HomeMy WebLinkAboutSTONERIDGE PUD, FOURTH FILING FINAL - 21 92I - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSVAUGHT
FRYE
architects
June 9, 1994
Ms. Kirsten Whetstone
Planning Department
City of Fort Collins
281 N. College Avenue
Fort Collins, CO 80522-0580
Re: Stone Ridge P.U.D., Fourth Filing Final
Dear Kirsten,
In reference to your May 23, 1994 Staff Comments, we offer the following responses:
1. O.K.
2. O. K.
3. O.K.
4. O. K.
5. O.K.
6. O.K., a note has been added to the Landscape Plans regarding extra
conduit.
7. O.K.
8. O.K., street lights and tree locations will be closely coordinated at time of
construction.
9. O.K.
10. A soils report was submitted for the overall Stone Ridge development, as
well as a Traffic Study.
11. Contours are now shown on the Site Plan.
12, O.K., easements will be added to the Engineering Plans.
13. O.K., RBD is clarifying this item.
14. O.K., Tracts G and H will be removed.
15.-16. RBD is having discussions with Engineering.
17. O. K.
18. O.K., We will address this on the Final Landscape Plans.
19. As per our discussion with Ted Shepard during the preliminary process, the
bike/pedestrian accesses shown were adequate.
land planning • architecture
1113 Stoney Hill Drive • Fort Collins, Colorado 80525 • 303-224-1191 • FAX 303-224-1662
K. Whetstone
Stone Ridge Fourth Filing
Page 2
20.
O.K.
21.
This item was discussed at preliminary.
22.
O.K.
23.
O.K.
24.
The Landscape Plans will show the phasing of the landscaping.
25.
O.K.
26.
O.K.
Please let us know if you have any further issues regarding this project.
Best Regards,
0'"kA-1 al 0A k'O
Cathy Mathis
Vaught*Frye Architects, P.C.
CM/rp