HomeMy WebLinkAboutMOSAIC CONDOS - PDP200003 - SUBMITTAL DOCUMENTS - ROUND 3 - OTHER WATER AND OR SANITATION DISTRICTS3201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org
April 6, 2020
Brandi Bethurem Harras
City of Fort Collins Planning
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Case Number: PDP 200003
Title: East Ridge Fifth Filing -Mosaic Condominiums
Engineering/Survey: Galloway
Engineer Contact:
Parcel Number(s):
Boxelder Sanitation District (BSD) has reviewed the Preliminary Development Plan identified
as:
Preliminary Utility Plans for 14 condo buildings with a total of 112 units.
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of ______________.
Comments:
1) Plat – Provide a place for Boxelder to sign to assure that the Utility Easements
include the BSD sewers.
2) On the south end of the site the BSD sewer is located within an easement. In this
area and all weather access road needs to be provided to allow for BSD truck to
access the west road. The access should be designed with the same geometry
required for firefighting apparatus. The road needs to be shown throughout all the
drawings for this project. Include signage that no parking is allowed on the access
road.
3) Sheet C3.2 Provide all BSD standard details appropriate for this project including
manholes and bedding details
4) Provide Sanitary Sewer profiles that include all utility crossings.
5) Remove BSD approval block from sheets that do not have any applicable utility
information.
The District has adequate capacity to service the property referenced above. The District is
in full compliance with federal and state water quality requirements. Please feel free to
contact me if you have any questions.
Sincerely,
Brian Zick, P.E.
District Manager