City of Fort Collins
From Basil Hamdan
Civil Engineer,
To Ted Shepard
Planner, CPES
Date : July 15, 1994
ZZ'er
Stormwater Utility
Subject: Tower Shoppes PUD
As we discussed this past week, the Stormwater Utility feels that
the Tower Shoppes project should be given conditional P&Z
approval.
The Tower Shoppes PUD currently is designed to drain into the
already built detention pond on the new Fort Collins High School
site which is still under review and has not been accepted by the
City.
Given that the size of the detention pond may be less than what
is needed to detain adequately for the Tower Shoppes, the
developer of this project understands that in the case where
additional detention is required on the Tower Shoppes site, the
developer will revise and resubmit preliminary plans for approval
by the City. These revised plans should first meet preliminary
utility plan approval before this project can be submitted as a
final.