Loading...
HomeMy WebLinkAboutPINECONE PUD THE TOWER SHOPPES PRELIMINARY - 60 91L - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSUtility : fices Stormwater City of Fort Collins From Basil Hamdan Civil Engineer, To Ted Shepard Planner, CPES Date : July 15, 1994 ZZ'er Stormwater Utility Subject: Tower Shoppes PUD As we discussed this past week, the Stormwater Utility feels that the Tower Shoppes project should be given conditional P&Z approval. The Tower Shoppes PUD currently is designed to drain into the already built detention pond on the new Fort Collins High School site which is still under review and has not been accepted by the City. Given that the size of the detention pond may be less than what is needed to detain adequately for the Tower Shoppes, the developer of this project understands that in the case where additional detention is required on the Tower Shoppes site, the developer will revise and resubmit preliminary plans for approval by the City. These revised plans should first meet preliminary utility plan approval before this project can be submitted as a final. 235 Mathews • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6589 • FAX (303) 221-6239