Loading...
HomeMy WebLinkAboutDAKOTA RIDGE PUD FIRST FILING FINAL - 60 91E - CORRESPONDENCE - APPLICANT COMMUNICATION (2)PARSONS & Its ASSOCIATES CONSULTING ENGINEERS July 24, 1992 Mr. Les Kaplan Stoneridge Development Fort Collins, Colorado RE: Dakota Ridge - Stoneridge Common Issues Dear Les: Thanks for reviewing the issues that effect both of our projects. I would like to summarize our discussion as follows: 1. Runoff from Horsetooth Road adjacent to Dakota Ridge (Approximately .4 acres) can continue easterly in the street and will be detained in the Stoneridge detention facility. There is street capacity available in Horsetooth Road and storage room available in the Stoneridge detention facility. This has been verified with both project engineers (RED and Parsons & Associates) This will allow us to eliminate a curb inlet and sidewalk culvert along Horsetooth Road. We can also reduce the size of the drainage pan between our common property line. 2. The reduction of the depth and width of the back yard drainage pan allows us an easier connection to a common back yard fence. Therefore, a common back yard fence becomes more attractive to the Dakota Ridge project and I would participate in 50% of the cost of this fence. Fence details are to be approved by both yourself and the CDL Partnership. Please feel free to contact me if other issues should arise. Sincerely, r (/ - Chuck Betters %� lyl�% bN%� Clyyc� f�a,( 1/ �`T 7-4-92 CDL Partnership owl fo 6G S/��rc� �� ChuCE U�d l/ SN�i7i/tr� gbl 432 Link Lane Plaza • Ft. Collins, Colorado 80524 • [3031221-2400