RE: Strauss Cabin Church, BDR200003, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Strauss Cabin Church. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/16/2020
03/16/2020 BEFORE DECISION: The trash enclosure will need to be
constructed of a durable material such as masonry and also be compatible with
the structure it's associated with. The proposed PVC enclosure would not
comply with this standard. Please update details to align with 3.2.5 - Trash and
Recycling Enclosures.
Response: Please see attached updated site detail sheet to illustrate conforming materials and
details to align with 3.2.5.
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573, dbetley@fcgov.com
Topic: General
Comment Number: 10 Comment Originated: 05/07/2020
05/07/2020: FOR APPROVAL: Thank you for addressing the previous
2
comments. The details included on sheet C 4.00 for the Fort Collins Loveland
Water District are blurry. The details will have to be legible before Mylars can
be turned in.
Response: The details have been revised.
Comment Number: 11 Comment Originated: 05/07/2020
05/07/2020: FOR APPROVAL:A draft of the development agreement is
complete with the exception of the lender information. City staff will need the
lender information to send complete the draft of the Development Agreement.
We will continue to work with your representative to obtain the information.
Response: Understood. Owner will share this information as soon as available.
Comment Number: 12 Comment Originated: 05/07/2020
05/07/2020: FOR INFORMATION: The Development Agreement will postpone
the right of way, which will include but not limited to roadway improvements,
undergrounding of power lines, curb and gutter, sidewalk, parkways, and other
right of way improvements. This note is just a general notification for future
submittals.
Response: Understood.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 7 Comment Originated: 05/06/2020
05/06/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Response: Please see updated sheets for resolution
Comment Number: 8 Comment Originated: 05/06/2020
05/06/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: Please see updated sheets for resolution
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 03/16/2020
05/07/2020: FOR FINAL APPROVAL-UPDATED:
There are line over text issues. See redlines.
03/16/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: The line over text issues indicated on the redlines have been corrected.
Comment Number: 9 Comment Originated: 05/06/2020
05/06/2020: FOR FINAL APPROVAL:
Please change the Basis Of Bearings statement as marked. See redlines.
Response: The basis of bearings statement has been corrected.
3
Topic: Plat
Comment Number: 1 Comment Originated: 03/16/2020
05/07/2020: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
03/16/2020: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
Response: The plat has been revised per the redlines. The point of beginning has been added
and monument records have been provided.
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 03/25/2020
03/25/2020: This building being more than 5000 square feet will require a fire
sprinkler system to add additional area or fire containment separation.
Response: Resolved
Comment Number: 2 Comment Originated: 03/25/2020
03/25/2020: Accessibility to all level may be required if additions or
renovations are made to the area of primary function.
Response: Resolved
Department: Light And Power
Contact: Cody Snowdon, 970-416-2306, csnowdon@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/16/2020
03/16/2020: The site is currently serviced by PVREA.
Department: Outside Agencies
Contact: Matt Organ, Poudre Valley Rural Electrical Association, Inc.,
morgan@pvrea.coop,
Topic: General
Comment Number: 1 Comment Originated: 03/10/2020
03/10/2020: PVREA currently serves this property. If the project needs to
upgrade the existing service, please contact our engineering department at 970
377-6650.
Contact: Nate Ensley, FCLWD, 970-226-3104 ext 113, nensley@fclwd.com,
Topic: General
Comment Number: 2 Comment Originated: 03/16/2020
4
05/08/2020: No further comments.
Response: Noted, thanks.
03/16/2020: Please see attached letter for comments.