HomeMy WebLinkAboutMOUNTAIN FARM PUD SECOND FILING FINAL - 18 92D - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETRevisions Routing Sheet -
•
1.
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT -
ZONING
BUILDING INSPECTION
MAPPING / DRAFTING
U.
',
STATE HIGHWAY DEPARTMENT
Rev. 5-07-97 j 0 (1 0 1
Project: M T ,e 1 o cE P-,oi<m r
Planner: T. J—
Engineer. M.tc
c2n•C )C:�NliL P (ool, p
Traft Operations:
Date:
Items Requested
Site I land Plat.1 Utility I Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land I Plat Utility Drainage Rpt Other Items Being Returned
Engineering
Stormwater
3x
>c x
Water/WastewaterX
Tragic Operations
Trans. Planning
Transfort
Natural Resources
X
Park Planning
X�(
Totals
to
G
(10
y
3
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.