Loading...
HomeMy WebLinkAboutSTONERIDGE PUD, FIRST FILING FINAL - 21-92D - CORRESPONDENCE - MEETING COMMUNICATIONJuly 24, 1992 Mr. Les Kaplan Stone Ridge Development Fort Collins, Colorado RE: Dakota Ridge - Stone Ridge Common Issues Dear Les: - - - Thanks for reviewing the issues that effect both of our projects. I would like to summarize our discussion as follows: Runoff from Horsetooth Road adjacent to Dakota Ridge (Approximately .4 acres) can continue easterly in the street and will be detained in the Stone Ridge detention facility. There is street capacity available in Horsetooth Road and storage room available in the Stone Ridge detention facility. This has been verified with both project engineers (RBD and Parsons & Associates). This will allow us to eliminate a curb. inlet and sidewalk culvert along Horsetooth Road. We can also reduce the size of the drainage pan between our common property line. 2. The reduction of the depth and width of the back yard drainage pan allows us an easier connection to a common back yard fence. Therefore, a common back yard fence becomes more attractive to the Dakota Ridge project and I would participate in 50% of the cost of this fence. This fence will be a double -sided wood fence approximately 1330 feet long along the west Stone Ridge property line. Final fence details and construction sequence are to be approved by both developers. It is anticipated that 50% of the fence construction costs be reimbursed by either developer within 30 days of completion of the fence construction. Please feel free to contact me if other issues should arise. Sincerely, Chuck Betters CDL Partnership gbl ACKNOWLEDGED BY DATE: ��h1 �2 - ']+:.-. .. �! ... .�. � ... ..�; .. _.. mot_.. �. ...... ...--. ..�... �.�-... �...�� L.� .. ..r �'.,^�YS":-Y;� �• � .... .. .. ..