Loading...
HomeMy WebLinkAboutPSD PROSPECT SCHOOL SITE - FDP200003 - SUBMITTAL DOCUMENTS - ROUND 3 - MAPS/GRAPHICSD6 A301 D6 A301 A6 A301 A6 A301 B6 A301 B6 A301 E3 A302 E3 A302 C6 A301 C6 A301 E6 A301 E6 A301 A1 A321 C3 A424 312'-8" 80'-0" A6 A302 A6 A302 A3 A302 A3 A302 B3 A302 B3 A302 B5 A302 B5 A302 C3 A302 C3 A302 D5 A302 D5 A302 E6 A302 E6 A302 C6 A302 C6 A302 A6 A321 C6 A424 A2 A323 A3 A323 A6 A323 A6 A324 C1 A424 12'-8" 141'-4" 90'-8" 155'-4" 18'-0" 102'-0" 76'-0" 10'-0" 155'-4" 81'-4" 16'-8" 229'-4" 34'-8" 59'-4" 127'-4" 50'-8" 34'-8" B H N N C E F G K W K L L M M P 10 10 4 5 8 11 16 J 17 18 19 20 21 27 23 25 22 15 1 2 X 3 Q S D Q 13 14 12 V Y T 24 26 Z 9 7 A A U 6 442'-0" 493'-4" 100'-8" 67'-5" 12'-4" 31'-0" 32'-8" 32'-8" 32'-4" 52'-6" 28'-3 1/2" 12'-4 7/8" 60'-5" 26'-10 5/8" 56'-10" 30'-8" 6'-0" 7'-8" 9'-0" 20'-0" 12'-8" 25'-7 1/2" 21'-4 1/2" 18'-1" 12'-11" 121'-4" 44'-8" 17'-11 5/8" 39'-6 3/8" 27'-6" 24'-4" 165'-4" 30'-7" 21'-11" 134'-0" 10'-10" 40'-0" 34'-6" 16'-6" 32'-4" 32'-8" 32'-8" 32'-8" 32'-4" 43'-8" 32'-8" 32'-8" 32'-4" 578'-8" 79'-6" 42'-4" 36'-8" LINE OF BUILDING EXTERIOR (BELOW) LINE OF BUILDING EXTERIOR (BELOW) 10'-8" 131'-0" 25'-0" 22'-4 1/2" 5/8" / 12" 3/8" / 12" 3/8" / 12" 3/8" / 12" 3/8" / 12" 3/8" / 12" TPO ROOF MEMBRANE TAPERED INSULATION (CRICKET) LEGEND - ROOF PLAN TAPERED INSULATION (CRICKET) 07 62 00 ROOF TERMINATION SYSTEM CONCRETE VIBRATION ISOLATION PAD ACOUSTIC ROOF DECK - TYPE I - R2 TPO MEMBRANE WALKWAY PADS TAPERED INSULATION (FIELD) ROOF ZONE MATCHLINES KNEE WALL EXTENT 2" BUILDING EXPANSION JOINT ACOUSTIC ROOF DECK - TYPE II - R3 - PLOT DATE SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT REVISIONS: ISSUE DATE: PROJECT #: ARCHITECTS CONSULTANT T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2019 www.rbbarchitects.com 6 5 4 3 2 1 A B C D E NOT FOR CONSTRUCTION VOLUME 3 0F 6 11/6/2019 6:34:19 AM A181 1801 ROOF PLAN - OVERALL PSD PROTOTYPE MS/HS #1 8543 NORTH COUNTY ROAD 9 WELLINGTON, COLORADO 80549 POUDRE SCHOOL DISTRICT 90% CONSTRUCTION DOCUMENTS 08/26/2019 GENERAL NOTES - ROOF 1. ALL SLOPES IN SHADED AREAS ARE DEVELOPED WITH TAPERED INSULATION. 2. ALL CRICKETS ARE ANGLED 30 DEGREES MIN, UNLESS NOTED OTHERWISE. ALL CRICKET SLOPES AT 3/8"/1'-0" SLOPED ROOFS ARE 3/8"/1'-0" NET (3/4" PER 1'-0" CRICKET ON 3/8" PER 1'-0" ROOF EQUALS 3/8" PER 1'-0" NET CRICKET SLOPE) UNLESS NOTED OTHERWISE. ALL CRICKET SLOPES @ 1/4"/1'-0" SLOPED ROOFS ARE 1/4"/1'-0" NET (1/2" PER 1'-0" CRICKET ON 1/4" PER 1'-0" ROOF EQUALS 3/8" PER 1'-0" NET CRICKET SLOPE) UNLESS NOTED OTHERWISE. 3. ALL MECHANICAL EQUIPMENT (EXHAUST FANS, ETC.) SHALL BE ON ROOF CURBS. ALL ROOF CURBS SHALL BE INSULATED AND THE VOID BENEATH ITEMS WITHIN THE CURB SPACE SHALL BE FILLED WITH INSULATION. 4. ALL OBJECTS GREATER THAN 24" IN WIDTH ACROSS SLOPE SHALL HAVE CRICKETS TO DIVERT WATER AROUND THEM. 5. PROVIDE PRECAST CONCRETE SPLASH BLOCKS AT ALL LAMB'S TONGUES AND DOWNSPOUTS ON ROOF AND AT GRADE. 6. INSTALL ROOF DRAIN LEADERS, FROM DRAIN ASSEMBLY TO DRAIN CHASE, AT MAXIMUM ALLOWABLE ELEVATIONS WHILE MAINTAINING REQUIRED SLOPE (I.E. HOLD AS CLOSE TO UNDERSIDE OF ROOF DECK AS POSSIBLE). 7. ANYWHERE EXPOSED FASTENERS ARE USED IN THE ROOFING SYSTEM, COPING SYSTEM, EXPANSION JOINT SYSTEM, OR FLASHING SYSTEM, UTILIZE SEALING WASHERS. N N ZONE A ZONE B ZONE C ZONE D MAIN ENTRY GYM ENTRY AREA K A6 ROOF 1" = 30'-0" PLAN - OVERALL DESCRIPTION DATE ROOF DECK ELEVATION: 140' ROOF DECK ELEVATION: 122' ROOF DECK ELEVATION: 116' ROOF DECK ELEVATION: 138' ROOF DECK ELEVATION: 133' ROOF DECK ELEVATION: 130' ROOF DECK ELEVATION: 128' COMPLIANT AERIAL ACCESS COMPLIANT LADDER ACCESS (PARAPET < 30') SHIPS LADDER #5 SHIPS LADDER #3 SHIPS LADDER #4 SHIPS LADDER #2 SHIPS LADDER #1