Loading...
HomeMy WebLinkAboutWOODSPRING SUITES - FDP200004 - SUBMITTAL DOCUMENTS - ROUND 2 - SUPPORTING DOCUMENTATIONProject: Disturbed Acres: 2.73 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price LF 1,090 $2.50 $2,725.00 LF 1,480 $8.00 $11,840.00 LF 30 $10.00 $300.00 EA 4 $200.00 $800.00 EA 1 $200.00 $200.00 EA 1 $100.00 $100.00 EA 1 $1,000.00 $1,000.00 LF 180 $9.00 $1,620.00 LF 175 $2.00 $350.00 EA 3 $200.00 $600.00 EA 1 $1,000.00 $1,000.00 LS 1 $5,000.00 $5,000.00 Sub-Total: $25,535.00 1.5 x Sub-Total: $38,302.50 Amount of security: $38,302.50 Total Acres x Price/acre: $6,825.00 $2,500.00 Sub-Total: $6,825.00 1.5 x Sub-Total: $10,237.50 Amount to Re-seed: $10,237.50 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $38,302.50 Fields in yellow should be amended for this project. Street Sweeping Temporary Traffic Marker or Bollard Miniumum Escrow Amount Woodspring Suites Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Inlet Protection (IP) Concrete Washout (CWA) Final Escrow Amount Stockpile Management (SP) Sediment Control Logs Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence (SF) Vehicle Tracking Control (VTC) Reseeding Amount Rock Socks Perimeter Control (RS) Construction Fence (CF) Outlet Protection (OP) Construction Gate 1/24/2020 9:33 AM K:\DEN_Civil\096813000_WoodSprings FoCo\_Project Files\Submittals\Fort Collins\200124 - FDP Submittal\Woodspring Fort Collins - Erosion Control Escrow Calculation.xls