HomeMy WebLinkAboutOLIVE GARDEN MINOR SUBDIVISION - 14 92 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDevelopm. Services
Planning Department
City of Fort Collins
March 27, 1992
Jack Blake
Stewart and Associates
214 N. Howes
Fort Collins, CO 80521
Dear Jack:
We have completed our review of the Olive Garden Minor Subdivision
and have the following comments to make on this plat:
1. A 60' half street, or right-of-way 16' from flowline (whichever
is greater) needs to be dedicated and the appropriate dedication
language needs to be added to the plat.
2. The City Clerk's signature block should be relocated, so that
it is not a part of the Director of Planning's signature block.
The minor plat hearing is scheduled for Tuesday, April 14, 1992 at
1:30 P.M. in the Planning Department Conference Room.
The vacation of the Colboard right-of-way is tentatively scheduled
for first reading before City Council on Tuesday, April 21 and for
second reading. May 5, 1992. The ordinance vacating this right-of-
way would go into effect May 15. We will delay recording the plat
until the ordinance number for the vacation is established, so that
the ordinance number can be added to the plat.
Since a restaurant is a use -by -right at this site, coordination of
the site plan review will be handled by Building Inspection. The
following comments are pertinent to review of a site plan for this
site:
1. Access to the property will be taken from Boardwalk Drive, with
no direct access to the property from College Avenue (SH 287).
2. The original drainage report for South College Investments
Subdivision stated that on -site detention would be provided on each
lot and designed as .each lot developed. This requirement will have
to be met when development of this site is proposed.
3. Sidewalk will be required to be installed along the Site's
frontage on College Avenue and Boardwalk Drive.
281 North College Avenue • P.O. Box 580 • Fort gollins, CO 80522-0580 (303) 221-6750
4. The transformer location must be coordinated with Light and
Power and a Commercial-1 Form must be completed to determine
electrical loads.
Please contact me if you have any questions regarding this project.
Sincerely,
Sherry Alr�ston-Clark, AICP
Chief Pladneir
cc Kerrie Ashbeck
Susan Hayes