HomeMy WebLinkAboutDAKOTA RIDGE PUD THIRD FILING PRELIMINARY 9.26.94 P AND Z BOARD HEARING - 60 91K - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 12
MEETING DATE 9-26-94
STAFF Steve Olt
PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Dakota Ridge P.U.D., Filing No. 3, Preliminary -
#60-91K
APPLICANT: CDL Partnership
2412 Rolling Wood Lane
Fort Collins, CO. 80525
OWNER: Same As Applicant
PROJECT DESCRIPTION:
This is a request for 74 single family lots on 20.73 acres located
north of East Horsetooth Road and east of Timberline Road. The
property is in the RP, Planned Residential Zoning District.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This request for preliminary P.U.D. approval:
* Is in conformance with the Pinecone P.U.D., Overall
Development Plan that was approved on April 27, 1992;
* scores 60% on the Residential Uses Density Chart in the
Land Development Guidance System, which supports the
proposed gross residential density of 3.57 dwelling units
per acre;
* meets the applicable All Development Criteria in the Land
Development Guidance System;
* requires a variance to the City's adopted Solar
Orientation Ordinance. Staff is recommending approval of
the variance request.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
V • � \ VY Y �
Activity A: ALL DEVELOPMENT CRITERIA,
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
applicable?
Will the criterio
tw satisfied?
If no, please explain
a 4 a u
O LL = 4
a �
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
1.2 Comprehensive Plan
1.3 Wildlife Habitat
1.4 Mineral Deposit
1..5 Ecologically Sensitive Areas
reserved
reserved
1.6 Lands of Agricultural Importance
1.7 Energy Conservation
1.14
1.8 Air Quality
-
✓
1.9 Water Qualitv
1.10 Sewage and Wastes
1.12 Residential Density
A 2. NEIGHBORHOOD COMPATIBILITY CRITERIAI
2.1 Vehicular, Pedestrian, Bike Transportation
I
✓�
2.2 Building Placement and Orientation
2.3 Natural Features
I ✓1,
2.4 Vehicular Circulation and Parking
V1
V/
2.5 Emergency Access _
2.6 Pedestrian Circulation
2.7 Architecture
2.8 Building Height and Views
2.9 Shading
-2.10-Solar Access
2.11 Historic Resources
2.12 Setbacks
V1
I
I/
2.13 Landscape
2.14 Signs
2.15 Site Lighting
,/
2.16 Noise and Vibration
t/
,/,
2.17 Glare or Heat
2.18 Hazardous Materials
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
3.2 Design Standards
3.3 Water Hazards
3.4 Geologic Hazards
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised ch 1994
-61-
f UcE��
ATTACHMENT "B".
ACTIVITY:
Residential Uses
DEFINITION:
J79
All residential uses. Uses include single family attached dwellings, townhomes, duplexes, mobile homes,
and multiple family dwellings; group homes; boarding and rooming houses; Paternity and sorority
houses; nursing homes; public and private schools; public and non-profit quasi -public recreational uses
as a principal use; uses providing meeting places and places for public assembly with incidental office
space; and child care centers.
CRITERIA:
The following applicable criterion must be answered "yes" and
implemented within the development plan.
1. DOES THE PROJECT EARN THE MINLMUM PERCENTAGE
POINTS AS CALCULATED ON THE FOLLOWING "DENSITY
CHART" FOR THE PROPOSED DENSITY OF THE RESIDENTIAL
PROJECT? The required earned credit for a residential project shall be
based on the following:
60 percentage points
60 - 70 percentage points
70 - 80 percentage points
80 - 90 percentage points
90-100 percentage points
100 or more percentage points
6 or fewer dwelling units per acre
6 - 7 dwelling units per acre
7 - 8 dwelling units per acre
8 - 9 dwelling_units per acre
9-10 dwelling units per acre
10 or more dwelling units per acre
Yet No
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised August 1994
N/A
n
-78-
W
Q
m
DENSITY CHART
Criterion Maximum Earned
Credit Credit
CI 2000 feet of an existing or accroved neighborhood shopping center; or
_ _ _ _ _ _ _ _ _ _ _ 2090
2000 feet of an approved b . .:a constructed neighborhood shopping center — —' —' " — —
1090
b 650 feet of an existing transit stop (applicable only to projects having a density of at least six (6] dwelling
20% units per acre on a gross acreage basis)
C
4000 feet of an existing or approved regional
shopping center 10%
Ci
3500 feet of an existing neighborhood or community park; or
_ _ _ _ _ _ _ _ _ _ 2090
3500 feet of a publicly owned bur not developed, neighborhood or community— —"
""'
e
park 1090
2500 feet of an existing school, meeting all requirements of the State of Colorado compulsory education 10%
f
laws
3000 feet of a major employment center
D
g
209,
1000 feet of a child care center
O
5%
h
"North" Fort Collins
zo90
j
The Central Business District
2090
A project whose boundary is contiguous to existing urban development Credit may be earned as follows: "' -F
096 For projects whose property boundary has 0 - 10% contiguity;
10 - 15% For projects whose property boundary h10 - 20% contiguity;
k If it can be demonstrated that the project will reduce non-renewable energy usage either through the application of
alternative energy systems or through committed energy conservation measures beyond those normallrequired by
City Code, a 3% bonus may be earned for every 5% reduction in energy use.
j Calculate a 1% bonus for every 50 acres included in the project
m Calculate the percentage of the total acres in the project that are devoted to recreational use. Enter 1/2 of that
percentage as a bonus.
n If the applicant commits to preserving permanent off -site open space that meets the City's minimum requirements,
calculate the percentage of this open space acreage to the total development acreage and enter this percentage as a
bonus. ,
O If pan of the total development budget is to be spent on neighborhood public transit facilities which are not
otherwise required by City Code, enter a 2% bonus for every S 100 per dwelling unit invested.
p If pan of the [oral development budget is to be spent on neighborhood facilities and services which are not otherwise
required by City Code, enter a 1% bonus for every S100 per dwelling unit invested.
q If a commitment is being made to develop a specified percentage of the total number of dwelling units for low
income families, enter that percentage as a bonus, up to a maximum of 30%.
If a commitment is being made to develop a. specified percentage of the total number of dwelling units for Type "A"
_ -and Type "B" handicapped housing as defined by the City of Fort Collins, calculate the bonus as follows:
Type "A" .5 x Tvne "A" Uni rs ---
Total Units
Type "B" 1.0 x Tyre "B"Units
In no case shall the combined bonus be greater than 3090
Total Units
If the site or adjacent property contains a historic building or place, a bonus may be earned for the following:
3% For preventing or mitigating outside influences adverse to its preservation (e.g. environmentaL land
use, aesthetic, economic and social factors);
3% For assuring that new strictures will be in keeping with the character of the building or place, while
avoiding total units;
3% For proposing adaptive use of the building or place that will lead to its continuance, preservation. and
improvement in an appropriate manner.
Continued
Land. Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised August 1994
-79-
DENSITY CHART (continued)
Criterion
t If a portion or all of the required parking in the multiple family project is provided underground, within the
building, or in an elevated parking structure as an accessary use to the primary structure, a bonus may be earned as
follows:
9% For providing 75% or more of the parking in a structure;
6% For providing 50 - 74% of the panting in a structure;
N 3% For providing 25 - 49% of the parking in a structure.
Z U If a commitment is being made to provide approved automatic fire extinguishing systems for the dwelling units,
enter a bonus of 10%.
mV If the applicant commits to providing adequate, safe and convenient pedestrian and bicycle connections between the
project and any of the desination points described below, calculate the bonus as follows:
5% For connecting to the nearest existing City sidewalk and bicycle pathAane;
5% For connecting to any existing public school, pant and transit stop within the distances as defined in this
Density Chart;
5% For connecting to an existing City bicycle trail which is adjacent to or traverses the project
TOTAL
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised August 1994
- 79a -
Credit
(Pa
Utility � __vices
Stormwater
City of Fort Collins
TO: Steve Olt, CPES Planner
FROM: Basil Y. Hamdan, Stormwater Utility 'Fi13 /-/,
RE: Dakota Ridge Filing 3, Preliminary submittal
The Stormwater Utility has reviewed the updated Overall Drainage
Plan for the Pinecone Development area submitted to us on
September 7 th 1994. The 3 rd Filing of Dakota Ridge lies within
this general drainage area, referred to here as the Pinecone, and
this update to the Pinecone Overall Drainage Plan was required by
the Stormwater Utility to assess the changes that have occurred
since the original plan was submitted (in 1992) and what impacts
these changes might have on drainage within the proposed
development of Dakota Ridge Filing 3.
After a preliminary review of this Overall Plan update it is
concluded that no detention would be required within the 3rd
Filing site. While this allows the development to proceed
through the approval process from a drainage standpoint, it is
important that the plan comply to all parameters established
within that Overall Drainage Plan update. These parameters
include density (or imperviousness), which determines the amount
of runoff generated within this development. If you have any
further questions or clarifications please do not hesitate to
contact me at 221 6589.
235 Mathews • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6589 • FAX (303) 221-6239
Dakota Ridge PUD, 3rd Filing - Preliminary, #60-91K
September 26, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Backarou
The surrounding zoning and land uses are as follows:
N: Not zoned; C.S.U. Agronomy Farm
S: RP; existing single family residential, City
neighborhood park (Dakota Ridge, 2nd Filing)
E: Not zoned; C.S.U. Agronomy Farm
V: RP; existing multi -family residential, City
neighborhood park•(Pinecone Apartments)
The property was annexed into the City with the Blue Spruce Farm
Annexation in October, 1987.
The Pinecone P.U.D., Overall Development Plan was approved on April
27, 1992, designating this site as "Low Density Residential".
2. Land Use:
This is a request for 74 single family lots on 20.73 acres located
north of East Horsetooth Road and east of Timberline Road. It was
evaluated against the Residential Uses Density Chart and the
applicable All Development Criteria of the Land Development
Guidance System. It scores 60% on the Density Chart, earning points
for a) being within 3,500 feet of a publicly owned,. but not
developed, neighborhood park (Case Park); b) being within 2,500
feet of an existing school (new Fort Collins High School); c)
being within 3,000 feet of a major employment center (Platte River
Power Authority, NCR); and d) its property boundary having 30%
contiguity to existing urban development. The Density Chart
supports the proposed gross residential density of 3.57 dwelling
units per acre.
The Dakota Ridge P.U.D., Filing No. 3, Preliminary is in
conformance with the approved Pinecone P.U.D., Overall Development
Plan, which designates this site as "Low Density Residential".
3. Design:
Signage:
This site is located within the Residential Neighborhood Sign
District and all aspects of any proposed signage will be regulated
by the City's Sign Code.
Solar Orientation:
Only 23 of the 74 lots, equalling 31%, meet any of the definitions
Dakota Ridge PUD, 3rd Filing - Preliminary, #60-91K
September 26, 1994 P & Z Meeting
Page 3
of a solar -oriented lot in the Solar Orientation Ordinance. All
Development Criterion A-1.1 in the Land Development Guidance System
requires that at least 65% of the lots less than 15,000 square feet
in area in single- and two-family residential developments conform
to the definition of a "solar -oriented lot" in order to preserve
the potential for solar energy usage. When permitted, the Planning
and Zoning Board may authorize variances under Article V. Division
1. Section 29-627 of the City Code upon its finding that the
following requirements in (1), (2), or (3) have been satisfied:
(1) That by reason of exceptional topographical, soil or
other subsurface conditions of other conditions peculiar
to the site, hardship would be caused to a subdivider by
the strict application of any provisions of this Article.
Such variances shall not be granted if it would be
detrimental to the public good or impair the intent and
purposes of this Article. The decision of the Planning
and Zoning Board on any application for variance shall be
set forth in writing in the minutes of the Board.
(2) That by reason of exceptional conditions or difficulties
with regard to solar orientation or access, hardship
would be caused to a subdivider by the strict application
of any provisions of this Article. Such variances shall
not be granted if the same would be detrimental to the
public good or impair the intent and purposes of this
Article. The decision of the Planning and Zoning Board on
any application, for variance shall be set forth in
writing:in-.the minutes of the Board.
(3) The applicant demonstrates that the plan as submitted is
equal to or better than such plan incorporating the
provision for which a variance is -requested. __ _
(4) That the granting of a variance from the strict
application of any provision would result in a
substantial benefit to the City by reason of the fact
that the proposed project would help satisfy a defined
need (such as affordable housing or historic
preservation) or would alleviate an existing problem.
(such as traffic congestion or urban blight), and the
strict application of such a provision would render the
project practically unfeasible.
A request for a variance to the solar ordinance has been made by
the applicant for the following reasons:
1) Dakota Ridge P.U.D., Filing No. 3 is the final parcel of
the overall Development Plan.
Dakota Ridge PUD, 3rd Filing - Preliminary, #60-91K
September 26, 1994 P & Z Meeting
Page 4
2) There are site constrictions imposed by the lot layout
and street configurations of the existing Dakota Ridge
P.U.D., Filing No. 2 and Pinecone Apartments P.U.D. with
the need to connect into those existing street networks.
3) The layout of this filing is constricted on the northwest
by the Fort Collins Tributary Channel and on the south by
the City of Fort Collins Neighborhood Park.
Staff has determined that, due to the constrictions imposed by the
lot layout and street configurations of the adjacent developments
and the somewhat linear configuration of this development,
exceptional conditions or difficulties with regard to solar
orientation or access exist and a hardship would be caused to this
subdivider by the strict application of any provisions of this
Article. Staff is, therefore, recommending approval of the
applicant's request for a variance to the Solar Orientation
Ordinance, based on the conclusion that this request satisfies
requirement (2).
4. Transportation:
This filing of Dakota Ridge will be accessed from Red Mountain
Drive, to the southeast, and Pinecone Circle, to the west.
5. Storm Drainage:
The Stormwater Utility has reviewed an updated overall drainage
plan for the Pinecone Development area that was submitted to the
City on September 7, 1994. The Dakota Ridge P.U.D., Filing No. 3
lies within this general drainage area (referred to here as
-Pinecone) and this update to the Pinecone Overall Drainage Plan was
required by the Stormwater Utility to assess the changes that have
occurred since the original drainage plan was submitted in 1992 and
what impacts these changes might have on the drainage within the
proposed development known as Dakota Ridge P.U.D., Filing No. 3.
After a preliminary review of this overall drainage plan update,
the Stormwater Utility has concluded that no detention would be
required within the 3rd Filing site. While this allows the
development request to proceed through the Preliminary P.U.D.
approval process from a drainage standpoint, it is important that
a future Final P.U.D. plan comply to all the parameters established
within the Pinecone Overall Drainage Plan update. These parameters
include project density (imperviousness), which determines the
amount of runoff generated within this development. The proposed
gross residential density of 3.57 dwelling units per acre for the
Dakota Ridge P.U.D., Filing No. 3 is within the acceptable
parameters of the Pinecone Overall Drainage Plan update.
Dakota Ridge
September 26,
Page 5
PUD, 3rd Filing - Preliminary, #60-91K
1994 P & Z Meeting
FINDINGS of FACT/CONCLUSIONS:-
In evaluating the request for the Dakota Ridge P.U.D., Filing No.
3, Preliminary, staff makes the following findings of fact:
* It is in conformance with the approved Pinecone P.U.D.,
Overall Development Plan, which designates this site as
"Low Density Residential".
* It scores 60% on the Residential Uses Density Chart in
the Land Development Guidance System. The Density Chart
supports the proposed gross residential density of 3.57
dwelling units per acre.
* It meets the applicable All Development Criteria in the
Land Development Guidance System.
* The project is located within the Residential
Neighborhood Sign District and all aspects of any
proposed signage will be regulated by the City's Sign
Code.
* The proposed gross residential density of 3.57 dwelling
units per acre for the Dakota Ridge P.U.D., Filing No. 3
is within the acceptable parameters of the Pinecone
Overall Drainage Plan update.
RECOMMENDATION:
Staff recommends approval of the Dakota Ridge P.U.D., Filing No. 3,
-Preliminary - #60-91K.
Staff is recommending approval of the applicant's request for a
variance to the Solar Orientation Ordinance, based on the
conclusion that this request satisfies requirement (2) of the
variance Procedures in the Land Development Guidance System.
.1AI:(•lrA-10Oki IBiel =0101•
DAKOTA RIDGE P.U.D. FILING NO. 3
Planning Objectives
This proposed development is commensurate with the Pinecone Overall Development Plan and
meets all applicable City Land Use Policies. Due to the limited size of the development, and
the adjacent school site, no open space (public or private) is planned.
The density chosen is commensurate with the. adjacent developments, Dakota Ridge, P.U.D.
Filing No. 2 on the East, Pinecone Apartments on the west, and the new Fort Collins High
School to the south. The land to the north is owned by Colorado State University and is
currently agricultural.
A completed "Activity A .Chart" is attached hereto.
ACTIVITY A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the Criteria
Applicable?
Will the
criteria be
satisfied
If no, please explain
Pre
Final
N/A
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
X
X
Site Geometry
Constraints
1.2 Comprehensive Plan
X
X
1.3 Wildlife Habitat
X
1.4 Mineral Deposit
X
1.5-Ecologically Sensitive Areas
reserved
1.6 Lands of Agricultural Importance
reserved
1.7 Energy Conservation
X
X
1.8 Air Quality
X
1.9 Water Quality
X
X
1.10 Sewage and Wastes .
X
X
A2. NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular Pedestrian, Bike
Transportation
X
X
2.2 Building Placement and Orientation
X
X
2.3 Natural Features
X
X
2.4 Vehicular Circulation and Parking
X
X
2.5 Emergency Access
X
X
2.6 Pedestrian Circulation
X
X
2.7 Architecture
X
2.8 Building Height and Views
X
X
2.9 Shading
X
X
2.10 Solar Access
X
X
2.11 Historic Resources
X
2.12 Setbacks
X
X
2.13 Landscape
X
2.14 Signs
X
ACTIVITY A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the Criteria
Applicable?
Will the
criteria be
satisfied
If no, please explain
Pre
Final
N/A
Yes
No
2.15 Site Lighting
2.16 Noise and Vibration
X
X
X
X
2.17 Glare or Heat
X
2.18 Hazardous Materials
X
A3. ENGINEERING CRITERIA
3.1 Utility Capacity
X
X
3.2 Design Standards
X
X
3.3 Water Hazards
X
3.4 Geologic Hazards
X