Loading...
HomeMy WebLinkAboutPINECONE APARTMENTS AND NEIGHBORHOOD CONVENIENCE PUD FINAL - 60 91E - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSJanuary 6, 1993 Kirsten Whetstone Project Planner City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Kirsten; co urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (303) 226-4074 FAX (303) 226-4196 Attached are five prints of the Pinecone Apartments Final PUD Plans, revised in response to Staff Comments. Specific responses include: We are coordinating with Columbine Cablevision to accommodate their needs in conjunction with US West. 2. Public Service Company has agreed that an easement extending 6' beyond the back of walk will be adequate for their needs. The appropriate easements have been adjusted on the plat, and building envelopes have been adjusted accordingly. 3. Water meter locations are indicated on the utility plans. Gas and electric meters, and other utility service panels are grouped in defined, recessed areas at the ends of all apartment buildings. Meters for the convenience store will be located on the north side of the building. 4,5. We are coordinating with US West as needed to provide telephone service to the project. 6. Utility easements have been widened as requested. 7,8. Plat corrections have been made as requested. 9-1 1. Fire department comments have been addressed. Signs restricting parking have been noted; and the convenience store operator is completing the Hazardous Materials Impact Analysis. 12. Street trees have been adjusted as requested. 13. The high school's landscape architect has provided us only with alternative conceptual plans for the south side of Vermont; and has not authorized us to distribute their plans. We have also provided the school's LA with copies of our plans for the sake of design coordination, and have adjusted our plans to include applicable common concepts. 14. The "Species Use List" has been used as requested. coY2@@o urban design, inc. 15. Existing trees and their disposition have been indicated on the revised plans. Our site plan has been modified so that a greater number of existing trees may be saved than was anticipated on the approved Preliminary PUD. 16. The requested note has been added. 17. Seed and sod blends including a high percentage of fescue are anticipated to be used. 18. A fundamental concept of the Pinecone Master Plan has been to avoid creating a "Swallow Road" situation that encourages extraneous high school traffic from looping back through the residential neighborhood. The "T" intersection at Vermont and Pinecone Circle is an important part of that concept. The cul-de- sac could be modified or eliminated in favor of a more conventional parking area; but we feel strongly that the intersection should remain a "T" rather than an "L". 19. Local handicapped accessibility requirements will be met. 20. Both the irrigation ponds will be constructed in conjunction with completion of the apartment units. 21. Sidewalk modifications have been made. 23. The applicant was clearly informed at the time of Master Plan and Preliminary Plan approval that all "oversizing" of the 12' walk along Timberline was to be a public expense. The need for such extreme width is not due to the Pinecone Apartments project. 24. The actual size of the convenience store is only 3,000 sq. ft., plus the car wash. The applicant is comfortable that adequate parking is provided. 25-27. The convenience center is included in the Final PUD. Bike racks, berming and landscaping have been added as requested. 28. While some adjustments of bike rack locations have been made, it is not anticipated that this project will need the extensive quantity of bike racks suggested by staff. We also feel that reducing the visual clutter associated with an abundance of bike racks at building entries is a valid design goal. 29. Areas within building envelopes and adjacent to parking areas may be sodded. Larger expanses of open space will be seeded. 30. Additional architectural information has been provided as requested. 31-33. Architectural form and materials of the convenience store will match the apartments and associated garages. Both the apartment project developer and the convenience store owner have committed to closely tie the design of the project to a common residential character, while providing the needed visibility and identity for the non-residential uses in a compatible manner. Q'JVP@P@ urban design, inc. Additional architectural and signage information has been provided with our revised plans. Common materials and design criteria are being used for monument signs; window signage is being restricted; and canopy and building signage is proposed to be understated - to the extent allowed by Phillips 66. No designated service or loading area is planned for the convenience center. It will be "front loaded" as recommended by City guidelines. 34. The requested breakdown is attached. 35,36. Additional handicapped access ramps and conifers have been added as requested. Ten sets of prints, reductions, and color renderings will be submitted by January 19, 1993, and Final Documents will be submitted by January 21, 1993. We appreciate your assistance in the planning of this project. Please call if you need further information regarding the Pinecone Apartments PUD. Sincerely, l/w Eldon Ward, President Cityscape Urban Design, Inc. cc: Bill Reynolds, Jerry Lee, Rick Woodruff, and Libby Glass, The W.W. Reynolds Companies Wayne Schrader, Schrader Oil Stan Myers, RBD, Inc. Bob Gustafson, Wickham Gustafson Architects