HomeMy WebLinkAboutMOUNTAINRIDGE FARM PUD PRELIMINARY - 18 92 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 5 MEETING DATE 5 / 18 / 9 2 PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Mountain Ridge Farm, Filing One, P.U.D., #18-92 APPLICANT: California Construction, Inc. c/o Cityscape Urban Design 3030 South College Avenue, Suite 200 Fort Collins, CO. 80525 OWNER: G.T. Land Colorado, Inc. 3555 Stanford Road, Suite 100 Fort Collins, CO. 80525 PROJECT DESCRIPTION: Preliminary Request for 41 single family lots on 11.11 acres located west of Shields Street, approximately 1,300 feet south of Horsetooth Road. The zoning is R-L-P, Low Density Planned Residential. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The request for Mountain Ridge Filing One Preliminary P.U.D. conforms to the Arapahoe Farm - Mountain Ridge Farm Amended Overall Development Plan. The density of 3.69 dwelling units per acre is justified by a score of 50% on the Residential Uses Point Chart of the L.D.G.S. The open cul-de-sacs provide opportunity to create a visually interesting streetscape along Shields. The percentage of solar oriented lots is 78% which exceeds the 65% minimum. The improvements identified in the Site Access Study will mitigate the traffic impacts associated with the number of proposed lots. DEVELOPMENT SERVICES 300 LaPorte Ave. P.O. Bo: 580 Fort Collins. CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT MOUNTAINRIDGE .RM LAND USE BREAKDOWN March 30, 1992 Area Gross 484,087 sq. ft. 11.11 acres Net 346,768 sq'. ft. 7.96 acres Dwelling Units Single Family 41 Other 0 Total.Units 41 Solar Oriented Lots 32 78.05 % Density Gross 3.69 du/ac Net 5.15 du/ac Coverage Buildings Street R.O.W. Parking & Drives Open Space: Common Private Total Open Space Floor Area Residential Parking Provided 82,000 sq. ft. 16.94 % 137,319 sq. ft. 28.37 % 18,500 sq. ft. 3.82 % 10,247 sq. ft. 2.12 % 236,021 sq. ft. 48.76 % 246,268 sq. ft. 50.87 % 98,000 sq. ft. Garages 82. spaces 2.00 / unit Other spaces Total Vehicles 82 spaces 2.00 / unit *Note: Garages and / or driveways will accommodate Handicapped, Motorcycle, and Bike parking Max. Building Height 36 ft. Setbacks (unless otherwise noted) Front 20 ft. Side 5 ft. Corner Side 12 ft. * 15 ft. at Garage Doors Rear 10 ft. IAn@@P@ urban design, inc. MOUNTAINRIDGB FARM First Filing Preliminary PUD Statement of Planning Objectives March 30, 1992 The proposed Mountain Ridge Farm PUD, First Filing, is consistent with the adopted Land Use Policies Plan of the City of Fort Collins with regard to neighborhood planning and locational criteria for low density residential development; specifically: Policy 3 The City shall promote: ... The location of residential development which is close to employment, recreation, and shopping facilities. Policy 12 Urban density residential development usually at three of more units to, the acre should be encouraged in the urban growth area. Policy 79 Low Density residential uses should locate in areas: a. Which have easy access to existing or planned neighborhood.... shopping centers; C. Within walking distance to an existing or planned elementary school; and d. Within walking distance to an existing or planned neighborhood park and within easy access to a community park. (The subject property is approximately midway between Rolland Moore Park and the tentative location of the southwest community park). Landscape buffers - to be maintained by the adjacent property owners - are proposed along the Shields Street right-of-way. Additional landscape buffering is anticipated with completion of the regional detention pond to the south of the site. Development of Mountainridge Farm is expected to comprise a total of four phases. Project build out is expected to be complete by 1999. 1q40U/JT,#jtj%/D6F khtA AeEL/M,,1Aje V ALL DEVELOPMENT; NUMBERED CRITERIA CHART ALL CRITERIA APPLICABLE CRITERIA ONLY CRITERION Is"crme aodiedo1e7 wn the critedo be satlsfled? . " If no, please explain 0.�'`p�.�'� Yes No NEIGHBORHOOD COMPATABILITY 1. Social Computability 2. Neighbomood Character 3. Land Use Conflicts 4. Adverse Traffic Impact PLANS AND POLICIES 5. Comprehensive Plan PUBUC FACILITIES d SAFETY 6. Street Capacity 7. Utility Capacity 8. Design Standards 9. Emergencv Access 10. Security Lighting 0101 11. Water Hazaras RESOURCE PROTECTION 12. Soils & Slooe Hazara 13, Significant Vegetation 14. Wildlife Habitat 15. Historical LandmarK 16. Mineral Deoosit 17. Eco-Sensitive Areas . 18. Agricultural Lands ENVIRONMENTAL STANDARDS 19. Air Quality 20. Water QuaiitY 21. Noise 22. Glare & Heat 23. Vibrations 24. Exterior Lignting I 25. Sewages & Wastes SITE DESIGN 26. Community Organization 27. Site Organization 28. Natural Features 29. Energy Ccnservafion 30.Shadows 31. Solar Access 32. Privacy IN, .00, 33. Open Space Arrangement 34, Building Height 35. Vehicular Movement 36. Vehicular Design 37. Parking 38. Active Recreational Areas 39. Private Cutcoor Areas I 40, Pedestrian Convenience 41. Pedestrian Conflicts 42. Landscaoing/Open Areas 43. Land scooing/Buildings 44. LandscacfngiScreening 45. Public Access 46. Signs MAditniTa.,) ZJDKx trAAM PRAWAIMAAV R&.0. DENSITY CHART Maximum Earned Criterion Credit If All Dwelling Units Are Within: Credit a 20% 2ow festal an existing or approved neighborhood shopping center. .20 b 10% 650 feetof on exiting transit stop. C 10% 4000 feet Of an extra g of approved regional shopping center. d 20% 3600 feet at an exlsfifg or reserved neighborhood park Community pan or Community facility. � ?0 We 10% l000feet of aSchool, meeting all me requirements of me compuisory education laws at the state of Colorado. Vy� f 20% 3000 feet at a mdloremolovment center. W g 5% 1000festofachllocorecenter. h 20% 'Norm'FoftCo1I,m I 20% The Central Business District A project whOse bowdory is configuous to existing urban development. Credit maybe earned as follows: 0%— For projects whose property, boundary has 0 to 10% contiguity 10 to 15%— For projects whose propertyboundary has 10 to 20%Conijgu.ty.. l 0 30% 15 to 20%—FOf Dfolebts whose property boandory has 20 to 30%configurtC 20 to 25%— For projects whose property boundary has 30 to 40%contiguity. 25 to 30%— For projectswhos property boundary has 40 to 50%contiguity If it Can be demonstrated mat me project will reduce non-renewable energy useage either througn the application of adernahve energy k systems or through committed energy conservation measures beyond mat normally reauveo av City Code, a5% bonus may be earned for every 5%reduction in energy use. l SOLAA OR/EArri TiofJ /Q % m Calculate me percentage of me total acres in the project that are devoted to recreational use, enter 112 of that percentage as a bonus. If me applicant commits to orevennng permanent Ofhite open space that meets the Citys minimum requirements, calculate me percentage n olthis open space acreage to me total development acreage. enter this percentage as a bonus. B part of me total development budget Is to be spent on neighborhood public transit facilities which are not otherwise required by City Code. 0 enter 2%bonus for every s100 per dwelling wit nvesteQ If part of the total development budget is to be spent on neighborhood facilities and servloeswhich are not otherwise required by City Code. P enter al%bonus fo(every 5100 per dwelling unit invested If a commitment is being made to develop o specified percentage of the total number of dwelling units for low income families, enter mat q percentage as a bonus. up to a maximum of 30%.. If a commitment is being made to Oev9loP a s 111e0 percentage of the total number of dwelling units for Type'A'and Type B' handicapped Z housing as defined by the City of Fort Collins. calculate the bonus as follows: Or Tvpe'K— 5fimes TypeTniR W iype'B'—tOtlmes Type'nits 7677 ds OtT aT u� In no Case shall the combined bonus be greater than 30%. Me site or adjacent property contains an historic building or place, a bonus may be eomed for the following: 3% — For preventing or mifigallrg outride influence3(e.g.environmental, land use, aesmetk:, economic and social factors) adverse to its 5 preservation; 3% — For assunng mat new mctureswill be In keeping with the character Of the building Of place. while avoiding total units 3% — Far proposing adaptive use of the building or place that will lead to its continuance, preserwflon and improvemeniin on aporopnale manner. If a poMon or oil of the reouired caning In me multiple family Project is provided underground, within the building, or in an elevated panulg structure as an accessary, use to me armory structure, a bonus may be earned as follows t 9% - For providing75% or more of the parking in a mucmre; 6% — For providing 50-74 % of the boning in a structure; ' 3% — For providing 25-49%ot thepaning in amucture. u 11 a Commitment is being made to provide approved OUtOmafic fire elringuishing systems forme dwelling units, enter a bonus Of 10%. TOTAL 56 W11 00 co N O 00 M a M W d� V W O -12 W Q 10 O N P 10 10 M 0 M c� z Cr w w z CD z w J_ U z O Q F- ¢ O M. cc a U LL ll. Q ¢ F- MEMORANDUM To: Steve Hair, Community Construction, Inc. Eldon Ward, Cityscape Fort Collins Staff From: Matt Delich5 Date: March 30, 1992 Subject: Mountainridge Farm traffic study (File: 9217MEM1) Verbal authorization to proceed with the traffic study for Mountainridge Farm development was received on March 13, 1992. Poudre School District and CSU spring break occurred the week of March 16-20, 1992. Therefore, traffic data could not be collected until the week of March 23-27, 1992. Realizing that this would not. provide sufficient time to submit this traffic report by March 30, 1992, a delay for this element of the submittal was requested of the Fort Collins Planning Department staff. Staff agreed to allow the delay for the above reason and also that the submittal was considered to be a "Preliminary Submittal." Therefore, there will be ample time to submit the traffic study in a few weeks and still allow enough time for review and comments by city staff. MOUNTAINRIDGE FARM SITE ACCESS STUDY FORT COLLINS, COLORADO APRIL 1992 Prepared for: Community Construction, Inc. 531 California Avenue Bakersfield, CA 93304 Prepared by: MATTHEW J. DELICH, P.E. 3413 Banyan Avenue Loveland, CO 80538 Phone: 303-669-2061 EXECUTIVE SUMMARY Mountainridge Farm is a proposedsinglefamily detached residential development located west of Shields Street and south of Horsetooth Road in Fort Collins. This traffic study assessed the impacts of Mountainridge Farm at various phases of development. The following summarizes the significant findings as a result of this study: - - Traffic from a portion of the Mountainridge Farm can be handled on the area streets with various improvements. - Current traffic operation at the area intersections is acceptable. The Mountainridge Farm, Phases 1 and 2 will gain primary access to the street system via Wabash Street, which will intersect with Shields Street at a T intersection. - With development of Phase 1, the key intersections operate acceptably. At the Shields/Wabash intersection, the eastbound left turns will experience delays which are common at arterial/local street intersections_ with stop sign control. The following auxiliary lanes should be built at the Shields/Wabash intersection: 1) southbound right -turn radius and taper, 2) northbound left -turn lane, 3) _eastbound right -turn lane, and 4) eastbound left -turn lane. These can be striped on anticipated new pavement. Some widening will likely be necessary of Shields Street, not adjacent to Mountainridge Farm, to meet the requirements of the southbound right -turn taper. - With development of Phases 1 and 2, the key intersections will operate acceptably. During peak hours, eastbound left turns at the Shields/Wabash intersection will experience some delays. The auxiliary lanes mentioned above will handle the traffic at this level of development in a safe, efficient manner. Phases 3 and 4• of Mountainridge Farm can occur when alternative access is provided either via extension of Seneca Street to Horsetooth or connecting Troutman Parkway to Shields Street. - Troutman Parkway will go through the property to the south of Mountainridge Farm. When development proposals are put forth for this property, the traffic study should evaluate the long range impacts which will include development on all the nearby properties including Mountainridge Farm. 17 I. Introduction Community Construction, Inc. is proposing to build a single family detached residential development, located south of Horsetooth Road and west of Shields Street in Fort Collins, Colorado. The site location is shown in Figure 1. This development is known as Mountainridge Farm. This development is proposed to be built in four phases. The total development period will be dependent upon market conditions. Figure 2 shows the area street system, existing and future. Land adjacent to the south of Mountainridge Farm has some legal constraints, which may delay its development. Troutman Parkway, which will serve Mountainridge Farm and other properties as a collector street, is proposed to go through the legally constrained property. Since Troutman Parkway is proposed to be signalized when warranted in the future, delay in implementation of the west leg of Troutman Parkway may place temporary development limitations on Mountainridge Farm. Due to these questions, this traffic study analyzed development of Mountainridge Farm with access to Shields Street (at Wabash) and Seneca Street to the south. The analyses in this traffic study assumed no west leg of Troutman Parkway. When Troutman Parkway is built through the legally constrained property, a traffic study should analyze the impacts of this connection and the adjacent development. Horsetooth Road is classified as an arterial on the Fort Collins Master Street Plan. The segment between Shields Street and Taft Hill Road is currently two lanes with a rural cross section, with widening at the Shields Street and the Taft Hill Road intersections. East of Shields Street, Horsetooth Road has a standard four lane arterial cross section with raised medians. There is signal control at the Horsetooth/Shields and Horsetooth/ Taft Hill intersections. Other intersections in this area are stop sign controlled with Horsetooth Road receiving the right-of-way. It is posted at 35 mph. In the future, Horsetooth Road west of Shields is expected to have a four lane cross section with turn lanes at appropriate locations. Shields Street is classified as an arterial on the Fort Collins Master Street Plan. It is a street of varying width south of Horsetooth Road. The segment adjacent to Mountainridge Farm has a two lane rural cross section. North of Horsetooth Road, Shields Street has a four lane urban cross section with auxiliary turn lanes and a raised median at some locations. It is proposed to have a four lane urban cross section with turn lanes at appropriate locations in the future. It is posted at 35 mph in this area. There are signals at the Shields/Harmony and Shields/Horsetooth intersections. Troutman Parkway is a collector street east of Shields Street. It intersects Shields Street at a T intersection with stop sign 1 pits r C, f .. ..... .. .. ... 5 .. .... r U -it tma Field r L N' IilIV North Yard D J11 _Jr -it _i ug T. J 7_ tr I C5 F.r. - - ... - t 4 41 m�, A T It _A t --- 1 -1 I -A IV fjl;�j A .. 7 - I[1F . ; r p pal A IJ 1. J1 14- L .1 ar 7, tiolf Course ! w D1;p t L 1[S j /510 ti 8M4 or �_�_Dj' it 954 ll�li A R, II ll 17 .1tFI i� _[jrfQ_V1i_ -,CO JTFA 317�14 111"T_7F 1131' • T_ 11!�JEI`11 - it Fioslp U 14. -.1ca) SJ 15 ='Ij )(,'T 4 NIVER11TY it $065 1544 -r-—. 1t nS1) ill1R Drive-1 Hughes Stadium heat it 22 1�31 U11 1 2iI 0 23� zf It% 4 —7j - jG&M Pit Drive i� -J, J__,L ­j !Theafer,' : 111� - Drakes J.. AD, ZJ jr 1'. 1 9 '5" J�J W.l L 5 1 27 = — ----- r L �j —26 9 28 26 0 F ­jc- — Gras I r - Pits Cot I HORSETOOT 0111 29TH 508'? I549 A A y j, n aki!_j 313 6 ng Canyon 3 99 31 :11 Dam "Gravel Pit hie (Aellawls fLarnlo HARMONY 7 �u rid e Farm Ce M 'u-t 0 40 )6 4;1 152t5go No Scale SITE LOCATION Figure 1 W (EXISTING AND FUTURE) Figure 2 Mountain Ridge Farm PUD - Preliminary, #18-92 May 18, 1992 P & Z Meeting Page 2 COMMENTS 1. Background• The surrounding zoning and land uses are as follows: N: R-L-Pr R-E; Vacant (Mountain Ridge Farm O.D.P, Future Church Site) and Rural Residential (Skyline Acres) S: R-L-P; Vacant (Mountain Ridge Farm O.D.P., Multi -Family) E: R-L-P; Vacant (Four Seasons Future Residential) W: R-L-P; Vacant (Mountain Ridge Farm O.D.P., Single Family) Mountain Ridge Farm was annexed into the City as part of the Horsetooth - Harmony West annexation in 1980. It was included in a 224 acre Overall Development Plan that consisted of both Mountain Ridge Farm and Arapahoe Farm in October of 1987. The Mountain Ridge portion totals 66 acres. The Arapahoe - Mountain Ridge Farm was amended in April of 1991 to address changes on the Arapahoe Farm portion only. (Arapahoe Farm is presently developing as Woodridge P.U.D.) This Preliminary P.U.D. request represents the first filing within Mountain Ridge Farm. 2. Context Within the section: Filing One of Mountain Ridge Farm will be served by Wabash (local street) which will be extended into the Four Seasons Subdivision. Wabash will tie into Troutman Parkway (collector street) which will extend to Seneca Street (collector street). These streets will provide the route to Johnson Elementary, Webber Junior High, and future Westfield Neighborhood Park. The proximity to the two schools and the neighborhood park will promote pedestrian or bicycle usage. The Wabash/Troutman connection is the sole access to the internal collector street system. There is no planned connection to Richmond Drive in Skyline Acres due to the inadequacy of Richmond Drive through the former County subdivision. A bicycle/pedestrian path is planned along the Pleasant Valley and Lake Canal, located to the west, which will provide a non -vehicular, north -south connection to either Horsetooth Road or Harmony Road. This square mile section is actively developing with Regency Park P.U.D., Westbrook P.U.D., and Woodridge P.U.D., currently in the construction phase. A church was recently approved for the northeast corner of Harmony Road and Regency Drive. control. According to the Fort Collins Master Street Plan, Troutman Parkway will continue west of Shields Street, intersecting with Seneca Street near Phase 3 of Mountainridge Farm. Land uses in this area are residential, school, and vacant. Residential uses are north and west of the proposed Mountainridge i Farm. There is vacant land south and east of Mountainridge Farm. Johnson Elementary School is to the southwest. The .center of Fort Collins lies northeast of Mountainridge Farm. II. Existing Conditions The most recent daily traffic counts were obtained in 1991. These counts are one way volumes on Shields Street and Horsetooth Road, and are shown in Figure 3. Peak hour intersection counts were obtained in March 1992 at the Hors etooth/Shields intersection and at the Shields/Troutman intersection. These counts are also shown in Figure 3. Raw data is shown in Appendix A. With the existing control at the two counted intersections, the peak hour operation is shown in Table 1. The operation at the signalized intersection is deemed to be acceptable. Acceptable operation is defined as level of service D or better. Descriptions of level of service from the 1985 Highway Capacity Manual for signalized and unsignalized intersections are provided in Appendix B. Calculation forms for the operation shown in Table 1 are provided in Appendix C. At the stop sign controlled Shields/ Troutman intersection, minor street left turns are at levels of service E. Based upon recent research, it was found that the 1985 HCM capacity technique for stop sign controlled intersections gives an overstatement of the level of service. The expected delay to the westbound left turns would be 16-26 seconds per approach vehicle in the morning peak and 20-30 seconds per approach vehicle in the afternoon peak. By other criteria in the 1985 HCM, the level of service of these left turns is more appropriately defined as level of service C/D. Attached is a copy of two research papers discussing this subject in Appendix D. The conclusions of the one research paper are supported in a similar study conducted in Boston, Massachusetts. The signals at the Horsetooth/Shields and the Harmony/Shields intersections also have an impact on the queue of vehicles approaching the Shields/Troutman intersection. It is concluded that the level of service E shown in Table 1 should be tempered when considering the additional operational information provided above. The left -turn exits from Troutman Parkway are in the level of service C/D category. 2 HORSETOOTH 54 9�9 (1991) 5732 (1991) rn rn V W T T v' •� 0 T T m O M CO O O O N N W O � � � � O 173/361 --o--154/544 J i ,e-- 1111121 117/35:: I I 492/288 —� I 17/25 �� n O'" Icon I Tco O W cmL% M T to TT TT VT/ vT' V/ v, T T� W co w N n co N G J W n N co mm O c� coLo In N Lon co M CO � � (D O T co w 122/69 21/18 1TROUTMAN 8 723 ( 1991 ) do 8528 (199 ) AM / PM Q N RECENT DAILY AND PEAK HOUR TRAFFIC Figure 3 Table 1 Existing (1992) Peak Hour Operation Level of Service (*) Intersection AM PM Horsetooth/Shields (signal] C C Shields/Troutman WB LT E (C/D) E (D) WB RT C B SB LT A B (*) Level of service considering recent research pertaining to vehicle delay. . Table 2 Trip Generation Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out Phase 1 39 D.U. 390 8 21 25 14 Church - 25 KSF 190 2 1 9 8 Phase 2 - 35 D.U. 350 7 19 22 13 Phase 3 - 36 D.U. 360 8 20 23 13 Phase 4 - 40 D.U. 400 8 22 25 15 III. Proposed Development Community Construction, Inc. is proposing to develop 150 single family lots on a parcel of land west of Shields Street. A site plan showing expected phasing is shown in Figure 4. Phases 1 and 2 will gain access to the arterial street system via Wabash Street. Phases 1 and 2 also include a church site near the Shields/Wabash intersection. Phases 3 and 4 will access Seneca Street. At the present time, traffic accessing Phases 3 and 4 will be from the south. City staff has indicated that alternative access via an extension of Seneca Street to Horsetooth Road and/or Troutman Parkway to Shields Street will be necessary. This will be discussedfurther in this report. A. Trip Generation Trip generation estimates for Mountainridge Farm were obtained from Trip Generation, 4th Edition, ITE. Table 2 shows trip generation on a daily and peak hour basis. B. Background Traffic Background traffic is defined as the traffic that is and/or will be on the area streets that is not related to the proposed development. The intersections considered for the operations analysis are Hors etooth/Shields, Shields/Troutman, and Shields/ Wabash. Background traffic for impacted streets was projected for each of the future years analyzed. Background traffic was projected to increase at 3 percent per year for the short range future. This rate of increase is normal for streets and roads in the City of Fort Collins. It accounts for general traffic growth and some level of continued development in the vicinity that would also contribute to traffic growth. Long range traffic projections were not made due to the legal constraints of the property to the south. When development proposals are put forth on this property and Troutman Parkway continues west of Shields Street, this long range analysis would be more appropriate. That study should include the development of Mountainridge Farm as described in this traffic study. C. Trip Distribution Trip distribution was determined based upon an evaluation of attractions for home -based productions and the most likely routes available to travel to those attractions. The directional distribution of the approaching and departing traffic generated at the proposed uses is a function of: 3 Q SITE PLAN Figure...4 - Geographic location within the City of Fort Collins; - Location of employment and business centers which are likely to attract trips from this area; - Access to the site. Figure 5 illustrates the trip. distribution percentages used in the subsequent traffic assignments. D. Traffic Assignment and Intersection Operation Using the vehicular trip generation estimates presented in Table 2 and the trip distribution assumptions, the site generated traffic was assigned to the area street network. The initial network consisted of Horsetooth Road, Shields Street, and Troutman Parkway as they are today. Wabash Street was added to the network as shown in Figure 4. The analyzed intersections were Horsetooth/ Shields with the existing signalization, and Shields/Troutman and Shields/Wabash with stop sign control. Due to property lines, no connection could be made between Wabash Street and Seneca Street via a short segment of Troutman Parkway. Figure 6 shows the Phase 1 peak hour traffic assignment. This assignment also includes a 3 percent per year increase in background traffic assuming a 1995 future year. Table 3 shows the peak hour operation at the key intersections. Calculation forms are provided in Appendix E. The signalized Hors etooth/ShieIds intersection will operate acceptably with the existing geometrics. At the Shields/Troutman and Shields/Wabash intersections, operation will be acceptable for all movements, except the left -turn exits from the minor streets, which will be at level of service E. Based upon the recent research cited earlier, the delay per approach vehicle will be 19-29 seconds during the morning peak hour and 21- 31 seconds during the afternoon peak hour at the Shields/Troutman intersection. The delay per approach vehicle will be 18-28 seconds during the morning peak hour and 17-27 seconds during the afternoon peak hour at the Shields/Wabash intersection. Using delay criteria from the 1985 Highway Capacity Manual, the operation of these left turns would be largely in the level of service D category even though the operations technique shows the level of service in category E. It is recommended that this operation be accepted. At the new Shields/Wabash intersection, the following geometry is recommended: 1) southbound Shields - one through lane and one right -turn deceleration radius and taper' (radius >40' and taper = 2401); 2) northbound Shields - one through lane and one left -turn 'The southbound through and right -turn volumes do not warrant a full width deceleration lane based upon criteria in "Intersection Channelization Design Guide," NCHRPR 279, TRB,1985, Pg 63-65. The taper will allow right -turning vehicles to enter the taper slowing to 15 mph to make the turn. TRIP DISTRIBUTION Figure 5 tD w y co M T O CD M T \ \ N O cl' N* �— M In N 1 89/393 +---168/593 122/ 136 HORSETOOTH 128/38 —/ 536/314 19/28 �� rn O rn N ! T � \ \ \ M to co It owT co WABASH 4/3 I,- 0 to (D O \ T to \ . -TT ti (D N A )t to \ co N co to to CD N O to T T N 133/75 23/20 mmmmmmm� ITROUTMAN AM / PM Q N PHASE 1 PEAK HOUR TRAFFIC Figure 6 Intersection Table 3 Phase 1 (1995) Peak Hour Operation Level of Service (*) AM PM Horsetooth/Shields [signal] C C Shields/Troutman WB LT B (D) E (D) WB RT C C SB LT A B Shields/Wabash EB LT E (D) E (C/D) EB RT A B SB LT A A (*) Level of service considering recent research pertaining to vehicle delay. Table 3 Phase 1 and 2 (1995) Peak Hour Operation Level of Service (*) Intersection AM PM Horsetooth/Shields [signal] C C Shields/Troutman WB LT E (D) E (D) WB RT C C SB LT A C Shields/Wabash EB LT E (D) E (D) EB RT A B SB LT A B (*) Level of service considering recent research pertaining to vehicle delay. deceleration/storage lane (325 feet including taper); 3) eastbound Wabash - one left -turn lane (50 feet) and one right -turn lane; and 4) westbound Wabash - one lane. This development will be required to build the west half of Shields Street to an arterial cross section. Assuming that existing Shields Street is centered in the right-of-way, there will be 41 feet of pavement adjacent to the Mountainridge Farm property. Wabash Street intersects Shields Street 80 feet south of the north property line. Some of the southbound taper paving will occur along a portion of Shields Street that is not adjacent to Mountainridge Farm. The other aforementioned auxiliary lanes can be striped on the new pavement area. Figure 7 shows the Phase 1 and 2 (including the church site) peak hour traffic assignment which includes the background traffic on the area streets. Table 4 shows the peak hour operation at the key intersections. Calculation forms are provided in Appendix F. The range of delay per approach vehicle will be 19-29 seconds in the morning peak hour and 21-31 seconds in the afternoon peak hour at the Shields/Troutman intersection. At the Shields/Wabash intersection, the range of delay per approach vehicle will be 21- 31 seconds in both the morning and afternoon peak hours. There is little that can be done to improve this operation. With good signal progression on Shields Street, this operation could* be improved by one level of service category. This level of service occurs at many arterial/local street intersections throughout Fort Collins. This type of operation is generally accepted. Development of Phase 3 or 4 (36 D.U. and 40 D.U., respectively) would require primary access via Seneca Street to Harmony Road and via Wakerobin to Shields Street. A previously prepared traffic analysis for the Platt Property recommends a level of development of that property before alternative access (Troutman Parkway) be provided. Development of Phase 3 or 4 of Mountainridge Farm would push the Shields/Wakerobin intersection to unacceptable operation categories when coupled with the continued development of the Platt Property. City staff has suggested that alternative means of access be provided if Phase 3 or 4 of Mountainridge Farm develops. The suggested access is a continuation of Seneca Street north to Horsetooth Road. However, this segment goes through land not controlled by the developer of Mountainridge Farm. This option does not appear to be possible unless other developments .occur. Secondary access via Westfield Drive and Crescent Drive to Horsetooth through Imperial Estates would provide a second means of access. However, these streets are not suited for higher traffic volumes and would not fit the same role as Seneca Street continuing .to Horsetooth Road. If agreements could be reached to build the short segment of Troutman Parkway as shown in Figure 8, then Phases 3 and 4 of Mountainridge Farm would have a second means of access via Wabash Street. However, this presents a complication. While this will A Mountain Ridge Farm PUD - Preliminary, #18-92 May 18, 1992 P & Z Meeting Page 3 3. Land Use• Mountain Ridge, Filing One, Preliminary P.U.D. is located on Parcel 2-E of the Amended Arapahoe - Mountain Ridge Farm O.D.P. This parcel is designated as "Multi -Family" on the O.D.P. The conversion to single family is considered a minor change with Parcels 2-F, 2-G, and 2-H remaining as "Multi -Family" and "Townhomes". In addition, Parcel 2-B is designated as "Patio Homes". Within the 66 acre Mountain Ridge Farm, therefore, opportunity will remain to provide a variety of housing types at various densities. The request to a less intense land use is considered compatible with the Amended Overall Development Plan. The proposed density of 3.69 dwelling units per acre is justified by a score of 50% on the Residential Uses Point Chart of the Land Development Guidance System. Points were awarded for proximity to an approved neighborhood shopping center (Pineview), proximity to an approved neighborhood park (Westfield), and for exceeding the 65% minimum requirement for solar oriented lots. The density, therefore, is justified by the Residential Uses Point Chart of the L.D.G.S. 4. Neiahborhood Compatibilit The request for single family lots at a density of 3.69 dwelling units per acre is considered compatible with the approved P.U.D.'s within the square mile section. The site is separated from Skyline Acres (former County subdivision) by a future church site. Four Seasons, across Shields Street, is expected to develop in a mix of residential densities. For these reasons, no neighborhood information meeting was held, and the proposal is considered compatible with the surrounding area. 5. Desian• The single family homes will be served by Wabash Street and two cul-de-sacs. Wabash is classified as a local street. The two cul- de-sacs will be open to Shields Street and not be closed off by lots. Sidewalks will connect the cul-de-sacs to Shields Street. This will provide a break in the perimeter fence along Shields. Fencing along Shields will be uniform, six foot in height, wood, with a 2" x 6" trim cap. This fencing will be along the side yards of Lots 1, 10, 11, 30, and 31. No fencing will be allowed across the opening of the cul-de-sacs. The front 20 feet of these lots will not be allowed to have fences that exceed four feet in height. The detention pond south of Lots 31 - 41 will not be fenced along Shields Street. Thus, the streetscape along Shields will have HORSETOOTH c') (D co In r O (D M r � � r0 N N 't 0) lD N 128/38 536/314 19/29 WABASH 33/28 8/7 O co .'T r d r N O J r CD Lu J1= N t r M co Lo � Lo to co 189/393 168/59.3 123/140 133/75 23/20 TROUTMAN AM / PM Q N PHASES 1 & 2 PEAK HOUR TRAFFIC Figure 7 TROUTMAN PARKWAY LINK BETWEEN 14 SENECA STREET AND WABASH STREET Figure 8 serve as an access for Phases 3 and 4, it will also change some of the travel patterns of the existing traffic in the area. This connection will provide another means of access to the two schools, the Platt Property, and other existing residential areas. This will reduce some of the traffic load on the Shields/Wakerobin intersection, but increase the traffic load on the Shields/Wabash intersection. It is concluded that Phases 1 and 2 of Mountainridge Farm can be developed with access via the Shields/Wabash intersection. Development of Phases 3 or 4 can occur when alternative access is provided either via the extension of Seneca Street to Horsetooth Road or connecting Troutman Parkway to Shields Street. The auxiliary turn lanes at the Shields/Wabash intersection, mentioned earlier, will,provide safe, efficient operation through Phase 1 and 2 of Mountainridge Farm. When the property to the south of Mountainridge Farm develops, a traffic study should be performed which analyzes the impact of that property development and also the development of Phases 3 and 4 of Mountainridge Farm. It is likely that a signal will be warranted at the Shields/ Troutman intersection with the development of the property to the south. The convenience of using this signal by area motorists will, in turn, reduce the traffic volumes at both the Shields/ Wabash and Shields/Wakerobin intersections. IV. Conclusions The following summarizes the significant findings as a result of this study: - Traffic from a portion of the Mountainridge Farm can be handled on the area streets with various improvements. Current traffic operation at the area intersections is acceptable. - The Mountainridge Farm, Phases 1 and 2 will gain primary access to the street system via Wabash Street, which will intersect with Shields Street at a T intersection. - With development of Phase 1, the key intersections operate acceptably. At the Shields/Wabash intersection, the eastbound left turns will experience delays which are common at arterial/local street intersections with stop sign control. The following auxiliary lanes should be built at the Shields/Wabash intersection: 1) sorthbound right -turn radius and taper, 2) northbound left -turn lane, 3) eastbound right -turn lane, and 4) eastbound left -turn lane. These can be striped on anticipated new pavement. Some widening will likely be necessary of Shields Street, not adjacent L I to Mountainridge Farm, to meet the requirements of the southbound right -turn taper. - With development of Phases 1 and 2, the key intersections will operate acceptably. During peak hours, eastbound left turns at the Shields/Wabash intersection will experience some delays. The auxiliary lanes mentioned above will handle the traffic at this level of development in a safe, efficient manner. Phases 3 and 4 of Mountainridge Farm can occur when alternative access is provided either via extension of Seneca Street to Horsetooth or connecting Troutman Parkway to Shields Street. - Troutman Parkway will go through the property to the south of Mountainridge Farm. When development proposals are put forth for this property, the traffic study should evaluate the long range impacts which will include development on all the nearby properties including Mountainridge Farm.. 7 W V J W -13 W Q r� 10 0 10 0 M co z Q w LU Z CO Z w _J 7 U Z O cc a F- 0 a cc z a U LL LL Q ¢ F MEMORANDUM To: Steve Hair, Community Construction, Inc. Eldon Ward, Cityscape Fort Collins Staff From: Matt Delich Date: March 30, 1992 Subject: Mountainridge Farm traffic study (File: 9217MEM1) Verbal authorization to proceed with the traffic study for Mountainridge Farm development was received on March 13, 1992. Poudre School District and CSU spring break occurred the week of March 16-20, 1992. Therefore, traffic data could not be collected until the week of March 23-27, 1992. Realizing that this would not provide sufficient time to submit this traffic report by March 30, 1992, a delay for this element of the submittal was requested of the Fort Collins Planning Department staff. Staff agreed to allow the delay for the above reason and also that the submittal was considered to be a "Preliminary Submittal." Therefore, there will be ample time to submit the traffic study in.a few weeks and still allow enough time for review and comments by city staff. Mountain Ridge Farm PUD - Preliminary, #18-92 May 18, 1992 P & Z Meeting Page 4 sufficient variety in openings and fence height so that the monotony of stockade perimeter fencing is avoided. The Preliminary P.U.D. indicates landscaping along Shields Street, and at the entry at Wabash. The intent is to create a pleasing streetscape with a variety of materials. Exact species, sizes, and locations will be determined at Final P.U.D. 6. Solar Orientation: The project has 78% of the lots within 30 degrees of a true east - west line. This exceeds the minimum requirement of 65%. With this amount of solar oriented lots, the project was able to obtain a 10% bonus on the Residential Uses Point Chart. Staff applauds this effort to exceed the minimum requirements. In particular, Lots 31- 39, and 41 will have southern exposure at the back of the lot bordered by a detention pond acting as permanent open space. Such an arrangement will allow excellent solar access combined with the privacy that is so desirable. 7. Transportation: For Mountain Ridge Filing One, sole vehicular access is from Wabash. Shields and Wabash is an arterial/local intersection where the eastbound left turn will experience delays. This delay is common at arterial/local intersections that are controlled by a stop sign versus a traffic signal. Until Wabash is extended to Troutman Parkway to provide alternative access, the Shields/Wabash intersection is the only access point. In the short term, Shields/Wabash is expected to be a tee intersection, and remain unsignalized. In the long term, as Wabash is extended from Four Season to create a four-way intersection, a signal may be warranted. According to the Mountain Ridge Farm Site Access Study, (Delich, 1992), the following improvements must be made to mitigate the traffic impacts associated with Mountain Ridge Filing One: A. Southbound Shields right -turn deceleration lane B. Northbound Shields left turn deceleration/storage lane C. Eastbound Wabash left turn lane, right turn lane D. Westbound Wabash one lane E. West half of Shields Street to arterial cross section To accommodate the access requirements of the Poudre Fire Authority, a temporary second point of access will be provided at the Crestway Court cul-de-sac. This temporary access will be vacated only at the time a permanent second point of access is provided by Wabash being extended to Troutman Parkway. Mountain Ridge Farm PUD - Preliminary, #18-92 May 18, 1992 P & Z Meeting Page 5 The Transportation Department has reviewed the traffic impact analysis. The proposed improvements are expected to mitigate the traffic associated with this development. These improvements will be designed at the time of Final P.U.D. RECOMMENDATION Staff finds the request for Mountain Ridge Filing One Preliminary P.U.D. is in conformance with the Amended Arapahoe Farm - Mountain Ridge Overall Development Plan. The proposed density is justified by the performance on the Residential Uses Point Chart and the All Development Chart of the Land Development Guidance System. Staff, therefore, recommends approval of Mountain Ridge P.U.D., Filing One, Preliminary, #18-92. ITEM' MOVNTAINRIDGE FARM - Preliminary NUMBER: 1 s-92 FAMILY ) RE g \ 1 R.' CHURCH SITE (VACANT) 6' UTILITY �IR�.• �\ EASEMENT l ZONED rlp TYP. l / \ 2 d I 3\on •`� un x. FT,I EASEY' TT TYP. / \ 4 \:. \ m na 110 y w. ly 6 / �,a.x• / 8 R.x•RR 20 \ // 17SL RR r 7 16 21 15•"/I 1 raxmin� / - / 14: 13 I. In na +Rx W. na� \ EASEMENT\ R <\ 23 7 TYP.�•.. NLY RCaR /' 24 / r � � .�d 9 ZONE[I rip /A 40 / xM ao rta ITIAMRARYMRM '� A' �. \ x. ".. na I / 25 M0UN0 I ♦ \' � / In na/xx2m / ,R \ / / 6UTILITY In W. na xrb \ 1 EASEM 14, RAN. �. FUTU% RE DETENTION Pf ZONED rlo 28 M. naI Ix x. na FIRE .CCEyy • MAJ a61.' 111 I® 32Ix'31 A. 1134 a l,n.In rtI FOUR SEASONS (VACANT) ZONED RLP VICINITY MAAPP.�-y., GENERAL NOTES 14 '•' `"� LAND USE BREAKDOWN R-4 LEGAL�DESCR=�TION LLI Ln� 1 Engineering Consultants „roan aeaign. F— N� OnaN ` n wa .,au �n �� MOUNTAINRIDGE FARM PUD 1ST FILING PRELIMINARY PLAT, SITE & nu' Ill. PRWECT N0. In'. •'� LANDSCAPE PLAN LEGEND LOT MUMNG mbaoN RESOLW CAIWWELEIR$ IT14WOILNP♦D .Gf.L55 R.WP 0 IOENNIY SIGN W W I FORT COLLINS CHRISTIAN CENTER ZONED RL 1 AIXV ✓ . WEPmMNnON ]-.w-sx REV.SI.NONS� 0 In 100 _ sN.xT xo. 1 Gr 1 n SITE w Cc - owa. uu ® R Y row.AY WRN M�V�n. M_ ®4iON �O1 a105sl vYp_ uY ]m �ORYYR/O;:M Y..Z - r�Y.•...w.wfo0s �.J7 reoeAmw w.r�eYeYA. R' ___ I>ql TlA•P. , YIMfYMN -.-_ ARAPAHOE/ MOUNTAINRIDGE FARM =_ --fi PAAce, MASTER PLAN e oArz o rRv R,a.-e> 1 A Reweo m-r-n of-u-u Acz .�A.�w...�...w.. A•. L°..r�.:i ....wY. WATER PUMP STATION;'•°....w•'•'w •..A..rli.C•Cw:o"ruY.rs:. •' c \, ..T.. Aio°da0 IMPERIALSSTATESJI \ y..... • . 1—H _ .. BUSINESS SERVK; �• all, ... .a �rARtel ,V • x6 ACt •,\� � I 1 SINGLE FAMILY +(� .I i YYllln-i,IYILYI Be 01_I t P", 1—B 70A Ac 00000 =. 000000 0000 SNGLEFAMLV 00000 0 �• � 7 I o°°p 1 J 1—F 0.F LL SINGLE 2—A SttWGLE i I ININN 0��. ` rARcef Ia Aea - E l\ PATIO HOME9 , { \`z. I \ uYN,TKYYLYIu } I TUML ------------------- .YICS. µT0M111TM YOee RONATO wr _ :i.w 1—D i r-� - ArrROvm.r A0YNY1RnTry[ CRAfp[e a A CONVENEu CENTER LEGAL DESCRIPTION L-E� � r•J Yam.:.- � —�= — .Im PABgt ` f rAC1C[t \\M '�• 0� wr'w—�.' »—'_..w� �w� Ix.f n0. �° F 2 f .01C.f IIw /� w .: _'iG.iwr—w MO HOMES BtRiLE FAMLV 1 •I //• 2•:.e ncf I I - T _ '`y FAM TFLY 10 w_ :.S .•�.T�r'r.-.. w rn11CLL PA.ML I --u 1 _ t, _ -- � � _ w. ti r �.. •. - "- t\TOWNHOMES AAXT AMLY .. ..... .•...^.a-.-......-...........".. ° I LAND USE BREAKDOWN 3. HIGH SCHOOL PREVEW GENERAL NOTES _ � ___ -• - `THE VLLAGES�• - _— - ..• '•(.T HARMONY ` ;-•_._._._ _ _ � i t'wn �":��'"�M eR� i �`• REGENCY PARK PIA Cl SIGNATURE BLOCK HARMONY I SCHOOL PROJECTIONS PROPOSAL: MOUNTAINRIDGE FARM PUD DESCRIPTION: 41 single family units on 11.1 acres DENSITY: 3.69 du/acre General Population 41 (units) x 3.5 (persons/unit) = 143.5 School Age Population Elementary - 41 (units) x .450 Junior High - 41 (units) x .210 Senior High - 41 (units) x .185 Affected Schools Johnson Elementary Webber Junior High Rocky Mountain Senior High (pupils/unit) = 18.45 (pupils/unit) = 8.61 (pupils/unit) = 7.59 Design Capacity Enrollment 568 566 900 834 1312 1191