HomeMy WebLinkAboutSPRINGWOOD INSTITUTE PUD PRELIMINARY AND FINAL - 2 92 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCommt .y Planning and Environmental _rvices
Planning Department
City of Fort Collins
February 3, 1993
Dick Kyle
2800 Worthington Drive
Fort Collins, CO 80526
Dear Mr. Kyle:
For your information, attached is a copy of the Staff's comments concerning
boarding House at 706 E. Stuart Street, presented before the Conceptual Review
Team on February 1, 1993.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
AL V�
Kirsten Whetstone
Project Planner
KW/gjt
Attachments
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: February 1, 1993
ITEM: Boarding House at 706 E. Stuart St.
APPLICANT: Dick Kyle
2800 Worthington Drive
Fort Collins, CO 80526
LAND USE DATA: This is a proposal for a boarding house for up to
17 international/college students in an existing house located at
706 E. Stuart Street. The property is located in the RM, Medium
Density Residential, Zoning District. The two story house is
approximately 8,000 square feet in size and located on.1.5 acres.
There is also a two story garage, attached to the house by breeze
way, which is proposed to be altered to house,up to 8 students.
COMMENTS:
1. The proposed use is not allowed in the RM Zoning District and
would therefore have to be reviewed as a Planned Unit
Development (PUD) and evaluated against the All Development
Criteria of the Land Development Guidance System. The
Residential Point Chart would be used to evaluate the land use
(see attached information).
2. If you need to increase the size of the electrical panel you
will have to pay for the KVA upgrade. Please complete the
Commercial (C-1) Form and return it to Light and Power so they
can determine the service that you will need for this use.
Any transformer upgrades or system modifications will be at
the developer's expense.
3. Please provide a letter with your submittal to address
proposed increase in the amount of impervious surface that the
project would create. Also indicate on the plan, the general
direction of run-off flows. If you do not anticipate any
increase in the amount of run-off or impervious surface,
please state this in the letter and place a note on the plans,
to this effect.
4. The property is in the Spring Creek Basin. Stormwater
development fees are $1804.00 per acre of additional
impervious surface.
5. There is floodplain and flood fringe on the. property. There
are specific design restrictions for construction in these
areas. Please contact Glen Schlueter at 221-6589 for more
information.
F
. i
. `y
6. Any damaged curb, gutter, or sidewalks should be repaired or
replaced at this time.
7. The change of use to a multi -family rated building, will
require certain upgrades to comply with the current building
code. Please contact Sharon Getz at 221-6760 when you have
more information and a floor plan for the Building Department
to review.
8. The Fire Authority has an access concern if the "breeze way"
is a solid room with doors, as opposed to a covered open
walkway with lattice work, as it is now. Code requires that
there be emergency access of 150' to the back of the building,
from the front, on either side. The building may be just out
of access if the breeze way can not be used by emergency
personnel.
9. The are also Fire Code requirements for a fire hydrant within
400' of the building. If there is not a hydrant at this time,
one will have to be put in along Stuart Street at the
developer's expense.
10. A traffic study will be required. There was one submitted
with the Springwood Institute PUD which could be revised to
reflect the change of use. The study should focus on traffic
patterns that would result from this use, the number of trips
to and from the use per day, the case of all international
students with a 1 car in 10 ratio versus the all American
students with a higher ratio of cars per student, as well as
the critical issue of parking. Matt Dellich at 669-2061
submitted the previous study.
11,. Parking and the intensity of the land use in this neighborhood
are the greatest concerns.
12. A neighborhood meeting will be required, please see attached
information on neighborhood meetings. I can schedule a
meeting as soon as I have the "affected property owners"
mailing labels.
13. Portions of the property have not been platted, therefore the
property would need to be platted. A subdivision plat was
submitted with the previous PUD, but the plat was never
finalized. A significant amount of work was done on the plat
so you may want to have that plat finalized, rather than begin
on a new one.