports in the project
files, as the Utility Plans and/or Development. Agreements for these
projects have not yet been signed.
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (303) 221-6750
2. On —Item #8, Kingston Woods PUD #58-9 A., the applicant has
agreed to put a note on the plans to allow a 4' high fence, of
open construction, either a shadow box or split rail design,
along the north edge of the detention pond in the northeast
corner of the property. The applicant has agreed to
specifically exclude a 6' high solid wood fence in this
location.
3. On Item #10, Fort Collins Second and Harmony at the villages
at Harmony West POD # 3-90F, the applicant has agreed to put
a note on the site and landscape plans to restrict the 42"
high, steel, chain link fence to the parking lot area (along
the north and east property lines only) where the fence can be
well landscaped. A 42" high, dark colored, vinyl clad (coated
wire) fence will be provided in the front lawn area (along the
irrigation canal) south of the parking lot at the southeast
corner of the property:
010 ILY10I010
TRACT
I I II '
tY.4G6N'NHEEL F;1.11CG 1,10. 2
' II CRSA ; F.APiC'ii P.L.,..
I 1 4
I I II
i
Wl,w rtn. IMF to a oEIME
TRACT C DETENTION
1, \ ` '\ �..•' 7 . I 6 I 5 I' 4 I 3. I 2 I 1 POND
�' n• ,
\;\e. F..�,.�.. •. ,II —_ I I I j 5 4
�.I
2 . r B � PATiER50•l I T � _
',...'4 II. 12, 13 I I4 15 I' _
� I p
BLOCK' 4 IW _ �))
J—' e L BLOCK 2 2 I ' / '•
E _
/
�c
Seale: 1- = 50' /Y I
J ,
lw �l
yc
/
a '
❑
we �
am s
SO
17
2119- II�, - II .1
— I. 20 I . I18 j__ 5 6 ���i a ._._._.` .::..�.w-�........a........ �11
_ 2
SANEOPO-
.--__TRACT C
.,_....._.....
23
I 11 27 28 _ 29!�_____ �4 '" "
24 . I . 25 _ 26 I. I I I I �- -I!r�- Q' .� .\ 11
-� - �= LL �I
I I 16
1 I —I If /
TRACT D (^'�
- -
- __ T __
TRACT
�C;� ice, - -.Y=:'—__ '
-__----
3Rbo r " '-mac ' TRACT B� L_______________
0
— Q ROAD ------
-
C''-'"''---------------------
IF
HORSETOOTH ROAD CEWTERLINE j—
t
- — -- — -- — - — -- — -- — -- — --
II
"TO'_KEF.ICr_Ed..........
°.....�
,. R;<',€: eSSS �•WG.`•ti"a S; "w ..M'S :�FY .gug—
NORTHERN ENGINEERING SERVICES P""" 9123.00 11,11 D.I.
KINGSTON WOODS P.U.D. I' /
Aze SOUTH no.Es sulre3a3lee. rt.COLLINS. coLonnoo 86521 .� SITE PLAN
11 221 -NI163 Se -, ,,,,, _
WAzoNW4plLlNS N4. -Z
5
10
2: 20
22
23
24 25
VToor- ,P&e VIL.I Ru.o.
cJ GaY Ru P.
------------------------------ -----------
-- —TIL.-F --
2
4 3
12 I 13 I 14 I )5
p
19 18 t 7 5
3
77 27 28 29 8 7-
295 6
5f 7 e,) OTH RLOA p
a..WLIJBWW
Ah.
-I-
Kingston Woods
LANDSCAPE
PLAN
M