Loading...
HomeMy WebLinkAboutPSD PROSPECT SCHOOL SITE - FDP200003 - DOCUMENT MARKUPS - ROUND 3 - STREET RELATED DOCUMENT (2)PH SC H2O PROSPECT ROAD INTERSTATE 25 COUNTY ROAD 5 E. MULBERRY STREET 52' FL-EOP w/ DETACHED SIDEWALK ON NORTH SIDE (PER LCUASS DETAIL 7-2F 1 2 STREET SECTION) PROSPECT ROAD - PROPOSED SECTION 15' UTIL ESMT 8' WALK 10' PKWY 6' BIKE LANE 11' TRAVEL LANE 12' MEDIAN/ TURN LANE 54' ROADWAY (FL-EOP) 87.5' RIGHT-OF-WAY (MIN.) 8' BIKE LANE 12' TRAVEL LANE 57.5' SECTION LINE TO PROPOSED ROW 30' 1 2 ROW (MIN.) 76' FL-FL w/ 8' ATTACHED (SOUTH) AND DETACHED (NORTH) SIDEWALKS (MODIFIED LCUASS DETAIL 7-2F) PROSPECT ROAD - ULTIMATE SECTION (4-LANE ARTERIAL) 8' WALK 10' PKWY 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE 76' ROADWAY (FL-FL) 8' WALK 107.5' ROW 3' BIKE LANE BUFFER 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE 3' BIKE LANE BUFFER 3' BIKE LANE BUFFER MATCH EXISTING 12' TURN LANE LEFT TURN MEDIAN 4' MEDIAN 15' UTIL ESMT 15' UTIL ESMT 2' ACCESS ESMT A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Drainage Report for PSD Middle School High School #2 dated March 6, 2020 by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 CS3 UTILITY NOTES 3 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R CITY OF GREELEY The City's acceptance shall not relieve the design engineer's responsibility for errors, omissions, or design deficiencies for which the City is held harmless. C. CITY OF GREELEY NOTES: 1. All easements and Rights-of-Way crossing the City of Greeley Easement are subject to the rights of said City of Greeley Easement. 2. There shall be no permanent structures, concrete slabs, detention ponds, fences, walls, trees, or other landscaping or berms greater than 3 feet at mature growth, or other obstructions within the City of Greeley Easement. no cover shall be removed and/or added without written permission from City of Greeley Water Engineer. 3. There shall be no other utilities within the City of Greeley Easement except at right angle crossings and unless previously approved by the City of Greeley Water & Sewer Department. All plans shall be submitted during the design phase at least two weeks prior to construction and shall show potholed locations and elevations in plan and profile view. Greeley Water & Sewer will issue appropriate crossing approval. 4. In the event that excavation is required for the City of Greeley water pipelines due to water pipeline repairs, replacement or other operations, the excavation will be backfilled safely but surface restoration will not be done by/ or at the expense of the City of Greeley. 5. Greeley water pipeline locations are approximate, contact Keith Ikenouye at 970 371-3718 72 hours in advance of any locate request or any construction activities within the Greeley Water Pipeline Easement. 6. There shall be no vibratory or heavy sheepsfoot compaction within 20 feet of the existing water transmission pipeline. Static compaction equipment shall be used. 7. Greeley pipelines are to have a minimum of six (6) feet of cover at all locations to be used as a land bridge during any construction activities. 8. Greeley water line support at crossings shall be incorporated into the design if proposed utility crossing is below the water line using open trench construction. 9. Any irrigation lines and/or sprinkler systems located within Greeley Easement requires contractor to provide Greeley a full set of landscaping & irrigation/sprinkler system plans for review and approval. Plans to be provided a minimum of 2 weeks prior to construction. Valve boxes are not to be located within Greeley's Easement. 10. Any work to be done on City of Greeley waterline(s) shall conform to current City of Greeley Specifications. SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G CTV CTV CTV CTV CTV CTV X X X CTV CTV CTV CTV CTV CTV CTV OHU CTV CTV CTV CTV X X CTV CTV CTV CTV CTV CTV X X CTV CTV CTV / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G / / / / / / / / X X X X X / / / / / / / / CTV X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU SS SS SS SS SS SS SS SS SS W W G G G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHU OHU OHU OHU B M C S GAS C WV B M / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / B M WV W S O VAULT F.O. VAULT VAULT CABLE F.O. C VAULT F.O. F.O. CABLE CABLE TELE CABLE CABLE TELE W M M M M M GAS F.O. F.O. VAULT CABLE F.O. F.O. SS FO FO FO FO SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W G G G G G G G G G G G G G G G G G G G G G G G CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV X X X CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV X X CTV CTV CTV CTV CTV CTV CTV OHU OHU S S H2O H2O H2O H2O H2O H2O WV WV W S C M CABLE C M W W CC E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS CTV CTV CTV CTV CTV CTV CTV G G G G G G G G G G G G G G G G G G G G G G X X X CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU S S S S MM C W M CABLE CABLE CABLE CABLE CABLE VAULT CABLE CABLE M CABLE C WV MH MH 8" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G CTV X OHU OHU OHU OHU OHU OHU OHU OHU S S S C C GAS C C WV C WV WV W S O VAULT F.O. VAULT CABLE C CABLE CABLE CABLE TELE W GAS VAULT CABLE F.O. F.O. SS FO FO FO FO FO FO E T T T T X X W MH F.O. E E F.O. FO FO FO T T T T T G G G G G G FO FO FO FO FO FO FO FO FO FO FO FO W W W W W X G G G G 6" W E E E E EXISTING 20' UTILITY EASEMENT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / FES A1 STA 10+37.96 N: 124917.44 E: 221102.07 FES A STA 10+00.00 N: 124879.50 E: 221100.96 37.96 LF 15" RCP @ 0.50% MAIN STREET EXISTING 8" WATER EXISTING WATER METER PROPOSED FIRE HYDRANT (SEE ONSITE PLANS - SEE NOTE #7) PROPOSED RIPRAP 4905 4910 4915 4920 4925 4930 4935 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X 107.5' ROW 8' SIDEWALK 8' SIDEWALK EDGE OF PAVEMENT 30' BOXELDER SANITATION DISTRICT EASEMENT 66' FL-EOP 54' FL-EOP 15' UTILITY EASEMENT 15' UTILITY EASEMENT 14.96 15.12 17.99 17.94 17.78 17.77 16.88 17.49 15.01 (14.54) 14.39 (15.06) (13.05) (15.00) (14.62) 14.27 14.86 EOP MCLAUGHLIN LANE 17.55 16.93 17.07 17.08 16.68 16.42 16.28 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / TELE TELE T X X X X X X X X X X X X / / / / / / / / T (15.97) (15.74) (14.87) (14.79) (14.45) (14.52) (14.50) (14.48) (14.39) (15.08) (14.01) X X X X X X X X M M / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / CONNECT TO EXISTING STA.=8+54.26 OFFSET=-10.569 BEGIN TAPER STA.=8+54.26 OFFSET=-13.469 END TAPER STA.=10+00.00 OFFSET=-20.259 CONNECT TO EXISTING STA.=8+54.26 OFFSET=13.611 PROSPECT ROAD 87.5' ROW PROPOSED 54' FL-EOP 8' SIDEWALK 15' UTILITY EASEMENT PROPOSED 30" CURB & GUTTER PROPOSED EDGE EDGE OF PAVEMENT OF ASPHALT STA.=8+54.26 OFFSET=14.713 EXISTING 60' ROW APPROXIMATELY 24' EOP-EOP PROPOSED BARRICADES 2' ACCESS EASEMENT JIRON JACKLYN E 4525 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 14+50 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 24+50 4918.04 4918.04 4917.52 4917.05 4917.21 4917.76 4918.31 4918.84 4918.89 4918.38 4917.92 4918.11 4918.11 4917.93 4917.79 4917.65 4917.38 4917.24 4917.12 4917.02 4917.03 4917.10 4917.34 4917.48 4917.62 4917.89 4918.03 4918.17 4918.44 4918.58 4918.72 4918.92 4918.96 4918.95 4918.79 4918.66 4918.52 4918.24 -0.55% 0.55% -0.55% 0.55% 150.0' VC HP ELEV = 4918.13 HP STA = 15+50.82 PVI STA = 15+50.82 PVI ELEV = 4918.34 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 24+50 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+50 4917.83 4917.38 4917.57 4918.12 4918.67 4919.17 4919.07 4918.53 4917.98 4917.97 4917.69 4917.44 4917.36 4917.38 4917.45 4917.71 4917.85 4917.98 4918.26 4918.40 4918.53 4918.81 4918.95 4919.08 4919.21 4919.21 4919.17 4918.94 4918.80 4918.67 4918.39 4918.25 4918.12 4917.84 -0.55% 0.55% -0.55% 150.0' VC HP ELEV = 4919.22 HP STA = 30+37.00 PVI STA = 30+37.00 PVI ELEV = 4919.42 BVCS: 29+62 BVCE: 4919.01 EVCS: 31+12 EVCE: 4919.01 A.D. = 1.10 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 33+50 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 43+50 4917.43 4916.97 4917.15 4917.70 4918.25 4918.80 4919.35 4919.69 4919.33 4918.84 4917.57 4917.29 4917.15 4917.04 4916.95 4916.97 4917.04 4917.29 4917.42 4917.56 4917.84 4917.97 4918.11 4918.39 4918.52 4918.66 4918.94 4919.07 4919.21 4919.49 4919.60 4919.67 4919.66 4919.59 4919.47 4919.20 4919.06 4918.92 4918.75 0.55% -0.55% -0.35% PVI STA = 42+73.30 PVI ELEV = 4918.93 150.0' VC HP ELEV = 4919.69 HP STA = 40+98.52 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 43+50 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 4918.49 4918.14 4917.79 4917.43 4918.57 4918.40 4918.31 4918.22 4918.05 4917.96 4917.87 4917.70 4917.61 4917.52 4917.35 4917.26 -0.35% PVI STA = 47+56.46 PVI ELEV = 4917.24 -0.50% 0.50% PVI STA = 52+56.46 PVI ELEV = 4918.00 135.0' VC LOW PT ELEV = 4916.18 LOW PT STA = 48+57.92 PVI STA = 48+57.92 PVI ELEV = 4916.01 BVCS: 47+90.42 BVCE: 4916.34 EVCS: 49+25.42 EVCE: 4916.34 A.D. = 1.00 K = 135.00 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND FUTURE GRADE TIE TO EXISTING / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / CONNECT TO EXISTING STA.=10+00.00 OFFSET=12.531 STA.=10+00.00 OFFSET=-16.628 STA.=13+89.97 OFFSET=-24.751 BEGIN TAPER STA.=10+00.00 OFFSET=20.574 STA.=10+90.94 OFFSET=-18.522 STA.=11+90.90 OFFSET=-20.604 STA.=12+48.94 OFFSET=-21.813 STA.=10+71.28 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR STA.=15+24.73 OFFSET=-26.000 STA.=15+58.73 OFFSET=-26.000 PROPOSED 68' EOP-EOP 140' ROW 8' SIDEWALK EXISTING 10' TRAIL STA. = 17+16.77 MAIN STREET STA. = 42+73.30 PROSPECT ROAD R25' PROPOSED 54' EOP-EOP STA.=15+80.68 OFFSET=-26.000 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X 8' SIDEWALK 120' ROW CONNECT TO EXISTING STA.=33+16.84 OFFSET=-14.866 STA.=30+82.81 OFFSET=-25.245 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / CONNECT TO EXISTING STA.=35+05.15 OFFSET=22.541 EXISTING CULVERT PROPOSED SAWCUT MAIN STREET SERRATOGA FALLS PARKWAY KITCHELL WAY TRACT B SERRATOGA FALLS 2ND FILING DUNN, RICHARD L/CAROL B 5021 KITCHELL WAY EXISTING 120' ROW EXISTING ± 37' EOP-EOP 4915 4920 4925 4930 4935 4940 4915 4920 / / / / / / / / / / / / / / / / / / / / / / / / T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X A A 12' LEFT TURN LANE 11' TRAVEL LANE 12' TRAVEL LANE 54' FL-EOP 87.5' ROW 6' BIKE LANE 8' BIKE LANE PROSPECT ROAD MCLAUGHLIN LANE EXISTING EDGE OF ASPHALT 2' SHOULDER L PROPOSED BARRICADES 15' UTILITY EASEMENT 30" VERTICAL CURB & GUTTER 8' SIDEWALK EDGE OF PAVEMENT STA.=8+54.26 OFFSET=9' BEGIN 4 STA.=9+24.27 OFFSET=1' CONTINUE 7 STA.=9+24.57 OFFSET=13' BEGIN 6 STA.=13+49.01 OFFSET=32' BEGIN 9 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S / / / / / / / / A A A B B A 12' LEFT TURN LANE A 11' TRAVEL LANE 9' BIKE LANE 12' RIGHT TURN LANE 12' TRAVEL LANE 8' BIKE LANE 11' TRAVEL LANE 12' LEFT TURN LANE 12' TRAVEL LANE 6' BIKE LANE 72' FL-FL 97.5' ROW PROSPECT ROAD MEADOWAIRE DRIVE CARRIAGE ROAD B B H L L 5' BIKE LANE 12' RIGHT TURN LANE L L 15' UTILITY EASEMENT 8' SIDEWALK 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER STA.=30+72.26 OFFSET=22' BEGIN 4 STA.=30+72.26 OFFSET=33' BEGIN 1 STA.=30+72.26 OFFSET=42' BEGIN 4 STA.=32+77.26 OFFSET=42' BEGIN 3 END 4 STA.=32+77.26 OFFSET=33' BEGIN 6 END 1 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / C.O. B L 13' TRAVEL LANE A A 13' TRAVEL LANE 12' RIGHT TURN LANE 12' LEFT TURN LANE A 6' BIKE LANE 6' BIKE LANE 66' EOP-EOP 140' ROW 16' LEFT TURN LANE 13' TRAVEL LANE 13' TRAVEL LANE X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X SIGNORELLI JACKLYN C 4529 E PROSPECT RD JIRON JACKLYN E 4525 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD TROXELL BARBARA Y 4417 E PROSPECT RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD JIRON JACKLYN E 4525 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD TROXELL BARBARA Y 4417 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD POUDRE SCHOOL DISTRICT 12' LEFT TURN LANE 11' TRAVEL LANE 11' TRAVEL LANE 8' BIKE LANE 12' RIGHT TURN LANE 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 12' LEFT TURN LANE 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 16' MEDIAN/CENTER LANE 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 8' ATTACHED WALK 8' DETACHED WALK X X X TELE G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT 12' LEFT TURN LANE 11' TRAVEL LANE 11' RIGHT TURN LANE 8' BIKE LANE 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 12' LEFT TURN LANE 11' TRAVEL LANE 11' TRAVEL LANE 8' BIKE LANE 12' RIGHT TURN LANE 11' TRAVEL LANE 11' TRAVEL LANE 5' BIKE LANE w/ 3' BUFFER 8' ATTACHED WALK 8' DETACHED WALK 10' PARKWAY EXISTING ROW FUTURE ROW FUTURE ROW EXISTING ROW 7 A A 9 12 9 A A B B H B A K M TELE TELE T X X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T T T / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8' SIDEWALK 10' CROSS PAN PROPOSED 30" CURB & GUTTER PROPOSED EDGE OF ASPHALT R30' R30' 87.54' ROW PROPOSED 54' FL-EOP PROSPECT ROAD MCLAUGHLIN LANE 15' UTILITY EASEMENT PROPOSED BARRICADES 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8' SIDEWALK PROPOSED 30" CURB & GUTTER PROPOSED EDGE OF ASPHALT R30' 107.5' ROW PROPOSED 66' FL-EOP 107.5' ROW PROPOSED 54' FL-EOP PROSPECT ROAD PROPOSED 4' SIDEWALK CULVERT 15' UTILITY EASEMENT 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 12'x6' RCBC (TRIC) EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD CENTER LINE 17+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8' SIDEWALK 8' SIDEWALK 10' CROSS PAN PROPOSED 30" CURB & GUTTER 15' UTILITY EASEMENT R25' R25' 107.5' ROW PROPOSED 54' FL-EOP 97.5' ROW PROPOSED 54' FL-EOP 97.5' ROW PROPOSED 66' FL-EOP PROSPECT ROAD MEADOWAIRE DRIVE PROPOSED 4' SIDEWALK CULVERT 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 12'x6' RCBC (TRIC) NICHOLS LIVING TRUST 1601 MEADOWAIRE DR EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR CENTER LINE X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROPOSED 30" CURB & GUTTER PROPOSED 30" CURB & GUTTER PROPOSED EDGE PROPOSED EDGE OF ASPHALT OF ASPHALT 8' SIDEWALK 8' SIDEWALK 15' UTILITY EASEMENT 15' UTILITY EASEMENT 97.5' ROW PROSPECT ROAD CARRIAGE ROAD PROSPECT ROAD PROPOSED 4' SIDEWALK CULVERT 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 12'x6' RCBC (TRIC) RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT 4:1 4:1 5:1 CENTER LINE 33+00 4910 4912 4916 4920 4910 4912 / / / / / / / / / / / / / / / / / / / / / / / / T TELE / / / / / / / / / / / / / / / / G G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT 8' SIDEWALK 15' UTILITY EASEMENT 118' ROW PROSPECT ROAD PROSPECT ROAD MAIN STREET SEE SHEETS XS6-XS9 MAIN STREET SEE SHEETS XS6-XS9 R25' R25' R25' R25' EXISTING ±24.44' EOP-EOP 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50 EXISTING 10' TRAIL M X X X X X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / G G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 MAIN STREET R25' R25' R25' R25' CENTER LINE 18+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 18+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 19+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 19+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 20+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 24+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 24+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 25+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 25+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 26+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 30+00 4914 4916 4920 4924 4914 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 30+50 4914 4916 4920 4924 4914 4916 4920 4924 -40 -20 0 20 40 60 CENTER LINE 31+00 4916 4920 4924 4928 4916 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 31+50 4916 4920 4924 4928 4916 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 32+00 4916 4920 4924 4928 4916 4920 4924 4928 -40 -20 0 20 40 60 X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8' SIDEWALK PROSPECT ROAD 15' UTILITY EASEMENT 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 JIRON JACKLYN E 4525 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD TROXELL BARBARA Y 4417 E PROSPECT RD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE PROPOSED 30" CURB & GUTTER ULTIMATE 8' SIDEWALK ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL ULTIMATE 8' SIDEWALK ULTIMATE 30" CURB & GUTTER ULTIMATE 30" CURB & GUTTER ULTIMATE STRIPING (TYP.) CENTER LINE 9+00 4906 4908 4912 4916 4906 X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X 8' SIDEWALK R30' R30' 107.5' ROW PROSPECT ROAD MCLAUGHLIN LANE 15' UTILITY EASEMENT 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD POUDRE SCHOOL DISTRICT PROPOSED 4' SIDEWALK CULVERT 12'x6' RCBC (TRIC) ULTIMATE 88' FL-FL ULTIMATE 8' SIDEWALK PROPOSED 30" CURB & GUTTER ULTIMATE 30" CURB & GUTTER ULTIMATE STRIPING (TYP.) CENTER LINE 15+00 4910 4912 4916 4920 4910 4912 107.5' ROW 15' UTILITY EASEMENT 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD PROPOSED 4' SIDEWALK CULVERT 12'x6' RCBC (TRIC) ULTIMATE 76' FL-FL ULTIMATE 8' SIDEWALK ULTIMATE 30" CURB & GUTTER ULTIMATE STRIPING (TYP.) PROPOSED 30" CURB & GUTTER 8' SIDEWALK EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD CENTER LINE 21+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 21+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 X X X X X 8' SIDEWALK 15' UTILITY 8' SIDEWALK EASEMENT R25' R25' PROSPECT ROAD MEADOWAIRE DRIVE 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 NICHOLS LIVING TRUST 1601 MEADOWAIRE DR SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR POUDRE SCHOOL DISTRICT 10' CROSS PAN PROPOSED 30" CURB & GUTTER 12'x6' RCBC (TRIC) ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL ULTIMATE 8' SIDEWALK ULTIMATE 30" CURB & GUTTER ULTIMATE STRIPING (TYP.) ULTIMATE 107.5' ROW ULTIMATE 88' FL-FL ULTIMATE 8' SIDEWALK ULTIMATE 30" CURB & GUTTER CENTER LINE 30+50 4910 4912 4916 4920 4910 4912 X X 8' SIDEWALK 15' UTILITY EASEMENT CARRIAGE ROAD PROSPECT ROAD 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD POUDRE SCHOOL DISTRICT PROPOSED 30" CURB & GUTTER PROPOSED 4' SIDEWALK CULVERT POUDRE SCHOOL DISTRICT ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL ULTIMATE 8' SIDEWALK ULTIMATE 30" CURB & GUTTER ULTIMATE STRIPING (TYP.) ULTIMATE 30" CURB & GUTTER ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL ULTIMATE 8' SIDEWALK CENTER LINE 33+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE TELE G G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8' SIDEWALK 15' UTILITY EASEMENT PROSPECT ROAD MAIN STREET R25' R25' R25' R25' 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 EXISTING 10' TRAIL LACY KEITH W JR 1601 S COUNTY ROAD 5 ULTIMATE EDGE OF ASPHALT 12'x6' RCBC (TRIC) POUDRE SCHOOL DISTRICT ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL ULTIMATE 8' SIDEWALK ULTIMATE 30" CURB & GUTTER ULTIMATE STRIPING (TYP.) PROPOSED 30" CURB & GUTTER CENTER LINE 39+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 E E E E E E E E E E E E E TELE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S T S T S T S SIGNAL CABINET PEDESTRIAN BUTTON POLE PEDESTRIAN BUTTON POLE PEDESTRIAN BUTTON POLE PEDESTRIAN BUTTON POLE 55' SIGNAL POLE 55' SIGNAL POLE 55' SIGNAL POLE 45' SIGNAL POLE 42" Ø SIGNAL CAISSON 36" Ø SIGNAL CAISSON 42" Ø SIGNAL CAISSON 42" Ø SIGNAL CAISSON LACY KEITH W JR 1601 S COUNTY ROAD 5 TRACT C SERRATOGA FALLS 2ND FILING PROSPECT ROAD MAIN STREET HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR PROPOSED ELECTRIC E E E E E E E E E ELCO WATER DISTRICT DETAIL: DRAWN: DATE: A A 100 BEDDING REQUIREMENTS AIR RELIEF/VACUUM VALVE THRUST RESTRAINT THRUST BLOCKS TRACE WIRE TERMINAL BOX TRENCH REQUIREMENTS ELCO WATER DISTRICT DETAIL: TYPICAL THRUST RESTRAINT DRAWN: REM DATE: 8/00 SPECIFICATION: 02713 Swivel tee Anchor coupling Valve Valve Concrete thrust block- See Typical Thrust Blocks Detail Water main NOTE: IN-LINE VALVES DO NOT REQUIRE ANCHOR COUPLING RESTRAINT ELCO WATER DISTRICT DETAIL: DRAWN: DATE: MIN. THRUST AREA CASE A MIN. THRUST AREA CASE B AREA MIN. THRUST MIN. THRUST AREA CASE C CASE D TYPICAL THRUST BLOCKS RKB 7/92 MIN. THRUST NOTE: 1: ALL CONCRETE SHALL BE POURED AGAINST UNDISTURBED EARTH. 2: THRUST BLOCKS SHALL BE USED FOR ALL _ BENDS > 11 1/4 ° & ALL PLUGS. 3: ALL FITTINGS & PLUGS MUST BE WRAPPED WITH POLYETHYLENE TO PREVENT CONCRETE FROM ADHERING TO THE BOLTS OR PIPE. SPECIFICATION: 02713 & 03300 ELCO WATER DISTRICT DETAIL: TRACE WIRE TERMINAL BOX DETAIL DRAWN: DLS DATE: 10/98 SPECIFICATION 02622 WATER DROP LID - TOP VIEW DROP LID - SIDE VIEW TOP - SIDE VIEW BOX AND LID DETAIL NOT TO SCALE Box installed to grade - to either rigt or left of all new fire hydrant assemblies Trace wire, 12-guage insulated stranded copper Clean 3/4 inch rock French drain well INSTALLATION DETAIL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R GATE VALVE ELCO WATER DISTRICT DETAIL: DRAWN: DATE: 3-PIECE VALVE BOX GATE VALVE (AWWA C500) WATER LINE MECHANICAL JOINT GATE VALVE DETAIL BUTTERFLY VALVE (AWWA C504) VALVE BOX WATER LINE BUTTERFLY VALVE DETAIL WATER LINE MECHANICAL JOINT A A A-A VALVE DETAIL DLS NOTE: ALL VALVES OPEN LEFT MECHANICAL JOINT VALVE BOX SHALL BE SCREWED DOWN 6" & BURIED BELOW GRADE IF INSTALLED IN A NON-PAVED ROADWAY TRACER WIRE TAPED TO TOP OF PIPE "WATER" CAST IN TOP OF VALVE BOX COVER 2" OPERATING NUT OPEN LEFT 4'-0" MIN. 4'-0" MIN. BACKFILL TO BE HANDPLACED AND COMPACTED TOP OF VALVE BOX SHALL BE SET 1/8"-1/2" BELOW SURROUNDING ASPHALT 6" 2/00 SPECIFICATION 02641 ELCO WATER DISTRICT DETAIL: DRAWN: DATE: NOTE: CASING CHOCKS TO BE POWERSEAL MODEL 4810 (STANDARD CONFIGURATION) OR EQUAL. MANUFACTURER: POWERSEAL PIPELINE PRODUCTS CORP. P.O. BOX 2014 WICHITA FALLS, TX. 76307 (800) 433-0932 CASING CARRIER PIPE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 307 Z-CUT DETAIL NOTE: 1. TO BE USED AT ALL PAVEMENT EXPANSIONS AND CONTINUATIONS 2. MILL SAW CUT LINE PRIOR TO CUTTING. MILL PAVEMENT MIN 2" SAW CUT LINE. CUT TO CLEAN EDGE. EX DEPTH PLUS 2" UP TO 8". THEN EX DEPTH. MAX 30° EXISTING PAVEMENT NEW PAVEMENT 303 SIGN POST Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 D3 SITE DETAILS 46 300 CURB AND GUTTER 8' DOWELL IF JOINTS A TOOL JOINT A JOINTS (TYP.) CONTROL PARALLEL STREET CLASSIFICATION LOVELAND DEPTH OF INVERT W WIDTH / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD MAIN STREET - COUNTY ROAD 5 18.93 18.75 18.61 18.52 18.48 18.48 18.53 18.62 18.86 18.52 18.22 18.09 18.05 18.05 18.10 18.20 18.79 18.37 17.92 17.86 17.56 17.19 15.70 15.81 18.72 18.15 18.65 18.09 18.58 18.03 18.51 17.98 18.44 17.92 18.37 17.86 18.30 17.80 500 STORMWATER BEDDING REQUIREMENTS Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R D5 DRAINAGE DETAILS 48 502 CONCRETE END SECTIONS E C B E E C D PLAN BACK OF CURB EDGE OF STREET 5 8" GALV. STEEL PLATE 2 1 2 1 3"x2"x3 8" GALV. ANGLE SEE DETAIL 1 #4@12" O.C. #4@12" O.C. #4@12" O.C. 3"x2"x3 8" GALV. ANGLE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X PROSPECT ROAD MCLAUGHLIN LANE SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF 15' UTILITY EASEMENT 8' SIDEWALK 81' DITCH EASEMENT STORM DRAIN 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 30' BOXELDER / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / CARRIAGE ROAD SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF WD WD SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X MAIN STREET SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 EC4 EROSION CONTROL DETAILS 52 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner VEHICLE TRACKING CONTROL PAD SHALL BE LOCATED AT EVERY ACCESS POINT TO THE CONSTRUCTION SITE. A SIGN SHALL BE PLACED NEXT TO THE VEHICLE TRACKING CONTROL PAD TO DESIGNATE THE LOCATION AS THE CONSTRUCTION ENTRANCE/EXIT. VEHICLE TRACKING CONTROL PADS SHALL CONSIST OF HARD, DENSE, DURABLE STONE, ANGULAR IN SHAPE AND RESISTANT TO WEATHERING. ROUNDED STONE (i.e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heet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 EC5 EROSION CONTROL DETAILS 53 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner 008 009 010 MULCHING 011 SURFACE ROUGHENING NATIVE GRASS SEED MIX: Species Preferred Varieties Seeded Rate (lbs. per acre, drilled) PLS Seeded/acre Leymus Cinereus Great Basin Wilrye Mangar 3 285,000 Nassella Viridula Green Needlegrass Lodorm 2 362,000 Chnatherum Hymenoides Indian Ricegrass Paloma, Nezpar 1 188,000 Elymus Trachycaulus Slender Wheatgrass Primar, Revenue 2 320,000 Elymus Lanceolatus Thickspike Wheatgrass Critana 3 580,500 Pascopyrum Smithii Western Wheatgrass Arriba, Barton 4 504,000 Totals 15 2,239,500 012 NATIVE GRASS SEED MIX SURFACE ROUGHENING MULCHING MU MAINTENANCE NOTES: 1. 2. 3. CONSTRUCTION FENCE, TYP., TO DISCOURAGE VEHICLE ACCESS EXCEPT AT VTC SIGN "CONSTRUCTION ENTRANCE" R=5' 20' MIN. 3" - 6" ROCK NO MATERIALS INCLUDING 2x4'S, PIPES, DIRT, GRAVEL OR ASPHALT, SHALL BE PLACED IN GUTTER TO FACILITATE MOUNTING CURB; HOWEVER, CURB MAY BE CUT DOWN TO A HEIGHT OF 2" OR HIGHER FOR EASIER ACCESS AND REPLACED AT PROJECT COMPLETION. OTHER ACCESS DEVICES MAY BE USED AS ACCEPTED BY THE CITY. CURB CUT 50' MIN. 2" MIN. 6" MIN. 6" MIN. ALTHOUGH NOT NORMALLY USED, THE CITY RESERVES THE RIGHT TO REQUIRE VEHICLE TRACKING CONTROL WITH A TEMPORARY CATTLE GUARD AND/OR WHEEL WASH FACILITIES AT SITES WHERE TRACKING ONTO PAVED AREAS BECOMES A SIGNIFICANT PROBLEM AS DETERMINED BY THE CITY INSPECTOR. IF VEHICLE TRACKING CONTROL WITH WHEEL WASH FACILITIES ARE REQUIRED, ALL WHEELS ON EVERY VEHICLE LEAVING THE SITE SHALL BE CLEANED OF MUD USING A PRESSURE-WASHER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A WATER SOURCE AND CONSTRUCTING A WASHWATER SEDIMENT TRAP. 5. 6. IF VEHICLE WHEEL WASH FACILITIES ARE REQUIRED, CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL AND WHEEL WASH FACILITIES DAILY. ACCUMULATED SEDIMENTS SHALL BE REMOVED FROM THE PAD SURFACE. ACCUMULATED SEDIMENT IN THE WASHWATER/SEDIMENT TRAP SHALL BE REMOVED WHEN THE SEDIMENT REACHES AN AVERAGE DEPTH OF 12-INCHES. 4. 5. VTC IP 001 CONCRETE WASHOUT AREA 003 ROCK SOCK DETAIL 004 VEHICLE TRACKING CONTROL PAD 007 CURB INLET PROTECTION ROCK SOCK SECTION ROCK SOCK PLAN ROCK SOCK JOINTING ROCK SOCK INSTALLATION NOTES 1. SEE PLAN VIEW FOR: - LOCATION (S) OF ROCK SOCKS. 2. CRUSHED ROCK SHALL BE 11 2" (MINUS) IN SIZE WITH A FRACTURED FACE (ALL SIDES) AND SHALL COMPLY WITH GRADATION SHOWN ON THIS SHEET (11 2" MINUS). 3. WIRE MESH SHALL BE FABRICATED OF 10 GAGE POULTRY MESH, OR EQUIVALENT, WITH A MAXIMUM OPENING OF 1 2", RECOMMENDED MINIMUM ROLL WIDTH OF 48". 4. WIRE MESH SHALL BE SECURED USING "HOG RINGS" OR WIRE TIES AT 6" CENTERS ALONG ALL JOINTS AND AT 2" CENTERS ON ENDS OF SOCKS. 5. SOME MUNICIPALITIES MAY ALLOW THE USE OF FILTER FABRIC AS AN ALTERNATIVE TO WIRE MESH FOR THE ROCK ENCLOSURE. GRADATION TABLE SIEVE SIZE MASS PERCENT PASSING SQUARE MESH SIEVES NO. 4 2" 100 1-1/2" 90-100 1" 20-55 3/4" 0-15 3/8" 0-5 MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE, ALL SIDES WIRE ENCLOSED 1 1/2" WASHED ROCK 2' RS 002 005 SILT FENCE/PERIMETER PROTECTION SWALE WATTLE DIKE NOTES 1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. 2. VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 3. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 4. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 5. THE CONCRETE WASHOUT SHOULD BE EMPTIED WHEN HALF OF TOTAL HOLDING CAPACITY HAS BEEN REACHED. 6. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. 7. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. 8. LOCATION OF CONCRETE WASHOUT AREA IS CONCEPTUAL ONLY. FINAL LOCATION TO BE DETERMINED IN THE FIELD AT CONTRACTOR'S DISCRETION. 3H:1V OR FLATTER SIDE SLOPES 12" MIN 8'x 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE 12" 2'-0" MIN. COMPACTED EMBANKMENT MATERIAL, TYP. BERM AROUND PERIMETER GROUND SURFACE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA *IMPERMEABLE LINER MAY BE NEEDED IF GROUND WATER IS ENCOUNTERED. POSTS PREASSEMBLED SILT FENCE POSTS SHALL OVERLAP AT JOINTS SO THAT NO GAPS EXIST IN SILT FENCE. NOTE: THICKNESS OF GEOTEXTILE POST SHALL BE JOINED AS SHOWN, THEN HAS BEEN EXAGGERATED. ROTATED 180° IN DIRECTION SHOWN AND DRIVEN INTO THE GROUND. SILT FENCE JOINTS DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18". EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 4" DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. ANCHOR TRENCH SHALL BE EXCAVATED BY HAND, WITH TRENCHER, OR WITH SILT FENCE INSTALLATION MACHINE. NO ROAD GRADERS, BACKHOES, ETC. SHALL BE USED. NOT LESS THAN THE BOTTOM 1' OF THE SILT FENCE FABRIC SHALL BE BURIED IN THE TRENCH. THE TRENCH SHALL BE COMPACTED BY HAND, WITH "JUMPING JACK" OR BY WHEEL ROLLING. COMPACTION SHALL BE SUCH THAT THE SILT FENCE RESISTS BEING PULLED OUT OF ANCHOR TRENCH BY HAND. SILT FENCE INDICATED IN THE PLANS SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. USE WOOD POSTS OR OTHER MATERIAL AS ACCEPTED BY THE CITY. INSTALLATION NOTES: 1. 2. 3. 4. 5. 6. 7. THE CONTRACTOR SHALL INSPECT SILT FENCE EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM SEDIMENT REACHES A DEPTH OF 6". SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED BY THE CITY. IF ANY DISTURBED AREA EXISTS AFTER REMOVAL, IT SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. MAINTENANCE NOTES: 1. 2. 3. 4" MIN. 4" MIN. 1 1 2" x 1 1 2" WOODEN FENCE POSTS SF SF RP NOT TO SCALE PLANTED RIPRAP INSTALLATION 006 RIPRAP DETAIL SF SF SF SF SF SF WD WD RS SF SF SF SF SF SF PROSPECT ROAD LACY KEITH W JR 1601 S COUNTY ROAD 5 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR POUDRE SCHOOL DISTRICT COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 REED SANDRA K 1707 ENCHANTMENT DR LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 LEWIS ALFRED WRAY BEVERLY JANE 1709 S COUNTY ROAD 5 TRACT C SERRATOGA FALLS 2ND FILING STORM CULVERT D SEE SHEET ST1 WD WD WD WD WD WD SF SF RP 4:1 23:1 5:1 4:1 6:1 6:1 RP RIPRAP RUNDOWN RP RIPRAP RUNDOWN RP RIPRAP RUNDOWN PROPOSED CULVERT RP MU MU MU 4:1 7:1 4:1 7:1 4:1 4:1 4:1 4:1 STORM DRAIN / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X MAIN STREET SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF TRACT B SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT TRACT B SERRATOGA FALLS 2ND FILING COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 RP RP RP PROPOSED SAWCUT LINE PROPOSED STORM (SEE ONSITE PLANS) PROPOSED 2' SIDEWALK CULVERT & RIPRAP RUNDOWN STORM CULVERT A SEE SHEET ST1 STORM CULVERT B SEE SHEET ST1 STORM CULVERT C SEE SHEET ST1 RP RP RS WD WD WD WD WD WD WD WD WD WD WD WD SF SF MU MU MU MU MU MU MU MU E MAIN STREET Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH EC3 EROSION CONTROL PLAN MAIN STREET 51 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC F MAIN STREET A B C E F D MATCHLINE - SEE BOTTOM LEFT MATCHLINE - SEE TOP RIGHT LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER SILT FENCE SF SF RIPRAP w/ TURF REINFORCEMENT MAT RP 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. REFER TO THE DRAINAGE REPORT FOR PSD MIDDLE SCHOOL HIGH SCHOOL #2 DATED MARCH 6, 2020 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. GENERAL NOTES: WATTLE DIKE WD CONCRETE WASH AREA CWA VEHICLE TRACKING CONTROL VTC INLET PROTECTION IP ROCK SOCK IP PROPOSED EDGE OF PAVEMENT / / / / / / / / SEEDING & MULCHING MU NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Rip Rap Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Basin Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Under slope stabilization rolled products. Reseeding may be required. EROSION CONTROL NOTES: 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT LOW-IMPACT DEVELOPMENT FACILITIES FROM SEDIMENTATION. THIS INCLUDES EDUCATING SUBCONTRACTORS ON-SITE. 17. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 18. DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED NIGHTLY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 19. CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. CONTRACTOR SHALL NOTIFY CITY BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970)224-6015 AS THIS PROJECT WILL NEED TO BE INSPECTED DURING CONSTRUCTION. 2. ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OF REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENTEROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES,AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. FORT COLLINS STANDARD EROSION CONTROL NOTES: SF RS SF SF SF SF PROSPECT ROAD MAIN STREET 15' UTILITY EASEMENT 8' SIDEWALK 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT STORM DRAIN (SEE NOTE #14) STORM DRAIN 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 PROPOSED 4' SIDEWALK CULVERT PROPOSED STORM (SEE ONSITE PLANS) 4' CONCRETE PAN (SEE ONSITE PLANS) PROPOSED STORM (SEE ONSITE PLANS) RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 TRACT C SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR STORM DRAIN RP RIPRAP RUNDOWN RIPRAP RUNDOWN PROPOSED CULVERT RIPRAP RUNDOWN RS RS RS SF SF SF SF SF SF SF IP RP RS RS RP RP MU MU 4:1 4:1 23:1 5:1 4:1 6:1 RIPRAP RUNDOWN RP / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD SF SF SF SF SF SF SANDERS, DENNIS L/DONI D 1623 CAREFREE DR FORT COLLINS, CO 80525 TRACT C SERRATOGA FALLS 2ND FILING SF SF Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH EC2 EROSION CONTROL PLAN PROSPECT ROAD 50 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD A B C E F D C MATCH LINE - SEE SHEET EC1 LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER SILT FENCE SF SF RIPRAP w/ TURF REINFORCEMENT MAT RP 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. REFER TO THE DRAINAGE REPORT FOR PSD MIDDLE SCHOOL HIGH SCHOOL #2 DATED MARCH 6, 2020 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. GENERAL NOTES: WATTLE DIKE WD CONCRETE WASH AREA CWA VEHICLE TRACKING CONTROL VTC INLET PROTECTION IP ROCK SOCK IP PROPOSED EDGE OF PAVEMENT / / / / / / / / SEEDING & MULCHING MU NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. D PROSPECT ROAD MATCHLINE - SEE TOP RIGHT MATCHLINE - SEE MIDDLE LEFT TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Rip Rap Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Basin Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Under slope stabilization rolled products. Reseeding may be required. EROSION CONTROL NOTES: 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT LOW-IMPACT DEVELOPMENT FACILITIES FROM SEDIMENTATION. THIS INCLUDES EDUCATING SUBCONTRACTORS ON-SITE. 17. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 18. DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED NIGHTLY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 19. CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. CONTRACTOR SHALL NOTIFY CITY BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970)224-6015 AS THIS PROJECT WILL NEED TO BE INSPECTED DURING CONSTRUCTION. 2. ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OF REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENTEROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES,AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. FORT COLLINS STANDARD EROSION CONTROL NOTES: SANITARY EASEMENT 4 SIDEWALK CULVERT PROPOSED STORM (SEE ONSITE PLANS) 4' CONCRETE PAN (SEE ONSITE PLANS) JIRON JACKLYN E 4525 E PROSPECT RD EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE POUDRE SCHOOL DISTRICT RIPRAP RUNDOWN SF RS RS RS RS SF SF SF SF SF SF SF SF SF IP CWA VTC RS RP RP 4:1 4:1 4:1 4:1 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X MEADOWAIRE DRIVE SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROSPECT ROAD 15' UTILITY EASEMENT 8' SIDEWALK 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT STORM DRAIN 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 4' SIDEWALK CULVERT PROPOSED STORM (SEE ONSITE PLANS) 4' CONCRETE PAN (SEE ONSITE PLANS) PROPOSED STORM (SEE ONSITE PLANS) NICHOLS LIVING TRUST EKBLAD LARRY R/LINDA M 1601 MEADOWAIRE DR 4725 E PROSPECT RD SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR POUDRE SCHOOL DISTRICT RS RS RS RS RS SF SF SF SF SF SF SF IP 4:1 Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH EC1 EROSION CONTROL PLAN PROSPECT ROAD 49 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD PROSPECT ROAD A B C E F D A B MATCHLINE - SEE MIDDLE LEFT MATCHLINE - SEE TOP RIGHT MATCHLINE - SEE SHEET EC2 LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER SILT FENCE SF SF RIPRAP w/ TURF REINFORCEMENT MAT RP 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4. REFER TO THE DRAINAGE REPORT FOR PSD MIDDLE SCHOOL HIGH SCHOOL #2 DATED MARCH 6, 2020 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. GENERAL NOTES: WATTLE DIKE WD CONCRETE WASH AREA CWA VEHICLE TRACKING CONTROL VTC INLET PROTECTION IP ROCK SOCK IP PROPOSED EDGE OF PAVEMENT / / / / / / / / SEEDING & MULCHING MU NOTE: ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Rip Rap Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Basin Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Under slope stabilization rolled products. Reseeding may be required. EROSION CONTROL NOTES: 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16. CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT LOW-IMPACT DEVELOPMENT FACILITIES FROM SEDIMENTATION. THIS INCLUDES EDUCATING SUBCONTRACTORS ON-SITE. 17. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 18. DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED NIGHTLY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 19. CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. CONTRACTOR SHALL NOTIFY CITY BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970)224-6015 AS THIS PROJECT WILL NEED TO BE INSPECTED DURING CONSTRUCTION. 2. ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OF REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENTEROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES,AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. FORT COLLINS STANDARD EROSION CONTROL NOTES: 5 8" GALV. STEEL PLATE #3 REBAR ANCHOR 18 O.C. 3 8" BRASS SCREW 18 O.C. WITH COUNTERSUNK HEAD FLUSH WITH PLATE 6" 6" VARIES 2' 3' SECTION B-B DETAIL 1 SECTION A-A PLAN SECTION C-C SLOPE VARIES VARIES VARIES 2' DEPRESSED GUTTER VARIES EXPANSION MATERIAL 5 8" GALV. STEEL PLATE EDGE OF STREET 12" R 12" R 3'-3" 2' OPENING 3'-3" 6" (TYP.) BACK OF CURB 3" (TYP.) 3' (TYP.) SIDEWALK (TYP.) EXTEND WALK 6" ON BOTH SIDES OF WALK VARIES VARIES SLOPE C C B B A A 8'-6" EXPANSION MATERIAL 3 8" BRASS SCREW 18" O.C. WITH COUNTERSINK HEAD FLUSH WITH PLATE 2' 6" 0.5% SLOPE (MIN.) 501 METAL SIDEWALK CULVERT FLOW DIRECTION REVISED REVISED FLOW DIRECTION 503 GUARDRAIL * SEE REMAINING SHEETS FOR ADDITIONAL INFORMATION 18.23 17.74 18.16 17.68 18.73 18.52 18.36 18.53 18.10 18.29 17.85 19.16 19.21 19.24 19.24 19.20 19.14 19.04 18.93 18.81 18.70 18.71 18.55 18.61 18.65 18.65 18.62 18.56 18.47 18.37 18.32 18.25 17.76 18.42 18.14 17.58 17.58 18.04 17.63 18.04 18.09 17.72 18.18 19.61 19.66 19.68 19.68 19.64 19.57 19.48 19.37 19.26 19.15 19.04 19.21 19.26 19.28 19.27 19.24 19.17 19.08 18.97 18.82 18.72 18.67 18.28 18.25 17.86 18.88 18.93 18.95 18.94 18.90 18.83 18.74 18.63 18.47 18.42 18.17 17.79 17.88 18.08 18.27 18.04 18.24 18.18 18.11 17.98 17.92 17.85 17.78 17.72 18.18 18.08 17.96 17.93 17.89 17.89 17.94 18.03 17.60 17.93 18.26 17.71 17.72 17.92 17.91 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 400 STANDARD TEMPORARY DEAD END BARRICADES 401 SIDEWALK DETAIL Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 D4 SITE DETAILS 47 402 ACCESS RAMP DETAILS 403 DIRECTIONAL ACCESS RAMP DETAIL 404 INTERSECTION GRADING DETAIL NORTH Gutter to gutter width of approach street 1/2 R11-2 (48x30) 1/4 1/4 extended by future development. dead end on a temporary basis, and must be maintained by the Developer until the street is These signs and barricades must be installed by the Developer at the end of all new streets that background, front side only, paint back and edges white. 3. Use 6" wide reflectorized orange stripes on reflectorized white 2. Posts shall be 6" x 6" pressure treated, rot-resistant lumber. 1. Rails shall be nominal lumber dimension. NOTES: 8" to 12" 8" to 12" 8" to 12" 4. Other options may be used as approved by Local Entity Engineer. ROAD CLOSED ATTACHED / SIDEWALK DOES NOT END AT BARRICADE ENDS AT BARRICADE DETACHED OR SIDEWALK ATTACHED SIDEWALK DETAIL Slope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4" 1/4 SLAB THICKNESS 1/4" 1/2" Expansion Joint material DETACHED SIDEWALK DETAIL Variable Landscaping Slope sidewalk to curb 1/4" per foot. 2' min. Slope: Minumum 1 4"/ft Maximum 3"/ft Transition back of walk (typ.) Broom finish Broom finish * SECTION A-A MID-BLOCK LOCATION (min.) 6' 1:12 Slope (max.) 1:25** slope (max.) Flowline (min.) (max.) Slope 1:12 5' A Slope 1:25 (max.) 6' Wood float finish thru ramp Slope 1:12 Slope 1:12 CORNER LOCATION ramp finish thru Wood float Broom finish A (min.) 6' 1:25 (max.) Slope (max.) A A 4' (max) (Radius varies) (typ.) back of walk Transition 2 Broom finish 6" * BACK OF WALK / LANDING Curb (optional) 6" (min.) (min.) 6" Walk Curb Gutter NOTES: 1. * 6" Thickness applies to entire ramp area. 2. ** 1:25 Unless a landing behind ramp (then ramp can be 1:12 with 1:20 on the truncated dome warning.) 3. See CONST. DWG. 1606(a) and 1607 for Fort Collins. 4. See CONST. DWG. 1614, 1615 and 1616 for Loveland. 2'-0" 6" Walk Gutter Curb Only if needed (min.) 6' (min.) or same width as the widest walk 6' (max.) walk, if needed. ground behind the Curb to retain Warning Detection Truncated Dome at the corners of the truncated dome warning curb 0" curb 6" curb 0" curb 6" truncated dome warning detection Warning Detection Truncated Dome Radius = 8" 1. No joints are allowed in the flowline. Six inch wide curb or "dummy joint" may be tooled no closer than 6 inches from flow line as shown. 2. Pedestrian landing area required 4 ft length x 4 ft width, max slope in any direction 1 is 1:50 or 4" per foot. 3. Joint pattern to be according to intersection gutter detail' or as determined by the local entity. 4. Wood float finish is required over the sloped surface of ramp and flares. 5. A 6" wide curb option may be poured along side of the ramp as shown if required. If curb is used it shall match style of adjacent curb and gutter. 6. Minimum ramp width shall be four feet, or the same as the widest adjacent sidewalk, whichever is greater, up to a maximum width of 8 feet. 7. Detectable warning is to extend full width of the ramp and be a minimum of 2.0' in the direction of travel. Material to be approved by local engineer 8. T = Concrete thickness, 6" minimum for entire ramp area. SECTION A-A PLAN VIEW N.T.S. N.T.S. NOTES: 2' Transition (TYP.) 4' (min) 6" 2' 1:20 (max) 1:12 (max)  T, See Note 8 0" Curb  Lip of Gutter Detectable Warning A A 1/2" per ft. 1" per ft. Flare Curb Flare Detectable Warning Curb Option, See Note 5 Curb (TYP.) SIDEWALK SIDEWALK 0" Curb Height, See Section A-A (TYP) Standard Curb and Gutter, See Standard Dwg 701 (TYP) Pedestrian Landing Area, See Note 2 2' (min) CROSS PAN Arterial 10' 1 1/4" 1 1/2" Collector 8' 1" 1 1/8" Local 6' 3/4" 7/8" d (MIN.) d (MAX.) 1 1/2" 2 1/2" 2" DEPTH OF INVERT FT. COLLINS d d 8' MIN. WIDTH WHERE CROSSING A COLLECTOR ROADWAY. ** **   LENGTH (for monolithic pour) SECTION A-A PAVEMENT DESIGN + 1/2" FOR COLLECTOR 8" MIN. FOR RESIDENTIAL. USE CONCRETE 10' MINIMUM (ARTERIAL) 8' MINIMUM (COLLECTOR) PLAN VIEW 6' MINIMUM (LOCAL) COLD JOINT (See Standard Drawing 714) AT 10' O.C. TOOL JOINT FOR PANS OVER 40' CONTROL JOINT REQUIRED CONTROL ROADWAY WIDTH ALL INTERSECTIONS TO HAVE ACCESS RAMPS NOTE: * * & ARTERIALS. SIDES. TO PAN SECTION, TYPICAL BOTH TRANSITION FROM C & G SECTION WALK 301 STANDARD DRIVEWAY APPROACH 302 STREET INTERSECTION CROSSPAN 6 " 2"R. 2" 6" 6" 12" 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge may be tapered or battered. (Typical for all Curb & & Gutter Types) NOTES: 1. 6' wide pan for residential streets. 2. All intersections to have access ramps. 3. Standard Curb and Gutter Section, See Standard Drawing 701 4. 0" Curb Height, See Section A-A 5. All of these pedestrian improvements shall be in ROW or a pedestrian or public access easement. 6. Detectable Warning to extend the full width of the ramp and be 2'-0" in the direction of travel. Maximum slope in the direction of travel shall be no more than 5.0 percent (1:20). Material to be approved by local engineer 7. T = 6" for residential and 8" for commercial. 8. Distance from back of curb to the beginning of Detectable Warning cannot be greater than 5'-0" TYPE III DETACHED WALK N.T.S. SECTIONS A-A CLASSIFICATION APPROACH TYPE Single Family 12' 24' Commercial I, II, III, or IV Multi Family 24' 36' 24' 36' MINIMUM WIDTH WIDTH MAXIMUM Industrial 24' 36' I, II, III, or IV I or II RESIDENTIAL: * * * * * DRIVEWAY WIDTHS High volume driveways (Type III or IV) allowed for 350 or greater trip ends/day. * 30' maximum for 3 car garages. * *No single opening shall exceed 36'. Wider driveways shall be divided w/a median not less than 6' wide. 1/4" per ft. 1" per ft. 1:50 Slope  T Walk 1:50 1:12 (max.) Gutter Parkway Sidewalk Detached 1:12 A A (max) 2' Flare See Note 4 See Note 3 If Concrete Driveway Expansion Joint See Note 6 1/4" per ft. 1" per ft. 1:12 (max.) 1" per ft. Driveway FL See Note 8 I, II, III, or IV Sidewalk Detached Max. Sign Panel 1. Attach the sign panels tightly to the post and use oversized washers to keep the sign from breaking loose from the post when hit by a vehicle. 2. Sign panels should be mounted a minimum of 7 feet above the pavement or ground. Cross section of post 3" - 6" ABOVE GRADE 2 1/4" Anchor 3. Signs larger than 36 inches in length or width require wind bracing and special post design. NOTES: 4. Anchor Stub and post are square steel tube (perforated). Anchor/Stub Post Size CRITERIA FOR SINGLE POST 36" x 36" 2.25" x 2.25" x 3'-0"2" x 2" x 12'-0" 5. All "No Parking" signs shall be installed at 45° from Flow Line. * * 2" x 2" x 10' OR 12' 12 GAUGE TELESPAR POST (22F12A31) 7'-0" MIN. CLEARANCE 2' - 3' FROM F Street Curb See Figure 16-1 SWSAMPLEAVE 2400 R1-1 "STOP" SIGN 30" HIGH DENSITY/DIAMOND GRADE. SIGN MOUNTED TO POST WITH 1 EACH DRIVE RIVET WITH NYLON WASHER AGAINST SIGN FACE (ON TOP OF THE SIGN). THE BOTTOM OF THE SIGN SHALL BE MOUNTED WITH 1 EACH 5/16"x2-1/2" HEW BOLT WITH METAL AND FROM NYLON WASHERS (NYLON WASHER AGAINST SIGN FACE) AND SECURED WITH 1 EACH 5/16" HEX NUT ON THE BACK SIDE OF POST. L 2-1/4" x 2-1/4" x 3' ANCHOR/STUB 2 EACH 8" BLADES MOUNTED TO POST WITH 4 EACH DRIVE RIVETS WITH NYLON WASHERS * 12 Gauge 30" 8" 8" Double Lines Normal Width Line 4" White 4" Yellow 4" Space 4" White Preferential lane symbol (6' X 4') for designated bikeways. White pavement marking placed 65' (min) from the projected flowline and Projected Flowline (FL) NO CROSSPAN Continental bars (9' X 1.5'): NO CROSSPAN OR EXISTING CROSSPAN White Stop Bar (1.5' X Length) 30' Gaps 3:1 Ratio 10' Segments 4" White Broken Line STANDARD NO STOP BAR SPECIFIED STOP BAR SPECIFIED STOP BAR SPECIFIED EXISTING CROSSPAN Crosspan exits (no stop bar) -- shall No crosspan -- shall be positioned along projected flowline. match the edge of the pan. Crosspan exits (stop bar specified) -- shall be positioned along projected flowline overlapping 4' of crosspan. 1 2 3 CROSSWALK MARKINGS FL to stop bar 14.5' Projected 14.5' Stop Bar to FL 13' 9' 1.5' 6' Crosspan 4' 4' 4' NOTES: Continental crosswalk bars shall be placed centered on each lane line & in the center of each lane. (Lanes 5' wide or less shall not receive a bar centered in the lane.) Both outside Continental bars shall be centered on the curb & gutter when possible. If 6' crosspan exists, bars to match pan edge to 13' from projected FL. Exception: The downstream bike lane line shall terminate at the curb return. NOTE: All longitudinal (lane) striping shall terminate at the continental crosswalk bars when no stop bar exists. If a stop bar is specified, the striping shall terminate at the stop bar. 65' (min) centered on bike lane. PAVEMENT MARKINGS Projected Flowline (FL) Broken line 4" white 10' Segments 30' Gaps (3:1 Ratio) Wide Lane 1.5'x9' 8" White Line 4" white Double Line 4" Yellow 4" Space CROSSWALK MARKINGS: STRIPING: PREFERENTIAL LANE SYMBOL: STOP LINES: MANDATORY MOVEMENT: 1.5'x9 100' Taper (min.) .2L L = Turn Bay Storage Length .4L 10' .4L 10' 4" Ywllow 4" White Extension Line An Engineering study should be required before crosswalk markings are installed in locations away from traffic signals or stop signs. Continental crosswalk bars (1.5' x 9' typ.) shall be placed adjacent to the projected flowline or abutting to existing crosspan. A bar shall be placed centered on each lane line and in the center of each lane. Lanes 5' wide or less shall not receive a bar centered in the lane. It is important that the markings are in alignment with the access ramps / sidewalks. On curves: Dotted extension of lane edge with same as solid downstream line, 2' segments, 4' gaps. Mandatory movement lanes shall use a lane-use arrow marking, the word marking "only", another lane-use arrow marking (accompanied by signs). Symbols & words are 8' of more in height -- use CDOT specification sizes. Place stop lines (1.5' x Variable typ.) only when inportant to indicate the point behind which vehicles are required to stop (more often on main arterials) -- placement should ordinarily be 4' in advance of and parallel to the nearest crosswalk line in the absence of a marked crosswalk, the stop line should be placed at the desired stopping point no more than 30' or less than 4' from the nearest edge of the intersecting roadway. PLS shall be used for designated bikeways. Intersection placement -- the symbol shall be placed downstream to convey to turning traffic that the bike lane exists. It shall be placed 4" down from the PCR & centered on the bike lane. Frequency of placement between blocks is a matter for Engineering judgement. All Longitudinal (lane) striping shall terminate at the Continental crosswalk bars -- except the downstream bike lane which shall terminate at the curb return. If a stop line is in place -- upstream stripping shall terminate at the stop line. Not Required with lane lengths less than 100'. Not Required with lane lengths less than 100'. 8" White Line 8" White 8" White Extension Line Extension 4" White Line 65' (min) 4' 20' 4" White Line 20' 4' 6' Flow Line Curb 2' 304 STANDARD PAVEMENT MARKINGS 306 TYPICAL BICYCLE LANE PAVEMENT MARKINGS 305 STANDARD PAVEMENT MARKINGS w/ TURN LANE *DETAIL MODIFIED PER REQUEST BY TIMNATH AND FORT COLLINS 12' x 1.5' 12' *DETAIL MODIFIED PER REQUEST BY TIMNATH AND FORT COLLINS 12' x 1.5' 1' 12' x 1.5' CASING CHOCKS - 3 PER PIPE SECTION ON 6' CENTERS CASING CARRIER PIPE CASING CHOCK ASSEMBLY CENTERLINE SECTION END SECTION BURIED CASING DETAIL R.K.B. 12/28/93 SEAL ENDS WITH HIGH DENSITY RUBBER SEAL & STAINLESS STEEL BANDS PIPE BELL 1 " MIN SPECIFICATION: 02224 BURIED CASING DETAIL EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 D2 UTILITY DETAILS 45 200 201 NOT TO SCALE Note: Box and lid assembly shall be cast iron Tyler Slip-Type model 6865 (top only) or approved equal. REVISED: 3/06 ELCO WATER DISTRICT DETAIL: DRAWN: DATE: TRENCH WIDTH TABLE PVC PIPE DUCTILE IRON PIPE AC PIPE PIPE DIAMETER (inches) MAXIMUM TRENCH WIDTH (inches) PIPE DIAMETER (inches) (inches) TRENCH WIDTH MAXIMUM PIPE DIAMETER (inches) (inches) TRENCH WIDTH MAXIMUM 4 28 6 30 8 32 10 34 12 36 14 38 16 40 18 42 24 46 4 28 6 30 8 32 10 34 12 36 4 28 6 32 8 32 10 36 12 36 14 42 16 42 18 44 24 48 SEE TRENCH WIDTH TABLE BELOW PIPE TRENCH DETAIL RKB 10/91 12" MIN. SPECIFICATION: 02221 ELCO WATER DISTRICT DETAIL: DRAWN: DATE: 1/4 O.D. 4" MIN. TRENCH BACKFILL UNDISTURBED SOIL 3/4" WASHED ROCK COMPACTED PIPE SUBGRADE CLASS B BEDDING DETAIL PIPE O.D. PIPE SUBGRADE UNDISTURBED SOIL 1/4 O.D. 4" MIN. DO NOT USE MECHANICAL EQUIPMENT IN THIS ZONE CAREFULLY COMPACTED SELECT SOIL MODIFIED CLASS B BEDDING DETAIL CLASS B BEDDING DETAIL RKB 10/91 12" MIN. CAREFULLY COMPACTED SELECT SOIL DO NOT USE MECHANICAL EQUIPMENT IN THIS ZONE REQD WITH RCP, VCP, CIP & DIP 3/4" WASHED ROCK COMPACTED REQD WITH PVC, RPM, STL & CMP 12" MIN. TRENCH BACKFILL REVISED: 5/6/94 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 D1 UTILITY DETAILS 44 101 102 104 105 103 E E E X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X T S T S T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S G G G G G G E E EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD PROSPECT ROAD MCLAUGHLIN LANE PEDESTRIAN BUTTON POLE 30' SIGNAL POLE 54" Ø SIGNAL CAISSON PEDESTRIAN BUTTON POLE 55' SIGNAL POLE 42" Ø SIGNAL CAISSON 50' SIGNAL POLE PEDESTRIAN BUTTON POLE 42" Ø SIGNAL CAISSON 70' SIGNAL POLE PROPOSED ELECTRIC SIGNAL CABINET 36" Ø SIGNAL CAISSON E E E E E E E E E E E E E TELE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S T S T S T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / SIGNAL CABINET PEDESTRIAN BUTTON POLE PEDESTRIAN BUTTON POLE 55' SIGNAL POLE 55' SIGNAL POLE 55' SIGNAL POLE 45' SIGNAL POLE 42" Ø SIGNAL CAISSON 36" Ø SIGNAL CAISSON 42" Ø SIGNAL CAISSON 42" Ø SIGNAL CAISSON LACY KEITH W JR 1601 S COUNTY ROAD 5 TRACT C SERRATOGA FALLS 2ND FILING PROSPECT ROAD MAIN STREET HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR PROPOSED ELECTRIC FUTURE PEDESTRIAN BUTTON POLE FUTURE PEDESTRIAN BUTTON POLE E E E E E E E E E E E E X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X T S T S T S T S G G G G G G E E EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD PROSPECT ROAD MCLAUGHLIN LANE 30' SIGNAL POLE 54" Ø SIGNAL CAISSON PEDESTRIAN BUTTON POLE 55' SIGNAL POLE 42" Ø SIGNAL CAISSON 50' SIGNAL POLE PEDESTRIAN BUTTON POLE 42" Ø SIGNAL CAISSON 70' SIGNAL POLE PROPOSED ELECTRIC SIGNAL CABINET FUTURE PEDESTRIAN BUTTON POLE 36" Ø SIGNAL CAISSON KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 4 5 4 0 3 2 1 G 1 0 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 TS1 TRAFFIC SIGNAL LAYOUT 43 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE CONTRACTOR SHALL CONTACT TRAFFIC OPERATIONS A MINIMUM OF 6 MONTHS PRIOR TO EXPECTED SIGNALIZATION AT (970)-416-2268. 2. THE CONTRACTOR SHALL PROVIDE FIELD SURVEY FOR IMPROVEMENTS. TRAFFIC SIGNAL INFRASTRUCTURE LOCATIONS SHALL BE MARKED IN THE FIELD AS SHOWN ON THE PLANS. THE EXACT LOCATION SHALL BE DETERMINED AND APPROVED IN THE FIELD BY THE CITY PRIOR TO BEGINNING INSTALLATION. 3. PULL BOXES SHALL NOT BE INSTALLED WITHIN CONCRETE CURB ACCESS RAMPS. PULL BOXES SHOULD NOT BE INSTALLED IN CONCRETE WALKWAYS IF ACCEPTABLE LOCATIONS OUTSIDE OF WALKWAYS EXIST. 4. THE TRAFFIC SIGNAL OPERATION AT EXISTING SIGNALIZED INTERSECTIONS SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. 5. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE IN PLACE PRIOR TO THE ACTIVATION OF THE TRAFFIC SIGNAL. ANY EXCEPTIONS SHALL BE APPROVED BY THE TRAFFIC ENGINEER. PROPOSED STORM INLET EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER A PROSPECT ROAD & MAIN STREET B PROSPECT ROAD & MCLAUGHLIN LANE TRAFFIC SIGNAL CASSION T S TRAFFIC SIGNAL CASSION TRAFFIC SIGNAL MAST SIGNAL CABINET A B A ULTIMATE PROSPECT ROAD & MAIN STREET B ULTIMATE PROSPECT ROAD & MCLAUGHLIN LANE CENTER LINE 39+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 40+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 40+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 41+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 41+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 42+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 4918.1 4918.80 4918.2 4919.07 4918.4 4919.35 4918.6 4919.60 4918.8 4919.69 4919.0 4919.59 4919.2 4919.33 -2.45% -2.20% -2.39% -2.20% -2.32% -2.20% -2.26% -2.20% -2.22% -2.20% -2.20% -2.20% -2.20% -2.20% PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW EXISTING GROUND ULTIMATE GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND ULTIMATE GROUND ULTIMATE CURB & GUTTER ULTIMATE SIDEWALK EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS15 ULTIMATE ROADWAY CROSS SECTIONS PROSPECT ROAD 42 XS10 XS11 XS12 XS13 XS14 XS15 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 33+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 34+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 34+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 35+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 35+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 36+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 36+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 37+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 37+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 38+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 38+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 4918.1 4917.98 4917.9 4917.70 4917.7 4917.43 4917.5 4917.15 4917.3 4916.97 4917.1 4916.97 4917.2 4917.15 4917.3 4917.42 4917.5 4917.70 4917.6 4917.97 4917.8 4918.25 4917.9 4918.52 -2.07% -2.20% -2.15% -2.20% -2.24% -2.20% -2.35% -2.20% -2.61% -2.20% -2.62% -2.20% -2.44% -2.20% -2.51% -2.20% -2.57% -2.20% -2.63% -2.20% -2.58% -2.20% -2.51% -2.20% PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW EXISTING GROUND ULTIMATE GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND ULTIMATE GROUND ULTIMATE CURB & GUTTER ULTIMATE SIDEWALK EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS14 ULTIMATE ROADWAY CROSS SECTIONS PROSPECT ROAD 41 XS10 XS11 XS12 XS13 XS14 XS15 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 4916 4920 -60 -40 -20 0 20 40 60 ULT. ROW CENTER LINE 27+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 27+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 28+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 28+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 29+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 29+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 30+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 31+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 31+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 32+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 32+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 4918.5 4917.57 4918.6 4917.85 4918.7 4918.12 4918.8 4918.40 4918.9 4918.67 4918.9 4918.95 4918.9 4919.17 4918.8 4919.21 4918.7 4919.07 4918.7 4918.80 4918.5 4918.53 4918.3 4918.25 -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.19% -2.20% -2.20% -2.20% -2.20% -2.20% -2.16% -2.20% -2.11% -2.20% -2.07% -2.20% EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW EXISTING GROUND ULTIMATE GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND ULTIMATE GROUND ULTIMATE CURB & GUTTER ULTIMATE SIDEWALK EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS13 ULTIMATE ROADWAY CROSS SECTIONS PROSPECT ROAD 40 XS10 XS11 XS12 XS13 XS14 XS15 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 CENTER LINE 22+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 22+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 23+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 23+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 24+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 24+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 25+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 25+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 26+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 26+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 4918.0 4918.31 4918.4 4918.58 4918.5 4918.84 4918.4 4918.96 4918.2 4918.89 4918.1 4918.66 4918.0 4918.38 4918.0 4918.11 4918.1 4917.83 4918.2 4917.56 4918.3 4917.38 4918.4 4917.38 -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.38% -2.20% -2.36% -2.20% EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW EXISTING GROUND ULTIMATE GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND ULTIMATE GROUND ULTIMATE CURB & GUTTER ULTIMATE SIDEWALK EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS12 ULTIMATE ROADWAY CROSS SECTIONS PROSPECT ROAD 39 XS10 XS11 XS12 XS13 XS14 XS15 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 15+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 16+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 16+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 17+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 17+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 18+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 18+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 19+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 19+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 20+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 20+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 4916.0 4918.04 4916.0 4918.13 4916.1 4918.04 4916.0 4917.79 4916.1 4917.52 4916.2 4917.24 4916.3 4917.05 4916.5 4917.03 4916.6 4917.21 4916.8 4917.48 4917.2 4917.76 4917.6 4918.03 -2.20% -2.20% -2.20% -2.20% 2.39% -2.20% -2.25% -2.20% -2.20% -2.20% -2.20% -2.20% -2.31% -2.20% -2.35% -2.20% -2.19% -2.20% -2.19% -2.20% -2.19% -2.20% -2.20% -2.20% EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW EXISTING GROUND ULTIMATE GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND ULTIMATE GROUND ULTIMATE CURB & GUTTER ULTIMATE SIDEWALK EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS11 ULTIMATE ROADWAY CROSS SECTIONS PROSPECT ROAD 38 XS10 XS11 XS12 XS13 XS14 XS15 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 4908 4912 4916 -60 -40 -20 0 20 40 60 CENTER LINE 11+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 9+50 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 60 CENTER LINE 10+00 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 60 CENTER LINE 10+50 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 60 CENTER LINE 11+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 12+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 12+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 13+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 13+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 14+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 CENTER LINE 14+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 60 4915.1 4914.81 4915.2 4915.06 4915.3 4915.31 4915.4 4915.58 4915.5 4915.86 4915.6 4916.13 4915.6 4916.41 4915.7 4916.68 4915.7 4916.96 4915.8 4917.23 4915.9 4917.51 4915.9 4917.78 -2.20% -2.20% -2.20% 2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% 2.20% -2.20% -2.20% 2.20% 2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% ULT. ROW ULT. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW ULT. ROW EXISTING GROUND ULTIMATE GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND ULTIMATE GROUND ULTIMATE CURB & GUTTER ULTIMATE SIDEWALK EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS10 ULTIMATE ROADWAY CROSS SECTIONS PROSPECT ROAD 37 XS10 XS11 XS12 XS13 XS14 XS15 NORTH PROSPECT ROAD CROSS SECTION PROFILES CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 CENTER LINE 32+50 4918 4920 4924 4928 4918 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 33+00 4918 4920 4924 4928 4918 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 33+50 4918 4920 4924 4928 4918 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 34+00 4918 4920 4924 4928 4918 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 34+50 4918 4920 4924 4928 4918 4920 4924 4928 -40 -20 0 20 40 60 CENTER LINE 35+00 4918 4920 4924 4928 4918 4920 4924 4928 -20 0 20 40 -2.09% -2.20% -2.24% -2.20% -2.35% -2.20% 4:1 -2.51% -2.20% 4:1 -2.71% -2.20% 4:1 -2.96% 4:1 -2.20% 4:1 -3.28% 4:1 -2.20% 4:1 -2.02% 4:1 -2.17% 4:1 -2.32% 4:1 -2.48% 4:1 4922.1 4922.44 4922.6 4922.93 4923.1 4923.38 4923.7 4923.84 4924.1 4924.29 4924.7 4924.75 4925.2 4925.7 4925.20 4927.1 4926.6 4926.1 PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISITNG GROUND PR. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X C ONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 MAIN STREET SERRATOGA FALLS PARKWAY KITCHELL WAY DUNN, RICHARD L/CAROL B 5021 KITCHELL WAY COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 TRACT B SERRATOGA FALLS 2ND FILING PROPOSED CULVERT PROPOSED BARRICADE PROPOSED 27' CL-EOP EXISTING 120' ROW EXISTING ±37' EOP-EOP (4.1%) (1.8%) EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS9 ROADWAY CROSS SECTIONS MAIN STREET 36 XS6 XS7 XS8 XS9 NORTH MAIN STREET CROSS SECTION PROFILES CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 CENTER LINE 26+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 27+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 27+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 28+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 29+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 29+50 4914 4916 4920 4924 4914 4916 4920 4924 -60 -40 -20 0 20 40 60 -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% CENTER LINE 28+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 -2.16% -2.20% 4:1 -2.03% -2.20% -2.00% -2.05% -2.20% 4920.8 4920.71 4920.9 4920.47 4920.9 4920.22 4920.8 4920.10 4920.7 4920.14 4920.8 4920.34 4920.9 4920.59 4921.2 4920.84 4921.3 4921.09 4921.5 4921.34 4921.7 4921.62 4921.9 4921.99 PROPOSED SIDEWALK PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISITNG GROUND PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW TIE INTO SERRATOGA FALLS OFFSITE GRADING TIE INTO SERRATOGA FALLS OFFSITE GRADING TIE INTO SERRATOGA FALLS OFFSITE GRADING / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 EXISTING 10' TRAIL 8' SIDEWALK 8' SIDEWALK R30' 8' SIDEWALK MAIN STREET TRACT B SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT PROPOSED CULVERT R30' 15' UTILITY EASEMENT PROPOSED STORM DRAIN (SEE ONSITE PLANS) PROPOSED CULVERT (SEE ONSITE PLANS) PROPOSED CULVERT (SEE ONSITE PLANS) PROPOSED 54' EOP-EOP PROPOSED 140' ROW EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS8 ROADWAY CROSS SECTIONS MAIN STREET 35 XS6 XS7 XS8 XS9 NORTH MAIN STREET CROSS SECTION PROFILES CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 CENTER LINE 20+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 21+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 21+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 22+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 22+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 23+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 CENTER LINE 23+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 60 -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% 4918.7 4918.48 4919.1 4918.59 4919.6 4918.84 4920.1 4919.09 4920.5 4919.34 4920.7 4919.59 4920.8 4919.84 4920.8 4920.09 4920.7 4920.34 4920.7 4920.59 4920.7 4920.80 4920.8 4920.84 TIE INTO SERRATOGA FALLS OFFSITE GRADING TIE INTO SERRATOGA FALLS OFFSITE GRADING TIE INTO SERRATOGA FALLS OFFSITE GRADING PROPOSED SIDEWALK PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISITNG GROUND TIE INTO SERRATOGA FALLS OFFSITE GRADING PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW PR. ROW EX. ROW EX. ROW G G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 8' SIDEWALK EXISTING 10' TRAIL R25' R25' R25' R25' MAIN STREET TRACT C SERRATOGA FALLS 2ND FILING 1601 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT PROSPECT ROAD SEE SHEETS XS1-XS5 PROSPECT ROAD SEE SHEETS XS1-XS5 PROPOSED 15' UTILITY CULVERT EASEMENT PROPOSED STORM DRAIN (SEE ONSITE PLANS) PROPOSED GUARDRAIL 12'x6' RCBC (TRIC) PROPOSED 68' EOP-EOP PROPOSED 140' ROW PROPOSED CULVERT EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS7 ROADWAY CROSS SECTIONS MAIN STREET 34 XS6 XS7 XS8 XS9 NORTH MAIN STREET CROSS SECTION PROFILES CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 LACY KEITH W JR 1601 S COUNTY ROAD 5 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 REED SANDRA K 1707 ENCHANTMENT DR LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 HILL SANDRA K/ANTHONY O 1739 ENCHANTMENT DR PROSPECT ROAD SEE SHEETS XS1-XS5 PROSPECT ROAD SEE SHEETS XS1-XS5 PROPOSED GUARDRAIL 12'x6' RCBC (TRIC) EXISTING 90' ROW PROPOSED 53' EOP-EOP EXISTING ±26' EOP-EOP (3.5%) (3.0%) CENTER LINE 10+00 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 10+50 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 11+00 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 11+50 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 12+00 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 12+50 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 13+00 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 13+50 4906 4908 4912 4916 4906 4908 4912 4916 -40 -20 0 20 40 60 CENTER LINE 14+00 4908 4912 4916 4920 4908 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 14+50 4908 4912 4916 4920 4908 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 15+00 4908 4912 4916 4920 4908 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 15+50 4908 4912 4916 4920 4908 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 16+00 4910 4912 4916 4920 4910 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 16+50 4910 4912 4916 4920 4910 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 17+00 4910 4912 4916 4920 4910 4912 4916 4920 -40 -20 0 20 40 60 CENTER LINE 17+50 4912 4916 4920 4924 4912 4916 4920 4924 -40 -20 0 20 40 60 -2.83% -2.00% -2.45% 4:1 -2.20% -2.20% 4:1 -2.20% -2.00% -2.20% -2.20% Vertical -2.20% -2.20% Vertical -2.20% 4:1 -2.20% Vertical -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% -2.20% 4:1 -2.20% -2.20% -2.20% -2.20% -2.20% 4:1 -2.20% 4:1 0.49% 0.48% 0.47% 0.04% 0.00% -0.17% -0.-0.93% 90% -0.90% -0.88% -0.87% -0.71% -0.71% -0.41% 0.56% 0.54% -0.40% PROPOSED GROUND 4913.8 4913.80 4914.1 4914.05 4914.3 4914.30 4914.5 4914.55 4914.5 4914.80 4914.5 4915.05 4914.5 4915.30 4914.6 4915.55 4915.1 4915.80 4915.7 4916.05 4916.1 4916.39 4916.6 4916.87 4917.1 4917.50 4917.6 4918.20 4918.5 4918.76 4918.0 4918.65 EXISTING GROUND PROPOSED GROUND EXISITNG GROUND EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS6 ROADWAY CROSS SECTIONS MAIN STREET 33 XS6 XS7 XS8 XS9 NORTH MAIN STREET CROSS SECTION PROFILES CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 12'x6' RCBC (TRIC) LACY KEITH W JR 1601 S COUNTY ROAD 5 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR SANDERS, DENNIS L/DONI D 1623 CAREFREE DR FORT COLLINS, CO 80525 (2.9%) (1.1%) 4:1 CENTER LINE 41+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.22% -2.01% CENTER LINE 41+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.02% CENTER LINE 42+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.02% CENTER LINE 42+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -1.79% -1.98% -0.22% -0.23% -0.25% -0.26% CENTER LINE 43+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -1.84% -1.87% -0.40% -0.-41% 0.43% -0.45% CENTER LINE 43+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.50% 5.00% -2.19% CENTER LINE 44+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.71% -2.16% 4:1 CENTER LINE 44+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.64% -2.14% 4:1 CENTER LINE 45+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.57% -2.11% 4:1 CENTER LINE 45+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.50% 4:1 -2.08% 4:1 CENTER LINE 46+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.43% 4:1 -2.04% 4:1 CENTER LINE 46+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.36% 4:1 -2.00% 4:1 CENTER LINE 47+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.29% 4:1 -1.96% 4:1 CENTER LINE 47+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.22% 4:1 -1.91% 4:1 4918.8 4919.69 4919.0 4919.59 4919.2 4919.33 4918.9 4919.06 4918.5 4918.84 4919.2 4918.66 4919.2 4918.49 4918.9 4918.31 4918.7 4918.14 4918.4 4917.96 4918.3 4917.79 4918.0 4917.61 4917.6 4917.43 4917.3 4917.26 EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND TIE INTO TRIC GRADING (SEE NOTE #6) 4:1 4:1 4:1 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS5 ROADWAY CROSS SECTIONS PROSPECT ROAD 32 XS1 XS2 XS3 XS4 XS5 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.07% CENTER LINE 33+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.15% CENTER LINE 34+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.24% CENTER LINE 34+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.35% CENTER LINE 35+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.61% CENTER LINE 35+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.62% CENTER LINE 36+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.44% CENTER LINE 36+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.32% -2.51% CENTER LINE 37+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.57% -2.76% CENTER LINE 37+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.63% -2.72% CENTER LINE 38+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.58% -2.65% CENTER LINE 38+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.51% -2.40% CENTER LINE 39+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.45% -2.22% CENTER LINE 39+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.39% -2.07% CENTER LINE 40+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.32% -1.95% CENTER LINE 40+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.26% -1.97% 4918.1 4917.98 4917.9 4917.70 4917.7 4917.43 4917.5 4917.15 4917.3 4916.97 4917.1 4916.97 4917.2 4917.15 4917.3 4917.42 4917.5 4917.70 4917.6 4917.97 4917.8 4918.25 4917.9 4918.52 4918.1 4918.80 4918.2 4919.07 4918.4 4919.35 4918.6 4919.60 EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EXISTING GROUND PROPOSED GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND PROPOSED GROUND 4:1 4:1 4:1 4:1 4:1 4:1 4:1 4:1 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS4 ROADWAY CROSS SECTIONS PROSPECT ROAD 31 XS1 XS2 XS3 XS4 XS5 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 25+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 25+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.20% CENTER LINE 26+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.38% CENTER LINE 26+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.36% CENTER LINE 27+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 27+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 28+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 28+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 29+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 29+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 30+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% CENTER LINE 30+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% CENTER LINE 31+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% 4:1 -2.20% CENTER LINE 31+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% 4:1 -2.16% CENTER LINE 32+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.11% CENTER LINE 32+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.07% 4918.1 4917.83 4918.2 4917.56 4918.3 4917.38 4918.4 4917.38 4918.5 4917.57 4918.6 4917.85 4918.7 4918.12 4918.8 4918.40 4918.9 4918.67 4918.9 4918.95 4918.9 4919.17 4918.8 4919.21 4918.7 4919.07 4918.7 4918.80 4918.5 4918.53 4918.3 4918.25 EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EXISTING GROUND PROPOSED GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND PROPOSED GROUND EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS3 ROADWAY CROSS SECTIONS PROSPECT ROAD 30 XS1 XS2 XS3 XS4 XS5 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 17+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 18+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.20% CENTER LINE 18+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.20% CENTER LINE 19+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 4:1 -2.20% CENTER LINE 19+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 20+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 20+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 21+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 21+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 22+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 22+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 23+00 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 23+50 4912 4916 4920 4924 4912 4916 4920 4924 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 24+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 24+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 4916.1 4916.2 4917.52 4916.3 4917.05 4916.5 4917.03 4916.6 4917.21 4916.8 4917.48 4917.2 4917.76 4917.6 4918.03 4918.0 4918.31 4918.4 4918.58 4918.5 4918.84 4918.4 4918.96 4918.2 4918.89 4918.1 4918.66 4918.0 4918.38 4918.0 4918.11 EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW EXISTING GROUND PROPOSED GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND PROPOSED GROUND EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS2 ROADWAY CROSS SECTIONS PROSPECT ROAD 29 XS1 XS2 XS3 XS4 XS5 NORTH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROSPECT ROAD CROSS SECTION PROFILES ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 16+00 16+50 17+00 JIRON JACKLYN E 4525 E PROSPECT RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD TROXELL BARBARA Y 4417 E PROSPECT RD CENTER LINE 11+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 CENTER LINE 9+00 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 -3.63% -2.71% 4:1 4:1 CENTER LINE 9+50 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 2.82% -2.46% 4:1 4:1 CENTER LINE 10+00 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 CENTER LINE 10+50 4906 4908 4912 4916 4906 4908 4912 4916 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 -2.20% -2.20% 4:1 CENTER LINE 11+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% 2.20% 4:1 CENTER LINE 12+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 2.20% -2.20% 4:1 CENTER LINE 12+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 2.20% -2.20% 4:1 CENTER LINE 13+00 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 13+50 4908 4912 4916 4920 4908 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 14+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 14+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 15+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 EX. ROW -2.20% -2.20% 4:1 CENTER LINE 15+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4:1 CENTER LINE 16+00 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 2.20% -2.20% CENTER LINE 16+50 4910 4912 4916 4920 4910 4912 4916 4920 -60 -40 -20 0 20 40 -2.20% -2.20% 4915.1 4915.10 4915.2 4915.21 4915.3 4915.31 4915.4 4915.58 4915.5 4915.86 4915.6 4916.13 4915.6 4916.41 4915.7 4916.68 4915.7 4916.96 4915.8 4917.23 4915.9 4917.51 4915.9 4917.78 4916.0 4918.04 4916.0 4918.13 4916.1 4918.04 4916.0 4917.79 EXISTING GROUND PROPOSED GROUND PROPOSED SIDEWALK PROPOSED CURB & GUTTER EXISTING GROUND PROPOSED GROUND EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW PR. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW EX. ROW 4:1 4:1 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC XS1 ROADWAY CROSS SECTIONS PROSPECT ROAD 28 XS1 XS2 XS3 XS4 XS5 NORTH PROSPECT ROAD CROSS SECTION PROFILES CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 LACY KEITH W JR 1601 S COUNTY ROAD 5 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 REED SANDRA K 1707 ENCHANTMENT DR LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 LEBSOCK BRANDON J/KIMBERLY J 1717 S COUNTY ROAD 5 FORT COLLINS, CO 80524 HILL SANDRA K/ANTHONY O 1739 ENCHANTMENT DR FORT COLLINS, CO 80525 12' LEFT TURN LANE 13' TRAVEL LANE 12' RIGHT TURN LANE 13' TRAVEL LANE 6' BIKE LANE 6' BIKE LANE A B B A 7 8 1 1 4 7 1 K 13' TRAVEL LANE 16' LEFT TURN LANE 13' TRAVEL LANE 6' BIKE LANE 6' BIKE LANE FUTURE ROW EXISTING ROW FUTURE ROW EXISTING ROW FUTURE ROW EXISTING ROW FUTURE ROW EXISTING ROW MAIN STREET MAIN STREET ULTIMATE 140' ROW ULTIMATE 54' EOP-EOP EXISTING 90' ROW 6 L 4 1 G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / TRACT C SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT POUDRE SCHOOL DISTRICT 13' TRAVEL LANE 12' RIGHT TURN LANE 12' LEFT TURN LANE 13' TRAVEL LANE 13' TRAVEL LANE 16' LEFT TURN LANE 13' TRAVEL LANE 6' BIKE LANE 6' BIKE LANE A B A 3 7 1 1 7 A A 1 1 4 PROPOSED ROW EXISTING ROW 6' BIKE LANE 6' BIKE LANE MAIN STREET 140' ROW 54' EOP-EOP B K 1 L 4 4 L L B X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / TRACT B SERRATOGA FALLS 2ND FILING COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT 13' TRAVEL LANE 13' TRAVEL LANE 1 1 7 16' MEDIAN/CENTER LANE 6' BIKE LANE 6' BIKE LANE FUTURE ROW MAIN STREET 140' ROW 54' EOP-EOP ULTIMATE 140' ROW B L L Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC NORTH R15 SIGNAGE & STRIPING PLAN MAIN STREET ULTIMATE 27 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC R13 R14 R15 LEGEND: PROPOSED EDGE OF ASPHALT / / / / / / / / CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) RIGHT-OF-WAY NOTES: LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY AND EASEMENT INFORMATION. 3. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH TRAFFIC ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 10 YELLOW ISLAND CROSS HATCHING WHITE ISLAND CROSS HATCHING 4" SOLID YELLOW LINE 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 4" BROKEN YELLOW LINE 8" SOLID WHITE LINE DOUBLE YELLOW LINE 4" SOLID AND 4" BROKEN; 4" APART 9 6 3 5 1 8 2 4 7 STRAIGHT AND RIGHT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW 18" X 12' CROSSING LINE, SEE NOTES PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING 18" WIDE STOP BAR PREFORMED PLASTIC PAVEMENT MARKING "STOP" (22.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING STRAIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING RIGHT TURN ARROW (15.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING LEFT TURN ARROW (15.5 S.F. EA.) RIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING TWO WAY LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING "ONLY" (22.5 S.F. EA.) L H D C B A K E F G I J M LANE REDUCTION ARROW PREFORMED PLASTIC PAVEMENT MARKING 11 MEDIAN LINE YELLOW 18" WIDE 50' O.C. 45° ANGLES 10' 30' 10' 30' 10' 12 4" BROKEN WHITE 10' N "LANE ENDS" PREFORMED PLASTIC PAVEMENT MARKING 4" WHITE DASHED LINE 3' 9' 3' 9' 3' O 18" WIDE WHITE MEDIAN STRIPING PREFORMED PLASTIC PAVEMENT MARKING A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER TOWN OF TIMNATH AND CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS AND TOWN OF TIMNATH RESERVE THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS AND TOWN OF TIMNATH DETERMINE THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. P. STREET NAME SIGNS AT INTERSECTIONS SHALL BE INSTALLED ABOVE STOP SIGNS ON SAME POLE, PER LCUASS DRAWING 1401. STRIPING LEGEND: STRIPING NOTES: 8" WHITE DASHED LINE 3' 9' 3' 9' 3' (NOTE: ALL ITEMS MAY NOT APPLY TO THIS PLAN) PAVEMENT STRIPING PAVEMENT MARKINGS STRAIGHT ARROW (15 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING 30' 10' 30' 10' EASEMENT MAIN STREET MATCH LINE - SEE BOTTOM LEFT MATCH LINE - SEE TOP RIGHT MAIN STREET MATCH LINE - SEE BOTTOM LEFT MAIN STREET MATCH LINE - SEE TOP RIGHT City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R FOR REFERENCE ONLY NOT FOR CONSTRUCTION 4 12 11 7 A PROSPECT ROAD MAIN STREET ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL 10' 10' L 3 L 6 4 1 4 L 6 L 1 4 L L 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER PROPOSED 30" VERTICAL CURB & GUTTER B B L B 6 A K / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T T SD SD G G G P H PH / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR TRACT C SERRATOGA FALLS 2ND FILING SANDERS, DENNIS L/DONI D 1623 CAREFREE DR B A 7 4 7 3 1 PROSPECT ROAD ULTIMATE 120' ROW ULTIMATE 54' EOP-EOP 1 6 1 L L Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC NORTH R14 SIGNAGE & STRIPING PLAN PROSPECT ROAD ULTIMATE 26 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD PROSPECT ROAD R13 R14 R15 MATCH LINE - SEE MIDDLE LEFT MATCH LINE - SEE TOP RIGHT LEGEND: PROPOSED EDGE OF ASPHALT / / / / / / / / CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) RIGHT-OF-WAY NOTES: LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY AND EASEMENT INFORMATION. 3. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH TRAFFIC ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 10 YELLOW ISLAND CROSS HATCHING WHITE ISLAND CROSS HATCHING 4" SOLID YELLOW LINE 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 4" BROKEN YELLOW LINE 8" SOLID WHITE LINE DOUBLE YELLOW LINE 4" SOLID AND 4" BROKEN; 4" APART 9 6 3 5 1 8 2 4 7 STRAIGHT AND RIGHT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW 18" X 12' CROSSING LINE, SEE NOTES PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING 18" WIDE STOP BAR PREFORMED PLASTIC PAVEMENT MARKING "STOP" (22.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING STRAIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING RIGHT TURN ARROW (15.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING LEFT TURN ARROW (15.5 S.F. EA.) RIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING TWO WAY LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING "ONLY" (22.5 S.F. EA.) L H D C B A K E F G I J M LANE REDUCTION ARROW PREFORMED PLASTIC PAVEMENT MARKING 11 MEDIAN LINE YELLOW 18" WIDE 50' O.C. 45° ANGLES 10' 30' 10' 30' 10' 12 4" BROKEN WHITE 10' N "LANE ENDS" PREFORMED PLASTIC PAVEMENT MARKING 4" WHITE DASHED LINE 3' 9' 3' 9' 3' O 18" WIDE WHITE MEDIAN STRIPING PREFORMED PLASTIC PAVEMENT MARKING A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER TOWN OF TIMNATH AND CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS AND TOWN OF TIMNATH RESERVE THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS AND TOWN OF TIMNATH DETERMINE THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. P. STREET NAME SIGNS AT INTERSECTIONS SHALL BE INSTALLED ABOVE STOP SIGNS ON SAME POLE, PER LCUASS DRAWING 1401. STRIPING LEGEND: STRIPING NOTES: 8" WHITE DASHED LINE 3' 9' 3' 9' 3' (NOTE: ALL ITEMS MAY NOT APPLY TO THIS PLAN) PAVEMENT STRIPING PAVEMENT MARKINGS STRAIGHT ARROW (15 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING 30' 10' 30' 10' EASEMENT City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R MATCH LINE - SEE SHEET R13 FOR REFERENCE ONLY NOT FOR CONSTRUCTION 10' PARKWAY 8' ATTACHED WALK 8' DETACHED WALK 10' PARKWAY 8' ATTACHED WALK 6' DETACHED WALK 10' PARKWAY FUTURE ROW 8 12 9 A K A 7 9 12 PROSPECT ROAD ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL A L 4 L 9 4 12 1 4 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER B 6 MH MH EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD NICHOLS LIVING TRUST 1601 MEADOWAIRE DR POUDRE SCHOOL DISTRICT POUDRE SCHOOL DISTRICT 16' MEDIAN/CENTER LANE 11' TRAVEL LANE 11' TRAVEL LANE 11' TRAVEL LANE 11' TRAVEL LANE 8' ATTACHED WALK 8' DETACHED WALK 10' PARKWAY EXISTING ROW FUTURE ROW EXISTING ROW 12 A 3 9 7 3 7 A A PROSPECT ROAD ULTIMATE 107.5' ROW ULTIMATE 76' FL-FL 10' L 4 4 1 6 4 L 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER 5' BIKE LANE w/ 3' BUFFER 5' BIKE LANE w/ 3' BUFFER B 6 L Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC NORTH R13 SIGNAGE & STRIPING PLAN PROSPECT ROAD ULTIMATE 25 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD PROSPECT ROAD R13 R14 R15 MATCH LINE - SEE MIDDLE LEFT MATCH LINE - SEE TOP RIGHT MATCH LINE - SEE SHEET R14 LEGEND: PROPOSED EDGE OF ASPHALT / / / / / / / / CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) RIGHT-OF-WAY NOTES: LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY AND EASEMENT INFORMATION. 3. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH TRAFFIC ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 10 YELLOW ISLAND CROSS HATCHING WHITE ISLAND CROSS HATCHING 4" SOLID YELLOW LINE 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 4" BROKEN YELLOW LINE 8" SOLID WHITE LINE DOUBLE YELLOW LINE 4" SOLID AND 4" BROKEN; 4" APART 9 6 3 5 1 8 2 4 7 STRAIGHT AND RIGHT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW 18" X 12' CROSSING LINE, SEE NOTES PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING 18" WIDE STOP BAR PREFORMED PLASTIC PAVEMENT MARKING "STOP" (22.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING STRAIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING RIGHT TURN ARROW (15.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING LEFT TURN ARROW (15.5 S.F. EA.) RIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING TWO WAY LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING "ONLY" (22.5 S.F. EA.) L H D C B A K E F G I J M LANE REDUCTION ARROW PREFORMED PLASTIC PAVEMENT MARKING 11 MEDIAN LINE YELLOW 18" WIDE 50' O.C. 45° ANGLES 10' 30' 10' 30' 10' 12 4" BROKEN WHITE 10' N "LANE ENDS" PREFORMED PLASTIC PAVEMENT MARKING 4" WHITE DASHED LINE 3' 9' 3' 9' 3' O 18" WIDE WHITE MEDIAN STRIPING PREFORMED PLASTIC PAVEMENT MARKING A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER TOWN OF TIMNATH AND CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS AND TOWN OF TIMNATH RESERVE THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS AND TOWN OF TIMNATH DETERMINE THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. P. STREET NAME SIGNS AT INTERSECTIONS SHALL BE INSTALLED ABOVE STOP SIGNS ON SAME POLE, PER LCUASS DRAWING 1401. STRIPING LEGEND: STRIPING NOTES: 8" WHITE DASHED LINE 3' 9' 3' 9' 3' (NOTE: ALL ITEMS MAY NOT APPLY TO THIS PLAN) PAVEMENT STRIPING PAVEMENT MARKINGS STRAIGHT ARROW (15 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING 30' 10' 30' 10' EASEMENT City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R FOR REFERENCE ONLY NOT FOR CONSTRUCTION 6' BIKE LANE 6' BIKE LANE 140' ROW 68' MAIN STREET EOP-EOP L B B L L L 8' SIDEWALK 15' UTILITY EASEMENT 10' EXISTING TRAIL STA.=19+85.64 OFFSET=39' CONTINUE 1 STA.=21+85.64 OFFSET=21' BEGIN 1 END 6 STA.=20+15.64 OFFSET=4' CONTINUE 7 STA.=25+84.01 OFFSET=8' END 7 CONTINUE 7 STA.=28+07.05 OFFSET=21' END 1 STA.=28+19.01 OFFSET=8' END 7 STA.=28+19.01 OFFSET=8' END 4 STA.=28+80.06 OFFSET=8' BEGIN 7 STA.=28+80.06 OFFSET=27' BEGIN 4 STA.=28+97.06 OFFSET=39' BEGIN 1 STA.=19+85.64 OFFSET=27' BEGIN 3 END 4 STA.=19+85.64 OFFSET=21' BEGIN 6 END 1 STA.=21+85.64 OFFSET=27' END 3 STA.=21+57.07 OFFSET=27' END 1 STA.=28+80.06 OFFSET=8' BEGIN 7 STA.=28+80.06 OFFSET=21' BEGIN 1 STA.=29+70.05 OFFSET=21' BEGIN 6 END 1 STA.=29+70.05 OFFSET=27' BEGIN 3 END 4 STA.=29+70.05 OFFSET=39' CONTINUE 1 PROPOSED STOP SIGN TRACT C SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT POUDRE SCHOOL DISTRICT PROPOSED "SPEED STA.=20+15.64 LIMIT 45" SIGN R2-1 OFFSET=8' END 4 STA.=22+15.64 OFFSET=8' CONTINUE 7 STA.=23+84.01 OFFSET=8' CONTINUE 7 STA.=25+84.01 OFFSET=8' BEGIN 4 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 12' TRAVEL LANE 13' TRAVEL LANE MAIN STREET SERRATOGA FALLS PARKWAY KITCHELL WAY EXISTING EDGE OF ASPHALT 120' ROW STA.=34+02.81 OFFSET=8' CONTINUE 7 END 7 STA.=37+23.11 OFFSET=4' END 1 STA.=37+23.11 OFFSET=8' END 7 STA.=30+42.81 OFFSET=8' CONTINUE 7 STA.=30+33.65 OFFSET=27' END 3 END 1 STA.=30+42.81 OFFSET=21' BEGIN 1 END 6 STA.=34+25.67 OFFSET=4' CONTINUE 1 PROPOSED BARRICADE STA.=37+23.11 OFFSET=21' END 1 EXISTING STOP SIGN EXISTING STOP SIGN EXISTING RIGHT LANE MUST TURN RIGHT TRACT B SERRATOGA FALLS 2ND FILING DUNN, RICHARD L/CAROL B 5021 KITCHELL WAY COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 EXISTING ±25' EOP-EOP L EXISTING RIGHT LANE MUST TURN RIGHT PROPOSED "BIKE LANE" & "ENDS" SIGNS R3-17 & R3-17b / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S T S T S T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / LACY KEITH W JR 1601 S COUNTY ROAD 5 B A A 12' LEFT TURN LANE 13' TRAVEL LANE 13' TRAVEL LANE A 6' BIKE LANE 6' BIKE LANE 90' ROW 54' MAIN STREET EOP-EOP HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR PROSPECT ROAD L L RELOCATED TIMNATH TOWN LIMITS SIGN TRAFFIC SIGNAL TRAFFIC SIGNAL TRAFFIC SIGNAL K K 53' EOP-EOP STA.=10+00.00 OFFSET=11' BEGIN 1 STA.=10+00.00 OFFSET=15' BEGIN 1 STA.=14+50.00 OFFSET=21' CONTINUE 1 STA.=16+75.57 OFFSET=8' END 4 STA.=16+75.57 OFFSET=21' END 1 STA.=17+80.64 OFFSET=4' BEGIN 7 STA.=14+50.00 OFFSET=20' CONTINUE 1 STA.=10+00.00 OFFSET=1' BEGIN 7 BEGIN 7 STA.=14+50.00 OFFSET=4' CONTINUE 7 STA.=14+50.00 OFFSET=7' CONTINUE 7 STA.=16+75.57 OFFSET=7' END 7 STA.=16+75.57 OFFSET=4' END 7 STA.=17+80.64 OFFSET=8' BEGIN 7 STA.=16+59.98 OFFSET=20' END 1 STA.=17+80.64 OFFSET=21' BEGIN 1 STA.=17+80.64 OFFSET=21' BEGIN 1 STA.=17+80.64 OFFSET=27' BEGIN 4 STA.=17+80.64 OFFSET=39' BEGIN 1 STA.=17+80.64 OFFSET=8' BEGIN 4 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 REED SANDRA K 1707 ENCHANTMENT DR LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 LEBSOCK BRANDON J/KIMBERLY J 1717 S COUNTY ROAD 5 FORT COLLINS, CO 80524 HILL SANDRA K/ANTHONY O 1739 ENCHANTMENT DR FORT COLLINS, CO 80525 TRAFFIC SIGNAL EXISTING STRIPING EXISTING ±25' EOP-EOP PROPOSED "BIKE LANE" SIGN R3-17 PROPOSED "BIKE LANE" & "ENDS" SIGNS R3-17 & R3-17b STA.=12+50.00 OFFSET=5' CONTINUE 7 STA.=14+50.00 OFFSET=8' BEGIN 4 MAIN STREET Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH R12 SIGNAGE & STRIPING PLAN MAIN STREET 24 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC R10 R12 R11 MATCH LINE - SEE BOTTOM LEFT MATCH LINE - SEE TOP RIGHT LEGEND: PROPOSED EDGE OF ASPHALT / / / / / / / / CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) RIGHT-OF-WAY NOTES: LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY AND EASEMENT INFORMATION. 3. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH TRAFFIC ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 10 YELLOW ISLAND CROSS HATCHING WHITE ISLAND CROSS HATCHING 4" SOLID YELLOW LINE 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 4" BROKEN YELLOW LINE 8" SOLID WHITE LINE DOUBLE YELLOW LINE 4" SOLID AND 4" BROKEN; 4" APART 9 6 3 5 1 8 2 4 7 STRAIGHT AND RIGHT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW 18" X 12' CROSSING LINE, SEE NOTES PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING 18" WIDE STOP BAR PREFORMED PLASTIC PAVEMENT MARKING "STOP" (22.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING STRAIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING RIGHT TURN ARROW (15.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING LEFT TURN ARROW (15.5 S.F. EA.) RIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING TWO WAY LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING "ONLY" (22.5 S.F. EA.) L H D C B A K E F G I J M LANE REDUCTION ARROW PREFORMED PLASTIC PAVEMENT MARKING 11 MEDIAN LINE YELLOW 18" WIDE 50' O.C. 45° ANGLES 10' 30' 10' 30' 10' 12 4" BROKEN WHITE 10' N "LANE ENDS" PREFORMED PLASTIC PAVEMENT MARKING 4" WHITE DASHED LINE 3' 9' 3' 9' 3' O 18" WIDE WHITE MEDIAN STRIPING PREFORMED PLASTIC PAVEMENT MARKING A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER TOWN OF TIMNATH AND CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS AND TOWN OF TIMNATH RESERVE THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS AND TOWN OF TIMNATH DETERMINE THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. P. STREET NAME SIGNS AT INTERSECTIONS SHALL BE INSTALLED ABOVE STOP SIGNS ON SAME POLE, PER LCUASS DRAWING 1401. STRIPING LEGEND: STRIPING NOTES: 8" WHITE DASHED LINE 3' 9' 3' 9' 3' (NOTE: ALL ITEMS MAY NOT APPLY TO THIS PLAN) PAVEMENT STRIPING PAVEMENT MARKINGS STRAIGHT ARROW (15 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING 30' 10' 30' 10' EASEMENT MAIN STREET MATCH LINE - SEE BOTTOM LEFT MAIN STREET MATCH LINE - SEE TOP RIGHT City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R STA.=34+77.26 OFFSET=33' BEGIN 9 END 6 STA.=42+01.61 OFFSET=21' CONTINUE 7 STA.=42+19.47 OFFSET=10' END 7 STA.=42+19.47 OFFSET=18' END 4 STA.=40+14.47 OFFSET=13' BEGIN 1 STA.=29+82.26 END 6 OFFSET=10' END 4 STA.=30+72.26 OFFSET=2' BEGIN 1 STA.=30+72.26 OFFSET=10' BEGIN 4 STA.=32+78.92 OFFSET=10' CONTINUE 4 STA.=36+24.10 OFFSET=15' END 4 STA.=30+72.26 OFFSET=10' BEGIN 7 STA.=32+79.20 OFFSET=9' BEGIN 7 CONTINUE 7 STA.=33+07.26 OFFSET=10' CONTINUE 7 STA.=40+14.47 OFFSET=18' BEGIN 4 END 3 STA.=34+64.26 OFFSET=42' END 3 STA.=29+82.26 OFFSET=2' END 1 STA.=29+82.26 OFFSET=10' END 4 STA.=29+82.26 OFFSET=22' END 7 STA.=29+82.26 OFFSET=33' END 9 EXISTING "STOP" SIGN EDGE OF ASPHALT STA.=42+19.47 OFFSET=14' END 1 STA.=42+19.47 OFFSET=2' END 4 RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD RUST 1601 MEADOWAIRE DR SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT PROPOSED "STOP" SIGN 2' SHOULDER L STA.=33+07.26 OFFSET=22' END 4 STA.=35+34.00 OFFSET=8' BEGIN 6 END 1 EXISTING "STOP" SIGN STA.=32+78.92 OFFSET=2' CONTINUE 1 STA.=36+33.98 OFFSET=11' END 6 STA.=37+54.90 OFFSET=14' BEGIN 6 END 1 STA.=36+98.63 OFFSET=12' BEGIN 1 L STA.=37+84.47 OFFSET=2' CONTINUE 7 STA.=38+32.68 OFFSET=19' BEGIN 3 STA.=39+84.47 OFFSET=2' BEGIN 4 STA.=39+84.47 OFFSET=10' CONTINUE 7 PROPOSED "SPEED LIMIT 45" SIGN 30" VERTICAL CURB & GUTTER STA.=35+07.26 OFFSET=21' CONTINUE 7 STA.=35+57.38 OFFSET=32' BEGIN 7 STA.=42+19.47 OFFSET=32' END 9 END 7 K / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T S T S T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PH PH / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR L STA.=47+56.46 OFFSET=12' END 1 STA.=47+56.46 OFFSET=12' END 1 STA.=43+13.02 OFFSET=3' BEGIN 7 STA.=43+13.02 OFFSET=21' BEGIN 1 STA.=47+56.46 OFFSET=0' END 7 EXISTING TRAIL STA.=43+13.02 OFFSET=9' BEGIN 7 STA.=43+96.59 OFFSET=12' CONTINUE 1 STA.=43+96.46 OFFSET=0' CONTINUE 7 STA.=43+13.02 OFFSET=15' BEGIN 1 TRAFFIC SIGNAL TRAFFIC SIGNAL VARIES FL-EOP 118' 12' TRAVEL LANE ROW 12' TRAVEL LANE 5' BIKE LANE EXISTING STOP SIGN AHEAD SIGN EXISTING ±25' EOP-EOP TRACT C SERRATOGA FALLS 2ND FILING SANDERS, DENNIS L/DONI D 1623 CAREFREE DR VAN DYNE, DAVID M/AHN HAE K 1622 CAREFREE DR EXISTING GUARDRAIL PROPOSED GUARDRAIL K PROPOSED "BIKE LANE" SIGN R3-17 PROPOSED "BIKE LANE" & "ENDS" SIGNS R3-17 & R3-17b Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH R11 SIGNAGE & STRIPING PLAN PROSPECT ROAD 23 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 4 5 4 0 3 2 1 G 1 0 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD MATCH LINE - SEE SHEET R10 LEGEND: PROPOSED EDGE OF ASPHALT / / / / / / / / CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) RIGHT-OF-WAY NOTES: LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY AND EASEMENT INFORMATION. 3. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH TRAFFIC ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 10 YELLOW ISLAND CROSS HATCHING WHITE ISLAND CROSS HATCHING 4" SOLID YELLOW LINE 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 4" BROKEN YELLOW LINE 8" SOLID WHITE LINE DOUBLE YELLOW LINE 4" SOLID AND 4" BROKEN; 4" APART 9 6 3 5 1 8 2 4 7 STRAIGHT AND RIGHT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW 18" X 12' CROSSING LINE, SEE NOTES PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING 18" WIDE STOP BAR PREFORMED PLASTIC PAVEMENT MARKING "STOP" (22.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING STRAIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING RIGHT TURN ARROW (15.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING LEFT TURN ARROW (15.5 S.F. EA.) RIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING TWO WAY LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING "ONLY" (22.5 S.F. EA.) L H D C B A K E F G I J M LANE REDUCTION ARROW PREFORMED PLASTIC PAVEMENT MARKING 11 MEDIAN LINE YELLOW 18" WIDE 50' O.C. 45° ANGLES 10' 30' 10' 30' 10' 12 4" BROKEN WHITE 10' N "LANE ENDS" PREFORMED PLASTIC PAVEMENT MARKING 4" WHITE DASHED LINE 3' 9' 3' 9' 3' O 18" WIDE WHITE MEDIAN STRIPING PREFORMED PLASTIC PAVEMENT MARKING A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER TOWN OF TIMNATH AND CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS AND TOWN OF TIMNATH RESERVE THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS AND TOWN OF TIMNATH DETERMINE THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. P. STREET NAME SIGNS AT INTERSECTIONS SHALL BE INSTALLED ABOVE STOP SIGNS ON SAME POLE, PER LCUASS DRAWING 1401. STRIPING LEGEND: STRIPING NOTES: 8" WHITE DASHED LINE 3' 9' 3' 9' 3' (NOTE: ALL ITEMS MAY NOT APPLY TO THIS PLAN) PAVEMENT STRIPING PAVEMENT MARKINGS STRAIGHT ARROW (15 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING 30' 10' 30' 10' EASEMENT MATCH LINE - SEE MIDDLE LEFT MATCH LINE - SEE TOP RIGHT PROSPECT ROAD R10 R12 R11 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R END 1 STA.=15+84.26 OFFSET=21' END 7 STA.=15+84.26 OFFSET=3' END 1 STA.=11+49.26 OFFSET=9' BEGIN 3 CONTINUE 7 STA.=13+49.26 OFFSET=9' BEGIN 4 END 3 STA.=10+89.99 OFFSET=13' BEGIN 3 STA.=11+80.00 OFFSET=11' CONTINUE 3 STA.=15+84.26 OFFSET=11' END 3 STA.=13+49.26 OFFSET=22' CONTINUE 7 STA.=8+54.26 OFFSET=2' BEGIN 7 BEGIN 7 STA.=15+84.26 OFFSET=9' END 4 STA.=15+84.26 OFFSET=32' END 9 SIGNORELLI JACKLYN C 4529 E PROSPECT RD JIRON JACKLYN E 4525 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD TROXELL BARBARA Y 4417 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD POUDRE SCHOOL DISTRICT STA.=8+54.26 OFFSET=14' BEGIN 4 EXISTING 24' EOP-EOP STA.=10+25.10 OFFSET=8' BEGIN 1 END 6 STA.=11+49.55 OFFSET=2' CONTINUE 1 K L PROPOSED "BIKE LANE" SIGN R3-17 PROPOSED "BIKE LANE" & "ENDS" SIGNS R3-17 & R3-17b K T S T S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / A B A 107.5' ROW 66' FL-EOP 12' RIGHT TURN LANE 9' BIKE LANE 11' TRAVEL LANE 12' LEFT TURN LANE 12' TRAVEL LANE 8' BIKE LANE 12' LEFT TURN LANE 12' TRAVEL LANE 8' BIKE LANE 11' TRAVEL LANE 6' BIKE LANE 54' 97.5' FL-EOP ROW PROSPECT ROAD 107.5' ROW 2' SHOULDER B A L L J L 15' UTILITY EASEMENT 8' SIDEWALK 30" VERTICAL CURB & GUTTER EDGE OF PAVEMENT TRAFFIC SIGNAL STA.=16+74.26 OFFSET=22' BEGIN 4 STA.=16+74.26 OFFSET=10' BEGIN 7 STA.=18+79.26 OFFSET=42' BEGIN 3 END 4 STA.=18+79.26 OFFSET=33' BEGIN 6 END 1 STA.=20+79.26 OFFSET=42' END 3 STA.=20+79.26 OFFSET=33' BEGIN 9 END 6 STA.=27+47.26 OFFSET=22' END 7 CONTINUE 7 STA.=16+74.26 OFFSET=2' BEGIN 1 STA.=16+74.26 OFFSET=10' BEGIN 4 STA.=19+09.26 OFFSET=10' BEGIN 7 CONTINUE 7 STA.=16+74.26 OFFSET=42' BEGIN 4 STA.=16+74.26 OFFSET=33' BEGIN 1 EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD NICHOLS LIVING TRUST 1601 MEADOWAIRE DR EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD POUDRE SCHOOL DISTRICT POUDRE SCHOOL DISTRICT K L STA.=19+09.26 OFFSET=22' END 4 STA.=21+09.26 OFFSET=22' CONTINUE 7 STA.=27+47.26 OFFSET=10' BEGIN 4 STA.=25+47.26 OFFSET=10' CONTINUE 7 Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH R10 SIGNAGE & STRIPING PLAN PROSPECT ROAD 22 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD PROSPECT ROAD R10 R12 R11 MATCH LINE - SEE MIDDLE LEFT MATCH LINE - SEE TOP RIGHT MATCH LINE - SEE SHEET R11 LEGEND: PROPOSED EDGE OF ASPHALT / / / / / / / / CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) RIGHT-OF-WAY NOTES: LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY AND EASEMENT INFORMATION. 3. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH TRAFFIC ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 10 YELLOW ISLAND CROSS HATCHING WHITE ISLAND CROSS HATCHING 4" SOLID YELLOW LINE 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 4" BROKEN YELLOW LINE 8" SOLID WHITE LINE DOUBLE YELLOW LINE 4" SOLID AND 4" BROKEN; 4" APART 9 6 3 5 1 8 2 4 7 STRAIGHT AND RIGHT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW 18" X 12' CROSSING LINE, SEE NOTES PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING 18" WIDE STOP BAR PREFORMED PLASTIC PAVEMENT MARKING "STOP" (22.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING STRAIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING RIGHT TURN ARROW (15.5 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING LEFT TURN ARROW (15.5 S.F. EA.) RIGHT AND LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING TWO WAY LEFT TURN ARROW (31 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING PREFORMED PLASTIC PAVEMENT MARKING "ONLY" (22.5 S.F. EA.) L H D C B A K E F G I J M LANE REDUCTION ARROW PREFORMED PLASTIC PAVEMENT MARKING 11 MEDIAN LINE YELLOW 18" WIDE 50' O.C. 45° ANGLES 10' 30' 10' 30' 10' 12 4" BROKEN WHITE 10' N "LANE ENDS" PREFORMED PLASTIC PAVEMENT MARKING 4" WHITE DASHED LINE 3' 9' 3' 9' 3' O 18" WIDE WHITE MEDIAN STRIPING PREFORMED PLASTIC PAVEMENT MARKING A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER TOWN OF TIMNATH AND CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS AND TOWN OF TIMNATH ENGINEERS. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS AND TOWN OF TIMNATH RESERVE THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS AND TOWN OF TIMNATH DETERMINE THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. P. STREET NAME SIGNS AT INTERSECTIONS SHALL BE INSTALLED ABOVE STOP SIGNS ON SAME POLE, PER LCUASS DRAWING 1401. STRIPING LEGEND: STRIPING NOTES: 8" WHITE DASHED LINE 3' 9' 3' 9' 3' (NOTE: ALL ITEMS MAY NOT APPLY TO THIS PLAN) PAVEMENT STRIPING PAVEMENT MARKINGS STRAIGHT ARROW (15 S.F. EA.) PREFORMED PLASTIC PAVEMENT MARKING 30' 10' 30' 10' EASEMENT City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 4925 4930 4935 4940 34+50 35+00 36+00 37+00 38+00 4927.37 4928.72 4929.89 4927.11 4927.70 4928.04 4928.38 4929.05 4929.39 4929.68 4930.10 4930.32 4930.53 0.95% 1.35% 0.85% PVI STA = 34+95.68 PVI ELEV = 4927.31 PVI STA = 36+64.59 PVI ELEV = 4929.59 PVI STA = 37+85.68 PVI ELEV = 4930.62 FUTURE GRADE EXISTING GROUND EXISTING GROUND FUTURE GRADE 4915 4920 4925 4930 4935 4940 4915 4920 4925 4930 4935 4940 34+50 35+00 36+00 4926.45 4926.22 0.92% PVI STA = 35+05.27 PVI ELEV = 4926.50 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R9 PLAN & PROFILE MAIN STREET 21 R6 R7 R8 R9 CENTERLINE MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 34+50 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 RIGHT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) MATCH LINE SEE SHEET R8 STA 34+50 MAIN STREET MAIN STREET PROPOSED CULVERT (ON-SITE PLANS) EXISTING GRAVEL DRIVE TO BE PAVED w/ ASPHALT TO ROW PROPOSED 54' EOP-EOP 140' ROW R30' PROPOSED CULVERT (ON-SITE PLANS) PROPOSED BARRICADE PROPOSED SAWCUT R30' 40' PROPOSED 42' EOP-EOP TRACT B SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT TRACT B SERRATOGA FALLS 2ND FILING COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 STORM CULVERT A SEE SHEET ST1 STORM CULVERT B SEE SHEET ST1 STORM CULVERT C SEE SHEET ST1 PROPOSED SIDEWALK CULVERT 4915 4920 4925 4930 4935 4940 4915 4920 4925 4930 4935 4940 24+50 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 34+50 4920.22 4920.14 4920.59 4921.09 4921.62 4922.44 4923.38 4924.29 4925.20 4920.34 4920.14 4920.10 4920.10 4920.22 4920.34 4920.47 4920.72 4920.84 4920.97 4921.22 4921.34 4921.47 4921.80 4921.99 4922.20 4922.69 4922.93 4923.16 4923.61 4923.84 4924.07 4924.52 4924.75 4924.98 -0.50% 0.50% 1.00% 0.91% PVI STA = 30+42.81 PVI ELEV = 4922.86 PVI STA = 33+16.84 PVI ELEV = 4925.36 150.0' VC LP ELEV = 4920.09 LP STA = 25+62.74 PVI STA = 25+62.73 PVI ELEV = 4919.91 BCVS: 24+87.73 BVCE: 4920.28 ECVS: 26+37.73 EVCE: 4920.28 A.D. = 1.00 K = 150.01 150.0' VC PVI STA = 29+30.87 PVI ELEV = 4921.75 BCVS: 28+55.87 BVCE: 4921.37 ECVS: 30+05.87 EVCE: 4922.50 A.D. = 0.50 K = 299.94 1.00% 0.95% PVI STA = 30+42.81 PVI ELEV = 4922.86 PVI STA = 33+26.15 PVI ELEV = 4925.70 FUTURE GRADE PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE TIE TO EXISTING 4915 4920 4925 4930 4935 4940 4915 4920 4925 4930 4935 4940 24+50 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 34+50 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 4919.63 4919.54 4920.00 4920.50 4921.03 4921.84 4922.79 4923.70 4924.62 4925.54 4919.75 4919.55 4919.50 4919.63 4919.75 4919.87 4920.12 4920.25 4920.37 4920.62 4920.75 4920.88 4921.20 4921.39 4921.61 4922.09 4922.33 4922.56 4923.02 4923.25 4923.48 4923.93 4924.16 4924.39 4924.85 4925.08 4925.31 4925.76 -0.50% 0.50% 1.00% 0.92% PVI STA = 30+37.85 PVI ELEV = 4922.22 150.0' VC LP ELEV = 4919.50 LP STA = 25+62.86 PVI STA = 25+62.86 PVI ELEV = 4919.31 BCVS: 24+87.86 BVCE: 4919.69 ECVS: 26+37.86 EVCE: 4919.69 A.D. = 1.00 K = 149.98 150.0' VC PVI STA = 29+31.13 PVI ELEV = 4921.15 BCVS: 28+56.13 BVCE: 4920.78 ECVS: 30+06.13 EVCE: 4921.90 A.D. = 0.50 K = 300.05 4915 4920 4925 4930 4935 4940 4915 4920 4925 4930 4935 4940 24+50 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 34+50 -0.50% 0.50% 0.19% 1.30% 0.94% PVI STA = 28+08.45 PVI ELEV = 4920.53 PVI STA = 30+46.56 PVI ELEV = 4922.26 PVI STA = 33+20.89 PVI ELEV = 4924.85 150.0' VC LP ELEV = 4919.50 LP STA = 25+64.14 PVI STA = 25+64.13 PVI ELEV = 4919.31 BCVS: 24+89.13 BVCE: 4919.69 ECVS: 26+39.13 EVCE: 4919.69 A.D. = 1.00 K = 150.01 151.1' VC PVI STA = 29+30.98 PVI ELEV = 4920.76 BCVS: 28+55.42 BVCE: 4920.62 ECVS: 30+06.55 EVCE: 4921.74 A.D. = 1.11 K = 135.76 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 4919.64 4919.54 4919.99 4920.49 4920.78 4921.66 4922.77 4923.71 4924.65 4919.76 4919.55 4919.51 4919.50 4919.62 4919.74 4919.87 4920.12 4920.24 4920.37 4920.56 4920.61 4920.67 4920.93 4921.13 4921.37 4921.98 4922.30 4922.53 4923.00 4923.24 4923.47 4923.95 4924.18 4924.42 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R8 PLAN & PROFILE MAIN STREET 20 R6 R7 R8 R9 CENTERLINE MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 24+50 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 LINE MATCH STA 34+50 MATCH LINE SEE SHEET R9 STA 34+50 MATCH LINE SEE SHEET R7 STA 24+50 RIGHT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) LEFT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) STA.=16+24.68 OFFSET=-26.000 MAIN STREET PROSPECT ROAD SEE SHEETS R1-R5 PROSPECT ROAD SEE SHEETS R1-R5 12'x6' RCBC TIMNATH RESERVOIR INLET CANAL R25' TRACT C SERRATOGA FALLS 2ND FILING LACY KEITH W JR 1601 S COUNTY ROAD 5 COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW R25' R25' PROPOSED GUARD RAIL STORM CULVERT D SEE SHEET ST1 90' ROW 53' EOP-EOP PROPOSED CULVERT 4910 4915 4920 4925 4930 4935 4910 4915 4920 4925 4930 4935 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 24+50 4917.50 4918.76 4918.84 4919.34 4919.84 4920.34 4920.80 4920.71 4916.61 4916.87 4917.17 4917.85 4918.20 4918.51 4918.86 4918.65 4918.53 4918.50 4918.59 4918.72 4918.97 4919.09 4919.22 4919.47 4919.59 4919.72 4919.97 4920.09 4920.22 4920.47 4920.59 4920.71 4920.84 4920.84 4920.80 4920.59 1.40% 1.00% -0.90% -0.55% 0.50% -0.50% PVI STA = 16+64.61 PVI ELEV = 4918.41 PVI STA = 17+16.77 PVI ELEV = 4918.93 PVI STA = 17+44.59 PVI ELEV = 4918.68 150.0' VC HP ELEV = 4920.84 HP STA = 23+37.58 PVI STA = 23+37.58 PVI ELEV = 4921.03 BVCS: 22+62.58 BVCE: 4920.66 EVCS: 24+12.58 EVCE: 4920.66 A.D. = 1.00 K = 150.00 150.0' VC PVI STA = 15+22.42 PVI ELEV = 4916.42 ECVS: 15+97.42 EVCE: 4917.47 A.D. = 0.90 K = 166.67 90.0' VC LP ELEV = 4918.48 LP STA = 18+05.21 PVI STA = 18+03.05 PVI ELEV = 4918.36 BCVS: 17+58.05 BVCE: 4918.61 ECVS: 18+48.05 EVCE: 4918.58 A.D. = 1.05 K = 85.67 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 4910 4915 4920 4925 4930 4935 4910 4915 4920 4925 4930 4935 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 24+50 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 4918.25 4918.75 4919.25 4919.75 4920.20 4920.12 4917.92 4917.90 4918.00 4918.12 4918.37 4918.50 4918.62 4918.87 4919.00 4919.12 4919.37 4919.50 4919.62 4919.87 4920.00 4920.12 4920.24 4920.24 4920.20 4920.00 1.40% 1.00% PVI STA = 16+64.66 PVI ELEV = 4917.81 PVI STA = 16+71.76 PVI ELEV = 4917.88 150.0' VC PVI STA = 15+20.08 PVI ELEV = 4915.79 ECVS: 15+95.08 EVCE: 4916.84 A.D. = 0.93 K = 161.10 0.50% -0.50% -0.55% 150.0' VC HP ELEV = 4920.25 HP STA = 23+37.70 PVI STA = 23+37.70 PVI ELEV = 4920.44 BVCS: 22+62.70 BVCE: 4920.06 EVCS: 24+12.70 EVCE: 4920.06 A.D. = 1.00 K = 149.99 80.5' VC LP ELEV = 4917.87 LP STA = 18+00.94 PVI STA = 18+03.18 PVI ELEV = 4917.76 BCVS: 17+67.68 BVCE: 4917.96 ECVS: 18+48.18 EVCE: 4917.99 A.D. = 1.05 K = 76.66 4910 4915 4920 4925 4930 4935 4910 4915 4920 4925 4930 4935 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 24+50 -0.55% -0.50% 0.50% 0.50% 0.65% PVI STA = 19+86.62 PVI ELEV = 4918.37 PVI STA = 21+86.86 PVI ELEV = 4919.68 150.0' VC HP ELEV = 4920.25 HP STA = 23+39.00 PVI STA = 23+38.97 PVI ELEV = 4920.44 BVCS: 22+63.97 BVCE: 4920.06 EVCS: 24+13.97 EVCE: 4920.06 A.D. = 1.00 K = 149.95 64.9' VC LP ELEV = 4917.52 LP STA = 17+99.10 PVI STA = 18+03.96 PVI ELEV = 4917.46 BCVS: 17+84.01 BVCE: 4917.57 ECVS: 18+48.96 EVCE: 4917.68 A.D. = 1.05 K = 61.83 4917.94 4918.46 4919.11 4919.74 4920.20 4920.13 4917.58 4917.69 4917.81 4918.06 4918.19 4918.31 4918.62 4918.78 4918.95 4919.27 4919.44 4919.60 4919.87 4919.99 4920.11 4920.24 4920.25 4920.21 4920.01 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 1.40% PVI STA = 16+60.08 PVI ELEV = 4917.77 150.0' VC PVI STA = 15+18.98 PVI ELEV = 4915.80 ECVS: 15+93.98 EVCE: 4916.85 A.D. = 0.95 K = 158.57 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R7 PLAN & PROFILE MAIN STREET 19 R6 R7 R8 R9 CENTERLINE MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 15+00 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 LINE MATCH STA 24+50 MATCH LINE SEE SHEET R8 STA 24+50 MATCH LINE SEE SHEET R6 STA 15+00 RIGHT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) LEFT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) OFFSET=-18.113 STA.=11+42.92 OFFSET=-19.605 STA.=12+31.89 OFFSET=-21.458 STA.=12+78.82 OFFSET=-22.436 MAIN STREET EXISTING ±26' EOP-EOP 90' ROW EXISTING GRAVEL DRIVE EXISTING CONCRETE IRRIGATION DITCH STA.=13+55.82 OFFSET=-24.040 STA.=13+46.53 OFFSET=-23.854 EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW CONNECT TO EXISTING STA.=9+59.84 OFFSET=-11.642 EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 REED SANDRA K 1707 ENCHANTMENT DR LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 LEWIS ALFRED WRAY BEVERLY JANE 1709 S COUNTY ROAD 5 LEBSOCK BRANDON J/KIMBERLY J 1717 S COUNTY ROAD 5 HILL SANDRA K/ANTHONY O 1739 ENCHANTMENT DR 90' ROW 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 4913.80 4914.30 4914.80 4915.30 4915.80 4913.93 4914.05 4914.18 4914.43 4914.55 4914.68 4914.93 4915.05 4915.18 4915.43 4915.55 4915.68 4915.93 4916.05 4916.20 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 0.50% PVI STA = 10+00.00 PVI ELEV = 4913.80 BCVS: 14+47.42 BVCE: 4916.04 0.50% PVI STA = 5+00.00 PVI ELEV = 4911.30 PVI STA = 10+00.00 PVI ELEV = 4913.80 FUTURE GRADE TIE TO EXISTING 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 4913.22 4913.82 4914.29 4914.76 4915.23 4913.40 4913.59 4913.70 4913.94 4914.05 4914.17 4914.41 4914.52 4914.64 4914.87 4914.99 4915.11 4915.34 4915.46 4915.61 0.72% 0.47% PVI STA = 10+00.00 PVI ELEV = 4913.22 PVI STA = 10+50.07 PVI ELEV = 4913.59 BCVS: 14+45.08 BVCE: 4915.44 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 4913.40 4913.89 4914.35 4914.80 4915.25 4913.53 4913.67 4913.78 4914.01 4914.12 4914.23 4914.46 4914.57 4914.69 4914.91 4915.03 4915.14 4915.37 4915.48 4915.63 0.54% 0.45% PVI STA = 10+00.00 PVI ELEV = 4913.40 PVI STA = 10+50.08 PVI ELEV = 4913.67 BCVS: 14+43.98 BVCE: 4915.45 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R6 PLAN & PROFILE MAIN STREET 18 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner R6 R7 R8 R9 CENTERLINE MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) RIGHT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) LEFT EOP MAIN STREET SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 15+00 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 MATCH LINE SEE SHEET R7 STA 15+00 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / D D / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T T VAULT F.O. F.O. / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD PROSPECT ROAD 118' ROW EXISTING ±24' EOP-EOP STA.=43+96.76 OFFSET=17.000 STA.=47+56.46 OFFSET=12.296 STA.=47+56.46 OFFSET=-11.948 TIMNATH RESERVOIR INLET CANAL PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR SANDERS, DENNIS L/DONI D 1623 CAREFREE DR FORT COLLINS, CO 80525 VAN DYNE, DAVID M/AHN HAE K 1622 CAREFREE DR FORT COLLINS, CO 80525 TRIC BOX CULVERT (SERRATOGA 2ND FILING) STA.=47+56.46 OFFSET=17.000 STA.=47+56.46 OFFSET=-17.004 GUARDRAIL (SERRATOGA 2ND FILING) 10' TRAIL (SERRATOGA 2ND FILING) 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 43+50 44+00 45+00 46+00 47+00 48+00 4918.03 4917.70 4917.38 4917.05 4918.11 4917.95 4917.86 4917.78 4917.62 4917.54 4917.46 4917.29 4917.21 4917.13 4916.97 4916.89 -0.33% -0.33% PVI STA = 43+97.61 PVI ELEV = 4918.04 PVI STA = 47+57.31 PVI ELEV = 4916.86 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 43+50 44+00 45+00 46+00 47+00 48+00 48+50 4917.97 4917.68 4917.39 4917.09 4918.04 4917.90 4917.82 4917.75 4917.60 4917.53 4917.46 4917.31 4917.24 4917.17 4917.02 4916.95 -0.29% PVI STA = 47+61.50 PVI ELEV = 4916.91 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R5 PLAN & PROFILE PROSPECT ROAD 17 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner R1 R2 R3 R4 R5 CENTERLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) LEFT EOP PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 43+50 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 MATCH LINE SEE SHEET R4 STA 43+50 RIGHT EOP PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) PVI STA = 40+98.52 PVI ELEV = 4919.89 BVCS: 40+23.52 BVCE: 4919.48 EVCS: 41+73.52 EVCE: 4919.48 A.D. = 1.10 K = 136.36 150.0' VC LP ELEV = 4916.95 LP STA = 35+25.30 PVI STA = 35+25.30 PVI ELEV = 4916.74 BCVS: 34+50.30 BVCE: 4917.15 ECVS: 36+00.30 EVCE: 4917.15 A.D. = 1.10 K = 136.36 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND FUTURE GRADE VAULT F.O. TELE F.O. MH / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / STA. = 42+73.30 PROSPECT ROAD STA. = 17+16.77 PROSPECT ROAD MAIN STREET MAIN STREET SEE SHEETS R6-R9 CARRIAGE ROAD 97.5' ROW PROPOSED 72' FL-FL MAIN STREET SEE SHEETS R6-R9 STA.=36+33.82 OFFSET=17.619 BEGIN CURB & GUTTER STA.=36+98.54 OFFSET=16.199 STA.=37+78.08 OFFSET=17.500 STA.=42+21.99 OFFSET=30.500 STA.=43+25.41 OFFSET=19.933 STA.=43+25.02 OFFSET=-26.067 15' UTILITY EASEMENT 8' SIDEWALK PROPOSED 30" CURB & GUTTER R25' 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 R20' PROPOSED GUARD RAIL 4' SIDEWALK CULVERT RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 POUDRE SCHOOL DISTRICT STORM DRAIN (SEE NOTE #6) STORM DRAIN (SEE NOTE #6) 4' CONCRETE PAN (SEE ONSITE PLANS) 2' ACCESS EASEMENT R25' R25' R25' HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR STA.=40+14.44 OFFSET=30.500 RYAN JEFFREY L/SYBIL A R20' PROPOSED 30" CURB & GUTTER PROPOSED RIPRAP RUNDOWN 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 33+50 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 43+50 4916.29 4915.79 4916.00 4916.50 4917.04 4917.64 4918.24 4918.64 4918.32 4916.41 4916.16 4916.04 4915.91 4915.66 4915.75 4915.87 4916.12 4916.25 4916.37 4916.62 4916.75 4916.89 4917.19 4917.34 4917.49 4917.79 4917.94 4918.09 4918.39 4918.52 4918.61 4918.63 4918.56 4918.46 -0.50% -0.55% 0.50% 0.50% 0.60% PVI STA = 35+28.98 PVI ELEV = 4915.64 PVI STA = 36+03.98 PVI ELEV = 4916.02 PVI STA = 37+56.50 PVI ELEV = 4916.78 PVI STA = 42+11.15 PVI ELEV = 4918.26 150.0' VC HP ELEV = 4918.64 HP STA = 41+05.46 PVI STA = 41+02.20 PVI ELEV = 4918.86 BVCS: 40+27.20 BVCE: 4918.41 EVCS: 41+77.20 EVCE: 4918.44 A.D. = 1.15 K = 130.43 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND -0.29% PVI STA = 43+29.97 PVI ELEV = 4918.18 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 33+50 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 43+50 4916.55 4916.09 4916.27 4916.82 4917.37 4917.92 4918.47 4918.80 4918.45 4916.68 4916.41 4916.27 4916.16 4916.06 4916.09 4916.15 4916.41 4916.54 4916.68 4916.96 4917.09 4917.23 4917.51 4917.64 4917.78 4918.06 4918.19 4918.33 4918.61 4918.72 4918.78 4918.78 4918.71 4918.59 -0.55% 0.55% -0.55% PVI STA = 42+20.97 PVI ELEV = 4918.34 150.0' VC HP ELEV = 4918.80 HP STA = 40+98.52 PVI STA = 40+98.52 PVI ELEV = 4919.01 BVCS: 40+23.52 BVCE: 4918.60 EVCS: 41+73.52 EVCE: 4918.60 A.D. = 1.10 K = 136.36 150.0' VC LOW PT ELEV = 4916.06 LOW PT STA = 35+25.29 PVI STA = 35+25.29 PVI ELEV = 4915.86 BVCS: 34+50.29 BVCE: 4916.27 EVCS: 36+00.29 EVCE: 4916.27 A.D. = 1.10 K = 136.36 -0.33% PVI STA = 43+26.20 PVI ELEV = 4918.27 -0.55% 0.50% 0.50% 0.50% 0.50% PVI STA = 36+98.53 PVI ELEV = 4917.13 PVI STA = 42+22.35 PVI ELEV = 4918.47 PVI STA = 37+54.89 PVI ELEV = 4917.41 PVI STA = 37+78.15 PVI ELEV = 4917.53 PVI STA = 40+14.87 PVI ELEV = 4918.71 150.0' VC HP ELEV = 4918.95 HP STA = 40+96.80 PVI STA = 41+00.37 PVI ELEV = 4919.14 BVCS: 40+25.37 BVCE: 4918.77 EVCS: 41+75.37 EVCE: 4918.73 A.D. = 1.05 K = 142.85 FUTURE GRADE EXISTING GROUND FUTURE GRADE EXISTING GROUND PROPOSED FLOW LINE GRADE KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R4 PLAN & PROFILE PROSPECT ROAD 16 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner R1 R2 R3 R4 R5 CENTERLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) LEFT FLOWLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 33+50 LINE MATCH STA 43+50 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 MATCH LINE SEE SHEET R5 STA 43+50 SCALE : 1" = 40' HORIZONTAL 1" = 5' VERTICAL PROSPECT ROAD ULTIMATE RIGHT FLOWLINE MATCH LINE SEE SHEET R3 STA 33+50 K = 136.36 150.0' VC LP ELEV = 4917.36 LP STA = 26+23.56 PVI STA = 26+23.56 PVI ELEV = 4917.15 BCVS: 25+48.56 BVCE: 4917.56 ECVS: 26+98.56 EVCE: 4917.56 A.D. = 1.10 K = 136.36 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND X X X X X M / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD MEADOWAIRE DRIVE 107.5' ROW PROPOSED 54' FL-EOP 97.5' ROW PROPOSED 66' FL-EOP STA.=30+02.58 OFFSET=12.500 STA.=30+67.61 OFFSET=12.500 8' SIDEWALK 15' UTILITY EASEMENT 8' SIDEWALK 10' CROSS PAN PROPOSED 30" CURB & GUTTER PROPOSED 30" CURB & GUTTER PROPOSED EDGE OF ASPHALT R25' R25' 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 R20' R20' 4' SIDEWALK CULVERT ∆ ∆ NICHOLS LIVING TRUST 1601 MEADOWAIRE DR SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR POUDRE SCHOOL DISTRICT EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD STORM DRAIN (SEE NOTE #6) STORM DRAIN (SEE NOTE #6) 4' CONCRETE PAN (SEE ONSITE PLANS) 2' ACCESS EASEMENT 14' ACCESS EASEMENT RYAN JEFFREY L/SYBIL A BEGIN TAPER STA.=32+78.91 OFFSET=12.50 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 24+50 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+50 4916.80 4916.28 4916.53 4917.08 4917.63 4918.16 4917.79 4917.29 4916.79 4916.94 4916.67 4916.53 4916.40 4916.15 4916.28 4916.40 4916.66 4916.80 4916.94 4917.21 4917.35 4917.49 4917.76 4917.90 4918.03 4918.16 4918.04 4917.91 4917.66 4917.54 4917.41 4917.16 4917.04 4916.91 4916.66 -0.55% -0.50% 0.50% -0.50% -0.50% 0.50% 0.55% -0.50% PVI STA = 25+50.37 PVI ELEV = 4916.53 PVI STA = 26+25.37 PVI ELEV = 4916.15 PVI STA = 27+00.37 PVI ELEV = 4916.53 PVI STA = 29+63.81 PVI ELEV = 4917.98 PVI STA = 30+13.16 PVI ELEV = 4918.22 PVI STA = 31+15.32 PVI ELEV = 4917.71 PVI STA = 32+80.58 PVI ELEV = 4916.89 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 24+50 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+50 4916.95 4916.50 4916.69 4917.24 4917.79 4918.29 4918.19 4917.65 4917.10 4917.09 4916.81 4916.67 4916.56 4916.47 4916.50 4916.57 4916.83 4916.96 4917.10 4917.38 4917.51 4917.65 4917.93 4918.06 4918.20 4918.33 4918.33 4918.28 4918.06 4917.92 4917.78 4917.51 4917.37 4917.23 4916.96 -0.55% 0.55% -0.55% 150.0' VC HP ELEV = 4918.34 HP STA = 30+37.00 PVI STA = 30+37.00 PVI ELEV = 4918.54 BVCS: 29+62 BVCE: 4918.13 EVCS: 31+12 EVCE: 4918.13 A.D. = 1.10 K = 136.36 150.0' VC LOW PT ELEV = 4916.47 LOW PT STA = 26+23.56 PVI STA = 26+23.56 PVI ELEV = 4916.27 BVCS: 25+48.56 BVCE: 4916.68 EVCS: 26+98.56 EVCE: 4916.68 A.D. = 1.10 K = 136.36 FUTURE GRADE EXISTING GROUND FUTURE GRADE EXISTING GROUND KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R3 PLAN & PROFILE PROSPECT ROAD 15 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner R1 R2 R3 R4 R5 CENTERLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) LEFT FLOWLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 33+50 LINE MATCH STA 24+50 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 MATCH LINE SEE SHEET R4 STA 33+50 SCALE : 1" = 40' HORIZONTAL 1" = 5' VERTICAL PROSPECT ROAD ULTIMATE RIGHT FLOWLINE MATCH LINE SEE SHEET R2 STA 24+50 BVCS: 14+75.82 BVCE: 4917.92 EVCS: 16+25.82 EVCE: 4917.92 A.D. = 1.10 K = 136.36 150.0' VC HP ELEV = 4918.96 HP STA = 22+56.75 PVI STA = 22+56.75 PVI ELEV = 4919.17 BVCS: 21+81.75 BVCE: 4918.76 EVCS: 23+31.75 EVCE: 4918.76 A.D. = 1.10 K = 136.36 150.0' VC LP ELEV = 4917.02 LP STA = 18+28.20 PVI STA = 18+28.20 PVI ELEV = 4916.81 BCVS: 17+53.20 BVCE: 4917.22 ECVS: 19+03.20 EVCE: 4917.22 A.D. = 1.10 K = 136.36 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND W X X X M M MM M W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / STA.=16+00.01 OFFSET=12.498 STA.=16+54.01 OFFSET=12.500 PROSPECT ROAD MCLAUGHLIN LANE 107.5' ROW PROPOSED 66' FL-EOP 8' SIDEWALK 15' UTILITY EASEMENT 10' CROSS PAN PROPOSED 30" CURB & GUTTER PROPOSED EDGE OF ASPHALT EXISTING 60" STEEL GREELEY WATER MAIN 4' SIDEWALK CULVERT 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 R20' R20' ∆ ∆ EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD EKBLAD LARRY R/LINDA M SIGNORELLI JACKLYN C 4725 E PROSPECT RD 4529 E PROSPECT RD POUDRE SCHOOL DISTRICT STORM DRAIN (SEE NOTE #6) 4' CONCRETE PAN (SEE ONSITE PLANS) 14' ACCESS EASEMENT 2' ACCESS EASEMENT 2' ACCESS EASEMENT 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 14+50 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 24+50 -0.-0.50% 50% -0.50% -0.80% -0.50% 0.68% 0.55% -0.55% -0.50% 0.50% 0.68% -0.55% 0.55% PVI STA = 15+70.47 PVI ELEV = 4917.07 PVI STA = 15+97.43 PVI ELEV = 4916.93 PVI STA = 16+62.54 PVI ELEV = 4916.42 PVI STA = 16+92.70 PVI ELEV = 4916.26 PVI STA = 20+81.07 PVI ELEV = 4917.16 PVI STA = 17+54.64 PVI ELEV = 4915.92 PVI STA = 18+29.64 PVI ELEV = 4915.55 PVI STA = 18+82.91 PVI ELEV = 4915.82 PVI STA = 19+78.38 PVI ELEV = 4916.46 92.2' VC HP ELEV = 4917.14 HP STA = 15+46.91 PVI STA = 15+38.07 PVI ELEV = 4917.23 BVCS: 14+75.04 BVCE: 4916.88 EVCS: 15+67.25 EVCE: 4917.08 A.D. = 1.05 K = 87.74 150.0' VC HP ELEV = 4917.93 HP STA = 22+58.56 PVI STA = 22+58.56 PVI ELEV = 4918.13 BVCS: 21+83.56 BVCE: 4917.72 EVCS: 23+33.56 EVCE: 4917.72 A.D. = 1.10 K = 136.36 4917.00 4916.91 4916.22 4915.70 4915.93 4916.61 4917.26 4917.80 4917.86 4917.35 4916.88 4917.09 4917.13 4917.05 4916.71 4916.52 4916.35 4916.09 4915.95 4915.82 4915.57 4915.65 4915.78 4916.10 4916.27 4916.44 4916.78 4916.95 4917.12 4917.40 4917.54 4917.67 4917.88 4917.92 4917.92 4917.76 4917.63 4917.49 4917.22 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 14+50 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 24+50 4917.15 4917.16 4916.63 4916.16 4916.32 4916.87 4917.42 4917.96 4918.01 4917.50 4917.04 4917.22 4917.25 4917.23 4917.05 4916.91 4916.77 4916.50 4916.36 4916.24 4916.14 4916.15 4916.22 4916.46 4916.60 4916.74 4917.01 4917.15 4917.29 4917.56 4917.70 4917.84 4918.04 4918.08 4918.07 4917.91 4917.77 4917.64 4917.36 -0.55% 0.55% -0.55% 0.55% 150.0' VC HP ELEV = 4917.25 HP STA = 15+50.81 PVI STA = 15+50.81 PVI ELEV = 4917.45 BVCS: 14+75.81 BVCE: 4917.04 EVCS: 16+25.81 EVCE: 4917.04 A.D. = 1.10 K = 136.37 150.0' VC HP ELEV = 4918.08 HP STA = 22+56.75 PVI STA = 22+56.75 PVI ELEV = 4918.29 BVCS: 21+81.75 BVCE: 4917.87 EVCS: 23+31.75 EVCE: 4917.87 A.D. = 1.10 K = 136.36 150.0' VC LOW PT ELEV = 4916.14 LOW PT STA = 18+28.19 PVI STA = 18+28.19 PVI ELEV = 4915.93 BVCS: 17+53.19 BVCE: 4916.34 EVCS: 19+03.19 EVCE: 4916.34 A.D. = 1.10 K = 136.36 FUTURE GRADE EXISTING GROUND FUTURE GRADE EXISTING GROUND KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R2 PLAN & PROFILE PROSPECT ROAD 14 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner R1 R2 R3 R4 R5 CENTERLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) LEFT FLOWLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 14+50 LINE MATCH STA 24+50 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 MATCH LINE SEE SHEET R3 STA 24+50 SCALE : 1" = 40' HORIZONTAL 1" = 5' VERTICAL PROSPECT ROAD ULTIMATE RIGHT FLOWLINE MATCH LINE SEE SHEET R1 STA 14+50 TROXELL BARBARA Y 4509 E PROSPECT RD 4417 E PROSPECT RD POUDRE R-1 SCHOOL DISTRICT BEGIN CURB AND GUTTER 2407 LAPORTE AVE STA.=10+00.00 OFFSET=-41.546 END OF TAPER STA.=11+80.00 OFFSET=12.467 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+50 0.20% 0.55% PVI STA = 8+53.58 PVI ELEV = 4915.01 PVI STA = 10+00.01 PVI ELEV = 4915.31 4915.10 4915.31 4915.86 4916.41 4916.96 4917.51 4915.05 4915.16 4915.21 4915.26 4915.44 4915.58 4915.72 4915.99 4916.13 4916.27 4916.54 4916.68 4916.82 4917.09 4917.23 4917.37 4917.64 0.50% PVI STA = 10+00.01 PVI ELEV = 4915.31 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND FUTURE GRADE TIE TO EXISTING 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+50 0.55% PVI STA = 10+00.01 PVI ELEV = 4914.27 4914.82 4915.37 4915.92 4916.47 4914.41 4914.55 4914.68 4914.96 4915.10 4915.23 4915.51 4915.65 4915.78 4916.06 4916.20 4916.33 4916.61 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND 0.50% FUTURE GRADE 4905 4910 4915 4920 4925 4930 4905 4910 4915 4920 4925 4930 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+50 4912.43 4912.93 4913.43 4913.93 4914.43 4914.98 4915.53 4916.08 4916.63 4912.05 4912.18 4912.30 4912.55 4912.68 4912.80 4913.05 4913.18 4913.30 4913.55 4913.68 4913.80 4914.05 4914.18 4914.30 4914.56 4914.70 4914.84 4915.11 4915.25 4915.39 4915.66 4915.80 4915.94 4916.21 4916.35 4916.49 4916.76 0.50% 0.55% PVI STA = 10+00.00 PVI ELEV = 4914.43 FUTURE GRADE EXISTING GROUND FUTURE GRADE EXISTING GROUND KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 R1 PLAN & PROFILE PROSPECT ROAD 13 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner R1 R2 R3 R4 R5 CENTERLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) LEFT FLOWLINE PROSPECT ROAD SCALE : 1" = 40' (H) 1" = 5' (V) NORTH LINE MATCH STA 14+50 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 3. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 4. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. EASEMENT LINE EXISTING LOT LINE EXISTING LIGHT POLE PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING EDGE OF ASPHALT / / / / / / / / EXISTING STORM SEWER PROPOSED LIGHT POLE ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 MATCH LINE SEE SHEET R2 STA 14+50 SCALE : 1" = 40' HORIZONTAL 1" = 5' VERTICAL PROSPECT ROAD ULTIMATE RIGHT FLOWLINE (14.18) (13.72) (13.75) (13.36) 15.46 13.22 (13.37) (13.80) 13.40 (13.55) 13.76 13.85 14.09 14.31 14.49 14.57 14.71 15.01 15.05 15.21 16.01 16.37 16.40 18.37 19.32 19.68 17.45 20.37 2.6% 2.2% 2.0% 2.1% 2.2% 2.2% 2.2% 2.2% 2.2% 0.5% 0.5% 2.0% 2.0% 2.0% 0.5% 0.5% (3.5%) (3.0%) 2.2% 2.2% 2.2% 2.2% 2.2% 2.2% 18.26 17.95 17.60 17.20 18.51 17.93 17.96 17.94 17.81 17.42 17.34 (17.00) (16.95) 15.04 18.06 18.14 18.31 18.12 17.90 17.25 17.74 18.02 18.64 (16.01) 0.4% MAIN STREET MAIN STREET PROPOSED STORM DRAIN (ON-SITE PLANS - SEE NOTE #8) 8' SIDEWALK 15' UTILITY EASEMENT 8' SIDEWALK 15' UTILITY EASEMENT 68' EOP-EOP 140' ROW 90' ROW EDGE OF EXISTING 10' TRAIL PAVEMENT EDGE OF PAVEMENT LACY KEITH W JR 1601 S COUNTY ROAD 5 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR POUDRE SCHOOL DISTRICT COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 FORT COLLINS, CO 80524 REED SANDRA K 1707 ENCHANTMENT DR FORT COLLINS, CO 80525 LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 FORT COLLINS, CO 80524 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 FORT COLLINS, CO 80524 LEWIS ALFRED WRAY BEVERLY JANE 1709 S COUNTY ROAD 5 FORT COLLINS, CO 80524 STORM DRAIN (SEE NOTE #9) PROSPECT ROAD SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 12'x6' RCBC (TRIC) EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW STORM CULVERT D SEE SHEET ST1 0.5% 18.28 18.58 18.59 18.45 17.42 17.56 16.78 FES E1 INV. OUT=4916.94 (N) FES E INV. IN=4916.85 (S) 30.00 LF 15" RCP @ 0.30% 10'x4'x1.5' DEEP RIPRAP RUNDOWNS 10'x4'x1.5' DEEP RIPRAP RUNDOWN 17.09 18.42 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X 18.72 16.79 20.25 18.30 20.43 20.21 20.10 20.16 20.28 20.89 20.36 20.73 20.57 20.60 21.71 18.90 21.35 19.48 19.85 22.26 20.04 22.65 (21.00) (20.89) 21.14 24.62 (24.85) (25.40) (26.97) 26.50 (26.61) 24.17 22.27 2.2% 2.2% 2.2% 2.2% 2.0% 2.2% 2.0% 2.2% 2.2% 2.2% 3.3% 2.2% (2.8%) 2.5% 0.5% 0.8% 0.5% 0.8% 0.5% 18.06 0.5% 2.0% 2.0% 2.0% 2.0% 2.0% 0.5% 20.91 21.23 22.31 22.91 0.6% 0.6% 25.13 24.77 (2.0%) 18.09 MAIN STREET PROPOSED CULVERT PROPOSED CULVERT (ON-SITE PLANS) PROPOSED CULVERT (ON-SITE PLANS) PROPOSED BARRICADE PROPOSED STORM DRAIN (ON-SITE PLANS) 8' SIDEWALK 15' UTILITY EASEMENT 8' SIDEWALK 15' UTILITY EASEMENT 120' ROW 54' EOP-EOP 140' ROW EXISTING 10' TRAIL PROPOSED EDGE OF PAVEMENT PROPOSED EDGE OF PAVEMENT 2' SIDEWALK CULVERT (3.8%) TRACT B SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT TRACT B SERRATOGA FALLS 2ND FILING DUNN, RICHARD L/CAROL B COCHRAN, BRAD M/SANDRA J 5021 KITCHELL WAY 1225 S COUNTY ROAD 5 EXISTING GRAVEL DRIVEWAY TO BE PAVED TO ROW PROPOSED SAW CUT STORM CULVERT A SEE SHEET ST1 STORM CULVERT B STORM CULVERT C SEE SHEET ST1 SEE SHEET ST1 D MAIN STREET Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH G2 GRADING PLAN MAIN STREET 12 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC E MAIN STREET A B C D E MATCHLINE - SEE BOTTOM LEFT MATCHLINE - SEE TOP RIGHT LEGEND: PROPOSED CONTOUR EXISTING CONTOUR PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 5. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. 6. ADD 4900-FT TO PROPOSED CONTOURS,AND SPOT ELEVATIONS WHERE TRUNCATED. 7. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 8. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. NOTES: 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED STORM PROPOSED VERTICAL CURB AND GUTTER PROPOSED SWALE SAW CUT NOTE: SEE SHEET D4 FOR INTERSECTION GRADING DETAIL 16.26 16.62 16.96 15.55 4 SIDEWALK CULVERT 2.2% 2.2% 2.2% 2.2% 2.2% 2.2% 2.2% 2.5% (4.2%)(5.3%) 2.0% BARRICADE 30" VERTICAL CURB & GUTTER 17.29 16.40 WALK 2.0% 15.45 FL 17.11 2.0% 4:1 4:1 EDGE OF PAVEMENT 15.80 16.66 17.16 18.01 2.2% 2.2% 2.0% 30" VERTICAL CURB & GUTTER 87.5' ROW PROSPECT ROAD PROSPECT ROAD JIRON JACKLYN E 4525 E PROSPECT RD EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 POUDRE SCHOOL DISTRICT PROPOSED STORM (SEE ONSITE PLANS - NOTE # 8) 4' CONCRETE PAN (SEE ONSITE PLANS - NOTE # 8) 81' DITCH EASEMENT STORM DRAIN (SEE NOTE #9) 12'x6' RCBC (TRIC) 17.80 17.83 17.80 17.37 17.34 17.65 17.60 (13.01) 17.08 17.11 17.52 17.40 17.43 14' EOP-EOP 3.9% 4.0% 1.1% 1.1% 0.5% 0.8% 1.5% 1.5% 0.5% 2.0% 2.3% 10'x4'x1.5' DEEP RIPRAP RUNDOWN / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X 8' SIDEWALK 8' SIDEWALK EDGE OF PAVEMENT 15' UTILITY EASEMENT 15' UTILITY EASEMENT 18.90 18.10 18.03 18.91 (17.83) (17.72) 16.15 4' SIDEWALK CULVERT 18.02 18.05 18.12 18.03 17.90 17.85 17.85 18.34 18.09 18.21 18.37 18.43 18.82 18.64 18.80 18.89 2.2% 2.6% 2.2% 2.2% 2.2% 2.2% 2.2% 2.2% 17.00 WALK 2.0% 2.0% 54' FL-EOP 107.5' ROW 66' FL-EOP 97.5' ROW 16.89 17.73 2.0% EDGE OF PAVEMENT 18.71 2.0% 2.0% 30" VERTICAL CURB & GUTTER 16.06 FL PROSPECT ROAD MEADOWAIRE DRIVE NICHOLS LIVING TRUST 1601 MEADOWAIRE DR EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD POUDRE SCHOOL DISTRICT POUDRE SCHOOL DISTRICT 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT STORM DRAIN (SEE NOTE #9) STORM DRAIN (SEE NOTE #9) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 12'x6' RCBC (TRIC) PROPOSED STORM (SEE ONSITE PLANS - NOTE # 8) 4' CONCRETE PAN (SEE ONSITE PLANS -NOTE # 8) 0.9% 0.9% 1.1% 2.0% 1.3% 1.3% PROPOSED STORM (SEE ONSITE PLANS - NOTE # 8) PROPOSED STORM (SEE ONSITE PLANS - NOTE # 8) / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T TELE EDGE OF PAVEMENT 118' ROW 30' ELCO EASEMENT 55' CACHE LA POUDRE RESERVOIR CO. EASEMENT 8' SIDEWALK EDGE OF PAVEMENT 15' UTILITY EASEMENT 16.95 16.37 16.22 17.13 (16.23) (16.17) (16.01) (16.00) 18.72 18.42 18.27 17.88 18.11 16.86 16.91 18.14 17.96 17.88 17.93 17.97 17.42 17.34 15.04 18.26 17.89 17.60 18.06 18.04 18.08 15.64 PROPOSED 4' SIDEWALK CULVERT (17.01) (17.24) (16.97) 17.28 17.77 17.20 18.31 (17.00) (16.95) 2.2% 2.9% 2.0% 2.2% 2.6% 2.2% 2.5% 2.1% 2.2% 1.9% 16.49 WALK 2.0% 2.0% 2.0% (2.6%)(1.0%) 73' FL-EOP 97.5' ROW TIMNATH RESERVOIR INLET CANAL 15.55 FL 4:1 EXISTING 10' TRAIL 2.1% 2.2% 2.0% 0.5% 2.2% 2.2% 0.4% PROSPECT ROAD PROSPECT ROAD CARRIAGE ROAD MAIN STREET PROSPECT ROAD 8' SIDEWALK 15' UTILITY EASEMENT KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 TRACT C SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR SANDERS, DENNIS L/DONI D 1623 CAREFREE DR FORT COLLINS, CO 80525 RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT STORM DRAIN (SEE NOTE #9) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 12'x6' RCBC (TRIC) 4' CONCRETE PAN (SEE ONSITE PLANS - SEE NOTE #8) PROPOSED STORM (SEE ONSITE PLANS - NOTE # 8) STORM DRAIN FES E1 (SEE NOTE #9) INV. OUT=4916.94 (N) FES E INV. IN=4916.85 (S) 30.00 LF 15" RCP @ 0.30% 0.5% 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER 17.42 17.53 18.27 18.16 17.92 10'x4'x1.5' DEEP RIPRAP RUNDOWN 18.06 17.96 18.20 18.30 18.17 17.59 17.91 18.16 18.21 19.29 19.13 18.58 18.45 17.42 18.59 17.56 17.99 17.84 PROPOSED GUARDRAIL 10'x4'x1.5' DEEP RIPRAP RUNDOWN 10'x4'x1.5' DEEP RIPRAP RUNDOWN 18.41 18.42 Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH G1 GRADING PLAN PROSPECT ROAD 11 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC PROSPECT ROAD PROSPECT ROAD PROSPECT ROAD A B C D E A B C MATCHLINE - SEE MIDDLE LEFT MATCHLINE - SEE TOP RIGHT MATCHLINE - SEE BOTTOM LEFT MATCHLINE - SEE MIDDLE RIGHT LEGEND: PROPOSED CONTOUR EXISTING CONTOUR PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 5. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. 6. ADD 4900-FT TO PROPOSED CONTOURS,AND SPOT ELEVATIONS WHERE TRUNCATED. 7. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 8. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. NOTES: 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED STORM PROPOSED VERTICAL CURB AND GUTTER PROPOSED SWALE SAW CUT NOTE: SEE SHEET D4 FOR INTERSECTION GRADING DETAIL 4940 4945 4905 4910 4915 4920 4925 4930 4935 4940 4945 11+00 10+00 9+50 37.96 LF 15" RCP @ 0.50% FES A STA 10+00.00 INV. 4919.85 (N) FES A1 STA 10+37.96 INV. 4920.04 (S) PROPOSED GROUND EXISTING GROUND 4900 4905 4910 4915 4920 4925 4930 4935 4940 4900 4905 4910 4915 4920 4925 4930 4935 4940 11+50 11+00 10+00 9+50 77.04 LF 15" RCP @ 0.50% FES B STA 10+00.00 INV. 4918.22 (N) FES B1 STA 10+77.04 INV. 4918.60 (S) PROPOSED GROUND EXISTING GROUND 4900 4905 4910 4915 4920 4925 4930 4935 4940 4900 4905 4910 4915 4920 4925 4930 4935 4940 9+50 10+00 11+00 40.23 LF 15" RCP @ 0.50% FES C STA 10+00.04 INV. 4916.60 (E) FES C1 STA 10+40.27 INV. 4916.80 (W) PROPOSED GROUND EXISTING GROUND 4900 4905 4910 4915 4920 4925 4930 4935 4940 4900 4905 4910 4915 4920 4925 4930 4935 4940 9+50 10+00 11+00 11+50 64.84 LF 24" RCP @ 4.45% FES D STA 10+00.00 INV. 4913.50 (E) FES D1 STA 10+64.84 INV. 4916.38 (W) PROPOSED GROUND EXISTING GROUND VAULT CABLE F.O. T T T T T T G G G G G G FO FO FO FO FO FO W W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / FES B1 STA 10+77.04 N: 124720.41 E: 221085.09 FES B STA 10+00.00 N: 124643.75 E: 221092.79 77.04 LF 15" RCP @ 0.50% MAIN STREET EXISTING 8" WATER PROPOSED CULVERT (SEE ONSITE PLANS - SEE NOTE #7) PROPOSED CULVERT (SEE ONSITE PLANS - SEE NOTE #7) 15' UTILITY EASEMENT 8' SIDEWALK PROPOSED RIPRAP PROPOSED 2' SIDEWALK CULVERT & RIPRAP RUNDOWN T T T T G G G G FO FO FO FO FO FO FO FO FO FO W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / FES C1 STA 10+40.27 N: 124358.06 E: 221091.93 FES C STA 10+00.04 N: 124357.25 E: 221051.70 40.23 LF 15" RCP @ 0.50% MAIN STREET EXISTING 8" WATER PROPOSED STORM DRAIN (SEE ONSITE PLANS - SEE NOTE #7) 15' UTILITY EASEMENT 8' SIDEWALK PROPOSED RIPRAP SS SS SS SS SS SS S F.O. F.O. VAULT CABLE F.O. E E T T T T T G G G G G FO FO FO FO FO FO FO FO FO FO FO FO W W W W W MAIN STREET 15' UTILITY EASEMENT 8' SIDEWALK / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / FES D1 STA 10+64.84 N: 123812.97 E: 221085.97 FES D STA 10+00.00 N: 123813.15 E: 221021.13 64.84 LF 24" RCP @ 4.45% EXISTING 12" PVC SANITARY SEWER (BOXELDER) PROPOSED STORM DRAIN (SEE ONSITE PLANS - SEE NOTE #7) PROPOSED 2' CONCRETE PAN (SEE ONSITE PLANS - SEE NOTE #7) PROPOSED RIPRAP PROPOSED 15" RCP CULVERT KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC CULVERT D CULVERT A NORTH Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 ST1 PLAN & PROFILE STORM CULVERTS A, B, C, & D 10 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: W G T E EXISTING STORM SEWER EXISTING ELECTRIC EXISTING TELEPHONE EXISTING GAS EXISTING ELECTRIC METER EXISTING WATER METER EXISTING IRRIGATION BOX EXISTING POWER POLE EXISTING GAS METER EXISTING SANITARY SEWER SS PROPOSED LIGHT POLE PROPOSED CURB & GUTTER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EASEMENT LINE CONTROL IRR PROPOSED GAS G 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3. PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4. ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5. ALL RIPRAP PADS SHALL BE 4'x4'x1.5 DEEP TYPE L. 6. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 7. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. NOTES: PROPOSED ELECTRIC E EASEMENT LINE ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 PROFILE SCALE: PROFILE SCALE: PROFILE SCALE: PROFILE SCALE: CULVERT A CULVERT B CULVERT C CULVERT D NORTH NORTH NORTH CULVERT B CULVERT C T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO G G G G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO CTV CTV CTV CTV T T T T T T T T T G G G G G MH W W OHE OHE W W W W W G WV W W W W W W G 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / STA.=43+25.53 CONNECT TO EXISITNG w/ 12"X12" CROSS w/ TB 1-12" BFV (W), 12"x2" REDUCER (S), & 12"x8" REDUCER (E) 72' FL-FL 97.5' PROPOSED ROW EXISTING GAS LINE EXISTING GAS LINE 15' UTILITY EASEMENT 8' SIDEWALK 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT PROSPECT ROAD MAIN STREET CARRIAGE ROAD STORM DRAIN (SEE NOTE #14) EXISTING 12" PVC SANITARY SEWER (BOXELDER) TIMNATH RESERVOIR INLET CANAL APPROXIMATE LOCATION EXISTING 8" WATER STORM DRAIN (SEE NOTE #14) APPROXIMATE LOCATION EXISTING 2" WATER 24" STEEL CASING PIPE (SEE NOTE #14) APPROXIMATE LOCATION EXISTING 2" WATER STA.=41+13.89 ARV 80.17 LF 12" PVC S89°59'09"E 91.71 LF 12" PVC S89°59'09"E 22.63 LF 12" PVC S44°59'09"E 17.13 LF 12" PVC S89°59'09"E STA.=42+05.60 12"X6" SWIVEL TEE w/ FH ASSEMBLY & 6" GV (N) 442.88 LF 12" PVC S89°59'09"E 629.84 LF 12" PVC S89°59'09"E FIRE HYDRANT N:123599.13 E:221047.93 STA.=42+85.77 45° BEND w/TB STA.=43+08.40 45° BEND w/TB 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 76.93 LF 8" PVC N00°38'58"E RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 TRACT C SERRATOGA FALLS 2ND FILING POUDRE SCHOOL DISTRICT HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR STA.=36+71.01 12"X8" TEE w/TB 1-12" BFV (E), 1-8" GV (S) CONNECT TO EXISTING 4" WATER LINE w/ 8"x4" REDUCER RELOCATE EXISTING VALVE AS NEEDED N:123508.09 E:220511.94 PROPOSED 15" RCP CULVERT EXISTING 8" WATER 4895 4900 4905 4910 4915 4920 4925 4930 4935 4895 4900 4905 4910 4915 4920 4925 4930 4935 33+50 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 4916.85 4916.24 4916.28 4916.79 4917.32 4917.91 4918.50 4918.97 4918.75 4918.72 4917.00 4916.69 4916.39 4916.13 4916.06 4916.16 4916.40 4916.53 4916.66 4916.91 4917.04 4917.17 4917.46 4917.61 4917.76 4918.05 4918.20 4918.35 4918.64 4918.79 4918.90 4918.98 4918.95 4918.88 4918.61 4918.46 4918.53 4918.56 12" PVC 12" PVC 12" PVC 12" PVC STA. 43+25.5 CONNECT TO EXISITNG w/ 12"X12" CROSS w/ TB 1-12" BFV (W), 12"x2" REDUCER (S), & 12"x8" REDUCER (E) T.O.P.=4913.69 STA. 36+71.0 0.0° DEFLECTION T.O.P.=4912.18 STA. 35+94.2 0.3° DEFLECTION T.O.P.=4911.72 STA. 36+71.01 12"X8" TEE w/TB 1-12" BFV (E), 1-8" GV (S), & 8"x4" REDUCER (S) T.O.P.=4912.18 STA. 42+85.77 45° BEND w/TB T.O.P.=4913.79 STA. 43+08.40 45° BEND w/TB T.O.P.=4913.73 STA. 41+13.89 ARV T.O.P.=4914.29 STA. 42+05.60 12"X6" SWIVEL TEE w/ FH ASSEMBLY & 6" GV (N) T.O.P.=4914.00 100.7' DEF. STA. 40+79.58 T.O.P.=4914.24 STA. 41+80.25 T.O.P.=4914.06 (@ 0.1°) PROPOSED GROUND EXISTING GROUND TOP OF PIPE PROPOSED GROUND Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH WT3 PLAN & PROFILE 12" WATER LINE - PROSPECT ROAD 9 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC WT1 WT2 WT3 12" WATER LINE-PROSPECT RD PROFILE SCALE: LINE MATCH STA 33+50 MATCH LINE SEE SHEET WT2 STA 33+50 SS W EXISTING RIGHT OF WAY EXISTING WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER CONSTRUCTION SHALL BE PER THE EAST LARIMER COUNTY WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND TOWN SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 8. PIPE LENGTH LABELS SHOWN IN PLAN VIEW DENOTE THE HORIZONTAL DISTANCE BETWEEN HORIZONTAL FITTINGS, AND DO NOT ACCOUNT FOR VERTICAL BENDS OR DEFLECTIONS. 9. ALL WATERLINES SHALL HAVE A MINIMUM COVER OF 4.5' AND MAXIMUM COVER OF 5.5' FROM FINISHED GRADE TO TOP OF PIPE. 10. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITHIN THE EXISTING 50' GAS LINE EASEMENT WITH MAGELLAN PIPELINE CO. AND COMPLY WITH ALL MAGELLAN PIPELINE CO. CRITERIA. 11. ALL TEES AND CROSSES SHALL USE FOSTER ADAPTERS AND MEGALUGS. 12. CONTRACTOR TO USE 11.25° BEND(S) WITH ALL JOINTS RESTRAINED 5-FT BOTH SIDES OF BEND, IF REQUESTED DURING CONSTRUCTION BY ELCO FIELD INSPECTOR (BASED ON SITE CONDITIONS). 13. CONTRACTOR TO COORDINATE LOCATION OF RELOCATED SERVICE TAPS AND METERS WITH ELCO FIELD STAFF AND CONNECT TO EXISTING HOME'S SERVICE LINE. 14. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 15. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. 16. EXISTING 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE REMOVED BY EAST LARIMER COUNTY WATER DISTRICT DUE TO HAZARDOUS MATERIAL. CONTRACTOR'S DEMOLITION RESPONSIBILITIES FOR THE 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE LIMITED TO EXPOSING THE PIPE. CONTRACTOR SHALL COORDINATE ALL WATER LINE'S DEMOLITION ACTIVITIES WITH EAST LARIMER COUNTY WATER DISTRICT G E EXISTING STORM SEWER EXISTING ELECTRIC EXISTING GAS EXISTING SANITARY SEWER PROPOSED CURB & GUTTER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EASEMENT LINE PROPOSED RIGHT OF WAY PROPOSED LOT LINE PROPOSED WATER MAIN W EXISTING OVERHEAD UTILITY OHU EXISTING TELEPHONE T EXISTING CABLE CTV City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8" SS STA.=30+41.16 12"X8" TEE w/TB 1-12" BFV (E), 1-8" GV (S), 54' FL-EOA 107.5' PROPOSED ROW ±24' OF SERVICE TO BE EXTENDED WITH 2" HDPE CASING EXISTING GAS LINE STA.=23+21.60 12"X8" TEE w/TB 1-12" BFV (E) & 1-8" GV (N) TEMP FH w/ 8"x6" REDUCER T.O.P. ELEV: 4911.54 N:123615.35 E:219163.93 719.57 LF 12" PVC S89°59'09"E 15' UTILITY EASEMENT 8' SIDEWALK 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT 629.84 LF 12" PVC S89°59'09"E MEADOWAIRE DRIVE PROSPECT ROAD EXISTING 12" PVC SANITARY SEWER (BOXELDER) STORM DRAIN (SEE NOTE #14) 20" STEEL CASING PIPE (SEE NOTE #14) 97.5' PROPOSED ROW 560.25 LF 12" PVC S89°59'09"E 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 79.97 LF 8" PVC N00°12'06"E CONNECT TO EXISTING 4" WATER LINE w/ 8"x4" REDUCER RELOCATE EXISTING VALVE AS NEEDED N:123505.20 E:219883.21 30.00 LF 8" PVC S00°00'48"W NICHOLS LIVING TRUST 1601 MEADOWAIRE DR EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR POUDRE SCHOOL DISTRICT 8" WATER LINE (SEE NOTE #15) 4895 4900 4905 4910 4915 4920 4925 4930 4935 4895 4900 4905 4910 4915 4920 4925 4930 4935 21+50 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+50 4918.05 4918.25 4917.80 4917.25 4916.72 4916.78 4917.31 4917.86 4918.40 4918.46 4917.97 4917.45 4917.91 4918.17 4918.27 4918.19 4918.08 4917.94 4917.66 4917.53 4917.39 4917.11 4916.98 4916.84 4916.61 4916.55 4916.66 4916.90 4917.04 4917.18 4917.45 4917.59 4917.73 4918.00 4918.14 4918.28 4918.49 4918.52 4918.51 4918.36 4918.23 4918.10 4917.84 4917.71 4917.58 4917.30 12" PVC STA. 30+41.16 12"X8" TEE w/TB 1-12" BFV (E), 1-8" GV (S) T.O.P.=4911.55 STA. 23+21.60 12"X8" TEE w/TB 1-12" BFV (E) & 1-8" GV (N) T.O.P.=4911.33 PROPOSED GROUND EXISTING GROUND TOP OF PIPE PROPOSED GROUND Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH WT2 PLAN & PROFILE 12" WATER LINE - PROSPECT ROAD 8 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC WT1 WT2 WT3 12" WATER LINE-PROSPECT RD PROFILE SCALE: MATCH LINE SEE SHEET WT3 STA 33+50 LINE MATCH STA 33+50 MATCH LINE SEE SHEET WT1 STA 21+50 LINE MATCH STA 21+50 SS W EXISTING RIGHT OF WAY EXISTING WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER CONSTRUCTION SHALL BE PER THE EAST LARIMER COUNTY WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND TOWN SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 8. PIPE LENGTH LABELS SHOWN IN PLAN VIEW DENOTE THE HORIZONTAL DISTANCE BETWEEN HORIZONTAL FITTINGS, AND DO NOT ACCOUNT FOR VERTICAL BENDS OR DEFLECTIONS. 9. ALL WATERLINES SHALL HAVE A MINIMUM COVER OF 4.5' AND MAXIMUM COVER OF 5.5' FROM FINISHED GRADE TO TOP OF PIPE. 10. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITHIN THE EXISTING 50' GAS LINE EASEMENT WITH MAGELLAN PIPELINE CO. AND COMPLY WITH ALL MAGELLAN PIPELINE CO. CRITERIA. 11. ALL TEES AND CROSSES SHALL USE FOSTER ADAPTERS AND MEGALUGS. 12. CONTRACTOR TO USE 11.25° BEND(S) WITH ALL JOINTS RESTRAINED 5-FT BOTH SIDES OF BEND, IF REQUESTED DURING CONSTRUCTION BY ELCO FIELD INSPECTOR (BASED ON SITE CONDITIONS). 13. CONTRACTOR TO COORDINATE LOCATION OF RELOCATED SERVICE TAPS AND METERS WITH ELCO FIELD STAFF AND CONNECT TO EXISTING HOME'S SERVICE LINE. 14. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 15. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. 16. EXISTING 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE REMOVED BY EAST LARIMER COUNTY WATER DISTRICT DUE TO HAZARDOUS MATERIAL. CONTRACTOR'S DEMOLITION RESPONSIBILITIES FOR THE 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE LIMITED TO EXPOSING THE PIPE. CONTRACTOR SHALL COORDINATE ALL WATER LINE'S DEMOLITION ACTIVITIES WITH EAST LARIMER COUNTY WATER DISTRICT G E EXISTING STORM SEWER EXISTING ELECTRIC EXISTING GAS EXISTING SANITARY SEWER PROPOSED CURB & GUTTER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EASEMENT LINE PROPOSED RIGHT OF WAY PROPOSED LOT LINE PROPOSED WATER MAIN W EXISTING OVERHEAD UTILITY OHU EXISTING TELEPHONE T EXISTING CABLE CTV City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT C M M CABLE W W W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / STA.=10+51.62 12"X6" SWIVEL TEE & 1-6" GV (N) STA.=10+41.62 45° BEND w/TB & 12"X4" REDUCER (E) STA.=16+72.83 12"X8" TEE w/TB 1-8" GV (N) & 2-12" BFV (E,W) 12" SS 12" SS G G G G E E STA.=10+05.00 45° BEND w/TB TEMP FH w/ 8"x6" REDUCER T.O.P. ELEV: 4912.12 N:123615.51 E:218515.17 54' FL-EOA 87.5' ROW ±57' OF SERVICE TO BE EXTENDED WITH 2" HDPE CASING ±57' OF SERVICE TO BE EXTENDED WITH 2" HDPE CASING ±57' OF SERVICE TO BE EXTENDEDWITH 2" HDPE CASING EXISTING GAS LINE EXISTING 15" SANITARY SEWER (BOXELDER) EXISTING 60" GREELEY STEEL WATERLINE 15' UTILITY EASEMENT 8' SIDEWALK 15' UTILITY EASEMENT 8' SIDEWALK 81' DITCH EASEMENT 30' BOXELDER SANITARY EASEMENT 107.5' ROW PROSPECT ROAD MCLAUGHLIN LANE STORM DRAIN (SEE NOTE #14) 24" STEEL CASING PIPE (SEE NOTE #14) 8" WATER LINE EXISTING 60" (SEE NOTE #15) GREELEY STEEL WATERLINE STA.=17+61.34 12"X6" SWIVEL TEE w/ FH ASSEMBLY & 1-6" GV (N) STA.=16+49.83 12"X12" TEE w/TB & 1-12" BFV (S) 560.25 LF 12" PVC S89°59'09"E 88.51 LF 12" PVC S89°59'09"E 23.01 LF 12" PVC S89°59'09"E FIRE HYDRANT N:123599.91 E:217893.95 FIRE HYDRANT N:123611.74 E:218603.67 12'x6' RCBC (TRIC) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 CONNECT TO EXISTING 2" WATER w/ 12"x2" REDUCER N:123425.82 E:218492.09 APPROXIMATE LOCATION OF EXISTING 2" PVC WATERLINE 159.69 LF 12" PVC S00°01'26"W RELOCATED SERVICE FOR 4529 E. PROSCPECT ROAD (NOTE #13) N:123476.79 E:218474.52 30.00 LF 8" PVC S00°00'48"W RELOCATED SERVICE FOR 4533 E. PROSCPECT ROAD (NOTE #13) N:123456.79 E:218474.51 STA.=10+00.00 CONNECT TO EXISTING 4" AC w/ 4"X2" TEE w/TB & 1-2" GV (S) 5.00 LF 4" PVC N89°48'30"E 36.62 LF 4" PVC N45°00'36"E 5.00 LF 4" PVC N89°48'30"E 10.00 LF 12" PVC S89°59'24"E 32.00 LF 2" PVC S00°11'30"E APPROXIMATE LOCATION EXISTING 2" PVC WATER 40' CITY OF GREELEY WATER EASEMENT REC. NO. 2006-0079451 JIRON JACKLYN E 4525 E PROSPECT RD EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE POUDRE SCHOOL DISTRICT 598.21 LF 12" PVC S89°59'09"E CONNECT TO EXISTING 2" PVC WATER N:123529.26 E:217852.92 EXISTING WATER METER (TYP.) PVC UTILITY CONDUIT (SEE NOTE #15) EXISTING 12" SANITARY SEWER (BOXELDER) 4895 4900 4905 4910 4915 4920 4925 4930 4935 4895 4900 4905 4910 4915 4920 4925 4930 4935 9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 21+50 12" PVC 12" PVC 12" PVC STA. 10+00.0 CONNECT TO EXISTING 4" AC T.O.P.=4910.04 STA. 12+50.0 0.3° DEFLECTION T.O.P.=4911.19 STA. 10+51.62 12"X6" SWIVEL TEE & 1-6" GV (N) T.O.P.=4910.28 STA. 17+61.34 12"X6" SWIVEL TEE w/ FH ASSEMBLY & 1-6" GV (N) T.O.P.=4911.19 STA. 16+72.83 12"X8" TEE w/TB 1-8" GV (N) & 1-12" BFV (E) T.O.P.=4911.19 STA. 10+05.00 45° BEND w/TB T.O.P.=4910.07 STA. 10+41.62 45° BEND w/TB & 12"X4" REDUCER (E) T.O.P.=4910.23 STA. 16+49.83 12"x12" TEE w/ TB & 1-12" BFV (S) T.O.P.=4911.19 PROPOSED GROUND EXISTING GROUND 4915.16 4915.05 4915.60 4916.15 4916.70 4917.25 4917.41 4916.94 4916.40 4916.42 4916.95 4917.50 4914.92 4914.91 4915.19 4915.33 4915.46 4915.74 4915.88 4916.01 4916.29 4916.43 4916.56 4916.84 4916.98 4917.11 4917.36 4917.42 4917.44 4917.33 4917.21 4917.07 4916.80 4916.66 4916.52 4916.30 4916.23 4916.31 4916.54 4916.67 4916.81 4917.09 4917.22 4917.36 4917.64 TOP OF PIPE PROPOSED GROUND 15" PVC SANITARY STA.=17+42.31 INV.=4898.64 EXISTING 60" GREELEY STEEL WATERLINE STA.=17+06.43 TOP=4904.11 Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH WT1 PLAN & PROFILE 12" WATER LINE - PROSPECT ROAD 7 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC WT1 WT2 WT3 12" WATER LINE-PROSPECT RD PROFILE SCALE: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT MATCH LINE SEE SHEET WT2 STA 21+50 LINE MATCH STA 21+50 SS W EXISTING RIGHT OF WAY EXISTING WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER CONSTRUCTION SHALL BE PER THE EAST LARIMER COUNTY WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND TOWN SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 8. PIPE LENGTH LABELS SHOWN IN PLAN VIEW DENOTE THE HORIZONTAL DISTANCE BETWEEN HORIZONTAL FITTINGS, AND DO NOT ACCOUNT FOR VERTICAL BENDS OR DEFLECTIONS. 9. ALL WATERLINES SHALL HAVE A MINIMUM COVER OF 4.5' AND MAXIMUM COVER OF 5.5' FROM FINISHED GRADE TO TOP OF PIPE. 10. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITHIN THE EXISTING 50' GAS LINE EASEMENT WITH MAGELLAN PIPELINE CO. AND COMPLY WITH ALL MAGELLAN PIPELINE CO. CRITERIA. 11. ALL TEES AND CROSSES SHALL USE FOSTER ADAPTERS AND MEGALUGS. 12. CONTRACTOR TO USE 11.25° BEND(S) WITH ALL JOINTS RESTRAINED 5-FT BOTH SIDES OF BEND, IF REQUESTED DURING CONSTRUCTION BY ELCO FIELD INSPECTOR (BASED ON SITE CONDITIONS). 13. CONTRACTOR TO COORDINATE LOCATION OF RELOCATED SERVICE TAPS AND METERS WITH ELCO FIELD STAFF AND CONNECT TO EXISTING HOME'S SERVICE LINE. 14. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 15. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. 16. EXISTING 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE REMOVED BY EAST LARIMER COUNTY WATER DISTRICT DUE TO HAZARDOUS MATERIAL. CONTRACTOR'S DEMOLITION RESPONSIBILITIES FOR THE 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE LIMITED TO EXPOSING THE PIPE. CONTRACTOR SHALL COORDINATE ALL WATER LINE'S DEMOLITION ACTIVITIES WITH EAST LARIMER COUNTY WATER DISTRICT G E EXISTING STORM SEWER EXISTING ELECTRIC EXISTING GAS EXISTING SANITARY SEWER PROPOSED CURB & GUTTER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EASEMENT LINE PROPOSED RIGHT OF WAY PROPOSED LOT LINE PROPOSED WATER MAIN W EXISTING OVERHEAD UTILITY OHU EXISTING TELEPHONE T EXISTING CABLE CTV FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO E E E E E T T T T T T T T T FO FO FO FO FO FO FO FO G G G G G G G G G G G G G G G G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO CTV CTV T T T T T T G G G T MH W W W W W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W W W OHE OHE OHE OHE OHE W W W W W W W W G OHU OHU / / / / / / / / / / / / / / / / X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU F .O. T W WV W W W W W W W W W G W W W PROSPECT ROAD / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING 90' ROW EXISTING ±26' EOP-EOP TO BE REMOVED / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING BOXELDER SANITARY EASEMENT (WIDTH VARIES) EXISTING GAS LINE TO REMAIN EXISTING GRAVEL DRIVEWAY APPROACH TO BE REMOVED AND REPLACED EXISTING GRAVEL DRIVEWAY APPROACH TO BE REMOVED AND REPLACED EXISTING GRAVEL DRIVEWAY APPROACH TO BE REMOVED AND REPLACED EXISTING 8" WATER (ELCO) EXISTING FIBER OPTIC VAULT TO BE RELOCATED EXISTING SIGN TO BE REMOVED EXISTING STOP SIGN AHEAD SIGN TO BE REMOVED EXISTING CONCRETE DITCH LACY KEITH W JR 1601 S COUNTY ROAD 5 HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR COOK STANLEY L/CHRISTINE K 1609 S COUNTY ROAD 5 FORT COLLINS, CO 80524 REED SANDRA K 1707 ENCHANTMENT DR FORT COLLINS, CO 80525 LONGMIRE CAROLYN A/ROBERT C 1617 S COUNTY ROAD 5 FORT COLLINS, CO 80524 LOPP JOHN W/PATRICIA A 1701 S COUNTY ROAD 5 FORT COLLINS, CO 80524 LEWIS ALFRED WRAY BEVERLY JANE 1709 S COUNTY ROAD 5 FORT COLLINS, CO 80524 LEBSOCK BRANDON J/KIMBERLY J 1717 S COUNTY ROAD 5 FORT COLLINS, CO 80524 HILL SANDRA K/ANTHONY O 1739 ENCHANTMENT DR FORT COLLINS, CO 80525 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / MAIN STREET MAIN STREET EXISTING GAS EXISTING COMMMUNICATION EXISTING OVERHEAD UTILITY EXISTING CONCRETE IRRIGATION DITCH TO BE REMOVED AS NEEDED EXISTING ELECTRIC PEDESTAL (TO BE RELOCATED IF NEEDED) APPROXIMATE LOCATION OF EXISTING 2" WATER LINE (ELCO) FIBER OPTIC VAULT TO BE RELOCATED EXISTING STOP SIGN TO BE REMVOED EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) HAZARD STRIPS SIGNS TO BE REMOVED EXISTING GRAVEL ACCESS TO BE REMOVED 24" STEEL CASING PIPE (SEE NOTE #8) APPROXIMATE LOCATION EXISTING 2" WATER (ELCO) APPROXIMATE LOCATION EXISTING 8" WATER (ELCO) STOP SIGN TO BE REMOVED EXISTING 15" PVC SANITARY SEWER (BOXELDER) TIMNATH RESERVOIR INLET CANAL (SEE NOTE #8) POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHU OHU C / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X W MH F.O. S C.O. S S VAULT CABLE F.O. F.O. F.O. F.O. S SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S E E E E E E E E E E E E E E E E E E E E E E E E E E E E E FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T T T T G G G G G G G G G G G G G G G G G G G G G G G G G G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W W W W W W W W W W W W W W W W W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X EXISTING ±25' EOP-EOP TO BE REMOVED EXISTING ±25' EOP-EOP TO BE REMOVED EXISTING 10' CONCRETE TRAIL 100' EXISTING ROW 100' EXISTING ROW EXISTING SIGNS TO BE REMOVED SPEED LIMIT SIGN TO BE REMOVED AND REPLACED EXISTING FIBER OPTIC LINES TO REMAIN EXISTING GAS LINE TO REMAIN LINE TO REMAIN EXISTING GAS LINE TO REMAIN EXISTING 8" WATER (ELCO) EXISTING CABLE BOX TO BE REMOVED & RELOCATED ±63 LF 12" ADS CULVERT TO BE REMOVED AND REPLACED EXISTING GRAVEL DRIVEWAY APPROACH TO BE REMOVED AND REPLACED SECTION LINE TRACT B SERRATOGA FALLS 2ND FILING COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 MAIN STREET EXISTING GAS EXISTING ELECTRIC EXISTING COMMUNICATION EXISTING COMMUNICATION EXISTING 8" PVC SANITARY SEWER (BOXELDER) EXISTING CULVERT TO BE REMOVED EXISTING ±8' GRAVEL DRIVEWAY TO BE REMOVED EXISTING 8" WATER (ELCO) POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 SS SS SS SS SS LT LT LT LT LT LT LT LT LT SP SP SP SP SP SP SP SP SP SP SP D / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X F E S F E S W E C S CONTROL IRR VAULT ELEC ELEC BRKR F.O. F.O. CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR F.O. F.O. SD SD SD SD SD SD SD SD SD SD SD E E E E E E E E E E E E E FO FO FO FO FO FO FO FO FO FO FO T T T T T G G G G G G G G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W W T T T T T F.O. F.O. CONTROL IRR VAULT ELEC ELEC BRKR VAULT ELEC VAULT F.O. VAULT F.O. T WV WV WV W W T W T FO FO FO FO FO G G G G G G FO FO W W E E E CTV CTV T T T T T T T W W W W W W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING 120' ROW 120' EXISTING ROW EXISTING 36.8' EOP-EOP TRACT B SERRATOGA FALLS 2ND FILING DUNN, RICHARD L/CAROL B 5021 KITCHELL WAY COCHRAN, BRAD M/SANDRA J 1225 S COUNTY ROAD 5 EXISTING MAIN STREET GAS EXISTING CULVERT EXISTING 8" WATER (ELCO) PROPOSED SAWCUT SERRATOGA FALLS PARKWAY KITCHELL WAY Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH EX3 DEMOLITION PLAN EXISTING CONDITIONS & 6 ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC EXISTING ELECTRIC E LEGEND: EXISTING STORM SEWER EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING RIGHT-OF-WAY EXISTING CONTOUR FIELD SURVEY BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. ENGINEER IS NOT RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION ARE TO BE DETERMINED IN THE FIELD BY THE CITY OR TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OR TOWN STREET REPAIR STANDARDS. 4. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 5. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 7. POWERPOLE RELOCATION TO BE COORDINATED WITH UTILITY PROVIDER AT CONSTRUCTION. OVERHEAD UTILITIES TO BE UNDERGROUNDED, UNLESS SPECIFIED OTHERWISE BY UTILITY PROVIDER. 8. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 9. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. 10. EXISTING 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE REMOVED BY EAST LARIMER COUNTY WATER DISTRICT DUE TO HAZARDOUS MATERIAL. CONTRACTOR'S DEMOLITION RESPONSIBILITIES FOR THE 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE LIMITED TO EXPOSING THE PIPE. CONTRACTOR SHALL COORDINATE ALL WATER LINE'S DEMOLITION ACTIVITIES WITH EAST LARIMER COUNTY WATER DISTRICT. EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT VAULT ELEC CONTROL IRR EXISTING ASPHALT & CONCRETE TO BE REMOVED NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-019 DATE: JULY 2016 ADDITIONAL SURVEY: NORTHERN ENGINEERING SERVICES, INC. NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-019 PROJECT NO. 100-019 DATE: MAY 2019 DATE: JULY 2019 NORTHERN ENGINEERING SERVICES, INC. NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-024 PROJECT NO. 694-003 DATE: AUGUST 2019 DATE: JUNE 2014 EXISTING OVERHEAD UTILITY OHU EXISTING FIBER OPTIC FO EXISTING CABLE CTV G EXISTING TELEPHONE T EXISTING GAS EXISTING LOT LINE EASEMENT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING WATER TO BE REMOVED/LEFT IN PLACE W EX1 EX3 EX2 MATCH LINE - SEE BELOW LEFT MATCH LINE - SEE ABOVE RIGHT MATCH LINE - SEE BELOW LEFT MATCH LINE - SEE ABOVE RIGHT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner OHU OHU OHU OHU OHU OHU S S S C CC WV WV C C T T T FO FO FO FO FO FO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING ±25' EOP-EOP TO BE REMOVED EXISTING 70' ROW 30' BOXELDER SANITATION DISTRICT UTILITY EASEMENT 81' DITCH EASMENT TIMNATH RESERVOIR INLET CANAL STORM DRAIN (SEE NOTE #8) EXISTING 15" PVC SANITARY SEWER (BOXELDER) SECTION LINE EXISTING SPEED LIMIT SIGN TO BE REMOVED & RELOCATED STORM DRAIN (SEE NOTE #8) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 EXISTING FENCES TO BE REMOVED EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) ±49 LF EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) / / / / / / / / / / / / / / / / / EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) SPLITTGERBER RICHARD P/MEREDITH JEAN 1600 MEADOWAIRE DR RYAN JEFFREY L/SYBIL A 1601 CARRIAGE RD KNIEVEL JANET A 5001 E PROSPECT RD LACY KEITH W JR 1601 S COUNTY ROAD 5 EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD MEADOWAIRE DRIVE CARRIAGE ROAD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 EXISTING "STOP" SIGN EXISTING "STOP" SIGN SS SS SS SS SS SS W W G G G / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHU OHU OHU OHU B M C S GAS C WV B M / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / D / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / T B M H2O WV WV WV W S O TELE VAULT F.O. VAULT VAULT CABLE F.O. C CABLE CABLE CABLE TELE GAS VAULT CABLE F.O. F.O. GAS GAS T GAS H Y D S SD SD SD S G G G FO FO FO FO E T T T T T T T FO FO FO FO FO FO FO FO G G G G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV T T T T T T T T T T T T T T T T T T T T T T T G G G G G G G G G G G G G G G G G G G G G P H PH MH W W WV / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE W W W W W W W W W W W W W W W G OHU OHU / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHU OHU OHU WV W W W W W W W W W W W W W W W W W W G W W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING ±24' EOP-EOP TO BE REMOVED EXISTING 118' ROW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / TIMNATH RESERVOIR INLET CANAL EXISTING ±25' EOP-EOP TO BE REMOVED 10' CONCRETE TRAIL IRRIGATION EASEMENT 50' GAS LINE EASEMENT 30' ELCO WATER LINE EASEMENT 55' CACHE LA POUDRE RESERVOIR CO. EASEMENT 30' ELCO WATER LINE EASEMENT TRACT C SERRATOGA FALLS 2ND FILING HEBBELN JAMES E/DEBRA S 1647 ENCHANTMENT DR SANDERS, DENNIS L/DONI D 1623 CAREFREE DR FORT COLLINS, CO 80525 VAN DYNE, DAVID M/AHN HAE K 1622 CAREFREE DR FORT COLLINS, CO 80525 EXISTING CABLE BOX TO BE REMOVED AND RELOCATED HAZARD STRIPS SIGNS TO BE REMOVED EXISTING GRAVEL ACCESS TO BE REMOVED EXISTING MANHOLE EXISTING 8" WATER (ELCO) APPROXIMATE LOCATION EXISTING 2" WATER 24" STEEL CASING PIPE (SEE NOTE #8) EXISTING 15" PVC SANITARY SEWER (BOXELDER) EXISTING STOP SIGNS TO BE REMOVED EXISTING TREES TO BE REMOVED EXISTING FIBER OPTIC 15" STORM PIPE (SEE NOTE #8) EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) MAIN STREET PROSPECT ROAD APPROXIMATE LOCATION EXISTING 8" WATER APPROXIMATE LOCATION EXISTING 2" WATER EXISTING 12" WATERLINE BY OTHERS EXISTING FIRE HYDRANT Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH EX2 DEMOLITION PLAN EXISTING CONDITIONS & 5 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC EXISTING ELECTRIC E LEGEND: EXISTING STORM SEWER EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING RIGHT-OF-WAY EXISTING CONTOUR FIELD SURVEY BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. ENGINEER IS NOT RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION ARE TO BE DETERMINED IN THE FIELD BY THE CITY OR TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OR TOWN STREET REPAIR STANDARDS. 4. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 5. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 7. POWERPOLE RELOCATION TO BE COORDINATED WITH UTILITY PROVIDER AT CONSTRUCTION. OVERHEAD UTILITIES TO BE UNDERGROUNDED, UNLESS SPECIFIED OTHERWISE BY UTILITY PROVIDER. 8. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 9. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. 10. EXISTING 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE REMOVED BY EAST LARIMER COUNTY WATER DISTRICT DUE TO HAZARDOUS MATERIAL. CONTRACTOR'S DEMOLITION RESPONSIBILITIES FOR THE 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE LIMITED TO EXPOSING THE PIPE. CONTRACTOR SHALL COORDINATE ALL WATER LINE'S DEMOLITION ACTIVITIES WITH EAST LARIMER COUNTY WATER DISTRICT. EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT VAULT ELEC CONTROL IRR EXISTING ASPHALT & CONCRETE TO BE REMOVED NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-019 DATE: JULY 2016 ADDITIONAL SURVEY: NORTHERN ENGINEERING SERVICES, INC. NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-019 PROJECT NO. 100-019 DATE: MAY 2019 DATE: JULY 2019 NORTHERN ENGINEERING SERVICES, INC. NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-024 PROJECT NO. 694-003 DATE: AUGUST 2019 DATE: JUNE 2014 EXISTING OVERHEAD UTILITY OHU EXISTING FIBER OPTIC FO EXISTING CABLE CTV G EXISTING TELEPHONE T EXISTING GAS EXISTING LOT LINE EASEMENT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING WATER TO BE REMOVED/LEFT IN PLACE W EX1 EX3 EX2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R MATCH LINE - SEE SHEET EX1 MATCH LINE - SEE BELOW LEFT MATCH LINE - SEE ABOVE RIGHT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU S H2O H2O H2O H2O H2O H2O WV WV W S C C C M CABLE C M W W CC E C M M CABLE W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W WV W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING ±24' EOP-EOP TO BE REMOVED EXISTING ±24' EOP-EOP EXISTING 60' ROW TIMNATH RESERVOIR INLET CANAL 40' CITY OF GREELEY WATER EASEMENT REC. NO. 2006-0079451 EXISTING 15" PVC SANITARY SEWER (BOXELDER) EXISTING 60" WATERLINE (CITY OF GREELEY) EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) SECTION LINE 24" STEEL CASING PIPE (SEE NOTE #8) EXISTING WATER METER (TYP.) APPROXIMATE LOCATION OF ±100 LF EXISTING 2" PVC WATERLINE TO BE ABANDONED IN PLACE EXISTING SERVICE FOR 4533 E. PROSPECT ROAD TO BE RELOCATED APPROXIMATE LOCATION OF EXISTING 2" PVC WATERLINE TO BE ABANDONED IN PLACE (ELCO) EXISTING SERVICE TO BE RELOCATED EXISTING 4" A.C. WATERLINE TO REMAIN APPROXIMATE LOCATION OF EXISTING 2" PVC WATERLINE EXISTING UTILITY POLE TO BE REMOVED (SEE NOTE #7) EXISTING UTILITY POLE TO BE REMOVED (SEE NOTE #7) JIRON JACKLYN E 4525 E PROSPECT RD WHITE ERIC S. CW SUBTRUST 1100 SE FRONTAGE RD SIGNORELLI JACKLYN C 4529 E PROSPECT RD GRAY VAL/DELORES K 4517 E PROSPECT RD ALVAREZ ALBERTO 4509 E PROSPECT RD TROXELL BARBARA Y 4417 E PROSPECT RD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT ROAD MCLAUGHLIN LANE APPROXIMATELY 115 LF EXISTING ±12'-16' GRAVEL ROAD TO BE REMOVED SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS CTV CTV CTV CTV CTV CTV CTV W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU S S S MM C W M CABLE CABLE CABLE CABLE CABLE VAULT CABLE C CABLE M CABLE VAULT ELEC ELEC C WV MH MH / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / TIMNATH RESERVOIR INLET CANAL EXISTING 80' ROW 30' BOXELDER SANITATION DISTRICT UTILITY EASEMENT EXISTING ±25' EOP-EOP TO BE REMOVED EXISTING 97.5' ROW 81' DITCH EASMENT EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) STORM DRAIN (SEE NOTE #8) SECTION LINE EXISTING 15" PVC SANITARY SEWER (BOXELDER) EXISTING ELECTRIC EQUIPMENT TO BE REMOVED & RELOCATED EXISTING OVERHEAD UTILITY TO BE REMOVED AND UNDERGROUNDED (SEE NOTE #7) STORM DRAIN (SEE NOTE #8) 20" STEEL CASING PIPE (SEE NOTE #8) SEE CONSTRUCTION PLANS FOR TIMNATH RESERVOIR INLET CANAL DATED DECEMBER 19, 2019 EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) EXISTING UTILITY POLE TO BE REMOVED (SEE NOTE #7) EXISTING UTILITY POLE TO BE REMOVED (SEE NOTE #7) EXISTING POWER POLE TO BE REMOVED (SEE NOTE #7) EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) ±49 LF EXISTING 4" A.C. WATERLINE TO BE REMOVED (SEE NOTE #10) / / / / / / / / / / / / / / / / / EXISTING UTILITY POLE TO BE REMOVED (SEE NOTE #7) EKBLAD LARRY R/LINDA M 4701 E PROSPECT RD NICHOLS LIVING TRUST 1601 MEADOWAIRE DR EKBLAD LARRY R/LINDA M 4725 E PROSPECT RD / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / MEADOWAIRE DRIVE PROSPECT ROAD POUDRE R-1 SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 NORTH EX1 DEMOLITION PLAN EXISTING CONDITIONS & 4 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 KEYMAP C.O. G 1 2 3 4 5 4 3 2 1 0 G G 1 0 2 0 3 0 4 0 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 G 1 2 3 4 5 4 3 2 1 0 G G 1 2 3 4 5 0 4 0 3 0 2 0 1 0 G 0 0 0 0 0 0 0 0 0 0 0 0 / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD MAIN STREET TRIC EXISTING ELECTRIC E LEGEND: EXISTING STORM SEWER EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING RIGHT-OF-WAY EXISTING CONTOUR FIELD SURVEY BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. ENGINEER IS NOT RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION ARE TO BE DETERMINED IN THE FIELD BY THE CITY OR TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OR TOWN STREET REPAIR STANDARDS. 4. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 5. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 7. POWERPOLE RELOCATION TO BE COORDINATED WITH UTILITY PROVIDER AT CONSTRUCTION. OVERHEAD UTILITIES TO BE UNDERGROUNDED, UNLESS SPECIFIED OTHERWISE BY UTILITY PROVIDER. 8. EXISTING INFORMATION FOR TIMNATH RESERVOIR INLET CANAL, DATED DECEMBER 19, 2019, IMPROVEMENTS BASED ON DESIGN INFORMATION ONLY AND HAVE NOT BEEN SURVEYED. CONTRACTOR TO VERIFY RELEVANT INFORMATION PRIOR TO CONSTRUCTION. 9. THIS PROJECT IS TO BE CONSTRUCTED CONCURRENTLY WITH THE UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2. REFER TO UTILITY PLANS FOR PSD HIGH SCHOOL MIDDLE SCHOOL #2 FOR ADDITIONAL INFORMATION. 10. EXISTING 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE REMOVED BY EAST LARIMER COUNTY WATER DISTRICT DUE TO HAZARDOUS MATERIAL. CONTRACTOR'S DEMOLITION RESPONSIBILITIES FOR THE 4" A.C. WATER LINE IN PROSPECT ROAD SHALL BE LIMITED TO EXPOSING THE PIPE. CONTRACTOR SHALL COORDINATE ALL WATER LINE'S DEMOLITION ACTIVITIES WITH EAST LARIMER COUNTY WATER DISTRICT. EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT VAULT ELEC CONTROL IRR EXISTING ASPHALT & CONCRETE TO BE REMOVED NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-019 DATE: JULY 2016 ADDITIONAL SURVEY: NORTHERN ENGINEERING SERVICES, INC. NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-019 PROJECT NO. 100-019 DATE: MAY 2019 DATE: JULY 2019 NORTHERN ENGINEERING SERVICES, INC. NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 100-024 PROJECT NO. 694-003 DATE: AUGUST 2019 DATE: JUNE 2014 EXISTING OVERHEAD UTILITY OHU EXISTING FIBER OPTIC FO EXISTING CABLE CTV G EXISTING TELEPHONE T EXISTING GAS EXISTING LOT LINE EASEMENT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING WATER TO BE REMOVED/LEFT IN PLACE W EX1 EX3 EX2 MATCH LINE - SEE BELOW LEFT MATCH LINE - SEE ABOVE RIGHT MATCH LINE - SEE SHEET EX2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R D. EAST LARIMER COUNTY WATER DISTRICT GENERAL NOTES FOR CONSTRUCTION Version: 11/22/2019 The following information is condensed from the current "Standard Construction Specifications for Water Mains" (Specification) as adopted by the East Larimer County Water District (‘ELCO’ or ‘District’) and is to be considered as such. In the event of any conflict the full District Specification document shall take precedence over these general notes. 1. Standards and Specifications: Construction shall be per the District Specifications in effect at the start of construction. Material or equipment shall be manufactured per the most recent version of applicable industry standards. 2. Locates: Contractor shall coordinate field locates of all existing utilities prior to commencement of any construction and as required notify all affected utility companies prior to commencing construction. Cost of repairs to any utility damaged during District waterline installation shall be the responsibility of the Contractor. 3. Damage to Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done and shall be fully responsible for all costs associated with damage to any and all public and private property. 4. Safety: Contractor shall comply with any and all requirements and regulations as set forth by any local, City, County, State or Federal agency having applicable authority. 5. Landscaping Adjacent to District Waterlines: No landscaping (bushes, shrubs, trees or other plantings) that has a mature height of over 3 feet (3-ft) shall be placed within ten feet (10-ft) of any District waterline or appurtenance (distribution main, service line, fire hydrant, meter, etc.). Bushes or shrubs with a mature height of less than 3-ft shall be placed a minimum 4-ft from any District waterline or appurtenance. The District shall have the right to remove any landscaping that violates this standard, at any time such landscaping is discovered, and shall not be required to replace the removed landscaping. 6. Design Approval and Construction Start: No construction shall begin without prior design acceptance from ELCO. District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. 7. Permits: Contractor is responsible for obtaining all permits which may be required. For any permitting where the District must apply for a permit the Contractor shall coordinate, cover the cost and schedule the permit acquisition with the District. 8. Changes During Construction: No verbal authorization for field revision shall be given. All requests for such field revision shall be made in writing with the proposed change indicated on a copy of the signed design drawings. Any field revision approved and installed shall also be accurately documented on the As-Built Drawings. 9. Materials of Construction: a. Pipe: All water piping shall be Polyvinyl Chloride (PVC). All PVC piping 6-inch through 12-inch shall be DR 18 (pressure class 235 psi) and manufactured in accordance with AWWA Standard C900, "Polyvinyl Chloride (PVC) Pressure Pipe, 4-inch through 12-inch, For Water Distribution". All PVC piping 14-inch through 24-inch shall be DR 18 (pressure class 235 psi) and manufactured in accordance with AWWA Standard C905, "Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14-inch through 36". Pipe with a diameter greater than 24 inches shall be specified based on engineered design. b. Tracer Wire: All water piping shall be installed with a twelve (12) gauge solid copper wire, plastic coated, six hundred (600) volt taped to top of pipe and surfaced at each hydrant into a tracer wire box. c. Pipe Joints: Pipe joints shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber ring gaskets and machined pipe ends to form a push-on type joint. d. Materials and Installation: All materials installed shall be new and free of manufacturer defects. Any defective or damaged materials noted on the construction site shall be so marked and removed from the site. Under no circumstances shall any PVC piping be installed utilizing mechanical equipment to seat the joints. e. Pipe Fittings: All fittings shall be mechanical joint, ductile iron, manufactured in accordance with AWWA Standard C153. Fittings shall be furnished with a cement-mortar lining of standard thickness class with a 250 psi pressure rating. f. Gate Valves: Gate valves shall conform to AWWA Standard C509 with mechanical joint, 2" open left operating nut and resilient seat. g. Butterfly Valves: Butterfly valves shall be used for all valves 12-inches and larger and conform to AWWA Standard C504 with mechanical joint, 2" open left operating nut, resilient seat and shall be equipped with sand bonnet. h. Fire Hydrants: Hydrants shall conform to AWWA Standard C502, 1" square open-right operating nut. Allowable manufacturers and models are Mueller Super Centurion with epoxy coated shoe or American Flo Control Waterous Pacer WB-67-250X with epoxy coated shoe. All fittings shall be swing assemblies with anchor couplings. i. Pipe, Valve and Fitting Wrap: All fittings, valves, fire hydrant shoes and plugs shall be poly-wrapped with 8-mil thick polyethylene plastic wrap, double layered, and ends securely taped prior to backfill. All fitting bolts shall have zinc caps installed. 10. Bedding: All pipe shall be bedded in 3/4" washed rock uniformly graded and compacted. Trench shall be excavated to a depth below established grade equal to 1/4 of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe per the pipe manufacturer’s installation recommendations. Note maximum trench width detail. 11. Backfill: Backfill of acceptable material shall be placed in ‘lifts’ of uniform horizontal layers not to exceed 6-inches of compacted depth per lift. Minimum 18" of compacted backfill above pipe must be in place before rolling mechanical equipment type compaction is to be used. Backfill shall be compacted to 95% of optimum density in roadway areas or per road authority’s requirements, and 90% in fields or non-road locations. Backfill compaction testing frequency shall be at least one test per 100-lineal feet of pipeline length and at varying depths and locations in accordance with the requirements of the applicable road authority or beginning 1.5-feet above top of pipe and at 1-foot increments to grade. 12. Joint Restraint: All fittings, tees, plugs and fire hydrants shall be provided with anchor couplings and/or joint restraint in accordance with District Specifications or as required per engineer’s design. Thrust blocks shall be used only as required per field conditions and as approved or directed by the District field inspector. 13. Concrete: All concrete construction, including thrust blocks, shall be completed utilizing Type 5 or equal cement only. 14. Asphalt Replacement: For asphalt pavement that is cut and has been in place less than two years (according to City or County Engineer's record), the cut shall be a minimum of 20 feet in width and will be replaced to the specified depth by a paving machine. 15. Pipe Cover: A minimum cover of 4-1/2 feet of cover over top of pipe shall be maintained throughout the waterline and service line installation, particularly in areas of new grading and drainage swales. Extra bury depth may be required to maintain minimum cover at drainage culvert crossings and/or fire hydrant runs. Maximum allowable cover shall be 6 feet, unless specifically approved by the District. 16. Connection to Existing System: All connections to existing waterlines shall be completed at developer's expense by District personnel or the District's authorized contractor with no exception. 17. Inspection: The District shall have the authority to assign an inspector who shall inspect, check and verify that any and all work, including all materials to be incorporated in the work, excavation, bedding, backfill, testing and all construction methods and practices of the installed facilities is equal to or better than minimum construction requirements as set forth in the District’s Specifications. 18. Testing: All lines shall be pressure tested, chlorinated and flushed by the Contractor in accordance with District Specifications and under the District's supervision. Upon passing chlorination testing, bacteriological testing will be completed by a State certified water quality control laboratory. Copies of all passing test results, including soils compaction in the area of water main construction, shall be provided to the District. 19. Preliminary Acceptance: Preliminary Acceptance shall be issued to the Owner when all project work is complete, tested and operational such that the infrastructure is ready to be accepted by the District. Documentation required prior to issuance of Preliminary Acceptance includes but is not limited to chlorination test report, bacteriological test report, hydrotest report, compaction testing report, verification of project costs, As-built drawings and Record Drawings. Following receipt, review and acceptance by the District of these and other documents as may be required per project specifics, the District will issue Preliminary Acceptance. 20. Project As-Built and Record Drawing Requirements: a. As-Built Drawings are compiled and maintained during construction by the Contractor and identify, in red ink, on-site changes to the original design. As-Built Drawings shall be delivered to the District (electronically in PDF format or otherwise as requested by the District) for acceptance and to the project’s design engineer for creation of Record Drawings. 21. Record Drawings are prepared by the project’s design engineer and shall accurately reflect any change made in the field which varies from the accepted construction plans, as noted in the As-Built Drawings, including at a minimum, field dimensions and elevations, horizontal and vertical locations of underground utilities and appurtenances. The Record Drawings shall be reviewed and accepted by the District prior to Preliminary Acceptance of the project. Record Drawings are to be delivered to the District in electronic format as Adobe (PDF), AutoCAD and ArcView shape files (release version to be confirmed with District at time of submittal). 22. Warranty: The Owner shall warrant all work associated with the waterline installation including, but not limited to the materials, installation workmanship and surface restoration for a period of two years from date of Preliminary Acceptance. During this warranty period the Owner shall repair any defects in the work and maintain the work area. At the close of the two-year warranty period and upon satisfactory correction of any deficiencies noted, the District shall accept the constructed lines and appurtenances as the sole property and responsibility of the District. UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD88 City of Fort Collins Benchmark 27-01 Northeast corner of C.R.5 and E. Prospect RD., on the end block of a 15" diameter steel pipe. ELEV.= 4918.13 City of Fort Collins Benchmark 47-01 South Side of Prospect Road where it intersects I-25, on the west end of the parapet wall to the bridge (B16 AM) over I-25, On a Dept of Highways brass Cap ELEV.= 4934.13 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) for their vertical datums. If NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) is required for any purpose, the following equation should be used: NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) = NAVD88 - 3.19' Basis of Bearings The Basis of Bearings is the South line of the Southeast Quarter of Section 15 as bearing North 89° 59' 09" West (assumed bearing). 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: N.A. B. CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16. For additional information see separate Stormwater Management Plan / Erosion Control Report for TBD. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Drainage Report for PSD Middle School High School #2 dated March 6, 2020 by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 CS2 GENERAL & CONSTRUCTION NOTES 2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 7.5' GRADE TIE-IN 2' ACCESS ESMT MATCH EXISTING 16' CENTER MEDIAN 2' ASPHALT SHOULDER 2.2% (TYP.) 2.2% (TYP.) 2.2% (TYP.) 2.2% (TYP.) WIDTH VARIES FL-FL w/ DETACHED SIDEWALK ON NORTH SIDE (PER LCUASS DETAIL 7-2F 1 2 STREET SECTION) PROSPECT ROAD - PROPOSED SECTION (STA. 36+99 - 42+22) 15' UTIL ESMT 8' WALK 10' PKWY 6' BIKE LANE 11' TRAVEL LANE 72' ROADWAY (FL-FL (WIDTH VARIES) 97.5' RIGHT-OF-WAY 57.5' SECTION LINE TO PROPOSED ROW 40' 1 2 ROW 3' BIKE LANE BUFFER MATCH EXISTING 2' ACCESS ESMT 2.2% (TYP.) 2.2% (TYP.) 12' TRAVEL LANE 12' TURN LANE 11' TRAVEL LANE 5' BIKE LANE 12' TURN LANE 76' EOP-EOP w/ DETACHED SIDEWALK (PER SERRATOGA FALLS OFF-SITE PLANS) MAIN STREET/COUNTY ROAD 5 - LONG RANGE ULTIMATE SECTION (RURAL 4 - LANE ARTERIAL) 4:1 4:1 ROADSIDE SWALE (MIN. 2' DEPTH) 2' SHOULDER 80' EOP-EOP 4:1 ROADSIDE SWALE (MIN. 2' DEPTH) 2' SHOULDER 4:1 18" VERTICAL CURB & GUTTER 18" VERTICAL CURB & GUTTER 16' TURN / MEDIAN 140' ROW 54' EOP-EOP 13' TRAVEL LANE 6' BIKE LANE 13' TRAVEL LANE 6' BIKE LANE 2' GRAVEL SHOULDER 2' GRAVEL SHOULDER 4:1 4:1 ROADSIDE SWALE (MIN. 2' DEPTH) 15' UTIL ESMT MATCH EXISTING 54' EOP-EOP w/ DETACHED SIDEWALK (PER SERRATOGA FALLS OFF-SITE PLANS) MAIN STREET/COUNTY ROAD 5 - PROPOSED SECTION (RURAL 2 - LANE ARTERIAL) 16' TURN / MEDIAN 13' TRAVEL LANE 13' TRAVEL LANE 12' TRAVEL LANE 12' TRAVEL LANE 7' BIKE LANE 7' BIKE LANE 8' WALK 140' ROW 15' UTIL ESMT 8' WALK 2.2% (TYP.) 2.2% (TYP.) 2.2% (TYP.) 2.2% (TYP.) MARCH 2020 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: VICINITY MAP NORTH PROJECT DATUM: NAVD88 City of Fort Collins Benchmark 27-01 Northeast corner of C.R.5 and E. Prospect RD., on the end block of a 15" diameter steel pipe. ELEV.= 4918.13 City of Fort Collins Benchmark 47-01 South Side of Prospect Road where it intersects I-25, on the west end of the parapet wall to the bridge (B16 AM) over I-25, On a Dept of Highways brass Cap ELEV.= 4934.13 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) for their vertical datums. If NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) is required for any purpose, the following equation should be used: NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) = NAVD88 - 3.19' Basis of Bearings The Basis of Bearings is the South line of the Southeast Quarter of Section 15 as bearing North 89° 59' 09" West (assumed bearing). ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R THE RIGHT OF WAYS OF EAST PROSPECT ROAD AND MAIN STREET (COUNTY ROAD 5) LOCATED IN SECTIONS 14, 15, 22, & 23, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO OWNER/APPLICANT PROJECT TEAM: SITE ENGINEER Northern Engineering Services, Inc. Andy Reese 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SURVEYOR CONTACT INFORMATION PROJECT TEAM: SHEET INDEX ENGINEER ING N O R T H E RN ROADWAY IMPROVEMENT PLANS FOR UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS----------------- Xcel Energy----------------------------- Pat Kreager (970) 225-7840 ELECTRIC-------- City of Fort Collins Light & Power-- Luke Unruh (970) 416-2724 CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425 TELECOM.--------CenturyLink-------------------------------William Johnson (970) 377-6401 WATER------------ East Larimer County Water District-Randy Siddens (970) 493-2044 WASTEWATER--Boxelder Sanitation District-----------Brian Zick (970) 498-0604 STORMWATER- City of Fort Collins Utilities----------- Dan Mogen (970) 305-5989 LANDSCAPE ARCHITECT STORMWATER- Town of Timnath------------------------ Eric Fuhrman (970) 226-0557 GEOTECHNICAL ENGINEER PROJECT LOCATION PROSPECT ROAD & MAIN STREET BHA Design Incorporated Jeff Kroeger, PLA 1603 Oakridge Drive, Suite 100 Fort Collins, Colorado 80525 (970) 223-7577 Northern Engineering Services, Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 ENGINEER ING N O R T H E RN Ground Engineering Kelsey Van Bemmel, P.E. 41 Inverness Drive East Englewood, Colorado 80112 (303)-289-1989 Ground Engineering Preliminary Subsurface Exploration Program Report Poudre School District New Prospect 6-12 School Fort Collins, Colorado Ground Eng. Project No. 18-0045 Date: November 16, 2018 SUBSURFACE EXPLORATION BY: Poudre School District 315 E Mountain Ave, Fort Collins, Colorado, 80524 (970)-484-0117 TRAFFIC ENGINEER Delich Associates Matt Delich, PE 2272 Glen Haven Drive Loveland, CO 80538-4903 (970) 669-2061 1 CS1 COVER SHEET 2 CS2 GENERAL & CONSTRUCTION NOTES 3 CS3 UTILITY NOTES 4-6 EX1-EX3 EXISTING CONDITIONS & DEMOLITION PLAN 7-9 WT1-WT3 12" WATER LINE - PROSPECT ROAD 10 ST1 STORM CULVERTS A, B, C, & D - PLAN & PROFILE 11 G1 PROSPECT ROAD - GRADING PLAN 12 G2 MAIN STREET - GRADING PLAN 13-17 R1-R5 PROSPECT ROAD - PLAN & PROFILE 18-21 R6-R9 MAIN STREET - PLAN & PROFILE 22-23 R10-R11 PROSPECT ROAD - SIGNAGE & STRIPING PLAN 24 R12 MAIN STREET - SIGNAGE & STRIPING PLAN 25-26 R13-R14 PROSPECT ROAD - ULTIMATE SIGNAGE & STRIPING PLAN 27 R15 MAIN STREET - ULTIMATE SIGNAGE & STRIPING PLAN 28-32 XS1-XS5 PROSPECT ROAD - ROADWAY CROSS SECTIONS 33-36 XS6-XS9 MAIN STREET - ROADWAY CROSS SECTIONS 37-42 XS10-XS15 PROSPECT ROAD - ULTIMATE ROADWAY CROSS SECTIONS 43 TS1 TRAFFIC SIGNAL LAYOUT 44-45 D1-D2 UTILITY DETAILS 46-47 D3-D4 SITE DETAILS 48 D5 DRAINAGE DETAILS 49-50 EC1-EC2 PROSPECT ROAD EROSION CONTROL PLAN 51 EC3 MAIN STREET EROSION CONTROL PLAN 52-53 EC4-EC5 EROSION CONTROL DETAILS Sheet PROSPECT ROAD & MAIN STREET These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 53 CS1 COVER SHEET 1 UTILITY PLAN REVIEW Northern Engineering Services, Inc. EAST LARIMER COUNTY WATER DISTRICT Project No. 100-019 Date: July 2016 Additional Survey: Northern Engineering Services, Inc. Northern Engineering Services, Inc. Project No. 100-019 Project No. 100-019 Date: May 2019 Date: July 2019 Northern Engineering Services, Inc. Northern Engineering Services, Inc. Project No. 100-024 Project No. 694-003 Date: August 2019 Date: June 2014 TYPICAL SECTIONS: CITY OF GREELEY The City's acceptance shall not relieve the design engineer's responsibility for errors, omissions, or design deficiencies for which the City is held harmless.