Loading...
HomeMy WebLinkAboutSTONERIDGE PUD, FOURTH FILING FINAL - 21 92I - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSVAUGHT FRYE architects June 9, 1994 Ms. Kirsten Whetstone Planning Department City of Fort Collins 281 N. College Avenue Fort Collins, CO 80522-0580 Re: Stone Ridge P.U.D., Fourth Filing Final Dear Kirsten, In reference to your May 23, 1994 Staff Comments, we offer the following responses: 1. O.K. 2. O. K. 3. O.K. 4. O. K. 5. O.K. 6. O.K., a note has been added to the Landscape Plans regarding extra conduit. 7. O.K. 8. O.K., street lights and tree locations will be closely coordinated at time of construction. 9. O.K. 10. A soils report was submitted for the overall Stone Ridge development, as well as a Traffic Study. 11. Contours are now shown on the Site Plan. 12, O.K., easements will be added to the Engineering Plans. 13. O.K., RBD is clarifying this item. 14. O.K., Tracts G and H will be removed. 15.-16. RBD is having discussions with Engineering. 17. O. K. 18. O.K., We will address this on the Final Landscape Plans. 19. As per our discussion with Ted Shepard during the preliminary process, the bike/pedestrian accesses shown were adequate. land planning • architecture 1113 Stoney Hill Drive • Fort Collins, Colorado 80525 • 303-224-1191 • FAX 303-224-1662 K. Whetstone Stone Ridge Fourth Filing Page 2 20. O.K. 21. This item was discussed at preliminary. 22. O.K. 23. O.K. 24. The Landscape Plans will show the phasing of the landscaping. 25. O.K. 26. O.K. Please let us know if you have any further issues regarding this project. Best Regards, 0'"kA-1 al 0A k'O Cathy Mathis Vaught*Frye Architects, P.C. CM/rp