June 22, 1994
Chuck Betters
CDL Partnership
2412 Rollingwood Lane
Fort Collins, CO. 80525
Dear Chuck,
Staff has reviewed your documents for the Dakota Ridge, Third
Filing - Final that were submitted to the City on June 6, 1994, and
would like to offer the following comments:
1. A copy of the comments received from U.S. West is attached to
this letter.
2. Both Shavano Court and Milner Court street names exist in
Livermore, with the same hundred blocks. For City/County
Emergency Services 'dispatching purposes clarity needs to be
maintained.
3. The Stormwater Utility has stated that this project cannot
proceed without the Pinecone O.D.P. update that is still
outstanding. This update could determine whether this site
will require detention or not and could significantly alter
the site layout. Without the completed O.D.P. update this site
cannot be recommended for even preliminary approval by the
Planning and Zoning Board. Please address the comments that
were given as part of their preliminary review of this project
in your future submittal to them.
Also, how does this site impact the park site from a drainage
standpoint? This needs to be clearly defined. Enough contours
and grading must be provided to show how the park site and
Dakota Ridge, Third Filing is affected. The updated O.D.P.
will show how the park site will drain. Please contact Glen
Schlueter or Basil Hamdan with questions about the storm
drainage concerns. They can be reached at 221-6589.
4. Lots 35 through 39 fall along the Foothills Basin drainage
channel. The developer needs to contact the Natural Resources
Department regarding a possible need for a transition zone
between the development and this drainage channel. Please
contact Rob Wilkinson at 221-6288 to discuss their concerns.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80571-0580 • (303) 221-6730
Please contact me at 221-6750 if you have questions or concerns
related to these comments. I will be out of my office from June
30th to July llth. I am certain that any of the other planners
would be able to assist you should you have questions during my
absence.
Sincerely,
Azo*
Steve Olt
Project Planner
xc: Bob Blanchard, Chief Planner
Kerrie Ashbeck
Advance Planning
Stormwater Utility
Transportation
Parks & Recreation
TST Engineers
file/Project Planner