Planning Department
November 19, 1991
Poudre School District R-1
c/o Michael Spearnak
2407 LaPorte Avenue
Fort Collins, Co 80521
Dear Mr. Spearnak:
For your information, attached is a copy of the Staff's comments concerning,
Laurel Elementary School Demolition and Reconstruction, that was presented before
the Conceptual Review Team on November 18, 1991.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to,
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
7��L
Ted Shepard
Project Planner
TS/gjt
Attachment
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Project Planner
File
281 North Colle_e Avenue • P.O. Box 3ti0 • Fort Collins, CO (303) 221-6750
4+
ems.
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: November 18, 1991
ITEM: Laurel Elementary School Demolition and Reconstruction
APPLICANT: Poudre School District R-1, c/o Michael Spearnak, 2407
LaPorte Avenue, Fort Collins, CO. 80521
LAND USE DATA:
The demolition of the existing Laurel Elementary School and the
reconstruction of a new, larger elementary school for-approximat-ely--
550 students in grades K - 6th. The site is 8.4 acres and the
proposed school totals 51,000 square feet.
There are two concepts proposed at this time. First, Plan #SS2B
calls for a one-way loop for access off Locust Court as ingress,
and using a vacant lot as egress back to Colorado on the west.
Second, Plan SS4 calls for a cul-de-sac at the front entrance with
a private driveway leading to Laurel Street on the north for a
controlled second point of access. This private drive could be
closed during certain hours and double as play area.
COMMENTS:
1. The City Light and Power Department currently has underground
three-phase power to the transformer. It would be costly to
relocate this system and any relocation would be at the
developer's expense. If there is any need to upgrade the
electrical power needs at this site, then additional fees
would be due to the Light and Power Utility. Please
-coordinate -with Light and Power on the relocation of the
electrical transformer, if necessary.
2. There is a two inch diameter water service to the site. -This
service may be used to serve a new school. If this line is
not needed, please abandon back to the main. The new school
must have a water meter and pit that meet current standards.
There are several water and sewer lines in the area. These
lines should not be moved and should be in areas dedicated as
utility easements if not already done so. There is good water
pressure in the area based on a six. inch diameter main in
Locust Court.
3. The Poudre Fire Authority has approved the proposed fire
sprinkler system based on the 1992 Southeast and Southwest
elementary schools. Since a fire sprinkler system will be
installed, there is no need, from the Fire Code perspective,
to have a second point of access.
4. Please coordinate with the Poudre Fire Authority on the
technical aspects of making a fire line tap from the existing
water main.
5. The site is located in the Old Town.�Drainage Basin which, at
this time, has no drainage fees. Please be aware that there
is a portion of the site'on the north which is mapped as being
in the 100-year floodplain. This floodplain designation could
possibly be removed based on other improvements within the
drainage basin. Until these improvements occur, the local and
federal regulations apply.
The site will be required to provide onsite detention, and
detained flows must be routed to the channel on Laurel Street.
A Drainage Report and Drainage and Grading Plan will be
required. Please be sure to address erosion control within
the scope of the Report.
6. The Parks and Recreation Department would like to acquire
property in this area to construct a neighborhood park. A
park in this location is part of the approved Parks and
Recreation Master Plan and Choices 95 Capital Improvement
Plan. The problem, up to this point, has been to find a
willing seller at a fair market price. It is always
advantageous to locate a neighborhood park adjacent to an
elementary school so each use may benefit accordingly. The
City continues to pursue acquisition in this area.
7.. A traffic impact analysis will be required. The study should
address the issues and implications of a second point of
access. In addition, please address the issues associated
with construction traffic, access to Laurel Street, access
(pedestrian or vehicular) to Pennock Place, and the existing
pedestrian access to Elizabeth Street. Please explore methods
to separate bus traffic from car traffic, and pedestrian
traffic from vehicular traffic. Finally, please address the
boundary --area to be served by the new facility and how the
existing or proposed street system will serve the —target - —
population. (For instance, will there need to be caution
lights and crosswalks at the corner of Stover and Locust?)
Site plan scheme #SS2B would require the existing residents on
Locust Court to alter their existing pattern of exiting.
Presently, their exit pattern is south. Under #SS2B, the exit
pattern would shift to north. These residents should be fully
informed of this proposal and have a chance to comment.
The traffic study should also address the possibility of an
adjacent neighborhood park.
The transportation investigation should account for serving
this site and future developments. A broad perspective is
encouraged.
8. Utility Plans, showing the extent of public improvements must
be submitted to the City's Development Review Center in.the
Planning Department for review. All easements and public
rights -of -way that .will not be used must be vacated.
Similarly, new easements and rights -of -way must be properly
dedicated. The most efficient way to accomplish vacations and
dedications is by filing a plat document.
9. The City's Street Oversizing Fee is $5,252 per developed acre.
Please consult with the Engineering Department on the exact
calculation of this fee based on new versus existing
improvements.
10. A neighborhood meeting will be required prior to a formal
meeting with the Planning and Zoning Board. A logical
location for this meeting is the current school. The City
will facilitate the meeting and coordinate the notification to
the affected property owners.