PROJECT: Tower Shoppes at Pine Cone Preliminary P.U.D.
#60-91L
APPLICANT: The W.W. Reynolds Companies
c/o Cityscape Urban Design
3555 Stanford Road, Suite 105
Fort Collins, CO 80525
OWNER: Timberline Partnership
4875 Pearl East Circle
Boulder, CO 80301
PROJECT DESCRIPTION:
This is a request for Preliminary P.U.D. for a 105,000 square foot
neighborhood shopping center, with three pad sites, located at the
northeast corner of Timberline Road and Horsetooth Road. The site
is 11.74 acres and is zoned b-p, Planned Business.
RECOMMENDATION: Approval with One Condition
EXECUTIVE SUMMARY:
The proposed land uses, neighborhood service center with grocery
store anchor, in -line retail, and drive-thru restaurants, comply
with Pine Cone Overall Development Plan. The P.U.D. satisfies the
All Development Chart of the L.D.G.S. The proposed land uses are
supported by the performance on the Neighborhood Service Center and
Auto Related and Roadside Commercial Point Charts of the L.D.G.S.
The P.U.D. is compatible with the surrounding area. With traffic
mitigation measures and bicycle -pedestrian connections, the P.U.D.
is feasible from a traffic engineering standpoint and satisfies
transportation policies. The one condition of approval pertains to
obtaining revised Preliminary Utility Plans, if necessary, which
comply with offsite storm drainage requirements.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
r
61 1:811119
ely"7MCI =[elJ
.11
—w°�w `s ". �e•o`.i'..'.".w"`� � `�en�ox.i... u.'m.`.w.o�ronm*+ rrewom.�w.
PRELIMINARY WEST ELEVATION
u 0USE BREAKDOWN
LEGAL DESCRIPTION
�.eh._ 10�'+� •fib
Tower Sho pppes
PUD
PRELMIARY -� _ 7
ELEVATIONS t
COVER SHEET
. 1 � 2
r
MIGlIm[JIlL _-
_..
jam' -p•
SITE
14
Jam_--_
'•�
-=fit' ,cr_
„\; . 1.,
i -•- �
Al
� �.
`F�\ �y�.�.,.�pl�., . � � i I
IEWLOEfG/.o
i
LEGEND
_ �.o w m� A V u_.w ✓.0
I
• Q
PINECONE PUD
OVMF OEVELOPMW P1 _ o •;�
1-0
.R.. M❑�d�E-
VE A if our 54 '•�11.tu."
S > n
i T.MIfIY.HI .fCYl n.: !a+� i
Sy ....... .. . .r..3'iM'?sf3f'„S:
■MMO ■■
AV71E 15?/YER ....'
_HORSETOOTHMEN
_
I ?
j F lat-
y
o
W P M1
W �
•0 1
V 1
ITEM: PINECONE PUD
Overall Development Plan & F.C.H.S.
NUMBER: 60-9 1A, s
N so
TOWER SHOPPES
PRELIMINARY PUD
LAND USE BREAKDOWN
JUNE 6, 1994
Area
Gross
511,339
sq.ft.
11.74 acres
Net
458,198
sq.ft.
10.52 acres
Coverage
Buildings
105,000
sq.ft.
20.53%
Street R.O.W.
53,141
sq.ft.
10.39%
Parking & Drives
211,182
sq.ft.
41.30%
Landscaping
142,186
sq.ft.
27.81%
Floor Area
104,830
sq.ft.
Parking Provided
Standard
Handicapped
Subtotal
Motorcycle
Bicyles
Total Vehicles
482 spaces
16 spaces
498 spaces
6 spaces
36 spaces (6 per rack)
540 spaces
Maximum Building Height 36 ft.
Ld�Y7 O@P
urban design, inc.
THE TOWER SHOPPES
Statement of Planning Objectives
June 6, 1994
The Tower Shoppes is a key element in achieving the goal of "Creating a successful
mixed use development" established with the approval of the Pinecone ODP in 1992. This
proposed preliminary PUD is planned to include a major grocery (or alternative anchor) store,
multi -tenant retail space, and three "pad" sites on approximately 11 acres at the northeast
corner of Timberline Road and Horsetooth Road. The center is designed to complement the
adjacent Fort Collins High School, with close coordination between the School District and the
developer regarding allowed uses, building materials, pedestrian circulation, future transit
service, storm drainage, utilities, and governance. Employment at this site is estimated at up
to 200 t upon completion of construction.
As established with the Pinecone ODP, Neighborhood Commercial and/or Business
Service uses are appropriate at this location, and are consistent with the applicable Land Use
Policies of the City of Fort Collins, including those policies promoting maximum utilization of
land within the city; encouraging the use of alternative transportation modes; discouraging
commercial development from gaining primary access from College Avenue; giving preferential
consideration to urban development proposals with are contiguous to existing development
within the city limits; and locational criteria for commercial/business types of uses.
The scale of the proposed buildings forms a transition between the larger high school
structure to the north, and the residential uses to the south and east. Extensive perimeter
landscaping along, Tim berline.and.Horsetooth is planned in character with the landscape plans
for Fort Collins High School.
Development of the site may begin in late 1995, with completion of full site
development anticipated between 1998 and 2001.
The Towe"ppes .reliminary,PUD
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
applicable?
Will the crderlon
be satisfied?
If no, please explain
5 a
$v
g <
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
I
x
1.2 Comprehensive Plan
x
x
1.3. Wildlife Habitat
x
1.4 Mineral Deposit
x
1.5 Ecologically Sensitive Areas
reserved
reserved
1.6 Lands of Agricultural Importance
1.7 Enercv Conservation
x
x:-
1.8 Air Qualitv
x
1.9 Water Qualitv
x
x
1.10 Sewage and Wastes
x
x
A 2: NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular. Pedestrian. Bike Transportation
x
x
2.2 Buildino Placement and Orientation
x
x
2.3 Natural Features
x
2.4 Vehicular Circulation and Parking
x
x
2.5 Emergency Access
x
x
2.6 Pedestrian Circulation
x
x
2.7 Architecture
x
x
2.8 Building Height and Views
x
2.9 Shading
x
x
2.10 Solar Access
x
2.11 Historic Resources
x
2.12 Setbacks
x
x
2.13 Landscape
x
x
2.14 Sions
x
x
2.15 Site Lighting
x
x
2.16 Noise and Vibration
X1
I
x
2.17 Glare or Heat
x
2.18 Hazardous Materials
x
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
x
x
3.2 Design Standards
x
x
3.3 Water Hazards
x
3.4 Geologic Hazards
x
54
ACTIVITY:
Neighborhood Service Center B
DEFINITION:
A shopping and service center, approximately fifteen (15) acres in size, designed to meet consumer
demands from an adjacent neighborhood. The primary functional offering is usually a supermarket
grocery store with an approximately equivalent amount of associated mixed retail and service -oriented
gross square footage. Other functional offerings may include employment uses, such as offices, and/or
commercial development, traditionally located along major arterial streets.
CRITERIA:
Each of the following applicable criteria must be answered "yes" and implemented within the
development plan.
Yee No N/A
1. Does the project gain its primary vehicular access from a street other than q� ❑
South College Avenue?
2. Are all repair, painting and body work activities, including the storage of ❑ ❑ l�
refuse and vehicle parts, planned to take place within an enclosed
structure?
3. DOES THE PROJECT EARN AT LEAST FIFTY (50%) PERCENT OF ❑
THE MAXIMUM POINTS AS CALCULATED ON POINT CHART
"B" FOR THE FOLLOWING CRITERIA?
a. Is the project contiguous to an existing transit route?
b. Is the project located at the intersection of a collector and arterial street?
c. Is the project located within "north" Fort Collins?
d. Is the project located more than three-quarters (3/4) of a mile from an existing or approved
community/regional shopping center?
e. Is the project located more than one and one-half (1-1/2) miles from an existing or approved
neighborhood service center?
f. Is the project located outside the "South College Avenue Corridor"?
g. Does the project gain its primary vehicular access from a non -arterial street?
h. Is there direct vehicular and pedestrian access between on -site parking areas and adjacent existing
or future off -site parking areas which contain more than ten (10) spaces?
i. Does the project include a supermarket/grocery store?
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins; Colorado, Revised March 1994
-62-
C`-
Neighborhood Service Center (continued)
j. Does the activity reduce non-renewable energy usage through the application of alternative
energy systems or through energy conservation measures beyond those normally required by the
Model Energy Code as adopted by the City? Refer to Appendix "E" for energy conservation
methods to use for calculating energy conservation points.
k. Is the project located with at least one -sixth (1/6) of its property boundary contiguous to existing
urban development?
1. If the site contains a building or place in which a historic event occurred, has special public value
because of notable architecture, or is of cultural significance, does the project fulfill the following
criteria?
1. Prevent creation of influences adverse to its preservation;
2. Assure that new structures and uses will be in keeping with the character of the building or
place. Imitation of period styles should be avoided; and
3. Propose adaptive use of the building or place that will lead to its continuance, conservation,
and improvement in an appropriate manner while respecting the integrity of the
neighborhood.
7T/11./X-Ap , rNn Poz:C IOAP rLiM..) e t v O ii n
NEIGHBORHOOD
SERVICE CENTER
POINT CHART B
For All Criteria
Applicable Criteria Only
Criterion
the
CrtfeAon
Applicable
Yes No
u nl w
Circle
the
correct score
Mutlpler
Ponts
Earned
Ixll
Maximum
Applicable
Points
a. Transit Route
X
X-
2
0
2
O
4
b. At Collector/Arterial
x
1 2
3
Q
6
c. "North" Fort Collins
X
2
0
2
4
4
d. From Regional Center
JXJ&
0
1
.7,
2
e. From Neighborhood Center
X
2
2
0
4
f. -South College Corridor
X
0
4
8
8
g. Non -Arterial Access
X
X
2
0
3
Q
6
h. Joint Parking
x
1
2
0
3fUh
i. Grocery Store
X
X
0
3
(v
6
J. Energy Conservation
1
21314(6
2
Q
8
k. Contiguity
X
X
0
5
-1-0—
I. Historic Preservation
�(
1
2
0
2
_
Totals 3a v EarnedPercentage Eaed of Maximum Applicable Points V/Vi = VII
JAJ
Tower Shops at Pine
July 25, 1994 P & Z
Page 2
COMMENTS:
1. Background•
Cone PUD - Preliminary, 060-91L
Meeting
The surrounding zoning and land uses are as follows:
N: R-P; New Fort Collins High School
S: R-M-P; Vacant (Fox Meadows Business Park O.D.P
S: R-L-P; Single Family (Fox Meadows)
E: R-P; New Fort Collins High School
W: I-P; Office (Platte River Power Authority)
The subject parcel was included in Timberline Second Annexation
approved in 1979. This parcel (11.7 acres) is now part of Pine
Cone Overall Development Plan (170 acres), approved on April 27,
1992. -
In 1979, the Greenfield Village Master Plan was approved which
identified the 15 acres at the northeast corner of Timberline and
Horsetooth Roads as a "neighborhood shopping center." A First
Phase Final P.U.D. for a neighborhood shopping center was also
approved in 1979 which has subsequently expired. In 1981,
Greenfield Village Master Plan was amended to enlarge the
commercial area to include an office park. A Preliminary P.U..D. on
a portion of this enlarged commercial area was approved and
subsequently expired.
A neighborhood information meeting was held on April 29, 1991 to
discuss an Amended Greenfield Village Overall Development Plan.
This version was never submitted for formal review.
The Pine Cone O.D.P., adopted in 1992, is the current O.D.P. As a
reminder, the 68 acre Fort Collins High School campus is adjacent
to and surrounded by Pine Cone but not technically a part of the
O.D.P. The 19791 1981, 1991 and 1992 versions of the O.D.P. all
indicated a neighborhood shopping center at this location.
2. Plans and Policies:
A. Pine Cone Overall Development Plan
As mentioned, the 11.7 acre site is part of the Pine Cone O.D.P.
The parcel is designated as "Neighborhood Service Center". The
request for 105,000 square feet of retail, to be anchored by a
grocery store with in -line retail and three pad sites, complies
with the land use designation on the approved Overall Development
Plan.
I (7
14
3
4
jai
ACTIVITY Auto- Related and
Roadside Commercia
DEFINITION:
9
Those retail and wholesale commercial activities which are generally con-
sidered and typically found along highways and arterial streets. Uses
include: free standing department stores; auction rooms; automobile service
stations, repair facilities, car washes; boat, car, trailer, motorcycle
showrooms, sales and repair; fuel and ice sales; greenhouses and nurseries;
warehouses and storage; repair or rental of any article; exterminating
shops; drive-in restaurants; adult book stores; eating places with adult
amusement or entertainment; adult photo studios; adult theatres; any uses
intended to provide adult amusement or entertainment; and, other uses which
are of the same general character.
CRITERIA` Each of the following applicable criteria must be
answered "yes" and implemented within the develop-
ment plan.
Yes No NA
1. Does the project gain its primary ❑
vehicular access from a street other �J
than South College Avenue?
2. Are all repair, painting and body work ❑ o d
_ activities, including storage of refuse
- and vehicular parts, planned to take
place within an enclosed structure? -----
3. If the project contains any uses intended El ❑
to provide adult amusement or entertainment,
does it meet the following requirements:
a. Is the use established, operated or maintained no less than 500
feet from a residential neighborhood, church and/or school meeting
all the requirements of the compulsory education laws of the State
of Colorado?
b. Is the use established, operated or maintained no less than 1,000
feet from another similar use?
-19-
7[1L1Ht RAA r JTES
AUTO -RELATED AND
ROADSIDE COMMERCIAL
POINT CHART D
For All Criteria
Applicable Criteria Only
Criterion
Is
the
alfkabl
oppYcaae
Yes No
I II III IV
0cle
the
correct Score
Multtodw
Points
Earned
Ixll
Maximum
APdicaoie
Points
a. Not at Two Arterials
X
X 1
2
0
2
d
4
b. Part of Planned Center
X ja
0
3
6
6
c. On Non -Arterial
X
X
2
0
4
Q
8
d. Two Acres or More
X
X
0
0
3
6
6
e. Mixed -Use
X
X
2
CO
3
0
6
f. Joint Parking
X
11,00
3
6
6
g. Energy Conservation
1
1
1 2
3
0
1 2
8
h. Contiguity
X
1XIO
0
5
I p
10
i. Historic Preservation
1
2
0
2
1•
1
2
0
k.
1
2
0
1.
2
0
Totals d2 8 Sy
v vi
Percentage Earned of Maximum Applicable Points V/VI = VII a
mi
THE TOWER SHOPPES
REVISED GENERAL NOTES
JULY 18, 1994
All portions of the exterior walls of the first story of all buildings will be located within
150' of an access roadway in which emergency fire equipment can be maneuvered,
or the buildings will be provided with an approved automatic fire extinguishing system.
Building size or other criteria of the Poudre Fire Authority may also indicate the need
for an approved fire extinguishing system or other fire protection measures.
2. See subdivision plat and utility plans for all easements and lot and tract areas.
3. See utility plans for exact geometrics of parking areas, storm drainage areas, utility
mains and services.
4. Handicapped access ramps to be provided at all street and drive intersections and at
designated handicapped parking spaces.
5. Proposed restaurant will use existing trash enclosure(s) at The Square.
6. Location and number of building entries may vary with completion of construction.
7. Accent lighting of signage, sculptural, and/or landscape elements is allowed, subject
to Uniform Building Code requirements.
8. Any visible rooftop mechanical units are to be screened with metal decking structures
of a color complementary to the building finish.
9. "Pad" uses may include retail, standard or fast food restaurants, financial institutions,
personal services, offices, other business service use, day care, or limited auto -related
uses. Specific uses and architectural details to be determined with final PUD plans for
the affected pad.
10. Pad site development is expected to demonstrate architectural compatibility to the
anchor tenant and in -line retail spaces. The appropriateness of pad site architecture
will not be evaluated in isolation, but how it relates to the other dominant forms of the
immediate surrounding area. Architectural compatibility will be evaluated by
considering scale, form, materials, and colors. No pad site development shall detract
form the attractiveness of Tower Shoppes P.U.D.
i
NEIGHBORHOOD MEETING MINUTES
PROJECT: Tower Shoppes at Pinecone
DATE: May 31, 1994
APPLICANT: W.W. Reynolds Co.
CONSULTANT: Eldon Ward: Cityscape Urban Design
PLANNER: Ted Shepard
The meeting began with an introduction to the City of Fort Collins Planning Department and
their planning process. W.W. Reynolds Co. has proposed to build the Tower Shoppes. The
location of Tower Shoppes is the Northeast corner of Horsetooth and Timberline, next to the
new Fort Collins High School. The size of the development is 11 acres. They are
expecting one large anchor tenant and small mixed rental tenants such as retail, restaurants,
a bank, or possibly a daycare. No anchor tenant has been announced.
1.
A.
2.
A.
3.
QUESTIONS, CONCERNS, COMMENTS
Anchor building.
a. How many square feet will the anchor building be?
b. Who is the anchor going to be?
The square footage of the anchor is to be approximately 72,000 sq ft. No tenant for
the anchor building has been approved.
Will the Anchor building sit empty if there is not a tenant?
No, the company will not build it without securing tenants.
What about bicycle/pedestrian access to the center?
A. Sidewalks will be installed along the East side of Timberline and the North side of
Horsetooth along the entire frontage of both the new Fort Collins High School and the
Tower Shoppes Center. Bikepaths are planned to connect both the high school
campus and the Tower Shoppes back to Red Mountain Drive. Both arterials include
on -street bike lanes.
F1
-9,
4. What about increased traffic on Timberline? Trucks use Timberline to bypass the
weigh station on I-25.
A. Timberline is to be widened to four and eventually six lanes to handle increased
traffic in this area. Spot weigh stations are put occasionally up. Timberline will not
become a truck route.
5. What is the plan for crosswalk lights on Timberline?
A. Potential crosswalks at the Caribou/Horsetooth and Timberline/Horsetooth
intersections.
6. Where is the commercial access/entrance?
A. Service area will be off of Arctic Fox.
7. We are concerned about high school construction, and student traffic.
8. Is there a detailed plan for traffic signals, turn lanes?
A. Yes. Extensive traffic studies have been done for this area. Pedestrian circulation
plan has been done. Medians and turn lanes will be put in. Horsetooth and
Timberline roads will be improved to the City's arterial standard.
9. Would like to see a documented traffic plan for Arctic Fox and Bighorn with access
to Timberline.
10. Will streets be done before construction is done?
A. The City , in conjunction with PR-1 and W.W. Reynolds, will put the streets in, most
likely before the construction is done.
11. Will there be sidewalks, on South side of Horsetooth, built with the high school
project?
A. No. The improvement project for the new high school does not include building a
sidewalk on the South side of Horsetooth. Such a walk would be the responsibility of
the adjacent developer, at the time the property comes in for development.
12. Who is responsible for street improvements in this area due to the school and
shopping center?
A. Poudre R-1, W.W. Reynolds, and the City of Fort Collins will be responsible for
2
i
funding etc.
13. Will there be a left turn lane into shopping center of off.Timberline?
A. Yes. There will be a continuous left turn center lane in some areas and there will be
a raised median in others. There will be no left turn exits form the center onto
Timberline.
14. Bikelanes
a. Will there be bike lanes?
b. How big will they be?
A. Bike lanes will be put in at seven feet wide.
15. We are concerned with traffic on Arctic Fox.
16. How do residents get a traffic signal at Arctic Fox and Timberline?
A. Signals are installed when conditions warrant. It is likely that a signal will be.
installed at Caribou prior to Arctic Fox since Caribou is a collector.
17. Will Poudre R-1 dictate what type of business will go into the shopping center?
A. Poudre R-1 can't restrict land usage. The following restrictions can, however, apply:
no liquor stores, video arcades, tatoo parlors, drug paraphanalia stores or adult
entertainment/pornography stores.
18. Who is responsible for security at the shopping center?
-A. Poudre R-1 School District will be allowed to enforce school rules on the premises.
The property owner and City of Fort Collins Police Department will also be
responsible for security. If there is a questions as to what is proper for this center, a
committee will make the final decision.
19. Residents are opposed to fast food restaurants for aesthetic reasons. Since the school
will have a food court, they wouldn't need fast food restaurants in the Tower
Shoppes.
A. Poudre R-1 can't restrict fast food restaurants, regardless of the food court. There is
an open campus policy, students are free to go where they choose. If fast food is
within walking distance there will be less of an increase in traffic by students heading
two miles West to College Avenue.
K
20. Who decides which tenants will be located at the shopping center?
A. W.W. Reynolds Company will decide.
21. What will be done about the increase in traffic due to fast food restaurants?
A. Raised medians will be put in with controlled turn lanes. This will help control
traffic.
22. Floodlights?
a. Will they be the very bright kind?
b. Height of lights?
A. There will be limited height on the lights. High pressure sodium lights would be
used.
23. Larger trees would be nice to keep the lighting down.
24. What about utilities such as sewer and storm drainage?
A. Storm drainage and sewer will go in before school landscaping. Would like to get all
utilities in before streets and landscaping so things won't have to be torn up after
construction.
25. A mini -mall with connecting hallways would be nice here.
26. Does developer have control over layout?
A. Yes. A mini -mall would be better in a much larger square footage setting, but not in
this center.
27. Who collects rent from the shopping center tenants? —
A. W.W. Reynolds, Co.
28. How do residents get the following built: Library, Pool or Park?
A. There is already a proposed park located adjacent to the high school athletic fields.
The City will be building a South branch of the Public Library.
29. Will a fire station be put in?
A. Yes a new fire station will be built at the Southwest corner of Timberline and
4
♦ � l
Vermont.
30. What will keep construction traffic off Arctic Fox?
A. Weight limitations on street.
31. When will the deliveries for a grocery store be made?
A. The trucks usually just drop off a trailer and haul back an empty trailer. Usually four
to five trucks per day.
32. We would prefer limitations on restaurant hours. Twenty-four hour restaurants are
not acceptable.
33. We are concerned about the increase graffiti throughout the city.
34. Does City have a list of developers in area?
A. Most of neighboring property to the South belongs to Bill Tiley.
35. Can handicap parking be near the door of anchor store?
A. It will be considered. Not currently like that on plans.
36. Will there be sales in the parking lot?
A. This would not be something that W.W. Reynolds would want to see.
c
M
o
MEMORANDUM
co
o
c
- To: Libby Glass, W. W. Reynolds Companies
O
a
Eldon Ward, Cityscape
0
1
Fort Collins Planning Department .
C)
Fort Collins Transportation Division
From: Matt DelichG
J
W
O
J
Date: June 6, 1994
Subject: Tower Shoppes PUD traffic study (File: 9458MEM1)
z
a
This memorandum documents the trip generation analys.is
conducted for the Tower Shoppes PUD, located in the northeast
a
quadrant of the Horsetooth/Timberline intersection in Fort
m
Collins. This site was Parcel A of the Pinecone PUD, which
�2
was considered and approved by the City. of Fort Collins in
Cn
1992. This memorandum serves as an addendum to the "Pinecone
PUD Site Access Study," April 1992.
The Tower Shoppes PUD is a multi -use retail center that
will likely be anchored by a grocery store. The remainder of
the site will likely have uses that are typical of multi -use
retail centers (fast food restaurants, bank, miscellaneous
retail, etc.). Table l shows the expected trip generation
from the individual uses expected at the Tower Shoppes PUD.
Trkp Generation, 5th Edition, ITE was used to estimate the
daily and peak hour trip generation. Based upon research,
documented in.Chapter VIII, Multi -Use Developments/Quantifying
Capture Rates, Trip Gen_e_r_ation, 5th Edition, the total trip
z
generation of the individual uses can be factored to reflect
multi -purpose trips and captured trips. This is reflected in
—
w -
the line labelled "Adjusted Total."
z
LLi
Z
W
Table 2 shows the trip generation estimates for this
CL:
parcel from the cited site access study. The land use assumed
for this parcel was a 100,.000 square foot shopping center with
•
no specific uses indicated. Comparing Tables 1 and 2
o
indicates that the trip generation for the specific uses is
a
higher than the generalized land use, from the site access
cc
study.
o
a
Z
Since some of the differences are significant, the
cc
traffic assignment (Figure 6 in the site access study) was
adjusted at key intersections to reflect the trip generation
3
LL
differences. This reassignment is shown in Appendix A.
=
a
Analyses were performed on these key intersections using the
E--
new traffic assignments. Table 3 shows the peak hour
operation. All key intersections will operate similarly to
that indicated in the site access study. Calculation forms
are provided in Appendix B.
It is recommended that northbound right -turn and
southbound left -turn auxiliary lanes be built on Timberline
Road accessing the Tower Shoppes parcel. Due to physical
constraints, the northbound right -turn lane should be 120 feet
plus 90 feet of taper. The southbound left -turn lane on
Timberline Road should be 300 feet long with 90 feet of taper.
It is concluded that the Tower Shoppes PUD is in general
conformance with the overall intent of the "Pinecone PUD Site
Access Study." With the higher trip generation, all key
intersections will operate similarly to that indicated in the
site access study.
Tower Shops at Pine Cone PUD - Preliminary, #60-91L
July 25, 1994 P & Z Meeting
Page 3
B. Neighborhood service Center
The request for a Tower Shoppes Preliminary P.U.D. was evaluated by
the absolute and variable criteria of the Neighborhood Service
Center Point Chart. The project satisfies both absolute criteria
in that there will be no vehicular access to South College Avenue,
and there will be no repair, painting and body work activities,
including the storage of refuse and vehicle parts, occurring within
the P.U.D.
Under the variable criteria, the project scores 50% which equals
the minimum required score of 50%. Points were awarded for the
following:
Criterion d: Being located more than three-quarters of a mile from
an existing or approved community/regional shopping center.
Criterion f: Being located outside the South College Avenue
corridor.
Criterion h: Having direct vehicular and pedestrian access between
on -site parking areas and adjacent existing or future off -site
parking areas which contain more than ten spaces (F.C.H.S. parking
lot and pedestrian plaza).
Criterion is Including a supermarket/grocery store.
Criterion k: Being located with one -sixth of its property boundary
contiguous to existing urban development.
(It is interesting to note that points were awarded based on strict
-- — interpretations of the criteria resulting in a relatively low
score. For example, criterion.a asks:
"Is the project contiguous to an existing transit route?"
At the present time, there is no transit route on Timberline Road
or East Horsetooth Road. A transit stop, however, is being planned
in conjunction with the new F.C.H.S. It is located on the common
property line and is served by the high school's bus loop which is
segregated from student, faculty, and staff parking. It is
anticipated that Transfort will serve new F.C.H.S. and Tower Shops
from this internal transit stop rather than from the perimeter
streets.
Another example of strict interpretation is relative to criterion
which asks:
"Is the project located more than one and one-half miles from
an existing or approved neighborhood service center?"
1
Land Use
TOWER SHOPPES
Grocery - 73.1 KSF
Misc. Retail - 20.9KSF
Fast Food - 2.5 KSF
Fast Food - 2.5 KSF
Bank - 5.5 KSF
Total
Adjusted Total
Table 1
Trip Generation
Daily A.M. Peak P.M. Peak
Trips Trips Trips Trips Trips
,in out in out
9170
103
44
385
232
850
64
70
59
44
1580
71
68
47
44
1580
'71
68
47
44
1120
26
18
79
89
14300
335
268
617
453
13160
241
193
469
344
Table 2
Trip Generation
From Pinecone Site Access Study
Daily
A.M.
Peak
IP.M.
Peak
Land Use Trips
Trips
Trips
Trips
. Trips
in
out
in -
out -
Parcel A - 100,000 KSF 7430
122
53
305
318
Table 3
Long Range Peak Hour Operation
Intersection
Intersection #4
WB RT
SB LT
Intersection #5 (signal)
Horsetooth/Timberline
Intersection #6
SB RT
Intersection #7
NB
LT/T
NB
RT .
SB
LT/T
SB
RT
EB
LT
WB
LT
Level of Service
AM PM
A A
B C
C C
A A
F (D/E)
E (D)
A
A
E (D)
E (D)
A
A
B
A
A
A
(") Level of service considering vehicle delay, based upon recent.
research.
PlIvE co( 0. 0. 6'. 7,e,4 PF/C STvo y 6poe ic, / q9 a..
EXECUTIVE SUMMARY
Pinecone PUD is a proposed commercial/residential development
which also includes the new Fort Collins High School. It is
located east of Timberline Road and north of Horsetooth Road in
Fort Collins, Colorado. This site access study involved the steps
of trip generation, trip distribution, trip assignment, capacity
analysis, traffic signal warrant analysis, and accident analysis.
This study assessed the impacts of Pinecone PUD on the long
range (2010) street system in the vicinity of the proposed devel-
opment. As a result of this analysis, the following is concluded:
The development of Pinecone PUD is feasible from a traffic
engineering- standpoint. At full development as proposed,
approximately 25,640 trip ends will be generated at this site. Not
all of these will be new trips. Some will be pass -by trips on the
area streets as part of the background traffic. The high school
trip generation was based upon data collected at Rocky Mountain
High School in Fort Collins. The trip generation rates developed
from this data were significantly higher than those shown in Trip
Generation', 4th Edition. This local data source was deemed to be
more appropriate.
- Based upon current traffic volumes and existing geometrics,
the Timberline/Horsetooth signalized intersection operates
acceptably.
- As Pinecone PUD develops and traffic increases, a signal -
will be warranted at the Timberline/Vermont intersection. Vermont
is a major street serving the business park development west .of
Timberline, and will be designated as a collector street serving
Pinecone PUD.
- - With full development of all the proposed uses in Pinecone
PUD, the Timberline/Horsetooth and Timberline/Vermont signalized
intersections_ will operate acceptably. Selected movements at some
stop sign controlled intersections will not operate acceptably.
-This operation will be due to the background traffic on--Timber_l.ine. ___
Road and Horsetooth Road. There is little that can be done to
improve this operation. There are alternative means of egress
where this does occur. Selective accesses should be restricted to
limited turns as shown in Figure 7. This recommendation is made
assuming the build out future traffic volumes. The limited turn
accesses can initially be implemented as full turn intersections
and changed as traffic operation and safety dictates.
- Streets and intersections internal to Pinecone PUD will
operate acceptably.
- With'proper traffic control and the recommended geometries,
the accident rate should be minimal for typical urban conditions.
t . °o �i
r' r i_ - h
^ a-TI'�p-��R�
.7
° ] !
1
I
�i IfJ�
iuRar
�1 �I �l�l�i�h.\
1<Jl,l 1( Jl if ('t
--
1 / Rehn
�j
NOrlh Yards
r I
-'
�•G
OLORADO. • • [jlacl< Hnll tV
�--- - �11
Junction I
_
Ir
N
1�
I �[. �.
�I
FflJl._ryk:
��
H A< _s— ...
,�:' I pN
lt;', it
�,
=zl .
.I� .R.�I�I•.>.II II . .II JI
, I
' _�
i :
1,
Downtown Sinn:url
I,
l
.
�lIl
]J_IL,;61IIILTJiI�LI
Ch�
71HlL,C��1I1�t�.+1l
Z`_�
_\. I .
'F
'
r
Airpark Gavel Pit
t)
� %1�
COLOI RA0-
C
.--ttJHl,:"r`-
�t:iIaft]a(~�IL,
Il 11 l
5
till C1L. 'Dal
�C'n
;.' .�h
\�•" .�,,•'
RoselqNnJL11,_It',if
'\l•
L;1l.l
AIio%%head /
r\
Ci.
I
I11
IF; 11='WilLw 7
l?ITJ&
ILH1lL ,JIrL_
�e
nMl>ito
aysa
;.'in
I-'
7\`..```./R.,, /�']]II'�11(I1'if'I I
�J
,0
49Is ,
=cu
uJfu,-1~Ilr,tid�{lUY.
IcJA,t1I
0
'..
. _I_
IN
-
1�_\'
,,6k�Iud
�Jll4e-FlIJ,.
uNIVFRT.
ClU% EL
JUL �LJ1 T
1-1 l /'T�
i•
ls;iG'�
�r
Zos
<�\\ .p$,`
IL�• .`tttt.
•�''
7
.�
A
r
Gravel Pits`•�.\,
i
�_1l�I4Fl�_
I
-t
`�' `C. ] �'' llr
jrg( j�l� Il v r
� i A u_ ..1
°•� � ^n IRadio n
�TOw rs n
I.A�!MER 2�30..•o
E;eal��. `L
\Y +'`�Q2d . —._�1 ��, 21
--- .
n
�' I
brakes �
Y
�' � ._� 1
� KE
1 p y
_
77
.IyI. JJI. -��
IpI ,I-1i • (�
ii .;' �;
----'-T�•li"�'—`? - 4 : \
n:
c
(ry. ( I�� ,
�'_ vc 1 II ..1
-�I:n -�
li�7la J.11
/f,��
_ I •1l.1((ij
\
° I BM 4874
n
g50/1
_
,
_yLl1�IL.
30
1
DO
t °t1C�` r•,
� �
HORSEY O H
��=r�-------_
:� •
noel �— f
-
in
---
�36
Nk ` M
PIN
GON\ E P.U.
35
c9915./
// ��31?�'
- W
32
f-133
-I l,: r,::
;
Dtc Clellands
_
—
•
II
Ir
�
I•:,V' �'_'
� 1.L+
I.'•..
1
1
_
� _
0
-�1,^111� =p _
1'II_
k: •r.
Ifal'Illnll y
•ate- =>e� � ��•...
Cem�i''.
yn4
150)
_ e9J0
�:�r:_
-a=a�—a-v--•
— ••—
—
�g0—
.9.ILd
5000
- J .- \
1 •.r.r. !.
\II _ ,I�
- _ _ __-- i
_
L 9M
• 1 '. ' I
I
No Scale
SITE LOCATION Figure 1
0
DRAKE ROAD
C I _
a
O
.....� -.. ..1
_z '
J
w L
to
,
VERMONT I
Plnecone P.U.D.
a
DANFIELD
. I
HORSETOOTH ROAD
�G
v } m
v Q0 oC
a
v
PRIMARY STREETS Figure 2
—Mmmol u�
.......... ..
P............
K
0
VERMONT
DANFIELD
............
51
SITE PLAN
r
N
............
HORSETOOTH ROAD
0
2c
Figure 4
TABLE
2
Trip
Generation
Daily
A.M.
Peak
P.M.
Peak
Land Use
Trips
Trips
Trips
Trips
Trips
(r
in
out
in
out
I�
Parcel A
Neighborhood Retail
7430
122
53
305
318
Center - 100
KSF
Parcel B
High School -
1800 students
5250
655
355
112
169
Parcel C
Neighborhood Park
&
200
77
55
93
93
H.S. Athletic
Fields
Day Care - 100
students
700
63
56
62
67
Parcel D
C-store/gas &
retail - 6KSF
3000
85
80
95
100
Multi -Family -
200 D.U.
1170
14
75
75
37
Parcel E
Business Services
- 4.3 Ac
2620
44
19
106
110
Parcel F
Single Family
- 22 D.U.
220
5
12
14
8
Parcel G
Single Family
- 60 D.U.
600
13
33
38
22
Parcel H
Single Family
- 40 D.U.
400
8
22
25
15
Parcel J
Single Family
- 30 D.U.
300
6
17
19
11
---
- --Parcel K
Single Family
- 36 D.U.
360
8
20
23
13
Parcel L
Single Family
- 22 D.U.
220
5
12
14
8
Parcel M
Single Family
- 72 D.U.
720
15
40
45
27
Parcel N
Single Family-
85 D.U.
650
18
47
54
31
Parcel P
Single Family
- 100 D.U.
1600
34
88
101
59
d
iLl
® Land Use
�i The square mile containing the Pinecone PUD is currently in
agricultural use. There is currently sparse development east of
Timberline Road in Fort Collins. However, a major employer
(Hewlett Packard) is located approximately one mile to the
southeast of Pinecone PUD. The center of Fort Collins lies to the
northwest of the Pinecone PUD.
The adjacent land uses near Pine cone PUD are as follows: 1)
to the west are light industrial/office across Timberline Road; 2)
to the north, there are currently agricultural uses; 3) to the
east, terrain drops off into the valley of the Cache La Poudre
River; and 4) to the south are residential uses. It is expected
that there will be commercial development along Timberline Road to
the south of Horsetooth Road. The topography in the area is
essentially flat.
Roads .
The primary streets near Pinecone PUD are shown in Figure 2.
Timberline Road borders Pinecone PUD on the west. It is a north -
south street designated as a major arterial on the Fort Collins
Master Street Plan. Its existing cross section has one 12 foot
lane in each direction. The posted speed limit is 45 mph on
Timberline Road in this area. Sight distance is generally not a
problem. Currently, intersections along Timberline Road are
signalized at Harmony Road, Horsetooth Road, Drake Road, and
Prospect Road. These signals are all one mile apart. It is
expected that in the future, signals may be warranted at the
Timberline/Vermont and Timberline/Caribou intersections. Signal
warrants at Timberline/Vermont intersection will be addressed later
in this report. In the future, Timberline Road is expected to be
a six lane street according to the Fort Collins Master Street Plan.
When Timberline Road is connected to SH 14 across the Cache La
Poudre River, it is expected that traffic volumes will increase
dramatically on Timberline Road. This is expected to occur before
the year 2000.
Horsetooth Road borders Pinecone PUD on the south. It is an
east -west street designated as an arterial on the Fort Collins
Master Street Plan. Horsetooth Road is currently a two lane street
east of Timberline Road. It is widened near the Timberline Road
intersection.
rExisting Traffic
Daily traffic flow is shown in Figure 3. These are machine
counted volumes conducted by the City of Fort Collins in 1991.
r - 2
0
a
In addition to the daily count data, morning and afternoon
peak. hour traffic data were obtained in February 1992 at .the
Timberline/Horsetooth intersection. The peak hour turning
movements are also shown in Figure 3. All raw traffic data are
presented in Appendix A.
Existing Operation
Using the traffic volumes shown in Figure 3 and the existing
geometrics and control, the Timber line/Horsetooth intersection
operates as indicated in Table 1. Calculation forms for these
analyses are provided in Appendix B. Appendix C describes level
of service for signalized and unsignalized intersections as
provided in the 1985 Highway Capacity Manual. During the peak
hours, the Timberline/Horsetooth intersection operates at
acceptable levels of service. Acceptable level of service is
defined as level of service D or better.
III. PROPOSED DEVELOPMENT
Pinecone PUD is a proposed mixed -use development located north
of Horsetooth Road and east of Timberline Road in Fort Collins.
It will include residential, commercial, and high school uses.
Figure 4 shows a schematic of the site plan of Pinecone PUD,
indicating parcels which relate to the uses indicated in Table 2,
Trip Generation. As indicated earlier, one level of analysis was
.� performed which assumed build out of this deveiopment with a year
2010 level of traffic. Access locations to Pinecone PUD are also
shown in Figure 4. Operation, geometrics, and turn limitations on
the various accesses will be discussed later in this report. -
Volumes on streets internal to Pinecone PUD are expected to be
typical for residential development. Therefore, internal
intersections were riot analyzed. The accesses are numbered for
easy reference later in this report.
Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street
system. A compilation of trip generation information was prepared
by the Institute of Transportation Engineers and is presented in
Trip Generation 4th Edition. This document was used to project
trips that would be generated by the proposed uses at this site.
Table 2 shows the expected trip generation on a daily and peak hour
basis.
Since the new Fort Collins High School is such any integral
part of the Pinecone PUD, special studies were conducted to
3
in
■
I
r
determine the trip generation characteristics of a high school,
particularly a Fort Collins high school. Appendix D contains a
memorandum discussing the relationship between the ITE trip
generation rates for high schools and data collected at Rocky
Mountain High School in Fort Collins.
A shopping center use was used for the proposed retail uses
in the neighborhood shopping center. This was used rather than the
trip generation for the individual users such as, grocery store,
hardware store, drug store, etc. Trip generation characteristics
at multi -use centers have, for many years, been a concern to the
.Trip Generation Committees at the Institute of Transportation
Engineers. Specifically, questions have been raised about whether
the trip generation characteristics of multi -use centers are- the
same as for the individual components of the center. It appears
reasonable to assume that multi -use centers would potentially
generate less external vehicular trips because of internal matching
of trip ends within the center. In addition, one trip to a multi-
use center could satisfy a number of trip purposes at the same
time. In an effort to gain some insight to multi -use center trip
generation characteristics, the Colorado/ Wyoming Section Technical
Committee collected data at nine multi -use centers. It was found
that the trip generation estimate using the individual components
of the various centers predicted travel that was higher than the
actual driveway counts. The daily counts were approximately 1
percent higher. The morning peak hour was approximately 28 percent
higher. The afternoon peak hour was approximately 24 percent .
higher.
In addition to the above, the proximity of the high school to
the neighborhood center is expected to reduce the number of noon
high school vehicle trips significantly. The data collected at
Rocky Mountain High School indicated that the 1.5-2 hour period
around noon is the highest travel period of the day.
Trip Distribution
Directional distributions were determined for Pinecone PUD.
Three distributions were developed using the number of dwe-1+1-ng-
units and the number of employees in each traffic analysis zone as
variables in the gravity models used. The data used was obtained
from the Fort .Collins Transportation Department. The trip
distributions are shown in Figure 5.
Several land use generators such as shopping centers, drive-
in (fast food) restaurants, service stations, convenience markets,
and other support services (banks, etc.) capture trips from the
normal traffic passing -by the site. For many of these trips, the
stop at the site is a secondary part of a linked trip such as from
work to shopping center to home. In all of these .cases, the
driveway volumes at the site are higher than the actual amount of
4
Tower Shops at Pine Cone PUD - Preliminary, #60-91L
July 25, 1994 P & Z Meeting
Page 4
By direct line, or "as the crow flies," Tower Shoppes is located
within one and one-half miles from Scotch Pines (existing) and
Golden Meadows (approved on a Master Plan). Points, therefore,
were not awarded. For informational purposes, as measured along
the roadways, Tower Shoppes is 1.8 miles from Scotch Pines and 1.5
miles from Golden Meadows. These two examples are offered as an
illustration as to how Tower Shoppes continues to meet many city
goals and objectives, but scores at the low end of the allowable
range of points on the Neighborhood Service Center Point Chart.)
With a score of 50% on the variable criteria of the Neighborhood
Service Center Point Chart, Tower Shoppes P.U.D. is considered an
appropriate use at this location.
C. Auto Related Uses
The three pad sites are anticipated to be drive-thru or fast food
restaurants. ,These uses are subordinate to the anchor and.retail
uses and considered appropriate services within a Neighborhood
Service Center. As drive-thru or fast .food restaurants, these
three pads were evaluated by the criteria of the Auto Related and
Roadside Commercial Point Chart. The score of 52%, which exceeds
the required minimum of 50%, was achieved as follows:
Criterion b: Being a part of neighborhood center.
Criterion d: Being located on at least two acres.
Criterion f: Having.direct vehicular and pedestrian access between
on -site parking areas and adjacent off -site areas which contain
more than ten spaces (F.C.H.S. parking lot and pedestrian plaza).
r
Criterion h: Having at least one -sixth of its property boundary
contiguous to existing urban development. -"
By achieving a score of 52%. drive-thru and fast food restaurants
are considered appropriate pad site uses in Tower Shoppes P.U.D.
3. Neighborhood Compatibility:
A neighborhood information meeting was held on May 31, 1994.
(Neighborhood information meetings were also held for the Pine Cone
O.D.P. and new Fort Collins High School on January 29, 1992. and
for Amended Greenfield Village O.D.P. on April 29, 1991.) A
summary of the comments of the 1994 meeting is attached.
The primary concerns voiced by those attending the meeting were
increased traffic and the inclusion of fast food restaurants as
land uses on the pad sites. These concerns are discussed below:
traffic added to the adjacent street system, since some of the site
generated traffic was already counted in the adjacent street
traffic. The pass -by assumption was 40% for retail. '
The procedure used to account for both pass -by traffic and
primary destination traffic is as follows:
- Estimate the trip generation rate as is currently done and
determine the total number of trips forecast to occur, based
- on the size of the development.
Estimate the percentage of pass -by trips, and split the total
number of trips into two components, one for pass -by trips and
- one for new trips.
Estimate the trip distributions for the two individual
components. The distribution of pass -by trips -must- reflect. --
the predominant commuting directions on adjacent and nearby
roadway facilities. Most peak period pass -by trips are an
intermediate link in a work trip. _
Conduct two separate trip assignments, one for pass -by trips
and one for new trips. The distribution for pass -by trips
will require that trips be subtracted from some intersection
approaches and added back to others. Typically, this will
involve reducing through -roadway volumes and increasing
certain turning movements.
Combine the assigned trips to yield the total link loadings,
and proceed with capacity analysis as normally done.
Trip Assignment
Trip assignment is how the generated and distributed trips are
expected to be loaded on the street system. The assigned trips are
the resultant of the trip distribution process. Figure 6 shows the
morning and afternoon peak hour assignments of the Pinecone PUD
generated traffic at full build out of Pinecone PUD and other
nearby land parcels. Background traffic for the year 2010 was
determined following conversations with the Fort Collins _
Transportation Department staff. Recent traffic assignments done
.—by—the -City indicated year 2010 traffic volumes on Timberline Road
at 27,300 vehicles per. day, and on Horsetooth Road at 33,200
'This pass -by factor was obtained using the following sources:
1. Transportation Engineering Design Standards, City of Lakewood,
June 1985.
2. Development and Application of Trip Generation Rates, FHWA/
USDOT, January 1985.
3• "A Methodology for Consideration of Pass -by Trips -in Traffic
Impact Analyses for Shopping Centers," Smith, S., ITE Journal,
August 1986, Pg.37.
4. Trip Generation 4th Edition, ITE, 1987.
5
I
J
rvehicles per day. These daily volumes were used as guides to
determine the long range future peak hour volumes.
IV. TRAFFIC IMPACTS AND ANALYSIS
Signal Warrants
As a matter of policy, traffic signals are not installed at
any location unless warrants are met according to the Manual on
Uniform Traffic Control Devices. However, it is possible to
determine whether traffic signal warrants are likely to be met
based upon projected traffic and utilizing -the -chart shown in
Appendix E. Using the peak hour traffic volumes shown in Figure
6, it is likely that a new traffic signal will be warranted at the
Timberline/Vermont (#2) intersection. Even though unacceptable
operation may occur -during the peak hours at stop sign controlled
intersections, ,traffic signals will not be warranted. It is
important that alternative means of access be provided so that
users of an intersection that operates unacceptably with stop sign
control are given travel options to avoid the movements that
operate unacceptably.
Operation Analysis
Capacity analyses were performed on the key intersections
which provide access to Pinecone PUD and the Timber line/Horsetooth
intersection for the long range (2010) traffic conditions. From
these analyses, geometric requirements on the adjacent streets can -
be determined.
Using the traffic volumes shown in Figure 6, the intersections
operate in the long range condition time period as indicated in
Table 3. Calculation forms for these analyses are provided in
Appendix F. The signalized intersections operate acceptably -at
both=T-imberline/Horsetooth and Timberline/Vermont during the_peak
hours. The stop sign controlled intersection (#1) will operate
acceptably except for left -turn exits in both peak hours and left -
turn entrances during the afternoon peak hour. Based upon recent
research (provided in Appendix G), the measured delay to the left -
turn exits would be on the order of 27-37 seconds per approach
vehicle in the morning peak hour and 40+ seconds per approach
vehicle in the .afternoon peak hour. Based upon delay, the level
of service in the morning peak hour would be in the D/E category
and would be in the E/F category in the .afternoon peak hour.
Recent. research indicates that the capacity technique for stop sign
controlled intersections gives an overstatement of the level of
service. At the stop sign controlled '_ntersections in Table 3, a
second level of service is shown for various turning movements.
6
TABLE 3
2010 Peak Hour Operation
Intersection
Intersection #1
WB LT
WB RT
SB LT
Intersection #2 (signal)
Intersection #3
EB RT
WB RT
SB LT -
NB LT
Intersection #4
WB RT
SB LT
Intersection #5 (signal]
Intersection,#6
SB RT
Intersection #7
NB LT
NB RT/T
SB LT
SB RT/T
EB LT
WB LT
I_n_tersection #8
SB LT
SB RT
EB LT
Level of Service (x)
AM
PM
F (D/E)
F (E/F)
A
A
D (C)
E (C/D)
C
C
A
A _
A -
A
D (C)
D (C/D)
E (C/D)
E (C/D)
A A
D (C/D) E (C/-D)
C C
A A
F (D/E)
F (D)-
E
D
F (D/E)
F .(D)
B _
B
C
C
A
A
E (C/D)
E (D) ---
A
A
A
D
(") Level of service considering vehicle delay based upon recent
research.
9
rThis operation, in parentheses, is based upon the research
mentioned above. At intersection #1, the westbound left turns
continue to operate unacceptably during the peak hours. There is
jlittle that can be done to improve this. If possible, street
connections to Drake Road and/or streets that are expected to be
signalized should be made. VERroriT
The, Timber line/DanfieId intersection (#3) was analyzed with
full movements and with limited turn movements. With full
movements at this stop sign controlled intersection, minor street
throughs and left turns will operate unacceptably- The business
park on the west side of Timberline Road will have alternative
access via the signalized intersection at Vermont. An access to
Vermont from the high school circular -driveway should be provided
through the north parking lots.. Intersection #3_will be the bus
access to/from the high school. In the short range future, this
access could be a full movement intersection. However, as -traffic
increases on Timberline, the minor street left turns, especially
the slower accelerating buses, will find it very difficult to make
left turns to enter Timberline Road.
Intersection #4 is proposed to be a right-in/right-out/left-
in access to the commercial center. All allowed movements will
operate acceptably. Intersection #6 will operate acceptably with
right-in/right-out access. Intersection #7 (Hors etooth/Arctic Fox)
is intended to be a full turn stop sign controlled- intersection.
During 1-2 hours a day, some movements will operate unacceptably.
This is typical of arterial/local street intersections. There is
little short of signalization that can be done to improve the
operation. However, signals are not warranted. Left turns from
Arctic Fox do have an alternative route via Big Horn Road.
Intersection #8 will operate acceptably during the peak hours. The
street/street intersections within Pinecone PUD will operate
acceptably. Volumes on the interior streets will be typical of
local and collector streets in Fort Collins.
Figure 7 shows .the recommended long rang geometrics at the
intersections along Timberline Road and along Horsetooth Road.
Intersections which are shown with turn restrictions can initially
be -implemented as full movement intersections. As traffic vo•l-umes
increase, particularly on Timberline Road, evaluations should be
conducted to determine when turn limitations should be implemented
at various intersections. The double left -turn lanes at the
Timberline/Horsetooth intersection are based on traffic projections
made in this and other traffic studies performed in this area of
Fort Collins. The absolute need for double left -turn lanes will
be determined as volumes increase.at this intersection. They are
suggested in this report so that the City of Fort Collins can plan
for the right-of-way or easements in order that they can be
implemented, if necessary.
7
a
L1
NVE
r
IT
4
A
RECOMMENDED LONG RANGE GEOMETRICS Figure 7
CAccident Analysis
I
The recommended control devices and geometrics should minimize
vehicular conflicts and maximize vehicle separation. Therefore,
the accident rate should be at its minimum for a typical urban
condition.
VI. CONCLUSIONS
This study, assessed the impacts of Pinecone PUD on the long
range (2010) street system in the vicinity of the proposed
development. As a_ .result, of _this analysis, the following is
concluded:
- The development of Pinecone PUD is feasible from a traffic
engineering standpoint. . At full development as proposed,
approximately 25,640 trip ends will be generated at this site. Not
all of these will be new trips. Some will be pass -by trips on the
area streets as part of the background traffic. The high school
trip generation was based upon data collected at Rocky Mountain
High School in Fort Collins. The trip generation rates developed
from this data.were significantly higher than those shown in Trip
Generation, 4th Edition. This local data source was deemed to be
more appropriate.
- Based upon current traffic volumes and existing geometrics,
the Timberline/Horsetooth signalized intersection operates
acceptably.
- As Pinecone PUD develops and traffic increases, a signal
will be warranted at the Timberline/Vermont intersection. Vermont
is a major street serving the business park development west -of
Timberline, and will be designated as a collector street serving
Pinecone PUD.
With full development of all the proposed uses in Pinecone
P-UD,._ the Timber line /Horsetooth and Timberline/Vermont signalized ___
intersections will operate acceptably. Selected movements at some
stop sign controlled intersections will. not operate acceptably.
This operation will be due to the background traffic on Timberline .
Road and Horsetooth Road. There is little that can be done to
improve this operation. There are alternative means of egress
where this does occur. Selective accesses should be restricted to
limited turns as shown in Figure 7. This recommendation is made
assuming the build out future traffic volumes. The limited turn
accesses can initially be implemented as full turn intersections
and changed as traffic operation and safety dictates.
- Streets and intersections internal to Pinecone PUD will
operate acceptably.
�.. 8
Tower Shops at Pine
July 25, 1994 P & Z
Page 5
A. Traffic
Cone PUD - Preliminary, #60-91L
Meeting
The concern over increased traffic in the area was expressed by
residents of Fox Meadows Subdivision, located south of the
Horsetooth Road.
In response to this concern, the recommendations of the traffic
impact analysis were reviewed. One measure will be the
installation of medians in both Timberline and Horsetooth Roads
which will control turn movements, specifically left turns into the
shopping center. Fox Meadows residents have the ability to gain
access to the arterial system via Caribou, Arctic Fox and Bighorn
Drive.
B. Drive-Thru and Bast Food Restaurants
The concern was that introduction of three drive-thru and or fast
food restaurants will have a negative impact on the Fox Meadows
neighborhood.
The concept behind fast food restaurants, with drive-thru lanes, is
to capture high school lunch trips by a pedestrian mode versus
taking cars to South College Avenue (four miles round-trip). Given
the "open campus" philosophy of Poudre R-1, there is a strong
desire by students to travel off -campus rather than dine in the
cafeteria. It is anticipated that the convenience of a choice of
fast food restaurants will act as an incentive to walk to lunch
rather than drive two miles to College Avenue. Staff believes the
drive-thru/fast food_ restaurant land use on the pad sites is
appropriate.
— ---- The Preliminary P.U.D. addresses the aesthetics of the pad site
restaurants by requiring architectural compatibility with the
anchor tenant and in -line retail spaces. Note Number 10 on the
Preliminary P.U.D. sets a level of expectation that the free-
standing pads will be of high quality and will blend in with the
balance of the shopping center, and, thereby, indirectly with the
high school.
Tower Shoppes, at 11.7 acres, is a Neighborhood Service Center that
has been downsized from previously approved commercial P.U.D.'s.
The pad sites are located as far away from Fox Meadows Subdivision
as possible. The P.U.D. is found to be sensitive to and maintains,
the character of the residential area. Staff, therefore, finds
Tower Shoppes to be compatible with the surrounding neighborhood.
Tower Shops at Pine Cone PUD - Preliminary, #60-91L
July 25, 1994 P & Z Meeting
Page 6
4. Desi n•
The following design elements are included in Tower Shoppes P.U.D.:
A. Integration with Fort Collins High School
Tower Shoppes is connected to F.C.H.S. by a shared pedestrian
plaza. A sidewalk also ties the Pad Site C to the sidewalk that
serves the transit stop and bus loop. While sufficient parking for
the Tower Shoppes is provided onsite, there is opportunity for
shared parking in the high school lot during non -school periods.
B. Pedestrian circulation
A pedestrian path enters the Tower Shoppes from the east. This
path crosses the high school athletic fields and ties into Dakota
Ridge and Dakota Pines P.U.D.'s at Red Mountain Drive. The
shopping center parking lot is enhanced by an east -west landscaped
island that features shade trees and a sidewalk that connects the
anchor building to pad site C and the sidewalk along Timberline
Road. This central spine is accented by special pavers at each end
where there is conflict with internal drive aisles.
C. Architecture
Tower Shoppes will feature brick veneer to complement F.C.H.S. The
columns that support the covered entry will blend with the tower
feature at the entry to F.C.H.S. The one story form will provide
balance for the multi -storied high school. As mentioned, Note
Number 10 creates a level of expectation regarding architecture on
pad, site development as well. Since it is likely that the pad
sites will be developed by nationally recognized corporations, Note
10 will encourage more distinct and compatible facilities rather
than stock plans. -
D. Landscaping
The landscape plan is being designed to complement the plan for
F.C.H.S. Street trees will be provided on both arterial frontages,
and the parking lot will feature landscape islands. The service
area, on the east side of the building, will be screened from the
high school campus by a row of evergreen trees. The blending of
common materials will contribute to a compatible appearance between
the two adjacent uses.
Tower Shops at Pine Cone PUD - Preliminary, #60-91L
July 25, 1994 P & Z Meeting
Page 7
5. Transportation:
Tower Shoppes P.U.D. was included in the traffic impact analysis
conducted for Fort Collins High School (April, 1992). An updated
study was conducted specifically for Tower Shoppes (June, 1994).
As a result of these studies, the following traffic mitigation
measures have been recommended.
A. Median in Timberline Road
The median planned for Timberline Road will control turn movements
at the curb cut that aligns with the north drive -way of Platte
River Power Authority. The median will allow northbound right -in,
right -out, and southbound left -in turns. It will prevent left -out
(southbound) turns.
B. Median in Horsetooth Road
This median will extend east from Timberline Road to the
intersection of Arctic Fox Drive (local street). This median
limits the Tower Shoppes entry off Horsetooth Road to a right -in,
right -out only. Left turns will be physically prohibited by this
median.
C. Arctic Fox Drive Access
Tower Shoppes will share a full -turning access with the F.C.H.S.
parking lot at the intersection of Horsetooth Road and Arctic Fox
Drive. There are no restrictions at this intersection. This
intersection will be controlled by a stop sign, not a traffic
signal. As with most arterial/local intersections, left turn exits
- ---during peak periods may experience some delay. Alternative access
for residents of Fox Meadows can be made via Bighorn Drive or
Caribou Drive during these periods.
D. Level Of service
The 1994 updated traffic study analyzed the expected trip
generation for a multi -use retail center, anchored by a grocery
store, with fast food restaurants. Timberline/Horsetooth
intersection is expected to operate at Level of Service "C",during
peak hours in the long range. Horsetooth/Arctic Fox intersection
will experience delays (Level of Service "D" and "E") during the
peak hours for north (into Tower Shoppes) and southbound (exiting
Tower Shoppes) left turns. This delay is considered acceptable due
to the priority given to arterial traffic and the stop sign control
for the local streets.
Tower Shops at Pine Cone PUD - Preliminary, #60-91L
July 25, 1994 P & Z Meeting
Page 8
E. Mitigation
It will be required that northbound right -turn and southbound left
turn auxiliary lanes be built on Timberline Road accessing the
Tower Shoppes parcel. The design of these lanes will be evaluated
by Staff at the time of Final P.U.D.
F. Bike -Pedestrian Connections
The shopping center is directly connected to the high school campus
by a common plaza. Sidewalks are provided on the perimeter of the
site as well as a central spine down the middle of the parking lot.
A bike path ties the center to Red Mountain Drive and Dakota Ridge
via the school campus.
G. Transit Stop
As mentioned, a transit stop for dual use by Poudre R-1 and
Transfort is being planned along the shared property line with the
new F.C.H.S. This internal stop is closer and more convenient for
both uses than a stop on the perimeter arterials. While there is
no current route in the immediate area, it is anticipated that
Transfort will add a route in this area to serve not only the new
F.C.H.S. and Tower Shoppes but the major employers also.
6. Condition of Approval - Stormwater Detention:
At the request. of Stormwater Utility, a condition of approval has
been added. This condition stipulates that if the new Fort Collins
High School detention pond, located offsite, is found to not
contain sufficient capacity to handle runoff from Tower Shoppes,
then the applicant must resubmit Preliminary Drainage Report and
Drainage and Grading Plans demonstrating adequate onsite stormw'ater ----
detention. Such resubmittal must occur prior to submittal for
Final P.U.D.
FINDINGS OF FACT/CONCLUSIONS:
In evaluating the request for Tower Shoppes at Pine Cone
Preliminary P.U.D., Staff makes the following findings of fact:
1. The proposed land uses, Neighborhood Service Center and Auto
Related and Roadside Commercial, comply with the approved Pine
Cone overall Development Plan.
2. The Preliminary P.U.D. satisfies the All Development Criteria
of the L.D.G.S.
Tower Shops at Pine Cone PUD - Preliminary, #60-91L
July 25, 1994 P & Z Meeting
Page 9
3. As a retail -commercial shopping center, the proposed land uses
are supported by the performance on the Neighborhood Service
Center and Auto Related and Roadside Commercial Point Charts
of the L.D.G.S.
4. With traffic mitigation measures and bicycle -pedestrian
connections, the Preliminary P.U.D. is feasible from a traffic
engineering standpoint and satisfies transportation policies.
RECOMMENDATION:
Staff recommends approval of Tower Shoppes at Pine Cone Preliminary
P.U.D., #60-91L, subject to the following condition:
1. Tower Shoppes at Pine Cone Preliminary P.U.D. is conditioned
upon the City of Fort Collins Stormwater Utility granting
preliminary design approval or acceptance of the new Fort Collins
High School stormwater detention pond. Since this pond, located
offsite, serves both new F.C.H.S. and Tower Shoppes., and since the
ultimate design of this pond has not yet been approved or accepted
by the City, it must demonstrate that there is adequate capacity in
the' detention pond to accommodate Tower Shoppes. If it is
discovered that there is adequate capacity in the new F.C.H.S.
pond, then Tower Shoppes is relieved of the obligation of providing
onsite stormwater detention and the P.U.D. may proceed to Final
Phase. If, however, it is discovered that there is inadequate
capacity, then Tower Shoppes P.U.D. must resubmit Preliminary
Drainage Report and Drainage and Grading Plan to the City's
Stormwater Utility demonstrating sufficient onsite stormwater
detention in compliance with current requirements. If necessary,
.—review and approval of a revised Preliminary Drainage Report and
Drainage and Grading Plan must be granted by the Stormwater Utility
prior to submittal for Final P.U.D.