Loading...
HomeMy WebLinkAboutMOUNTAINRIDGE FARM PUD PRELIMINARY - 18 92 - CORRESPONDENCE - RESPONSE TO APPLICANT.+ Developn I Services Planning Department City of Fort Collins April 20, 1992 Mr. Eldon Ward Cityscape Urban Design 3030 South College Avenue Fort Collins, CO 80525 Dear Eldon: The Planning Staff has coordinated an interdepartmental review of Mountain Ridge First Filing, Preliminary P.U.D. The following comments represent the findings of this review: 1. There is a strong likelihood that the developer may need to provide off site easements along Shields Street from Mountain Ridge north several hundred feet to the to the existing electrical facilities. If it is necessary for the City of Fort Collins Light and Power Department to construct a temporary overhead power line to bring electricity to the site, then it will be at the developer's expense. Please contact Doug Martine, 221-6700 for full details on the location of the power source. 2. U.S. West has submitted comments that appear to be standard and generic in nature. These comments are passed along for your information and are quoted verbatim. A. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are, presently available. U.S. West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. B. Telephone facilities generally occupy rear lot utility easements, which must be located on terrain which permits trenching operations. If the developer prefers a front -lot telephone layout, then the front lot easement should be wide enough to accommodate all utilities to be located there. C. The developer is responsible for provision of all trenching for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. D. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 If there are any questions regarding these comments, please contact. Susan Peterson, Manager, Network and Technology Services, 224-7473. 3. Most of the comments from the City's Stormwater Utility are forwarded to the civil engineering consultant under separate cover. The following comments, however, are provided for your information: A. Storm flows from Basin 1 that drain north into the Foothills Drainage Basin must be within a drainage easement or existing right-of-way. At the time of Final, it must be shown that there is no offsite impact due to increased storm flows. B. The onsite storm sewer system and swales not located in City right-of-way will not be maintained by the City. C. The storm sewer parallel to Shields looks like it will be under the future curb and gutter. Is this true? At the time of Final design, it should be demonstrated that there will be no conflict with other utilities. D. Lots 31 - 39, adjacent to the regional pond, shall have a minimum opening elevations specified on the Final Grading Plan. An Elevation Certification will be required for each home prior to the release of a Final Certificate of Occupancy. These elevations should be indicated on the Final Drainage Plans. 4. The use of the temporary fire access lane, at the termination of Crestway Court, is contingent upon approval of plans demonstrating the lane to be constructed to handle fire fighting apparatus. Any combination of security chain, gate, or bollards may be used, subject to final approval by the Poudre Fire Authority. 5. Fire hydrants and water lines must be provided in accordance with City standards. 6. The Utility Plans should show the location of the existing Troutman Park irrigation headgate, and the future location, after development. 7. As you are aware, the Parkland Development Fee is presently $625 per unit, payable at the time of building permit issuance. 8. The P.U.D. should note, and possibly graphically represent, that rear yard fencing on Lots 31-39, and side yard fencing on Lot 41 not be a solid, six foot high privacy fence. The concern is that absent a visual connection, homeowners may be tempted to use the regional detention pond as a dumping area for lawn clippings, leaves, branches, or other lawn and garden debris. Please note that such fencing, if solid, will be limited to a height of four feet. If a six foot height is desired, then the top two feet must be an open design. It is suggested that the fencing be uniform and that the developer design a common, attractive fence for the 10 4 • �n affected lots that addresses the "out of sight - out of mind" concern. 9. Similarly, side yard fencing along Shields (Lots 1, 101,11, 30; and 31) should be uniform and attractive. These fences will not be allowed to exceed six feet in height, and may be solid in order to buffer the sound of Shields Street. It is our experience that mass is critical to buffer sound. Perhapsa material other than wood is appropriate at this location.. A fence material other than wood along an arterial street would be a most welcome addition to the Fort Collins streetscape. 10. The P.U.D. should indicate clearly that the termination points the two cul-de-sacs will remain open, even after the abandonment of the temporary fire access easement. The opening on Ridgeway Court should be equipped with a sidewalk connecting to Shields. Similarly, after the abandonment of the fire access on Crestway Court, a sidewalk connection to Shields should remain. 11. The name "Mountain Ridge Drive" should be deleted. The intersection will align with Wabash Street so "Wabash" should be used. Those areas in the City where two streets meet at an arterial with two different names are the result of two different projects being developed at two different times with a lack of coordination. In this case, we know, in advance, that Wabash will extend to Shields at this location. Please make the necessary modification. 12. Staff applauds the number of lots that meet the solar orientation specification. Good job! This concludes Staff comments at this time. Please note the following schedule for the.May 18, 1992 Planning and Zoning Board Preliminary hearing: Plan revisions are Thursday, April 30, 1992. P.M.T's, 10 prints, renderings are due May 11, 1992. As always, please feel free to call or set up a meeting to discuss these comments. Sincerely: Ted Shepard Senior Planner cc: Sherry Albertson -Clark, Chief Planner Kerrie Ashbeck, Civil Engineer