HomeMy WebLinkAboutDAKOTA RIDGE PUD FIRST FILING FINAL - 60 91E - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSf PARSONS & l- ASSOCIATES CONSULTING ENGINEERS July 1, 1992 Mr. Ted Shepard Planning Department City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522 RE: Dakota Ridge P.U.D. First Filing - Final Comments Our Project Number: 92.08 PIN Dear Ted: We have reviewed your comments as outlined in your June 19, 1992 letter and would like to offer the following responses: I met with Gary Huett of Public Service to review their easement needs. East of Red Mountain Drive (formerly Dakota Drive) there will only be one intermediate pressure feeder line and it can be located in the street just off of the edge of the curb. West of Red Mountain Drive there will be two lines which need to be placed in the 1 5' easement north of the Horsetooth right-of-way. Final location of fences will need to be coordinated with Public Service as Tract "A" is developed. 2. Modifications and clarifications have been made to easements as requested by U.S. West and as shown on the plans. 3. Ramp locations, sidewalk widths, street widths and green belt widths are now shown on the plans. • 432 Link Lane Plaza • Ft. Collins, Colorado 80524 • [3031221-2400 July 1, 1992 Page 2 of 3 Dakota Ridge P.U.D. First Filing Final Comments 4. Questions pertaining to the plat have been addressed. 5. The developer will maintain the temporary detention ponds proposed as part of this filing. No Homeowners Association will be established as a part of this development. 6. A mow strip has been added to the sidewalk section. 7. A fence detail has been added to the P.U.D. 8. All metal sidewalk culverts have been removed and concrete sidewalk culverts have been proposed. 9. These bike trail changes have been made. 10. A fire hydrant has been added. 1 1 . More detail has been added to show this secondary emergency access. At a meeting with CSU staff held on June 30, 1992 at 2:00 pm they agreed to allow this access through their property. Agreements are being drafted and are expected to be approved by the State Agricultural Board in a special executive session in July. 12. & 13. Dakota Drive is now Red Mountain Drive; Fall River Road is now Willow Creek Drive; and Wolf Creek Court is now Cucharas Court. 14. The tree detail has been added. 15. The note has been added. July 1, 1992 Page 3 of 3 Dakota Ridge P.U.D. First Filing Final Comments 16. The Landscape schedule has been changed to reflect a "Marshall" Green Ash 17. Conversations are ongoing between the CDL Partners and Les Kaplan of Stoneridge. It is expected that an agreement on the fence will be completed before the P & Z Board meeting. 18. A variance was requested and granted at the June 29`h meeting of the P & Z Board. 19. & 20. No reponse required 21. Mr. Webster has recently been contacted by Roberta Martin of G.T. Land. These conversations will be continuing; however, they probably will not have any impact on Dakota Ridge. I met with Stan Meyers of RBD on Monday June 29, 1992 and he explained that Stoneridge plans to use irrigation water from the Webster lateral to water their extensive open space system. If this concept becomes a reality, the irrigation system along Horsetooth will not be abandoned and we will need to continue to deliver water through the Dakota Ridge site to Stoneridge. The pipe we proposed on our plans will accomplish this. This design is being coordinated with Stoneridge. I hope this addresses any concerns you may have, and as always, please feel free to contact me should you have additional questions. cc: Chuck Betters, CDL Partnership