Planning Department
City of Fort Collins
April 22, 1992
Mr. Eldon Ward
Cityscape Urban Design
3030 South College Avenue
Fort Collins, CO. 80525
Dear Eldon:
The Planning Staff has coordinated an interdepartmental review of
Pine Cone Apartments, Preliminary P.U.D. The following comments
represent the findings of this review:
1. U.S. West has submitted some generic comments regarding
telephone service that are quoted below:
A. Review of these plans should not be construed as a
commitment that telephone facilities sufficient to serve this
project are presently available. U.S. West will provide
telephone service in accordance with the rates and tariffs on
file with the Colorado Public Utilities Commission.
B. The owner is responsible for provision of all conduit for
telephone facilities within the project, and the owner
provides terminal room space and power for the main terminal
at the site. The owner's vendor provides all facilities
beyond the main terminal to each building and living unit.
C. Any relocation of existing telephone facilities required
by these plans will be paid for by the developer.
2. The City's Stormwater Utility has several important comments
that are summarized below. Additional comments will be made to the
engineering consultant under separate cover. You are encouraged to
coordinate closely with this consultant so that P.U.D. documents do
not conflict with civil engineering documents.
A. The Foothills Channel is a regional Master Plan drainage
facility eligible for partial reimbursement under the
Utility's Developer Repayment program. Funds will not, be
available until 1993. Negotiations must begin as soon as
possible to avoid delay at the time of Final P.U.D.
B. The level of landscaping shown in the channel exceeds the
normal amount of landscaping usually planted in a storm
drainage facility. Such a level will require more maintenance
than the City is able to provide. The issue of maintenance
must be resolved at the time of Final P.U.D.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
Pine Cone.Apartments
Page 2
C. The location of C.S.U.'s irrigation pipe is not
indicated. Permission from C.S.U. will have to be obtained
prior to moving this pipe. Also, the issue of maintenance of
the pipe must be resolved at the time of Final P.U.D.
D. At the time of Final P.U.D., please provide a typical
cross-section of the channel showing the high water line and
relative locations of the bike path and plant material.
E. Please be aware that in large storms, flows will overtop
Timberline Road. At the time of final design, it must be
demonstrated that the buildings adjacent to Timberline will
not be impacted.
F. There is a possibility that interim downstream
improvements may be needed through C.S.U..'s property to
mitigate any impacts from upstream development.
G. Any improvements to the existing 54 inch R.C.P.'s under
Timberline. Road due to widening of Timberline will not be
eligible for reimbursement from the Stormwater Utility.
3. The City Light and Power Department will require an eight foot
wide easement along all roadways. Internally, a blanket easement
is an option for areas outside the building envelopes.. The risk of
blanket easements is that, once platted, any relinquishment will
require a vacation procedure. This may impact flexibility.
4. Columbine Cable will also need easements. Please indicate at
the time of platting.
5. The following comments are from the Poudre Fire Authority:
A. Buildings D, E, G, and H exceed the 150 foot fire access
requirement and must be equipped with approved fire sprinkler
systems for residential structures. Similarly, .all three
story buildings must have residential fire sprinkler systems.
Such systems may designed to U.B.C. 38-3 standards. Please
feel free to contact P.F.A. for proper sizing and further
details.
B. Additional hydrants must be provided at entrances to both
parking lots.
C. Please provide "No PARKING - FIRE LANE" signs in all
areas that can be obstructed by improper parking.
D. The temporary fire lane must be designed with the proper
surfaces, and gate, chain, or bollards. Again, please consult
with P.F.A. for final details.
Pine•Cone Apartments
Page 3
E. The convenience store, with gas sales, will require the
completion of the Hazardous Material Impact Analysis. This
form should be completed and returned to the P.F.A. at the
time of Final P.U.D. submittal on the convenience store.
6. The Parks and Recreation Department has expressed an interest
in shifting the 24 inch C.S.U. irrigation pipe so that it is routed
under the turf in the detention area rather than through the
parking lot. P & R would like to be involved in any discussion
regarding the relocation of this pipe.
7. It is strongly encouraged that the detention pond area be
planted in a naturalistic fashion using a drought -tolerant seed
mixture. Also, the trees and shrubs selected for the channel area
along the north property line should be native and require a low
level of maintenance. These specifications are not required at the
Preliminary P.U.D. stage but are passed along for consideration at
the time of Final P.U.D.
8. Any and all handicap access ramps that empty into or are
contained within the handicap parking space should be relocated
since the parked vehicle renders the ramps unusable. It is
preferred that the handicap space be located central to the parking
bay. During snow storms, parking bays are usually plowed so that
snow is stored on the raised landscaped islands at the ends of
rows. This impacts the handicap population unfairly if the
reserved stalls are all located at the ends of rows.
9. Please indicate whether the covered parking is a garage or
carport.
10. Please indicate whether the bicycle parking is covered or a
bike rack. Staff is curious as to the bicycle parking arrangement
that was used in Boulder as that community has a popular bicycle
path network. The data table represents 140 bicycle parking
spaces, how many spaces per rack?
il. Street trees along Timberline Road should match the
formalistic planting style established by the New Fort Collins High
School rather than a random style. Also, the street trees should
be located in anticipation of the major arterial right-of-way so
they do not have to be relocated in the future.
12. .Will there be berming around the front of convenience center?
Berms of moderate height will help soften the eight parking spaces
facing the intersection and help mitigate the internal hard surface
area. The level of landscaping and buffering for the c-store will
be closely evaluated at the time of Final because of the high
visibility at the intersection of an arterial and collector street.
Pine Cone Apartments
Page 4
13. Staff applauds the amount of bicycle/pedestrian paths.
provided. This network meets the intent of the yet to be decided
Pine Cone O.D.P. There should also, however, be a consideration
for linkage with the future residential project to the north since
the Neighborhood Park may become a logical destination. Is this
connection expected to occur on Pine Cone Circle, east of the
apartments? Please indicate how the bicycle/pedestrian network is
coordinated with future, off -site parcels. These linkages are
considered important in light of the trade-offs made regarding
internal collector street access to Parcel. A of the Pine Cone
O.D.P.
14. Staff is concerned about the powerful tendency to park
directly in front .of one's individual unit. This could create a
problem of parking on Vermont (and Pine. Cone Circle) for units
facing south in Buildings B, A, L, and K. This problem is
noticeable at the Landmark Apartments where Hobbit Street is relied
upon for parking, while adequate space exists in the internal
parking lots. To discourage this natural tendency, it is suggested
that strong consideration be given to berming and dense landscaping
along Vermont, and that portion of Pine Cone Circle that is
adjacent to Building K. Please bear in mind that Staff still
prefers buildings to front on Vermont, not parking lots.
15. Building L, in particular, suffers from lack of.easy access
from the interior parking lot to the southern entries. It is
suggested that internal sidewalks be extended from the nine parking
spaces to the west, and from the six parking spaces on the north.
Without these connections, Vermont on -street parking provides the
closest route to the entries.
16. Similarly, an internal sidewalk should be .extended from the
eight parking spaces east of Building A to serve the south entry.
You are encouraged to explore other solutions that will minimize
parking on Vermont, which will be a collector street at this
location.
17. You are obviously very familiar with efforts to coordinate the
New High School with the Timberline Partners commercial corner.
Part of this cooperative effort is to reach a degree of
architectural compatibility. It is likely that the exterior
materials will include some brick or jumbo brick. Staff encourages
a similar type of masonry to be included on the Pine Cone
Apartments. Brick is an effective material to establish
residential character and promote neighborhood compatibility.
Please indicate on the architectural sheet what materials are
anticipated.
Pine Cone Apartments
Page 5
18. Three story structures need generous foundation plantings.
Berming also helps to lessen the impact of structures reaching a
height close to 40 feet. At the time of Final P.U.D., the
landscape plan will be evaluated based on the ability to soften the
heights of the structures, especially along Vermont and Pine Cone
Circle. .Good examples include Fort Ram Village and Courtney Park.
Bad examples include Landmark Apartments, Collinswest, and Sun Ray.
19. It would be helpful to know the location of the office and the
manager's residence, and how many parking stalls are anticipated
for employees, managers, and customers visiting the office.
This concludes Staff comments at this time. Please note the
following deadlines for the May 18, 1992 Planning and Zoning Board
hearing:
Plan revisions are due May 1, 1992
P.M.T.'s, 10 prints, renderings are due May 11, 1992.
As always, if you have any questions or concerns, please call our
office to set up a meeting to discuss in detail.
Sincerely,
Ted Shepard
Senior Planner
TS/kdb
xc: Sherry Albertson -Clark, Chief Planner
Kerrie Ashbeck, Civil Engineer