HomeMy WebLinkAboutSILVERBERG PUD PRELIMINARY - 12 92A - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW4
Comr nity Planning and Environment-' Services
10100- _ Current elanning
City of Fort Collins
February 13, 1996
Gefroh-Hattman Architects/Planners
c/o Ric Hattman
145 West Swallow Road
Fort Collins, Co 80525
Dear Mr. Hattman:
For your information, attached is a copy of the Staffs comments concerning Silverberg P.U.D.,
(ODP approved in 1992), southeast corner of I-25 and Prospect Road presented before the
Conceptual Review Team on February 12, 1996.
The comments are offered informally by Staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review process,
please feel free to call me at 221-6750.
Since ely,
itc aas
City Planner
MH/gjd
Attachments
cc: Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6730
FAX (970) 221-6378 TDD (970) 224-6002
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: February 12, 1996
ITEM: Silverberg P.U.D., (O.D.P. approved in 1992), southeast corner of
I-25 and Prospect Road.
APPLICANT: Gefroh-Hattman Architects/Planners
% Rick Hattman
145 West Swallow Road
Fort Collins, CO 80525
LAND USE DATA: Request to develop two motels of approximately 24 units each, two
restaurants (1 fast food with a drive-thru, and 1 sit-down), and 1 gas
station/convenience store on approximately 7.4 acres. An Overall
Development Plan, known as the Silverberg PUD ODP, was
approved for this site in June of 1992. The plans submitted to the
Conceptual Review team are, for the most part, in accordance with
the approved ODP. The site is located at the southeast corner of I-25
and Prospect Road, west of the Frontage Road.
COMMENTS:
The property is zoned HB, Highway Business, with a P.U.D. condition. All projects
proposed on this site will have to be submitted as Planned Unit Developments (PUD) subject
to the requirements of the Land Development Guidance System's (LDGS) All Development
Criteria and Point Charts D (Auto -Related and Roadside Commercial) and E (Business
Service Uses).
2. A Hazardous Materials Impact Analysis will be required with the submittal of any plans
involving the development of a gas station. At least two fire hydrants with capacities of
1000 gallons per minute will be required on site. For more information regarding this
comment, contact Roger Frasco of the Poudre Fire Authority at 221-6570.
3. The City of Fort Collins requires that one (1) out of every seven (7) hotel units be handicap
accessible. Health Department approval will be required for all, food service facilities. For
further information regarding these comments, please contact Sharon Getz at 221-6760.
4. The site is served by the ELCO (East Larimer County) Water District and the Boxelder
Sanitation District. The City of Fort Collins requires connection to sanitary sewer lines if
the site is within four -hundred (400') feet of an existing line. Please contact Jeff Hill at 221-
6681 with any questions regarding these comments.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
5. You will be required to submit an updated traffic study (updated version of the study done
for the ODP). If the development of the overall site will be carried out in phases, these
phases should be reflected and accounted for in and by the updated traffic study. The traffic
study should also look into trip distributions based on different potential access schemes.
Developer may be responsible for improvements to Prospect Road to arterial standards, as
well as some off -site improvements to Prospect Road. Access to the frontage road should
be pursued with the property owner of the land to the east and with the State Department of
Transportation; there are sight distance problems associated with access onto Prospect Road.
CDOT review will be required, and it was suggested that you initiate the State review
process as soon as possible. The Street Oversizing Fees are $14,005 per acre, and will be
due at the time of building permit issuance. Standard submittal requirements for utility plans
will apply, and you will have to enter into a development agreement with the City. For more
information or clarification on these comments, please contact Kerrie Ashbeck at 221-6750.
6.. There is no storm drainage basin associated with this site, therefore, there are no associated
fees. This also means that the Stormwater Utility will not provide assistance. You are
required to submit a standard drainage and erosion control report prepared by a Colorado
licensed professional engineer. This report/plan will also have to include studies
documenting the existing drainage and outfall of the area. There are approximately 1900 cfs
from Boxelder Creek that flows to this side of the interchange; this flow must be accounted
for in the drainage report (contact Mike Grimm if you have any questions regarding this
flow). When conveying drainage, if you need to cross any properties other than your own,
a drainage easement from said property owners will be required. If an easement(s) is/are
required, you will have to submit a letter of intent (for each easement) to acquire the
easement with preliminary submittal. Proof of actual acquisition of said easements will be
required with submittal for final review. For more information or clarification on these
comments, please contact Glen Schlueter at 221-6589.
7. There is electrical power available along the west side of the frontage road. Normal
development charges will apply as each piece develops. You will need to acquire easements
from the owner of the strip of land to the east of the site in order to run power lines to the site
from the frontage road. You will have to submit a letter of intent to acquire this easement
with preliminary submittal. Proof of actual acquisition of the said easements will be required
with submittal for final review. For further information regarding these comments, please
contact Kevin Westhuis of the Light and Power Department at 221-6700.
8. Development plans for this property will be subject to review under the standards and
guidelines of the "Interchange Style" section (and applicable appendices) of the Prospect
Road Streetscape Program. Copies of this document can be obtained from the Advance
Planning Department (221-6376).
-9.. Aneighborhood .meeting will .be.required.pnor-.to.the.submittal..ofany-development•request
involving this land. I have prepared and enclosed a geographical notification map (affected
property owner notification boundary). The developer is responsible for obtaining the names
and addresses of property owners within the mailing area. The developer pays fifty cents
(50¢) per name for the mailing. The City will, upon request by the developer, set up a
meeting and facilitate the discussion. This entire process generally takes three to four (3-4)
weeks to complete. For further information, please contact Mitchell Haas of the Planning
Department at 221-6750.
Enc.