HomeMy WebLinkAboutPOTTS PUD PRELIMINARY - 6 92 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI
"PRELIMINARY'
DRAINAGE IlWESTIGATION
(CIA
POTTS' - P. U. D.
A PROPOSED 26 UNIT MULTI -FAMILY
RESIDENTIAL COMPLEX
FORT COLLINS, COLORADO
Prepared for
&RCHOVEC HE ONE
150 East 29th Street
Suite 200
Loveland, Colorado 80538
February 3,1992
Project No. PLA-071-92
PREPARED BY:
WON3M Engineering Associates
150 East 29th Street, Suite 225
Loveland, Colorado 80538
Telephone: (303) 663-2221
Civil and Environmental Engineering Consultants
Client: ARCHITECT uRE ONE
By: DRM
Project No. PLA-071-92
Date: Jan. 31, 1992
Calculations for Drainage Investigation for POTTS' - P.U.D. located in the SE1/4 of
Section 15, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins,
Larimer County, Colorado
Total Site Area = 1.669 ± acres
The proposed development of the site is to consist of the construction of 26 multi -family
residential units to be located in 5 separate structures.
EXISTING CONDITIONS - RUNOFF COEFFICIENT
From Table 3 - 2 of City Design Criteria manual
Rational "C" Factor = 0.20 for Unimproved Areas
Therefore, at Existing Condition use "C"an = 0.20
PROPOSED DEVELOPMENT - RUNOFF COEFFICIENT
Rational "C" Factor = 0.15 for Lawns and Landscaped Areas
It
= 0.95 for Roofs, Decks, Patios, etc.
" It = 0.95 for Asphalt and Concrete Streets, Drives, and Parking
"C"avg : Lawns and Landscaped Areas = 34,050 sq.ft.± = 0.78 acre ±
Roofs, Decks, Patios, etc. = 20,077 sq.ft.± = 0.46 acre ±
Streets, Drives, and Parking = 18.587 sq.ft.± = 0.43 acre ±
Total Site = 72,714 sq.ft.± 1.67 acre ±
"C" avg = ((34,050 x 0.15) + (20,077 x 0.95) + (18,587 x 0.95)) - 72,714 = 0.575
Therefore, at Proposed Condition use "C"avg = 0.58
TIME -OF -CONCENTRATION
Existing Conditions:
Time of Concentration (Overland) = To(min.) = 1.8 [ 1.1 - (Cf x C) ] �L(ft.) _ 3qS(%)
Distance, L = 200'±
Slope, S = 2' =.175' = 1.1 %
Elev. Diff. = 5042 - 5040 = 2'
Cf Q 2 Yr. Storm = 1.00 Cf Q 100 Yr. Storm = 1.25
2 Yr. To = 1.87 [1.1 - (1.00 x 0.20)14200 _ 341.1 = 23.05 min.
100 Yr. To = 1.87 [1.1 - (1.25 x 0.20)14200 - 341.1 = 23.33 min.
Time of Concentration (Channel): Grassed Swale w/ 140' length ® 0.8%, Tch = 1.55 min.
(Refer to attached Fig. 3 - 2)
Tc = To + Tch = 23.05 + 1.55 = 24.6 Therefore, at Existing Condition use, To = 30 minutes
Page 1 of 4
Client: ARCHITECT uRE ONE Project No. PLA-071-92
By: DRM Date: Jan. 31, 1992
TIME -OF -CONCENTRATION (cont. for Potts'- P.U.D.)
Proposed Conditions:
Time of Concentration (Roof to Ground) = 5 minutes
Time of Concentration (Ground to Street): Tc(min.) = L(ft.) + [Vel. (ft./sec.) x 60 min./sec.]
Based upon Velocity for Grassed Swale from Fig. 3 - 2 Vel. = 2.2 ft./sec.
Time of Concentration (Street Flow): T(min.) = L(ft.) + [Vel. (ft./sec.) x 60 min./sec.]
Based upon Velocity for 2% Gutter Slope from Fig. 3 - 2 Vel. = 2.8 ft./sec.
TTotal = TRoof + Tc + Ts
Tc=165+[2.2x60]=1.25min.
Ts=125+[2.8x60]=0.74min.
TTotal = Ts +Tc + Tr Therefore, T = 1.25 + 0.74 + 5.00 = 6.99 min.
Tc = (L + 180) + 10 = (340 + 180) + 10 = 11.88 min.
USE 10 minutes as Time of Concentration
RUNOFF
Runoff, Q = C x I x A x Cf
Runoff from Site at Existing Conditions::
I2 @ 25 minutes = 1.65 in./hr. Iioo @ 25 minutes = 4.85 in./hr.
Qz = 0.20 x 1.65 x 1.67 x 1.00 = 0.55 c.fs.
Qioo = 0.20 x 4.85 x 1.67 x 1.25 = 2.02 c.£s.
Runoff from Site at Proposed Conditions:
I2 @ 10 minutes = 2.50 in./hr. I100 @ 10 minutes = 7.25 in./hr.
Q2 = 0.58 x 2.50 x 1.67 x 1.00 = 2.42 c.f.s.
Qioo = 0.58 x 7.25 x 1.67 x 1.25 = 8.78 c.f.s.
The estimated difference in total runoff volume based upon the 2 and 100 Year Storms is
estimated on the following page.
Page 2 of 4
DETENTION VOLUME DETERMINATION FOR "RATIONAL METHOD"
Time
Q100 Prop.
Vol. Ca 0100
Q dis. @ 2 Yr.
Vol. dis.
Vol. Diff.
(min.)
(c.f.s.)
(cu.ft.)
(c.f.s.)
(cu.ft.)
(cu.ft.)
10
8.78
5267
0.55
331
4936
15
7.26
6538
0.55
496
6042
20
6.30
7555
0.55
661
6894
25
5.57
8354
0.55
827
7528
30
5.02
9044
0.55
992
8052
40
4.24
10170
0.55
1323
8848
50
3.63
10897
0.55
1653
9243
60
3.15
11333
0.55
1984
9349
At 02 Existing Q = CIACf = 0.20 x 1.65 x 1.67 x 1.0 = 0.55
At 0100 Proposed Q = CIACf = 0.58 x I x1.67 x 1.25
CACf = 0.58 x 1.67 x 1.25 = 1.21
Therefore, the Detention Volume desired is 9,349 cu. ft. at a release rate of 0.55 c.f.s.
This is based upon detaining the difference between the present site conditions with runoff
generated by a 2 Year Storm event and the proposed site conditions with runoff generated by
a 100 Year Storm event.
ARCHITECTURE ONE
POTT'S - P.U.D.
Proj. No. PLA-071-92
Page 3 of 4 Jan. 31, 1992 DRM
Client: ARCHITECTURE ONE Project No. PLA-071-92
By: DRM Date: Jan. 31, 1992
SIZE INLET IN PARKING LOT
From Fig. 5-3 with 0.8 depth of flow over grate
Q/sq.ft. = 3.95± cfs/sq.ft.
with 1.34 sq.ft. of opening Q = 1.34 x 3.95 = 5.29 cfs w/ No. 12 Grate & Frame
SIZE PIPE
Reduction Factor for sump condition = 80%
Q allowable = 0.80 x 5.29 = 4.23 cfs >> 2.42
Therefore, Standard "Area Inlet"is OK
Q = 1.486/n A R*2/3 S*1/2
Consider 8" dia. Pipe @ 0.50 %
Q = 1.486/0.013 x 0.35 x 0.30 x 0.07 = o.85 cfs>>0.55
Therefore, 8" dia. is OK
DETERMINE ORIFICE SIZE
Orifice Equation, Q = CA42gh
A = Q = C42gh
Q = 0.55 c.f.s. (form Page 3) C = 0.65
h=41.50-37.33=4.17ft.
A=0.55=[0.65x4(2x32.2x4.17)]= 0.109sq. ft.
A=w*2 w=CIA
w = �0.109 = 0.33 ft. = 4 inches
Therefore, Use 4" x 4" Orifice Opening
DETERMINE DETENTION VOLUME
High water Elevation = 41.50
Area @ 39.50 = 100 sq.ft.
Area @ 41.50 = 11,000 sq.ft.
Inlet Grate Elevation = 39.50
Area @ 40.50 = 3,800 sq.ft.
Vol. _ [(100 + 3900) 21 + [(3900 + 11000) + 2 ] = 9,450 cu. ft.> 9,350 OK
Page 4 of 4
DRAINAGE CRITERIA MANUAL
RUNOFF
C
50
30
I— 20
Z
W
U
cc
W
o. 10
Z
w
0.
O 5
N
w
oyc 3
O
v 2
Cr
w
I-
3
1
�■■■■�
IIII
/
I
/1DWANE
�M■
►A I
,�■ I I
I
AMNON�
����
Imam
����
IEmsMEN
I
■�
�WA-
MMII�
����
�/�=/IMFA
F
�AWA
MM
NO
INNONNIN
MMO
�jMWAM
EVIM
III■■�I����
2 .3 .5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING "UNDEVELOPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5 =1-84
URBAN DRAINAGE 8 FLOOD CONTROL DISTRICT
l
M
0.7
f-
w 0.6
z 0.5
Cr
> 0.4
0
x
a 0.3
w
0
? 0.2
0
z
0
a 0.1
0.(
EXAMPLE
> 3 5
p 4 I 2
FLOW INTO INLET PER SO. FT. OF OPEN AREA (CFS/FT2)
Figure 5-3
CAPACITY OF GRATED INLET IN SUMP
(From: Wright -McLaughlin Engineers,1969)
MAY 1984
5-11
DESIGN CRITERIA
Engineering Associates
February 3,1992
Project No. PLA-071-92
Mr. John Freeman, Architect
ARCHITECTURE ONE
150 East 29th Street
Suite 200
Loveland, Colorado 80538
Dear Mr. Freeman,
The enclosed report represents the results of the Preliminary Drainage Investigation for
POTTS' - P. U. D., a proposed multi -family residential complex to be located on a 1.7 ±
acre parcel at the Southwest corner of the Matador Apartments - Phase IV in the City of
Fort Collins, Larimer County, Colorado.
This investigation was based upon the proposed site development plan; proposed site
grading plan; on -site observations; and available topographic information. The
investigation was performed in accordance with the criteria established in the City of
Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards"
manual.
Thank you for the opportunity to be of service to you. If you should have any questions,
please feel free to contact this office.
Respect f y Submitted,
Dennis R. Messner, P.E.
MESSNER Engineering Associates
DRWmkm
Enclosures
Civil and Environmental Engineering Consultants
150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221
TABLE OF CONTENTS
Letter of Transmittal
Table of Contents
Scope
Site Description
Existing Conditions
Proposed Development
Erosion Control Measures
Conclusions and Recommendations
EXHIBITS
Vicinity Map
Existing Conditions Exhibit
Grading & Drainage Exhibit
Landscape Plan/Erosion Control Exhibit
Calculations
ii
SCOPE
The following report represents the results of a preliminary drainage investigation for a
proposed 26 unit multi -family residential complex to be located on a 1.67± acre parcel of
land situated in the Southeast Quarter of Section 15, Township 7 North, Range 69 West of
the 6th P.M., Larimer County, Colorado. The site is located at the Southwest corner of the
"Matador Apartments - Phase IV" in the City of Fort Collins.The investigation was
performed for ARCHITECTURE ONE. The purpose of this investigation is to determine
the effects of the proposed development on the area's existing drainage conditions and to
determine the improvements, if any, and the appropriate sizing for proposed
improvements so that it may be incorporated with the construction of the project. The
conclusions and recommendations presented in this report are based upon the proposed
site development plan; proposed site development construction plans; on -site
observations; and the available topographic information. The analysis was performed in
accordance with the City of Fort Collins "Storm Drainage Design Criteria and
Construction Standards" manual.
SITE DESCRIPITION
The site is irregular in shape and contains approximately 1.699 acres. The site's
East-West dimension varies but is considered to average approximately 175 feet. Its
North -South dimension is approximately 450 feet. The site abuts the easterly right-of-way
of the Larimer County Canal #2. The site is located approximately 350 feet south of West
Elizabeth Street and 700 feet west of City Park Avenue. The site is located In the SPRING
CREEK DRAINAGE BASIN.
EXISTING CONDITIONS
The site is presently vacant and undeveloped. The ground cover consists of native pasture
grasses and a few volunteer trees. The ground slopes toward the northeast and is
relatively flat with grades ranging from 0.75% to 1.5%. The "Soil Survey For The Larimer
County Area" prepared by the U.S.D.A., Soil Conservation Service, indicates that the
upper layer soils are a sandy clay loam. "The Survey" indicates that the soils have a slow
to moderate runoff potential and have slight to moderate wind and water erosion
potential.
The area surrounding the site is virtually fully developed. As previously stated, the
Larimer County Canal #2 forms the western boundary of the site. The area to the west of
the canal is a single-family residential subdivision known as Fairview. To the north of
the site are a Taco Bell restaurant and a Diamond Shamrock convienence store. The
areas immediately adjacent to the site on the north consist of parking lots for the Taco
Bell and a C.B. & Potts restaurants. The area adjacent to the site on the east consists of
the Matador Apartment complex.
The site does not receive runoff from the surrounding properties. The runoff from the
area to the west is intercepeted by the Larimer County Canal #2. Runoff from the area to
the north flows to the north and east away from the site. Runoff from the area to the east
flows to the north and east away from the site. Runoff from the site flows overland to the
C.B. & Potts' parking lot. The flow is detained within this parking lot and discharged
through a controlled release into the Diamond Shamrock drainage system. This
eventually discharges into a 15" dia. storm drain that flows east in West Elizabeth Street.
1
PROPOSED DEVEL. OMENT
The proposed development of the site is to consist of constructing 26 multi -family
residential units along with the associated access drives and parking. The runoff
generated on the major portion of the site is to be routed overland to the access drive. The
drive has been preliminarily designed to be graded to a low point situated approximately
in the middle of the site. A storm drain inlet is to be constructed at this point in order to
intercept and collect the runoff. An orifice plate is to be placed over the inlet end of the
pipe outfalling from the storm drain inlet. The orifice plate will act as a control device to
limit the rate of flow discharging from the site. The runoff will be detained and will pond
in the access drive and parking areas due to the restricted release rate. A 15" dia. storm
drain pipe is to be installed to route the flow to the C. B. & Potts' parking lot. The minor
area in the northeast corner of the site that is not routed to the internal detention area
will flow overland into the C. B. & Potts' parking lot. This routing will retain the original
drainage pattern and will provide for drainage of the proposed use.
EROSION CONTROL MEASURES
Erosion control considerations have been made based upon the short term, i.e., during
construction activities and the long term, through the life of the facility. The long term
measures that are to be incorporated into the project in order to reduce erosion are the
proposed methods and materials to be used to provide a surface covering for the parking
areas, walkways, driveways and the landscaped open areas. The structures and hard
surfaced areas will provide a covering to deter erosion. The landscaping to be established
will be a combination of plantings and ground covers to deter erosion. (Please refer to the
proposed "Landscaping Plan")
The short term erosion control method to be incorporated into the construction
requirements for the project is the placing of "Curb Inlet Filter Gravel" at the proposed
storm drain inlet to be constructed onsite. It is not considered as necessary to provide any
wind erosion measures due to the protected nature of the site.
The schedule for construction activities is anticipated to be: April 15 - June 30, perform
earthwork grading operations, install utilities and construct access drive; May 1 -
August 15 construct initial 6 unit structure; July 1 - April 1, 1993 construct remaining
structures; July 15 - April 15, 1993 instal landscaping in conjuntion with completion of
each structure. This schedule is proposed as the conservative time line with the
anticipation that actual construction will proceed on a faster schedule. In any case the
site will be "open" and subject to water caused erosion for an extremely short period of
time.
2
CONCLUSIONS AN , RECOMMENDATIONS
1. The proposed development will retain the existing drainage patterns.
2. The site is located in the SPRING CREEK DRAINAGE BASIN. The site is not
located within the floodway or flood plain.
3. All development is to be performed in accordance with City of Fort Collins
Standards and Specifications.
4. Onsite detention of stormwater is to be provided. The runoff volume difference
between the existing and proposed conditions is estimated to be 2,656 cu. ft. when
based upon the difference between the runoff from a 2 Year Storm with the site
considered at the existing condition and the runoff from a 100 Year Storm with the
site considered at the proposed conditions. Therefore, a detention volume of
approximately 9,350 cu. ft. has been designed to be provided onsite and the flow is to
be released at a rate of 0.55 c.f.s.
5. The City of Fort Collins Standards for temporary erosion control measures are to be
incorporated with the construction activities.
3
EXHI :ITS
VICINITY MAP
Tom• _ _/NE GRr E! I '• __r
,. .,•• I'• t° '. i i�.n` :I t 5022J r 1. SC r
r❑�j R ,❑ r
e,sl PU 1
�99. 1 l re . YFeWiI� �•r.,
— — - yi �Ll
dounlain \'iiw i i ��% i, 1 ..' l i�ve l�� 4985 �
_i 'Sch431
•9�iW�`.—= r ; C La',Porte Ave \ �,
15058'•.�� •,�l _ LL �L &h'1 �P ❑ A
Puadre Grandvee ' _:'r' s' rMOUNTA`Id`J I \2 EIr; '..
r Aigh h ii
+�A
LJ500
. ` - - I Munici z,� • -per':>, Ei Sch ( i �. —
5' =
oo--
LJI
`j 7I Golf Course • Skeldon, .
�...... y. 1. IS.; / •' 5069- . ' Lp 6 - _
..I! Trailer \�`i �I Z J
I� } Alzl
Park E �j \ �• ' = . - ra�o
,. Eirl_ ❑�
oil
�.
t fir:. �-ST Erg
5 •'• •��• oI= ti•L• ^'I z.�' ...R.. /UNR'ERSITY 4
n � r Be
FHig
_r
-�•-r__/�, ��. OSP OTi ,_�.�.: •�• 3�I� ���r._ _ L...1• R
�0 1 5065I c� 056 % 5028 �� . -
n 15.
Vicinty Map for
POWs' - P. U. D.
located in
SE 1/4 Section 15, Township 7 North, Range 69 West of the 6th P3L
Fort Collins, Colorado
No Text