Loading...
HomeMy WebLinkAboutRIVERSIDE JUNCTION PUD PRELIMINARY AND FINAL - 13 92 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI STORM DRAINAGE AND EROSION CONTROL REPORT ADDITIONAL PARKING LOT FOR RIVERSIDE JUNCTION P.U.D. PREPARED FOR POUDRE VALLEY HOSPITAL DISTRICT PREPARED BY STEWART AND ASSOCIATES. INC. MARCH 2. 1992 STORM DRAINAGE AND EROSION CONTROL'REPORT RIVERSIDE JUNCTION P.U.D. SITE LOCATION The additional parking lot for Riverside Junction P.U.D. is a 1.55 acre site located at the west end of Pennock Place in the Southeast I of the Northeast I of Section 13, Township 7 North, Range 69 West. EXISTING CONDITIONS The north half of the site is a gravel school playground, and the south half is a grassed pasture. The site slopes from southwest to northeast at a 3.5 percent slope. The Emigh Lateral irrigation runs along the south (high) side of the site. There is offsite flow onto the site from two—thirds of an acre of gravel playground. The attached plan shows the area of offsite flow contribution. PROPOSED IMPROVEMENTS A paved parking lot with concrete curbs and walks shall be constructed on the southerly three —fourths of the site, and a detention pond shall be constructed on the north one—fourth of the site. The detention pond will be sized large enough to handle the runoff from the 1.55 acre site plus the 0.66 acre offsite flow, a total of 2.21 acres. The detention pond will be seeded with low maintenance dryland grass, and the entire site will be maintained by the owner. The outfall from the detention pond will be into an existing overland drainage path which drains north along the west side of the pavement and curb behind Longs Drug Store. This drain path joins an existing drain Swale from the west, and the combined flows are picked up by an existing storm pipe which drains north along the west side of Longs Drug and Albertsons. The plans indicate this pipe is 8—inch diameter where it begins at the south end and increases to 18—inch diameter. Calculations of the runoff, site release and detention volume required and provided are shown on the attached computations sheets. These calculations comply with the City of Fort Collins Storm Drainage Design Criteria. EROSION CONTROL The detention pond shall be constructed, and the outlet pipe covered with a gravel sediment filter during the site grading process. The parking area will be paved, and the detention pond and bare ground areas will be seeded with dryland grass and straw mulched. The site is in a moderate wind erosion area, so the construction of the curbs and rainfall er4,sJon„control measures will provide adequate wind'erosion controls. ���•��Q I.o�UB�ry'��,,� s . QZ�o �&\STEqq°o��.4i: a o m o o � Phillip Robinson, P.E. & L.S. =izo 4502 0" e e. & 0000.0 e,. 4,4' ' j,ln'F' CO,`�P�. AMPUTATIONS Stewart& Associates, Inc. 214 N. Howes St. .,Ft. Collins, CO 80521 (303)482-9331 By: Date 3U Client: Foudre VC I Sheet No. 011e�e of 41, Chkd By: Date- Project: pa rkl nc LQ- in ZVE !Z2 Sec. 173-7-6-7 Subject -5-hOLen Drainaa 7 0' 6 61 /4 C;i GI=10�3h I TOTAL e sire A REA �0. f2 C/V'� ro� 11 i ::- f 2. Z) A Pi's 6 0 �l 0Sde X Cl. -7 0'6 7 X- 0; + Ol-qd �T .' 6 7Y/ I 0- -- Pew 0 0.1 T 3 T<1 is� Fr!v,� r- Z- �zC_ + /�41LOw/'4 DLS rK E L E,�, 5 E) �4 Is 75 S = lZ r�ih T�/ba I> F 10 min i ..I -V 0.77 6) 2�. z 13 OIL ff _7! 3 C4 VO L V M rZ.-, FOND t_." 0 ume n 4- C' L/ 445 ao it 3 1.4- 0 �9_ 7 6 C7"'er- V TF L a a p 0! v; SL� ��~ i 3 It- T C 0 r- r_V -S vv 1; e/ vk_� 0 V, + It. 31 2-5 4/( 3�V 3 v 151 i's C; S 151, is 0 P�' S Or I C, COMPUTATIONS Stewart & Associates, Inc. /214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 By: P1 %C Date 97 Client: F0'U� re V ck 11 e*7 /45L> cd Sheet No. of � Chkd By: - Date Project: PQFLK ns L(4- ih NF_ 14 17 -7- Subject _ _ S_IV r-rn bra i n a �, P RAINFALL PERFORMANCE STANDARD EVALUATION -------------------------------------------------------- PROJECT.: STANDARD FORM A COMPLETED BY: P ) JZ DATE: 3 Z 9 2— ----------- ---------------- ---- ------------------------------------ DEVELOPED ERODIBILITYI Asb I Lsb I Ssb I Lb I Sb I PS SUBBASIN I ZONE --- (ac) 1 (ft) 1 (%) 1(feet) I a To7N L I Mvdera�e 1 3 zo I I I e 2.5 51TE 0 1--------------------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HDI/SF-A:1989 TADI[ie:RY 1991 8-18 DESIGN C,-TERL. EFFECTIVENESS CALCULATIONS -------------------------------------------------- PROJECT: COMPLETED BY: pJJ Erosion Control C-Factor P-Factor Method Value Value -re- -oil --------------- 13are S ------------- 17 --aG, 1-00 TrQr. Pa vie. wc1<<r. 6/ r%Oc{ g SCCcti'S /.00 0.01 0 0.�0 1.06 /.0C/ MAJOR BASIN ToTA� 517E SUB BASIN AREA (Ac) ; ---------------- STANDARD FORM B DATE: 3 2 2 Comment Ale r7e on silt --------------------------------------------- CALCULATIONS -------------------------------------------- Pv,-14- a r--ea = I.00/ Ae- j3are 9rovk = (% SCCC;ftj ¢Mv1ck U.SS A-C -t 6?.0Ox.5s - FFF =(1 - o. 02 7X 0. s6),� ---------------------------------- -------------- DI/SF-B:1989 loci 8-19 f SIC I CR1773iI II CONSTRUCTION SEQUENCE PROJECT: Pa LO�-�i0erslr/ TVhe_- I( h P- V 14o5l,-7il a ) STANDARD FORM C SEQUENCE. FOR 19 ` Z ONLY COMPLETED BY: DATE: 3 2 Z Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR MONTH ---------------------------- OVERLOT GRADING WIND EROSION CONTROL Soil Roughing_... Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other cvY� f pvr^4 RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other A I/V1 I s I s I A I s 1 0 1 1 I I I ------------------------------------------------------- STRUCTURES: INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HDI/SF-C:1989 APPROVED BY CITY OF FORT COLLINS ON JAN ARY 1991 8-20 DESIGN CRITERIA