June 24, 1993
C.D.L. Development
c/o Chuck Betters
375 East Horsetooth Road
Fort Collins, CO. 80525
Dear Chuck,
Staff reviewed your submittal for Dakota Ridge P.U.D., Second
Filing - Final at their regularly scheduled Interdepartmental
Meeting on June 21, 1993, and would like to offer the following
comments at this time:
1. U.S. West has stated that the north arrow on the final
subdivision plat does not match the north arrow on the
preliminary subdivision plat (nor is it consistent with the
Final Site & Landscape Plan). They will require the following
utility easements in addition to those shown on the
subdivision plat:
a) along the north property lines of Lots 150 & 151,
b) along the side property line between Lots 159 & 160,
c) along the side property line between Lots 54 & 55, and
d) along the rear property lines of Lots 51 & 52.
A copy of the U.S. West comment sheet is attached to this
" letter. - -
2. North should be to the right of the sheets on the subdivision
plat, not up as shown.
3. Wally Muscott, the City Surveyor, has indicated that there are
many problems with the final subdivision plat. Please contact
Wally at 221-6588 to discuss the concerns.
4. Mark Taylor of the Water/Wastewater Department has indicated
that his comments have been forwarded to your engineer with
the red -lined check set of utility plans. Mark can be reached
at 221-6681 if there are any questions pertaining to water and
sanitary sewer services.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
A
1'
5. The Stormwater Utility has very significant concerns about
this project and wants to have a meeting with the developer,
Parks & Recreation, Larry Odau (builder), and the Planning
Department as soon as possible. Steve Olt, the project
planner, will be scheduling this meeting. Please contact him
at 221-6750 with available times for this meeting. A copy of
Stormwater's comment sheet is attached to this letter, as well
as a red'=lined Final Site & Landscape Plan that should be
returned to Planning when revisions have been made. Kate
Malers of the Stormwater Utility is your contact person and
can -be reached at 221-6589.
6. Two fire hydrants should be added; at the corner of Wetterhorn
Drive and Willow Creek Drive, and at Lots 25 & 26.
7. State on the plans who will maintain the 20' wide utility &
pedestrian easement behind Lots 1 through 7 and the detention
pond. Will there be a Homeowner's Association in this
development? Is the developer building a paved
pedestrian/bicycle walk? A cross section on the Site &
Landscape Plan of this area would be helpful. A section
apparently is shown on the utility plans.
8. The street tree spacing along Red Mountain Drive varies from
60' to 901. This should be more consistent and be closer to
40' on -center. There is a detached sidewalk along Creekstone
Drive where street trees should be provided. Also, one street
tree per lot is recommended by the City and should be
indicated on the Final Site & Landscape Plan. The note
."Trees will be planted in the curb areas along the east
side of Red Mountain Drive and Creekstone Drive as shown.
Trees will be maintained by the City of Fort Collins. Ground
cover in these areas will be planted and maintained by the
adjacent homeowners"... should be added to the Final Site &
Landscape Plan. This note is consistent with a note on the
Dakota Ridge, First Filing plans.
9. The final subdivision plat needs to show the solar lots and
address the solar orientation compliance (number and by
note or legend.
10. Do Lots 160 through 166 already have existing curb, gutter,
and sidewalk on their side of Creekstone Drive? If so, please
label as existing.
11. There are sight distance concerns associated with several of
these lots that must be addressed. Please contact Kerrie
Ashbeck of the Engineering Department to discuss these
concerns. Kerrie can be reached at 221-6750: Is Lot 63
buildable with the sight easement as shown?
12. A fencing detail and guidelines should be included on the
Final Site & Landscape Plan.
13. Lots 166 (167) through 169 (170) should be renumbered on the
Final Site & Landscape Plan to be consistent with the
subdivision plat.
14. The pedestrian path shown along the south property line (and
across the detention pond at the southeast corner) must be
continued north along the east property line and connect to
Willow Creek Drive between Lots 19 & 20 and/or 28 & 29.
15. Plant Note 4 should read "A Free Permit must be obtained from
the City Forester...".
16. How is Plant Note 6, referring to plant quality and quantity
going to end? Presently it is just left dangling.
17. What areas are included in the private open space and the
common open space as referred to in the PROJECT STATISTICS
table?
18. Two questions about the Planning Objectives:
* Under Access & Circulation - shouldn't that read "Red
Mountain Drive, which gives primary access to Dakota
Ridge 2nd Phase from Horsetooth Road;"?
* Under Land Use Policies - shouldn't the Policy 79
paragraph read "within walking distance to planned high
school..."? .l
This completes the review comments at this time. Additional
comments may be forthcoming as the various departments and
reviewing agencies continue to review this request. Please be aware
of the following dates and deadlines to assure your ability to stay
on schedule for the July 26, 1993 Planning and Zoning Board
hearings — - --- —
Plan revisions are due July 7, 1993 by 12:00 noon. Please contact
me for the number of folded revisions required for each document.
PMT's, renderings, and 8 folded copies of final revisions (for the
Planning and Zoning Board packets) are due July 19, 1993.
Final documents (including the signed development agreement,
applicable mylars and utility plans) are due July 22, 1993 by 12:00
noon.
Please contact me at 221-6750 if you
related to these comments. I would lik
you as soon as possible, if necessary,
S' rely,
t 1
roject Planner
xc: Kerrie Ashbeck
Sherry Albertson -Clark
Advance Planning
Stormwater Utility
Transportation
Parks & Recreation
Jim Sell, Jim Sell Design
TST, inc.
file/Project Planner
e
have questions or concerns
to schedule a meeting with
to discuss these comments.