HomeMy WebLinkAboutSTROBEL MINOR SUBDIVISION - 62 91B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDevelopmt_-. Services
Planning Department
City of Fort Collins
May 8, 1992
Greg Fisher
4308 Picadilly Drive
Fort Collins, CO. 80526
Dear Greg, j
City staff has reviewed your submittal for the Strobel Minor
subdivision and has the following comments to offer:
1. Vehicular access for Lot 2 must be from Charlie Lane, between
Lots 1 & 3. A note must be added to the plat stating that no
vehicular access to Lot 2 can occur from County Road No. 9.
2. The developer will need to provide off -site right-of-way
and/or easement along the east side of County Road No. 9 south
to the Hewlett-Packard property. It appears that the developer
will need to pay for the installation of a temporary overhead
electrical line in the aforementioned R.O.W./easement in
addition to the normal Light & Power development charges.
�3.
Utility
plans must be submitted that include
the design for
Charlie
Lane based.on the soils report.
4.
Is the
30' from the centerline of County
Road No. 9 a
dedicated R.O.W. or just an easement? You may
need to include
the 30'
in the R.O.W. dedication with the 20'
as shown.
5.
How was
Charlie Lane dedicated, if it was? This
plat does not
dedicate that road. G C,�ltn
6.
The 30'
�1 plat
utility easement as shown on the
is not located
or tied
to anything and must it be.
7. Have the outer boundary monuments been found or set? A
description of the status must be added to the plat.
8. A fire hydrant must be provided at the entrance to Lot 2. The
driveway for this lot must be 20' in width for emergency
access purposes.
9. The property owners will be responsible for the maintenance of
all landscaping in the public R.O.W.
10. Utility plans must be approved prior to issuance of any
building permits.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
s
r
11. A copy of U.S. West's comments is attached.
12. Stormwater utility has required submittal of a drainage report
and grading/erosion control plans. These documents were
received yesterday.
This concludes staff comments at this time. I would like to be able
to set the public hearing with Director of Planning as soon as
there is reasonable assurance that these comments are addressed.
Please call me at-221-6750 with questions about these comments.
S' rely,
yt�St -
Project Planner
xc: Kerrie Ashbeck
Sherry Albertson -Clark
Stewart & Associates