Loading...
HomeMy WebLinkAboutDAKOTA RIDGE PUD FIRST FILING FINAL - 60 91E - CORRESPONDENCE - TRANSPORTATION ISSUE#! a PARSONS & ASSOCIATES CONSULTING ENGINEERS July 22, 1992 Ms. Rita Davis Traffic Engineering City of Fort Collins 281 Mathews Fort Collins, Colorado 80521 RE: Dakota Ridge 1" Filing - Bike Trail Maintenance Our Project Number: 92.08 PIN Dear Rita: As a result of our discussions on the Pinecone Overall Development Plan (ODP) we have modified the roadway and bikeway systems within the proposed Pinecone Development. The major change was the creation of a connection to the south through the Stoneridge Project. This connection, known as Willow Creek Drive, will be a local street section, 36' wide in a 54' right-of-way, with vertical curb and gutter, a landscaped section and an eight foot wide detached bike trail. The bike trail, like the roadway connection to the south, is intended to provide a more direct access between the proposed Pinecone Park and Caribou Drive. This. bike trail runs approximately 800 feet through our site along the southwesterly side of Willow Creek Drive. We would like to propose that this section of bike trail be maintained by the City of Fort Collins in conjunction with normal city street maintenance proposed in this area. We feel that this is an appropriate request for the following reasons. 1. The bike trail functions as a regional collector of'bicycle traffic and carries traffic between public improvements including regional parks and schools. 2. The extensive trail system proposed as part of the Pinecone ODP was intended to decrease the size of roadway improvements and to reduce traffic intensity on the street system. Both changes will reduce the normal maintenance required on the street system over what could normally be expected in a similar residential neighborhood without detached bike trails. 3. The proposed eight (8) foot wide detached concrete trail system will require much less maintenance than its asphalt counterpart and have a much longer design life. • 432 Link Lane Plaza • Ft. Collins, Colorado 80524 • [303) 221-2400 July 22, 1992 Page 2 of 2 Bike Trail Maintenance 4. The residential development within the Pinecone ODP is being completed without a Homeowner's Association. There exists no mechanism which would be available to maintain this segment of the bike trail. Rita, the proposed extensive bike trail system within the Pinecone P.U.D. will result in reduced street maintenance costs for this area. We feel that a portion of these savings could be used to maintain this short segment of bike trail system. We look forward to discussing this request with you and the street department in the near future. Please feel free to contact me should you have additional questions. Sincerely, f Couc , P.E. roject Manager JWC/gbl cc: Ted Shepard, Planning Department, City of Fort Collins Chuck Better, CDL Partnership