Loading...
HomeMy WebLinkAboutPINECONE PUD THE TOWER SHOPPES PRELIMINARY - 60 91L - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY00 l`7 0 co J' W x MEMORANDUM To: Libby Glass, W. W. Reynolds Companies o r Eldon Ward, Cityscape Fort Collins Planning Department o Fort Collins Transportation Division From: Matt Delich Date: June 6, 1994 Subject: Tower Shoppes PUD traffic study (File: 9458MEM1) This memorandum documents the trip generation analysis conducted for the Tower Shoppes PUD, located in the northeast quadrant of the Hors etooth/Timberline intersection in Fort Collins. This site was Parcel A of the Pinecone PUD, which was considered and approved by the City of Fort Collins in 1992. This memorandum serves as an addendum to the "Pinecone PUD Site Access Study," April 1992. The Tower Shoppes PUD is a multi -use retail center that will likely be anchored by a grocery store. The remainder of the site will likely have uses that are typical of multi -use retail centers (fast food restaurants, bank, miscellaneous retail, etc.). Table 1 shows the expected trip generation from the individual uses expected at the Tower Shoppes PUD. Trip Generation, 5th Edition, ITE was used .to estimate the daily and peak hour trip generation. Based upon research, documented in Chapter VIII, Multi -Use Developments/Quantifying Capture Rates, Trip Generation, 5th Edition, the total trip z generation of the individual uses can be factored to reflect multi -purpose trips and captured trips. This is reflected in w---the line labelled "Adjusted Total." z — -- w Table 2 shows the trip generation estimates for this parcel from the cited site access study. The land use assumed for this parcel was a 100,000 square foot shopping center with • no specific uses indicated. Comparing Tables 1 and 2 o indicates that the trip generation for the specific uses is a higher than the generalized land use from the site access cc study. 0 a z Since some of the differences are significant, the cc traffic assignment (Figure 6 in the site access study) was adjusted at key intersections to reflect the trip generation LL differences. This reassignment is shown in Appendix A. Analyses were performed on these key intersections using the new traffic assignments. Table 3 shows the peak hour operation. All key intersections will operate similarly to that indicated in the site access study. Calculation forms are provided in Appendix B. 7.9E5 HCI•I: Si CN1LiiED INTERSEC71014S SUMMARY REFORT ++++x++•++xrrrrxx••++•xrxxxxxx+rrrrrxrrxxr•x•x.txxxx.rr++++.+x+++•i.++xxxx+•. INTEP.SECTION..horsetooth %timberline AREA T.YFE..... OTHEF. ANALYST....... ,i and h DATE.......... 616i 94 TIME_ ...... .`aii) am COMMENT....... ?.955 r.Ci•!: oi.Gla:.LLED TNTEREECTIOiJE SUMM.:F:V REPORT ++rxxrxrx••r•xrrx+rr•x•••++••r+rx•r•••••••rxr•x+••••••+rxrxxxxx•+x••+»++r TNTERSECTIOP1.. hor,-tocirrt /timberline AREA TYPE..... OTHE.^: / DnTE.......... 6/6�:�'974� ` T3 HE.......... am :./ COMMENT....... VOLUMES CEOMETR, VOLUMES GEOMETF:Y Er WB ND SE : EB WE NEE SD EB WB HE SB EB WE NE SB LT 415 2oi0 25C- L i2. i.i 12,' L 1=.. L 1C'.ii LT 7.10 1.95 7.40 24C! L 12.0 L 12.0 L 12.0 L 12.0 TH 480 440 77,Cl . 210 : L _ 12.i1 12.0 _ 12. L 12.0 TH 290 745 B90 11:160 L 12u T L.O L 12.0 L 1; RT 4i3O -65 205 2BO : T 12. i i T 12, r - I:!. Ci T 12. i t RT -80 7.10 165 45t, T 12. i• T 12. 0 T 12.0 T 1. P.F ii : TR 12..J '. 7.-.ii T 15.", T 17. it FF, 0 0 -, TR 12.0 R 1--.0 T 12.0 T i_:. i 12.O TF 12.G TR 1=.:. 12.0 12.O TR 12.0 TF. 12.1. 12. fl 2.v 12. it -------------------------------------------------------------------------- 12.0 12.0 12.171 1Z1. - ------------------------------------------------------------------------- ADJUSTMENT FACTORS ADJUSTMENT FACTORS GRADE HV ADJ PY.G BUSES PHF PEDS PED. BUT. ARR. TYPE GRADE HV ADJ Pi BUSES PHF REDS PED. BUT. ARR. TYPE 'Y/N Nit Nb Y/N in T (%i (i:1 V/N IJm IJb x/N min T EB ii. Of, 2. i10 N 0 C, I, nr: 20 Y 25.e - EE ..00 2.00 1J 0 C, 1.00 20 Y' 25.8 �. WE 0. 00 2. 00 N 0 0 1 . i10 2C, Y 25.0 WE Co. 00 2. 0t, N 0 0 1 . � ii � 20 Y 25. 8 NE O. Cot, �. C":) N O O 1. CP 1 20 Y 25.6 3 NE Co. Cot) 2. ili i N Co 0 1 . 00 20 Y 25.8 =. SE 0. 00 _. 00 N 1-1 O 1 . cot-, 20 'Y 25. 5 - SE -------------------------------------------------------------------------- 0. 0' i 2. 01 , N o 0 1 .00 20 Y 25.8 - ------------------------------------------------------------------------- SIGNAL SETTINGS CYCLE LENGTH = 120.0 SIGNAL SETTINGE CYCLE LENGTH = 120.0 PH-1 FH-2 F'H-- PH-4 PH-1 F'H-2 PH-- PH-4 PH-1 PH-2 PH-- PH-4 PH-1 PH-2 PH-7 PH-4 EB LT X x x NE LT X X EB LT x X ?: NE LT X X X TH I X TH X TH X: X TH x x RT X X RT x RT r X RT x x F'D X x PD x PD x is F'D x X WE LT x x SB LT x x x WE LT x .. SB LT x :X TH x TH x x TH .. TH x RT X FT .. x RT A PT x PD .. FIE, X x PD X PD GREEN -. Co -6. O 0. O GREEN 11 . C. -. to 41 . O to. v GREEN 5. 0 4. O -6. 0 0. 0 GREEN 10. 0 '. 0 42.0 YELLOW 0. 0 4.0 6. i i Co. 0 YELLOW i.:�.�.�. 4. C, 6. 0 i �, Cli ELLOW ---------_--`-----------------------'_-_-----------------------------' Co. CI 4.0 6.--) C', 0 YELLOW :i, i t A. 6 6. 0 -------------------------------------------------------------------------- LEVEL OF SSERVICE LEVEL OF SERVICE LANE CRF'. V/C G/C DELAY LOG APP. DELAY AF'F'. LOS - LANE GP.F'. V/C 6 C DELAY LOS APF. DELAY APP. LOS ED L 0. 7.4B 0.47,? 17.5 C 2i.4 C ED _ 0.717 i),4 3 17.2 C 18.2 C TF. 0. 729 0.7.87 21.7 C TR 0.554 0.-F2 18.7 C WE. L :.7-2' C'. 35. 55.9 E 28.6 D WE L 0.754 0. 342 25. D 24.0 C - V.-49 0. .25 20.4 C T 0.675 v-__25 6 C R 6. 544 i1_7.25 22.- C R 0.67.7 0.7.25 9 C NE L 0. 681 6.4-3 26.4 D 21.0 C NE L 0.679 ii:517 18.0 C 16.6 C TF, f1. 544 0.-,67 19.c. C TF: 0. St4 i�. 4--. 16. C' C SE L ii _.294 0.517 12.7 1 16.0 C. BP L. 1 -, 641 Il. 4J 25. 1 D 25. - L' TR 1:. 55c 11,425 16.;t C I TR �1_b7!1 _ V._%5 25.7. D 3NTERSECTTON: Delay = 20.7 leer_/veh) V%C = 6.641 LOS = C INTEF:SECTION: Delay = 21.4 (sec/vehi V/C = D.706 LOS = C 19E5 HCMz UNSI5NALIZED iIdTERSECTIOIdS Fage-1 r•xxxxxrr•+xxrr r:+x++•xwrx xxxxrx:wx++rxxxx+x+xwwx»+x•r+w+•+wx•++xx•w IDENTIFYING INFORMATION AVERAGE RUNNING SPEED. IFIAJOR STREET.. 40 PEAK HOUR FACTOR ..................... I AREA POPULATION ...................... Iiri!Otii, NAME OF THE EAST/WEST STREET......... access 6 NAME OF THE NORTH/SOUTH STREET....... norsetootrI NAME OF THE ANALYST .................. +md DATE OF THE. ANALYSIS (mm/ddivv)...... 61c/"4 TIME PERIOD ANALYZED.................(a Pm OTHER, INFORMATION.... INTERSECTION TYFE AND CONTROL INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES Eh Wb NE! SE ---- ---- ---- ---- LEFT O -- 1-1 THRU FIGHT 40 CAPACITY AND LEVEL -OF -SERVICE Fa4e-= --------------------------------------------------------------------- POTEid----TUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v(pcah) c (pcph) c (pcoh) c 1pcph:r c = c - v LOS p P! SH R SH MINOR STREET SE c EIGHT 99 757 757 757 65e A IDENTIFYING INFORMATION NAME OF THE EAST/WEST STREET...... access e NAME OF THE NORTH/SOUTH STREET.... horsetooth DATE AND TIME OF THE ANALYSIS..... 6/6/94 ; pm OTHER INFORMATION.... 19S5 HCM: IjNSIGNALIZED INTERSECTIONS Fane-1 riirrai.•riaii.aiiii•rsiiaiciii•ia.r•ii•••i.i.+rarri•arr••r.iar•iar.iii• IDENTIFYING INFORMATION AVERAGE RUNNING SFEED. MAJOR STREET.. 4i, PEAk: HOUR FACTOR ..................... I AREA POPULATION ...................... lOni ii �ii NAME OF THE EAST/WEST STREET......... access 6 NAME OF THE NORTH/SOUTH STREET....... norsetootr, NAME OF THE ANALYST .................. .ime DATE OF THE ANALYSIS immidd/vy)....... 6/e/94 TIME PERIOD ANALYZED ................. am Vim` OTHER INFORMATION.... INTERSECTION TYPE AND CONTROL INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES EE WE, NR SE ---- ---- ---- ---- LEFT O -- 11 THRU ii 69F -- RIGHT O 45 -- SS CAPACITY AND LtVE:--OF-SEF:VICE FaAe-- --------------------------------------------------------------------- F'OTEN- ACTUAL FLOW- TI AL. MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT vrRCPh) c lCcohl _ �. cPh) C kocph:� C = C LDS P. fM SH R SH MINOR STREET GE _ RIGHT `l4 661 661 661 56D A IDENTIFYING INFORMATION NAME OF THE EAST/WEST STREET...... access_ 6 NAME OF THE NORTH/SOUTH STREET.... horsetooth LATE AND TIME OF THE ANALYSIS..... 6/6/94 : am OTHER INFORMATION.... 1985 HCM: UNSIG14ALIZED INTERSECTIONS Pane-i r*+<.fxs♦resit♦ra.+itr+r+f.�a�.r+a+a♦s-------f-----*---------------- *-------- IDENTIFYING INFORMATION _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET.. 40 F'EAY: HOUR FACTOR ..................... 1 AREA POPULATION ...................... li�OCgiO NAME OF THE EAST/WEST STREET......... acces 7 NAME OF THE NORTH/SOUTH STREET....... horsetooth NAME OF THE ANALYST .................. .imd DATE OF THE ANALYSIS imm/dd/yyi...... 6/6194 TIME PERIOD ANALYZED. ................. �:.S pm OTHER INFORMATION.... INTERSECTION TYPE AND CONTROL --------------------------------------- ______________________________ INTERSECTION TYPE: 4-LEG MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES _____________________________________________________________________ EB WB NB SS ---- ---- ---- ---- LEFT 260 Jr. 65 40 THRU 417 7.96 ,., 10 RIGHT. 7C. 35 13,> NUMBER OF LANES AND LANE USAGE ----------------------- ______________________________________________ EB WB Iv= SB _______ _______ _______ LANES, LANNE USAGE LT 9 LT CAPACITY AND _____________________________________________________________________ LEVEL -OF -SERVICE pafle_. FOTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT vi_ecFhi c: ipcphi c 1pcphi ipcPV0 rSH c = c - v LOS _______ o ________ M _____________________ R SH ____________ --- MINOR STREET NB LEFT 72 96 52 > 62 52 -48 -2C' iF F THROUGH 7.9 151 95 95 57 > E RIGHT 22 793 793 793 77i A MINOR STREET 5B LEFT 44 113 57 62 �7 713 >E E THROUGH 11 152 96 96 85 _ RIGHT 143 GOO 5300 60C, 657 A MAJOR STREET EP LEFT 256 6a6 646 646 360 B WE LEFT 11 634 634 63:4 627. A IDENTIFYING INFORMATION NAME OF THE EAST/WEST STREET...... access 7 NAME OF THE NORTH/SOUTH STREET.... horsetooth DATE AND TIME OF THE ANALYSI5..... 6/6/94 ;(a(ye -m OTHER: INFORMATION.... 1905 HCN: UNSIGNALIZED INTERSECTIONS Page-1 tiitiiitttixittttxxxi••ttt••iixtxtt•i•ixtxt••x•xtxt.•••ttxii••t•x•..• I➢ENTIFYING INFORMATION --------------------------------------------------------------------- AVERAGE RU14NING SPEED. MAJOR STREET.. 40 PEAi:: HOUR FACTOR ...................... 1 AREA POPULATION ...................... 100000 NAME OF THE EAST/WEST STR.EET......... access 7 NAME OF THE NORTH/SOUTH STREET....... nor=_etooth NAME OF THE ANALYST .................. jmd DATE OF THE ANALYSIS (mmidd/yyi...... 6/6/94 TIME PERIOD ANALYZED _................. am I-pj OTHER: INFORMATION.... INTERSECTION TYPE AND CONTROL --------------------------------------------------------------------- INTERSECTION TYPE: 4-LEG MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN CONTROL TYPE SOUTHBOUND; STOP SIGN TRAFFIC VOLUMES --------------------------------------------------------------------- EB WB NB SE ---- ---- ---- ---- LEFT 55 30 45 50 THRU 327 663 10 1 , RIGHT 95 _, 10 60 NUMBER OF LANES AND LANE USAGE --------------------------------------------------------------------- EB WB NE SR ------- ------- ------- ------- LANES _ _ _ - LANE USAGE LT - F. L7 - F CAPACITY AND LEVEL -OF -SERVICE FaBe-- --------------------------------------------------------------------- POTEN- ACTUAL FLOI11- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT vtPcphi c (ncph) c (Pcph) c (pcph? c = c - v LOS p 11 SH F. SH ------------------------------------------------ --- MINOR STREET NB LEFT 50 Ili 89 95 89 34 39 it E THROUGH 11 157 136 > 17.6 :> 125 > D RIGHT 11 B04 004 604 793 A MINOR STREET SE LEFT 55 112 95 > 99 95 :> _7. 40 iE E THROUGH li 142 126 126 115 D RIGHT 66 695 695 695 629 A MAJOR STREET EB LEFT 61 403 403 463 422 A WB LEFT 652 652 652 bill A I➢ENTIFYING INFORMATION NAME OF THE EAST/WEST STREET...... access 7 NAME OF THE NORTH/SOUTH STREET.... horsetooth DATE AND TIME OF THE ANALYSIS..... 6/6/94 ; am ,.pm OTHER INFORMATION.... It is recommended that northbound right -turn and southbound left -turn auxiliary lanes be built on Timberline Road accessing the Tower Shoppes parcel. Due to physical constraints, the northbound right -turn lane should be 120 feet plus 90 feet of taper. The southbound left -turn lane on Timberline Road should be 300 feet long with 90 feet of taper. It is concluded that the Tower Shoppes PUD is in general conformance with the overall intent of the "Pinecone PUD Site Access Study." With the higher trip generation, all key intersections will operate similarly to that indicated in the site access study. Land Use TOWER SHOPPES Grocery - 73.1 KSF Misc. Retail - 20.9KSF Fast Food - 2.5 KSF Fast Food - 2.5 KSF Bank - 5.5 KSF Total Adjusted Total Table 1 Trip Generation Daily A.M. Peak P.M. Peak Trips Trips Trips Trips Trips in out in out 9170 103 44 385 232 850 64 70 59 44 1580 71 66 47 44 1580 '71 68 47 44 1120 26 18 79 89 14300 335 268 617 453 13160 241 193 469 344 Table 2 Trip Generation From Pinecone Site Access Study Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips -Trips in out in out Parcel A - 100,000 KSF 7430 122 53 305 318 Table 9 Long Range Peak Hour Operation Level of Service Intersection AM PM Intersection #4 WB RT A A SB LT B C Intersection #5 (signal) C C Horsetooth/Timberline Intersection #6 SB RT A A Intersection #7 NB LT/T F (D/E) E (D) NB RT A A SB LT/T E (D) E (D) SB RT A A EB LT B A WB LT A A (") Level of service considering vehicle delay, based upon recent research. APPENDIX A LLt t r P, 24 � (o S131 0 N 4401 4c Ic s C TO-OT 4 ?0/,z '? o 4-001.3 BO 40 -07 1d) Q) 0/110 APPENDIX B I cES HC!•i: Uj,!S i.GNA_ I ZED Ii•!TE^EE="I DIN=. F�ae-I ..+rr------a---•--a--------------•--------------*----------- IDEHTIF', INC3 INFORMAT IOPI --------------------------------------------------------------------- AVERAGE RUNNING SFEED, lli,JDF: STREET.. F'EAl: HOUR: FACTOR ..................... AREA FOFULAT 101,1 ...................... Ini it NAME OF THE EAST/WEST 'STREET......... NAME OF THE NnF.TH/SOUTH STREET....... timberline NAME OF THE ANALYST .................. .imd E•ATE OF THE ANALYSIS imm/ddivy)...... 6i6/G? TIME PEF:IOD ANALYZED .................: 89Q. Pa: OTHER. INFORMi,71ON.... INTERSECTION TYFE AND CONTROL --------------------------------------------------------------------- INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: NORTH. -SOUTH CONTROL. TYPE EASTBOUND: STOP SIO TRAFFIC VOLUMES EB WE NB- SB ---- ---- ---- ---- LE=T i' -- I()r p THRU -- 524 55c RIGHT 7, -- ,i NUMBER: OF LANES EB WE, Pl+ ------- -------------- ----- LANE' _ -- - - CAF'ACIT',' Ani6 LEVEL-OF-EEF:VA_E F'ene --------------------------------------------------------------------- PnTEPi- ACTUAL FLOW- TI. AL MOVEMENT SHARED RESERVE FATE CAFACITI' CAF'ACIT'i CAP.:CITx CAPACITY MOVEMEItiT y(PC Ph) c. ,: Pcpn) c iP-pn) c ipcnh) c c - v LDS P ri SH MINOR. STREET - FF RIGH 77 675 675 675 599 A MANOR STREET NEB LEFT Ilia 492 492 A92 IDENTIFYINe INFORMATION NAME OF THE EAST/WEST STREET...... access 4 NAME OF THE NORTH/SOUTH STREET.... timberline � DATE AND TIME OF THE ANALYSIS..... 6/61-4 ; . cm OTHER INFOF�MATION.... 1SS5 HCM: UNSIGiJALi ZED INTERSECTIONS. x••••.x••x•••x...r++••s�.•••x------•x••••+ra•.------- IDENTIFYING INFORMATION AVERAGE RUNNING SPEED. MAJOF. STREET.. 45 PEAK HOUR FACTOF:..................... 1 AREA POPULATION ..................... NAME OF THE EAST%NEST STREET......... access_ 4 NAME OF THE NORTH/SOUTH STREET....... timberline NAME OF THE ANALYST .................. amd DATE OF THE ANALYSIS mm/dd,yyi...... 6/6i P4 TIME PERIOD ANALYZED ................. am OTHER INFORMATION.... INTERSECTION TYPE AND CONTROL INTERSECTION TYPE: T-INTERSECTION MAJOR. STREET DIRECTION: NORTH/SOUTH CONTROL TYPE EASTBOUND: STOP SIGN TRAFFIC VOLUMES ___________________________________ EP 4!E NB SE ---- ---- ---- ---- LEFT P __ 126 0 THRU -- 556 ?0. RI6HT 80 -- 0 110 NUMEER LANES L'AP'i;CIT`;' AND LEVEL-OF-SEF:VICE F ape-- FF'OTEN- AC':"UAL FLOW- TIAL MOVEMENT SHAPIED RESERVE "RATE CAPAC 1TY CAPACITY CAP AC ITV CAFF'ACIT'i MOVEMENT vipcphi c (Pcoh] c rpconi f_ rpcehi c SH R SH MIiJOR STREET F_ RIGHT 8E 605 605 605 517 MAJOR STREET NB LEFT 132 384 64 7.4 25- C IDENTIFYING INFORMATION NAME OF THE EAST/WEST STREET...... access 4 NAME OF THE NORTHi SOUTH STREET.... timberline m DATE AND TIME OF THE ANALYSIS..... 6i6/94 am C J OTHER INFORMATION.... J