For your information, attached is a copy of the Staff's comments concerning Stone
Ridge PUD, Phase Two, presented before the Conceptual Review'Team on January 11,
1993.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
T�(
Ted Shepard
Senior Planner
TS/gjt
Attachments
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF LOMMENTS
MEETING DATE: January 11, 1993
ITEM: Stone Ridge P.U.D., Phase Two
APPLICANT: Les Kaplan c/o Vaught - Frye Architects, 1113 Stoney
Hill Drive, Fort Collins, CO. 80525.
LAND USE DATA: Phase Two of Stone Ridge P.U.D. is located on the
north and west portions of the Stone Ridge Overall Development
Plan. Phase Two consists of approximately 45 single family lots on
approximately 17 acres.
COMMENTS:
1. The existing electrical system can be logically extended to
serve the future phases. Normal residential development
charges will apply. Please contact Alan Rutz, 221-6700, for
further details.
2. The water main can be tapped to run mains up the proposed cut -
de -sacs. Looping these secondary mains is not required as it
is preferred to not run a main between side lot lines. It is
preferred that the sewer main be brought down to the south to
Fieldstone. Again, the primary reason is the reluctance to
have a sewer main located between side or rear lot lines
within a residential subdivision. For further information,
please contact Mark Taylor, 221-6681:
3. The "neighborhood" park for this square mile section will be
located just north of the high school athletic fields. The
"community" park for this area has not been located.
Generally, community parks serve a four square mile area.
Such a park is not in the works and land is not being sought
for acquisition. Since it takes a population threshold of
approximately 20,000 persons to support a community park, the
present lack of residential density makes community park
planning premature at this particular time.
4. The pedestrian and bicycle trail on the north side of the
project is part of the non -vehicular network that was planned
for the Pine,Cone/High School Overall Development Plan. The
design details and long term maintenance have not been
specified. The trail will not be a part of the City Parks and
Rec Department system.
5. The site is located in the Foothills Drainage Basin. The
stormwater fees in this basin are $5,501 per acre factored by
the amount of onsite detention and the runoff coefficient. It
is the City's understanding that the existing pond on the
eastern portion of the site will serve as the permanent
detention pond upon build -out of the project. For further
information, please contact Cathy Malers, Stormwater Utility,
221-6589.
6. The Engineering Department requests that a variance be applied
for the 28 foot wide streets and for the proposed entry
median. The median must use drip irrigation and be equipped
with full depth asphalt. Positive drainage away from the
median is preferable. There should be a minimum of 20 feet of
lane width on either side of the median.
7. The second phase will required the standard set of utility
plans and development agreement.
8. The Street Oversizing Fee remains at $584 per dwelling unit
payable at the time of building permit issuance.
9. Please address the compliance rate for solar orientation.
10. The P.U.D. should include the same fencing guidelines as on
Phase One.
11. Since the density for Phase Two will be less than 3.00
dwelling units per acre, please address the density for the
O.D.P.
12. A Preliminary and Final combined submittal is allowed subject
to the caveat that should the plans not be in final form at
the end of seven weeks, the project may be continued to the
following public hearing.