Loading...
HomeMy WebLinkAboutSTONERIDGE PUD, THIRD FILING FINAL - 21 92G - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet The following check sheet is'to be used in the preparation of a complete submittal of a Final PUD Plan:/ _ V --' 1. Application form (1 copy). 2. Filing fee ($110.00) plus S10.00 per page of the subdivision plat. 2,15 3. Site plan (25 folded copies). CO 4. Landscape plan (16 folded copies). ✓ 5. Final subdivision plat (21 folded copies). 6. Final utility plans (10 unfolded copies). 7. Final drainage report and plans and grading plans (4 copies). 8. Other documentation as determined by special circumstances. 4.16