Loading...
HomeMy WebLinkAboutMOUNTAINRIDGE FARM PUD PRELIMINARY - 18 92 - CORRESPONDENCE - APPLICANT COMMUNICATIONCOMMU_N_ITY C_0_NSTRUCTI_0_% INC. 531 California Avenue, Bakersfield, California 93304 (805) 327-7912 FAX (805) 327-3592 LICENSE N334582 March 11, 1992 Mr. Ted Sheppard City of Fort Collins Planning Department Post Office Box 580 Fort Collins, Colorado 80522-0580 Re: 10 Acres - Mountain Ridge Dear Ted: This letter is a formal request that we be allowed to submit a combined preliminary and final submittal on our 10 acre filing for the Mountain Ridge PUD. As you are aware, a substantial and costly amount of time was expended on our first proposal where we understood, after two staff meetings, that a combined filing would be satisfactory. One week after our second staff meeting, we were told a completely different set of development criteria would be placed upon us, making the development of the area unfeasible at this time. From an engineering standpoint, the master planning being done for March 30th submittal should provide the information required for the preliminary/final submittal. This is particularly true of the water and sewer extension since they comply with master planned street alignments. From a drainage standpoint, the area allocated for the pond along Shields Street is adequate for the pool size master planned for this area. Drainage alternatives upstream of the pond should not effect its overall size. Additionally, a traffic study for the entire Mountain Ridge PUD will be submitted. For these reasons and the undue hardship further delays will work on us, I respectfully request that a combined submittal be allowed. Please notify me immediately of your decision as financial commitments are hinging on the outcome. Best regards, COMMUNITY CONSTRUCTION, INC. Fh� w rd- en W. Hair Vice President SWH/dc cc: Mr. Peter Kest Mr. Stan Myers Mr. Eldon Ward