Loading...
HomeMy WebLinkAboutDUNN ELEMENTARY SCHOOL ADDITION REMODEL ADVISORY REVIEW - 3 92 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS2407 LAPORTE AVENUE FACILITIES SERVICES FORT COLLINS, COLORADO 80521 PHONE 303-482-7420 February 11, 1992 Ted Shepard Planning Department City of Fort Collins P. O. Box 580 Fort Collins, CO 80522 Re: Staff Comments Dunn Addition/Remodel, Feb 10, 1992 Dear Mr. Shepard: We have reviewed the referenced staff comments with Monte Peterson. At this time this is my best response: 1. The road on the south is intended for the use of kitchen and supply deliveries, and for trash pickup. Depending on budgetary constraints, we will either pave this road with new asphalt or spread recycled asphalt. 2. The road will not be equipped with a gate. 3. The road does have a curb cut. This was approved by the City of Fort Collins in August, 1991. 4. The three Locust trees are part of a memorial and will be moved, along with the benches, to a spot further east. We will submit a landscaping plan. 5. The dashed line on the corner indicates possible future expansion. This is not a play area. 6. The gate location on Mulberry will remain operable and meet the specifications of the Poudre Fire Authority. (Their request presented during Conceptual Review was to chain the gates and leave them operable). 7. By way of a copy of this memo, we have instructed our architects to meet ADA requirements on ramp specifications. 8. Our architects will provide a vicinity map along with existing square footage and proposed new square footage. Requested prints and colored renderings will be provided no later than February 18, 1992. Ted, thank you for your help and guidance. Sincerely, on Daggett Construction Project Manager c: Monte Peterson Bill Brenner