HomeMy WebLinkAboutSPRADLEY BARR FORD ENLARGEMENT OF A BUILDING CONTAINING A NON CONFORMING USE - 63 91 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW6 A" imme City of Fort Collins Developn«at Services Planning Department December 24, 1991 Jerry Ewing Spradley-Barr 2601 South College Avenue Fort Collins, CO. 80525 Dear Jerry: For your information, attached is a copy of the Staff's comments concerning the request for additions/expansions to the Spradley- Barr Automobile Dealership, which was presented before the Conceptual Review Team on December 23, 1991. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Steve ,O'It Project Planner xc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Project Planner File 281 North College Avenue • P.O. Boy 380 • Fort Collins, CO 80 22-0:;80 • (103) 221-n; ;n e A CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: December 23, 1991 ITEM: Spradley-Barr Automobile Dealership APPLICANT: Spradley-Barr 2601 South College Avenue Fort Collins, CO. 80525 Attn: Jerry Ewing LAND USE DATA: A request to add two small buildings to the west end of the existing service building, located at the southwest corner of the South College Avenue - Drake Road intersection. COMMENTS: 1. This dealership is a legal "non -conforming use" in the HB, Highway Business zoning district. It is necessary to go through the Non -Conforming Use Review process (see enclosed information) or the Planned Unit Development process to allow expansion or extension of existing buildings. In this case the request is to install two small buildings, a downdraft paint booth and a storage building for a paint mix system. It is recommended that you use the Non -Conforming Use Review, requiring a submittal for review and approval by the Planning and Zoning Board. The next possible Board public hearing is January 27, 1992. Due to the late date, and the fact that the submittal date for the January hearing was December 2nd, it is imperative that the required information be submitted by the close of the day Monday, December 30th. This request is minor in nature; however, the City departments and outside reviewing agencies need time to review the information and respond to the project planner, enabling the information to be presented to staff at Final Review on January loth. 2. If there is no net gain in the impervious area (paved/hard surface) on -site then a drainage report would not be necessary. This information must be noted on the Site Plan and a letter to the City Stormwater Utility, indicating no change, must be provided. 3. There will be street oversizing fees of $14,005 per acre (based on the square footage of the additions) assessed at the time of issuance of building permits. Please call Steve Olt at 221-6750 promptly if there are any questions about the submittal requirements.