Loading...
HomeMy WebLinkAboutDAKOTA RIDGE PUD THIRD FILING FINAL - 60 91L - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet r The following check sheet is to be used in the preparation of a complete submittal of a Final PUD Plan: 1. Application form (1 copy). 2. Filing`Fee: $2,808.00 + 510.00 per sheet of subdivisi plat 3. Site plan (25 folded copies). 4. Landscape plan (16 folded copies). ate_ 5. Final subdivision plat (21 folded copies). 6. Final utility plans (10 unfolded copies). 3 7. Final drainage report and plans and grading plans (4 copies). 8. Other documentation as determined by special circumstances. 9. Signage (Circle size) Large Small S.F. 100 or more D.U. S.F. up to 100 D.U. M.F. 100 or more D.U. M.F. up to 100 D.U. Non -Res 50,000 S.F. or more Non -Res 25,000-50,000 S.F. Non -Res w/ regional impact All other projects not listed el 4.16