Loading...
HomeMy WebLinkAboutPINECONE PUD THE TOWER SHOPS FINAL - 60 91M - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTCheeksheet Tower Shoppes Final PUD The following check sheet is to be used in the preparation of a complete submittal of a Final PUD Plan: X 1. Application (1 copy). X 2. Filing fee ($2,808.00 + $1,088.00 (plat) + $10.00 (1 sheet to the plat) _ $3,906.00) X 3. Site plan (25 folded copies). X 4. Landscape plan (16 folded copies). X 5. Final subdivision plat (21 folded copies). X 6. Utility plans (10 unfolded copies). X 7. Final drainage report and plans and grading plans (4 copies). X 8. Other documentation as determined by special circumstance. Land Use Breakdown (2 copies). Legal Description (2 copies). All Development Criteria (3 copies). Soils Report (3 copies). Elevations (5 copies). 4.16