HomeMy WebLinkAboutFORT COLLINS MONTESSORI SCHOOL - FDP200002 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTPrepared For:
Hauser Architects, P.C.
3780 East 15th Street, Suite 201
Loveland, CO 80538
970-669-8220
Prepared By:
Coffey Engineering & Surveying, LLC
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
970-622-2095
Project No. 2259.03
March 5, 2020
FINAL DRAINAGE REPORT
FORT COLLINS MONTESSORI SCHOOL
LOT 1, MONTESSORI SUBDIVISION
FORT COLLINS, CO 80526
PAGE | 1
Fort Collins Montessori School
FINAL DRAINAGE REPORT
ENGINEER’S CERTIFICATION
I hereby attest that this report for the final drainage design of stormwater management facilities
for the Fort Collins Montessori School site was prepared by me, or under my direct supervision,
in accordance with the provisions of the City of Fort Collins Stormwater Criteria Manual. I
understand that the City of Fort Collins does not and will not assume liability for drainage
facilities designed by others.
Ramsey J, Pickard, P.E.
Registered Professional Engineer
State of Colorado No. 56732
PAGE | 2
I. Table of Contents
I. GENERAL LOCATION AND DESCRIPTION ......................................... 4
A. Location .................................................................................................................... 4
B. Description of Property ........................................................................................... 4
II. DRAINAGE BASINS AND SUB-BASINS .................................................. 4
A. Major Basin Description ......................................................................................... 5
B. Sub-Basin Description ............................................................................................. 5
III. DRAINAGE CRITERIA ............................................................................... 6
A. Regulations ............................................................................................................... 6
B. Implementation of the “Four Step Process” .......................................................... 6
C. Development Criteria Reference and Constraints ................................................ 7
D. Hydrological Criteria............................................................................................... 8
E. Hydraulic Criteria ................................................................................................... 8
F. Modifications of Criteria ......................................................................................... 9
IV. DRAINAGE FACILITY DESIGN ............................................................... 9
A. General Concept....................................................................................................... 9
B. Specific Details ......................................................................................................... 9
V. CONCLUSIONS ............................................................................................. 9
A. Compliance with Standards .................................................................................... 9
B. Drainage Concept................................................................................................... 10
VI. REFERENCES .............................................................................................10
PAGE | 3
VII. APPENDICES
A. Hydrologic Computations
Vicinity Map
Fort Collins Flood Map
FEMA FIRM Map Panel 08069C0979H
USGS Soil Map
Figure 3.4-1 Fort Collins Rainfall Intensity Curve
Table 3.4-1Fort Collins Rainfall Intensity Table
Table 3.2-2 Surface Type - Runoff Coefficients
Rational Method Calculated Composite C Tables
Rational Method Calculated Imperviousness
Rational Method Calculated Flows
LID Rational Method Calculated Composite C Tables
LID Rational Method Calculated Imperviousness
LID Rational Method Calculated Flows
B. Hydraulic Computations
Fort Collins FAA Method
Stage-Storage Sizing for Detention Ponds
Water Quality Capture Volume Calculation
Restrictor Plate Calculation
Outlet Calculations
Spillway Calculation
LID Summary
Stage-Storage Sizing for Rain Gardens
Rain Garden Outlet Pipe Calculations
Rain Garden Storm Inlet Calculation
Equalizer Pipe Calculations
Swale Cross-Section A-A
2' Curb Cut Calculation
SDI Spreadsheet
C. Map Pocket
Drainage Plan
LID Plan
Outlet Structure Detail
PAGE | 4
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The proposed site is located in the northeast quarter (NE ¼) of Section 3, Township 6
North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of
Colorado. Specifically, the property is located southwest of the intersection of West
Harmony Road and South Shields Street. The property can be legally described as Lot 1,
Montessori Subdivision. (Please see the vicinity map located in the Appendix A).
B. Description of Property
The site is 4.29 acres currently zoned as low-density mixed-use neighborhood district
(LMN). The existing site consists of a residence, detached garage, various outbuildings,
gravel access drive and native vegetation. The site is bound by Harmony Road to the
north, Shields Street to the east, and residential lots to the south and west.
The existing site is comprised of two sub-basins. The northern portion of the site,
approximately 2.17 acres, drains to the northeast corner of the site at a slope of
approximately 3 percent to an existing 3’x3’ area inlet. The southern portion of the site,
approximately 2.12 acres, sheet flows to the south onto the adjacent property.
According to the NRCS soils map survey, the native soils consist of Altvan-Satanta
Loams (a United States Department of Agriculture Type “B” hydrologic soil). These
soils have a moderate rate of water transmission.
There are no active irrigation facilities located within the proposed site area.
The development of the site will occur in two phases. This drainage report will address
the improvements for phase I. Rain gardens and detention ponds have been designed for
full build out of Phase II. The development of phase I consists of the construction of a
14,700-sf Montessori school, two temporary modular buildings, concrete sidewalks,
playground area, right turn lane off Shields Street and landscaping improvements.
Parking will be provided to the north of the proposed building on an asphalt parking lot
with concrete curb and gutter allowing for site drainage. The site will utilize four on-site
detention ponds connected by equalizer pipes.
PAGE | 5
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin Description
The proposed site is located within the Mail Creek Basin, located in southwest Fort Collins.
The basin has a drainage area of approximately 1676 acres and is primarily located between
Taft Hill Road and Lemay Avenue between Horsetooth Road and County Road 36. The
basin generally drains from west to east to the confluence of Mail Creek and Fossil Creek,
and ultimately to Fossil Creek Reservoir.
The site is located within the FEMA Firm Map Panel 08069C1000F but is outside of the
FEMA floodplain and floodway (see FEMA Firm Map Panel in Appendix A).
B. Sub-Basin Description
Historically, the northern portion of the site drains to the northeast corner of the site to an
existing storm sewer inlet and the southern portion of the site sheet flows to the adjacent
property to the south.
The developed site is delineated into seven sub-basins, that will generally follow historic
drainage patterns. Runoff that enters the drainage system is directed northeast to the
Harmony drainage system. The total runoff to the south is decreased after development.
Sub-basin P1, (0.93 acres), consists of the northwest portion of the site, and is comprised of
a portion of the proposed building, asphalt parking lot, concrete sidewalks and landscaped
area. Runoff is directed north to the low point of the proposed parking lot. Runoff flows
through a curb cut to the proposed rain garden then east to the northern portion of the
proposed detention pond. This basin produces roughly 6.42 cfs of flow during a 100-year
event.
Sub-basin P2, (1.71 acres), consists of the southwestern portion of the site, and is comprised
of a portion of the proposed building, existing greenhouse and concrete sidewalks,
playground areas and detention pond. Runoff is directed southwest towards the proposed
rain garden then to the detention pond. Runoff is then directed through a storm pipe to the
ultimate outlet point located in the sub-basin P3 detention pond. This basin produces
roughly 4.09 cfs of flow during a 100-year event.
Sub-basin P3, (0.53 acres), consists of the northeast portion of the site, and is comprised of a
portion of the asphalt drive aisle, concrete sidewalks and detention pond. The asphalt drive
aisle is shaped as an oval with the detention pond located in the center. Runoff drains
towards the center of the drive aisle through curb cuts to the proposed detention pond.
Runoff exits the proposed detention pond through an outlet structure designed to release
runoff at the 2-year historic rate. This basin produces roughly 4.57 cfs of flow during a 100-
year event.
PAGE | 6
Sub-basin P4, (0.50 acres), consists of the southeast portion of the site, and is comprised of a
portion of the asphalt drive aisle, landscaping and detention pond. Runoff drains west
towards the flowline of the drive aisle then south to a proposed curb cut to the proposed rain
garden then to the detention pond. Runoff exits the proposed detention pond through a storm
pipe to the proposed detention pond located in sub-basin P3. This basin produces roughly
2.52 cfs of flow during a 100-year event.
Sub-basin P5, (0.07 acres), consists of the central portion of the site, and is comprised of a
portion of the proposed building, concrete sidewalks and landscaping. Runoff is directed
towards a 12” catch basin located at the center of the basin. Runoff is directed through a
storm pipe to the proposed detention pond located in sub-basin P3. This basin produces
roughly 1.0 cfs of flow during a 100-year event.
Sub-basin P6, (0.39 acres), consists of the south-central portion of the site, and is comprised
of landscaped area. Runoff sheet flows south to the adjacent property. This basin produces
roughly 0.35 cfs of flow during a 100-year event, which is less than the historic rate of 1.97
cfs that currently drains onto the property to the south.
Sub-basin P7, (0.13 acres), consists of the northeastern portion of the site, and is comprised
of landscaped area. Runoff sheet flows east to the flowline of South Shields Street. This
basin produces roughly 0.16 cfs of flow during a 100-year event.
Currently, offsite flows do not enter the site property per the Westbury P.U.D. First Filing
Utility Plans, dated November 17, 1944. This will not change after the site has been
developed.
III. DRAINAGE CRITERIA
C. Regulations
Drainage design criteria specified in the Fort Collins Stormwater Criteria Manual and the
Urban Storm Drainage Criteria Manual, Volume 3 by the Urban Drainage and Flood
Control District (UDFCD) have been referenced in the preparation of this study.
D. Implementation of the “Four Step Process”
Our stormwater management strategy utilizes the “Four Step Process” to minimize adverse
impacts of urbanization on receiving waters, as follows:
Step 1 – Employ Runoff Reduction Practices.
To reduce runoff peaks, volumes and pollutant loads from urbanizing areas, implement LID
strategies, including Minimizing Directly Connected Impervious Area (MDCIA). LID
PAGE | 7
practices reduce unnecessary impervious areas and route runoff from impervious surfaces
over permeable areas to slow runoff (increase time of concentration) and promote
infiltration.
Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV)
with Slow Release.
Rain gardens treat 80% of the new impervious area, exceeding the 75% requirement. Minor
storms are captured in the rain gardens, limiting the release rate to the infiltration rate of the
flat area of the rain gardens.
After runoff has been minimized, the remaining runoff should be treated again through
capture and slow release of the detention pond outlet structure. Extended detention basins
will be utilized to ensure that runoff is released at the 2-year historic rate and provide
additional water quality.
Step 3 – Stabilize Drainageways.
Mail Creek is the governing drainageway for the proposed site. By improving the water
quality, limiting runoff to 2-year historic rates and increasing infiltration the likelihood of
bed and bank erosion caused by runoff from this site is reduced. The Mail Creek Master
Plan update is currently underway. The development of this site will not impede the
progress of the master plan.
Step 4 – Implement Site Specific and Other Source Control BMPs.
Rain Garden- Bioretention areas (often called Rain Gardens) are depressed landscape
features that are designed to collect and treat stormwater. These areas can be linear or free
form depending on the site context. Bioretention areas primarily treat stormwater by
filtering sediment as the water travels downward through the soil, but it is also a living
system where plants and micro-organisms maintain the soil structure and break down
dissolved pollutants.
Extended Detention Basin: An extended detention basin (EDB) is a sedimentation basin
designed to detain stormwater for many hours after storm runoff ends. This BMP is similar
to a detention basin used for flood control, however; the EBD uses a much smaller outlet
that extends the emptying time of the more frequently occurring runoff events to facilitate
pollutant removal.
E. Development Criteria Reference and Constraints
The criteria used as the basis for analysis and design of stormwater management
improvements for this site are found in the references cited.
PAGE | 8
To the knowledge of the author, there are no other capital drainage improvements planned
for the site that would constrain or otherwise influence the design of the stormwater
improvements for this site.
F. Hydrological Criteria
Stormwater runoff is analyzed for storms with 2-year and 100-year return frequencies.
The Rational Method was chosen for this small site. The Rational Method provides that:
Q = CIA, where:
Q = Design flow in cubic feet per second (cfs)
C = Coefficient of runoff for the area under consideration
I = Rainfall intensity for the design storm duration (in/hr)
A = Area of the drainage sub-basin under consideration (ac)
Peak flows were calculated using the Rational Method for the 2-year and 100-year storm
events. This software uses the local 1-hour rainfall depth and Fort Collins rainfall
intensities, calculated as a function of the time of concentration. These values were
obtained by the City of Fort Collins Rainfall Intensity-Duration-Frequency (IDF)
curve/table; Figure 3.4-1 and Table 3.4-1, and can be found in Appendix A. Additionally,
per the City of Fort Collins, the “C’ coefficients have been multiplied by the appropriate
storm frequency factors.
“C” values were taken from Table 3.2-2, Surface Types – Runoff Coefficients (See
Appendix A). Soils of hydrologic soil type “B” dominate the site. Onsite runoff was
calculated to determine the runoff differential between existing and developed conditions for
use in sizing the WQCV as required by the FCSDM. The hydrologic basin parameters and
runoff rates are included in the Appendices.
The design worksheets included in the Appendices to this Final Drainage Report present
documentation of the hydrologic calculations for the on-site storm drainage systems. The
FAA spreadsheet incorporates the rainfall data from the Fort Collins Stormwater Criteria
Manual, Table 3.4-1.
G. Hydraulic Criteria
Within this development, all runoff will be conveyed on the surface, initially as sheet flow
and subsequently as concentrated flow in swales, bioswales, and curb & gutter. The
assessment of required capacity and the sizing of the respective components of the drainage
system are based on the anticipated runoff from the 100-year storm event. The surface
runoff will culminate into an on-site detention pond.
PAGE | 9
H. Modifications of Criteria
There are no modifications or variances requested in connection with the design of the
stormwater management for the Fort Collins Montessori School development.
IV. DRAINAGE FACILITY DESIGN
I. General Concept
The storm drainage system is designed to safely convey developed storm flows by sheet
flow, pipe flow, concentrated swale and gutter flow to the rain gardens and detention pond.
The design worksheets included in the Appendices to this Final Drainage Report present
details of the hydrologic and hydraulic calculations pertinent to the design of the on-site
storm drainage system. A drainage plan, showing the proposed development of the site and
developed drainage patterns is included in the map pocket following the Appendices.
J. Specific Details
The site will utilize on-site detention ponds and rain gardens. Runoff will enter the
detention system through proposed rain gardens and PVC pipes. Three rain gardens are
provided on-site. The rain gardens were sized based on full build out of Phase II of
development. Phase II was split into four drainage basins. Three of these basins are treated
with water quality, totaling 80% of the new impervious area. The proposed detention ponds
have a capacity of approximately 28,872 cubic feet. The required detention for the site is
27,626 cubic feet. The detention pond will drain through an outlet structure with a release
rate of 1.36 cfs. The 100-year release rate was based off the 2-year historic flow rate. The
proposed detention pond will have three controlled release rates. The detention pond has a
water quality volume of 696 cubic feet and a release rate of 0.04 cfs through a 1” orifice.
Runoff exceeding the water quality elevation of 5085.0 will flow through a grated lid into
the 12” outlet pipe. This pipe will be covered by a restrictor plate to control the release rate
to 1.36 cfs. Runoff greater than a 100-year event will exit the detention pond through an
emergency spillway at a rate no greater than the 100-year developed flow. The 100-year
WSEL is 5088.60’ with 1’ of freeboard provided.
V. CONCLUSIONS
K. Compliance with Standards
The drainage design for the Fort Collins Montessori School Site follows the requirements of
the Fort Collins Stormwater Criteria Manual as well as the City’s floodplain regulations.
PAGE | 10
The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also
reflected in the design of the drainage systems.
L. Drainage Concept
The drainage design for the Fort Collins Montessori School site will safely convey onsite
flows from the development into extended detention basin. Water quality treatment will be
achieved by the extended detention basin system and linear bioretention.
VI. REFERENCES
“Fort Collins Stormwater Criteria Manual”, City of Fort Collins, Adopted December 2018.
Natural Resources Conservation Service Web Soil Survey at websoilsurvey.nrcs.usda.gov/app
Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3, Urban Drainage and Flood Control
District, April 2008.
VII. APPENDICES
A. Hydrologic Computations
Vicinity Map
Fort Collins Flood Map
FEMA FIRM Map Panel 08069C0979H
USGS Soil Map
Figure 3.4-1 Fort Collins Rainfall Intensity Curve
Table 3.4-1Fort Collins Rainfall Intensity Table
Table 3.2-2 Surface Type - Runoff Coefficients
Rational Method Calculated Composite C Tables
Rational Method Calculated Imperviousness
Rational Method Calculated Flows
LID Rational Method Calculated Composite C Tables
LID Rational Method Calculated Imperviousness
LID Rational Method Calculated Flows
USGS The National Map: Orthoimagery. Data refreshed April, 2019.
National Flood Hazard Layer FIRMette
0 250 500 1,000 1,500 2,000 Feet
Ü
105°6'8.45"W
40°31'34.63"N
105°5'30.99"W
40°31'7.28"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
HAZARD SPECIAL FLOOD AREAS
Without Zone A, V, Base A99 Flood Elevation (BFE)
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.of 2% 1% Annual annual Chance chance Flood flood with Hazard, average Areas
depth areasdrainage of less less than than one one foot square or with mile
Zone X
Future ChanceAnnual Conditions Flood Hazard 1%
Zone X
Area Levee.to with See Reduced Notes. Flood Risk due
Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This digital map flood complies maps if with it is FEMA's not void standards as described for the below. use of
The accuracy basemap standards shown complies with FEMA's basemap
The authoritative flood hazard NFHL information web services is derived provided directly by FEMA. from This the map
was reflectnot exported changes on or 8/amendments 28/2019 at 2:subsequent 46:08 PM to and this does date and
time. becomeor The superseded NFHL and effective by new data information over time. may change
This elementsmap map image do not is appear: void if basemap the one or imagery, more of flood the following zone labels,
legend, FIRM panel scale number, bar, map and creation FIRM effective date, community date. Map identifiers,images for
unmapped regulatoryfor purposes. and unmodernized areas cannot be used
Legend
OTHER FLOOD AREAS HAZARD OF
OTHER AREAS
STRGUECNTUERREASL
FEATURES OTHER
MAP PANELS
8
1:6,000
B 20.2
The point pin selected displayed by the on the user map and is does an approximate not represent
an authoritative property location.
Soil Map—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/28/2019
Page 1 of 3
4485700 4485720 4485740 4485760 4485780 4485800 4485820 4485840 4485860 4485880 4485900
4485700 4485720 4485740 4485760 4485780 4485800 4485820 4485840 4485860 4485880 4485900
491690 491710 491730 491750 491770 491790 491810 491830 491850
491690 491710 491730 491750 491770 491790 491810 491830 491850
40° 31' 25'' N
105° 5' 53'' W
40° 31' 25'' N
105° 5' 46'' W
40° 31' 18'' N
105° 5' 53'' W
40° 31' 18'' N
105° 5' 46'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 15 30 60 90
Meters
Map Scale: 1:1,050 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
3 Altvan-Satanta loams, 0 to 3
percent slopes
4.7 100.0%
Totals for Area of Interest 4.7 100.0%
Soil Map—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/28/2019
Page 3 of 3
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 8
Table 3.4-1. IDF Table for Rational Method
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
5 2.85 4.87 9.95
39 1.09 1.86 3.8
6 2.67 4.56 9.31
40 1.07 1.83 3.74
7 2.52 4.31 8.80
41 1.05 1.80 3.68
8 2.40 4.10 8.38
42 1.04 1.77 3.62
9 2.30 3.93 8.03
43 1.02 1.74 3.56
10 2.21 3.78 7.72
44 1.01 1.72 3.51
11 2.13 3.63 7.42
45 0.99 1.69 3.46
12 2.05 3.50 7.16
46 0.98 1.67 3.41
13 1.98 3.39 6.92
47 0.96 1.64 3.36
14 1.92 3.29 6.71
48 0.95 1.62 3.31
15 1.87 3.19 6.52
49 0.94 1.6 3.27
16 1.81 3.08 6.30
50 0.92 1.58 3.23
17 1.75 2.99 6.10
51 0.91 1.56 3.18
18 1.70 2.90 5.92
52 0.9 1.54 3.14
19 1.65 2.82 5.75
53 0.89 1.52 3.10
20 1.61 2.74 5.60
54 0.88 1.50 3.07
21 1.56 2.67 5.46
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 9
Figure 3.4-1. Rainfall IDF Curve – Fort Collins
Composite C Values
Fort Collins Montessori School
Total Area Minor (2-YR) Major (100-YR)
(acres)
Runoff
Coefficent
Runoff Coefficent
- E1 0.00 0.05 0.24 0.10 1.78 2.17 0.20 0.25
- E2 0.00 0.00 0.00 0.01 2.11 2.12 0.10 0.13
- Site 0.00 0.05 0.24 0.11 3.89 4.29 0.15 0.19
1 P1 0.31 0.10 0.00 0.13 0.39 0.93 0.59 0.74
2 P2 0.00 0.07 0.10 0.22 1.32 1.71 0.27 0.33
3 P3 0.25 0.10 0.00 0.02 0.16 0.53 0.69 0.87
4 P4 0.16 0.02 0.00 0.00 0.32 0.50 0.41 0.51
5 P5 0.00 0.05 0.00 0.04 0.01 0.10 0.87 1.00
- P6 0.00 0.00 0.00 0.00 0.39 0.39 0.10 0.13
- P7 0.00 0.00 0.00 0.00 0.13 0.13 0.10 0.13
Phase I Site 0.72 0.34 0.10 0.41 2.72 4.29 0.40 0.50
Phase II Full Site 1.03 0.37 0.10 0.73 2.06 4.29 0.53 0.66
Notes: Values from Fort Collins Stormwater Criteria Manual Table 3.2-2
Developed
Design Point Basin(s)
Existing
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres)
RJP Rational Method Flow Calculations.xlsx 2/17/2020
Imperviousness
Fort Collins Montessori School
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent
(I = 100) (I = 100) (I = 40) (I = 90) (I = 2) (acres) Imperviousness
- E1 0.00 0.05 0.24 0.10 1.78 2.17 13%
- E2 0.00 0.00 0.00 0.01 2.11 2.12 2%
- Site 0.00 0.05 0.24 0.11 3.89 4.29 8%
1 P1 0.31 0.10 0.00 0.13 0.39 0.93 58%
2 P2 0.00 0.07 0.10 0.22 1.32 1.71 20%
3 P3 0.25 0.10 0.00 0.02 0.16 0.53 70%
4 P4 0.16 0.02 0.00 0.00 0.32 0.50 37%
5 P5 0.00 0.05 0.00 0.04 0.01 0.10 86%
- P6 0.00 0.00 0.00 0.00 0.39 0.39 2%
- P7 0.00 0.00 0.00 0.00 0.13 0.13 2%
Phase I Site 0.72 0.34 0.10 0.41 2.72 4.29 36%
Phase II Full Site 1.03 0.37 0.10 0.73 2.06 4.29 50%
Notes: Values from Fort Collins Stormwater Criteria Manual Table 4.1-3
Developed
Design Point Basin (s)
Existing
RJP Rational Method Flow Calculations.xlsx 2/17/2020
Individual Basin Flow Calculations
Fort Collins Montessori School
Area Minor Major Total Tc
(acres)
Composite
"C"
Composite
"C"
Length
(ft)
Slope
(%)
Minor tov
(min)a
Major tov
(min)a
Length
(ft)
Slope
(%)
Channel
Type
Velocity
(fps)c
tt (min)
Minor TC
(min)
Major TC (min) (min) 2-yr 100-yr 2-yr 100-yr
D1 E1 2.17 0.20 0.25 200 3.00 15.94 15.04 0 0.50 PA 1.41 0.00 15.94 15.04 11.11 2.05 7.16 0.90 3.94
D2 E2 2.12 0.10 0.13 200 3.00 17.70 17.24 0 0.50 PA 1.41 0.00 17.70 17.24 11.11 2.05 7.16 0.45 1.97
D3 Site 4.29 0.15 0.19 200 3.00 16.81 16.12 0 0.50 PA 1.41 0.00 16.81 16.12 11.11 2.05 7.16 1.36 5.92
1 P1 0.93 0.59 0.74 100 2.00 7.27 5.14 100 0.50 GW 1.06 1.5713 8.85 6.71 10.56 2.40 9.31 1.32 6.42
2 P2 1.71 0.27 0.33 210 2.00 17.33 15.93 0 0.50 GW 1.06 0.0000 17.33 15.93 11.17 2.05 7.16 0.94 4.09
3 P3 0.53 0.69 0.87 26 3.00 2.60 1.49 90 0.50 PA 1.41 1.0607 5.00 5.00 10.14 2.85 9.95 1.05 4.57
4 P4 0.50 0.41 0.51 35 2.00 5.90 5.03 130 0.50 PA 1.41 1.5321 7.43 6.57 10.19 2.67 9.95 0.54 2.52
5 P5 0.10 0.87 1.00 10 2.00 1.07 0.45 0 0.50 GW 1.06 0.0000 5.00 5.00 10.06 2.85 9.95 0.25 1.00
- P6 0.39 0.10 0.13 200 2.00 20.31 19.81 0 0.50 GW 1.06 0.0000 20.31 19.81 11.11 2.40 7.16 0.09 0.35
- P7 0.13 0.10 0.13 60 15.00 5.72 5.58 0 0.50 GW 1.06 0.0000 5.72 5.58 10.33 2.85 9.95 0.04 0.16
Phase I Site 4.29 0.40 0.50 100 2.00 10.05 8.61 100 0.50 GW 1.06 1.5713 11.62 10.18 10.56 2.13 7.72 3.66 16.58
Phase II Full Site 4.29 0.53 0.66 100 2.00 8.17 6.26 100 0.50 GW 1.06 1.5713 9.74 7.83 10.56 2.30 8.80 5.24 25.07
Notes:
HM = Heavy Meadow, TF = Tillage/field, PL = Short pasture and lawns, BG = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas
Design
Point
Developed
Existing
Initial/Overland Time Final TC Basin Flows (cfs)
Basin (s)
Travel Time Intensity (in/hr)
RJP Rational Method Flow Calculations.xlsx 2/17/2020
Composite C Values
Fort Collins Montessori School LID
Total Area Minor (2-YR) Major (100-YR)
(acres)
Runoff
Coefficent
Runoff Coefficent
- LID1 0.32 0.08 0.00 0.14 0.18 0.72 0.74 0.92
- LID2 0.27 0.13 0.07 0.38 1.10 1.95 0.45 0.57
- LID4 0.20 0.06 0.00 0.15 0.23 0.64 0.64 0.81
Notes: Values from Fort Collins Stormwater Criteria Manual Table 3.2-2
Design Point Basin(s)
LID
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres)
RJP Rational Method Flow LID Calculations.xlsx 12/12/2019
Imperviousness
Fort Collins Montessori School LID
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent
(I = 100) (I = 100) (I = 40) (I = 90) (I = 2) (acres) Imperviousness
- LID1 0.32 0.08 0.00 0.14 0.18 0.72 74%
- LID2 0.27 0.13 0.07 0.38 1.10 1.95 41%
- LID4 0.20 0.06 0.00 0.15 0.23 0.64 62%
0.25 0.10 0.00 0.07 0.17 0.59 71%
Notes: Values from Fort Collins Stormwater Criteria Manual Table 4.1-3
WQCV1 0.235447872 WQCV1 0.2354479
WQCV2 2.994849 WQCV2 0.1459833
WQCV4 0.200261632 WQCV4 0.194434
V1 0.0169522 738.4398699
V2 0.0284667 1240.011245
V4 0.0124438 542.050838
Design Point Basin (s)
LID
RJP Rational Method Flow LID Calculations.xlsx 12/12/2019
Individual Basin Flow Calculations
Fort Collins Montessori School LID
Area Minor Major Total TC
(acres)
Composite
"C"
Composite
"C"
Length
(ft)
Slope
(%)
Minor tov
(min)a
Major tov
(min)a
Length
(ft)
Slope
(%)
Channel
Type
Velocity
(fps)c
tt (min)
Minor TC
(min)
Major TC (min) (min) 2-yr 100-yr 2-yr 100-yr
- LID1 0.72 0.74 0.92 100 2.00 5.21 2.56 150 0.50 PA 1.41 1.77 6.97 5.00 10.56 1.87 9.95 0.99 6.60
- LID2 1.95 0.45 0.57 100 1.00 11.66 9.61 250 1.00 GW 1.50 2.78 14.43 12.38 10.56 1.98 6.92 1.75 7.66
- LID4 0.64 0.64 0.81 35 2.00 3.87 2.50 130 0.50 PA 1.41 1.53 5.40 5.00 10.19 2.85 9.95 1.18 5.13
Notes:
HM = Heavy Meadow, TF = Tillage/field, PL = Short pasture and lawns, BG = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas
Design
Point
LID
Initial/Overland Time Final TC Basin Flows (cfs)
Basin (s)
Travel Time Intensity (in/hr)
RJP Rational Method Flow LID Calculations.xlsx 12/12/2019
B. Hydraulic Computations
Fort Collins FAA Method
Stage-Storage Sizing for Detention Ponds
Water Quality Capture Volume Calculation
Restrictor Plate Calculation
Outlet Calculations
Spillway Calculation
LID Summary
Stage-Storage Sizing for Rain Gardens
Rain Garden Outlet Pipe Calculations
Rain Garden Storm Pipe Calculations
Equalizer Pipe Calculations
Swale Cross-Section A-A
2' Curb Cut Calculation
SDI Spreadsheet
Project: Fort Collins Montessori School
Basin ID:
Detemination of MAJOR Detention Volume Using FAA Method:
Catchment Drainage Area A= 4.29 acres
Catchment Drainage Imperviousness Ia
= 50 percent
Return Period for Detention Control T= 100 years (2 or 100)
Time of Concentration of Watershed Tc= 8 minutes
NRCS Soil Group Type= B A, B, C, or D
Allowable Unit Release Rate q= 0.32 cfs/acre
Runoff Coefficient C= 0.66
Inflow Peak Runoff Qp-in= 28.35 cfs
Allowable Peak Outflow Rate Qp-out= 1.37 cfs
Modified FAA Major Storage Volume= 27,626 cubic feet
Rainfall Rainfall Inflow Outflow Storage
Duration Intensity Volume Volume Volume
minutes inches / hr cubic feet cubic feet cubic feet
(input) (output) (output) (output) (output)
0 0.00 0 0 0
5 9.95 8,452 412 8,040
10 7.72 13,115 824 12,291
15 6.52 16,615 1,236 15,379
20 5.60 19,027 1,647 17,380
25 4.98 21,151 2,059 19,091
30 4.52 23,036 2,471 20,565
35 4.08 24,259 2,883 21,377
40 3.74 25,415 3,295 22,120
45 3.46 26,451 3,707 22,744
50 3.23 27,436 4,118 23,318
55 3.03 28,311 4,530 23,781
60 2.86 29,152 4,942 24,210
65 2.71 29,925 5,354 24,571
70 2.59 30,800 5,766 25,034
75 2.48 31,598 6,178 25,421
80 2.38 32,346 6,589 25,756
85 2.29 33,068 7,001 26,067
90 2.21 33,790 7,413 26,377
95 2.13 34,376 7,825 26,551
100 2.06 34,996 8,237 26,759
105 2.00 35,676 8,649 27,027
110 1.94 36,253 9,060 27,193
115 1.88 36,729 9,472 27,257
120 1.84 37,510 9,884 27,626
City of Fort Collins FAA Method
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5083.60 (input) 0 0.000 0.000
5084.00 0.00 0.00 263 53 0.006 0.001
5084.50 0.00 0.00 856 332 0.020 0.008
5085.00 0.00 0.00 1,353 885 0.031 0.020
5085.50 0.00 0.00 1,837 1,682 0.042 0.039
5086.00 0.00 0.00 2,348 2,728 0.054 0.063
5086.50 0.00 0.00 2,883 4,036 0.066 0.093
5087.00 0.00 0.00 3,444 5,618 0.079 0.129
5087.50 0.00 0.00 4,029 7,486 0.092 0.172
5088.00 0.00 0.00 4,640 9,653 0.107 0.222
5088.50 0.00 0.00 5,275 12,132 0.121 0.279
5088.60 0.00 0.00 5,405 12,666 0.124 0.291 100-YR
5089.10 0.00 0.00 5,070 15,285 0.116 0.351
5089.60 0.00 0.00 6,770 18,245 0.155 0.419
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 1
Detention Pond 1_v2.35.xls, Basin 10/14/2019, 4:57 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5086.10 (input) 0 0.000 0.000
5086.50 0.00 0.00 95 19 0.002 0.000
5087.00 0.00 0.00 190 90 0.004 0.002
5087.50 0.00 0.00 560 278 0.013 0.006
5088.00 0.00 0.00 924 649 0.021 0.015
5088.50 0.00 0.00 1,321 1,210 0.030 0.028
5088.60 0.00 0.00 1,404 1,346 0.032 0.031 100-YR
5089.10 0.00 0.00 1,837 2,157 0.042 0.050
5089.60 0.00 0.00 2,300 3,191 0.053 0.073
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 2
Detention Pond 2_v2.35.xls, Basin 10/14/2019, 4:01 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5084.95 (input) 0 0.000 0.000
5085.00 0.00 0.00 31 1 0.001 0.000
5085.50 0.00 0.00 374 102 0.009 0.002
5086.00 0.00 0.00 815 399 0.019 0.009
5086.50 0.00 0.00 1,249 915 0.029 0.021
5087.00 0.00 0.00 1,718 1,657 0.039 0.038
5087.50 0.00 0.00 2,220 2,642 0.051 0.061
5088.00 0.00 0.00 2,755 3,885 0.063 0.089
5088.60 0.00 0.00 3,442 5,744 0.079 0.132 100-YR
5089.60 0.00 0.00 4,676 9,803 0.107 0.225
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 3
Detention Pond 3_v2.35.xls, Basin 10/14/2019, 4:02 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5086.30 (input) 0 0.000 0.000
5087.00 0.00 0.00 1,397 489 0.032 0.011
5087.50 0.00 0.00 3,719 1,768 0.085 0.041
5088.00 0.00 0.00 7,272 4,516 0.167 0.104
5088.60 0.00 0.00 8,482 9,242 0.195 0.212 100-YR
5089.60 0.00 0.00 16,654 21,810 0.382 0.501
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond 4
Detention Pond 4_v2.35.xls, Basin 12/12/2019, 3:16 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
0.00 5083.60 (input) 0 0.000 0.000
0.40 5084.00 0.00 0.00 263 53 0.006 0.001
0.90 5084.50 0.00 0.00 856 332 0.020 0.008
1.40 5085.00 0.00 0.00 1,384 892 0.032 0.020 WQCV
1.90 5085.50 0.00 0.00 2,211 1,791 0.051 0.041
2.40 5086.00 0.00 0.00 3,163 3,135 0.073 0.072
2.90 5086.50 0.00 0.00 4,227 4,982 0.097 0.114
3.40 5087.00 0.00 0.00 6,749 7,726 0.155 0.177
3.90 5087.50 0.00 0.00 10,528 12,045 0.242 0.277
4.40 5088.00 0.00 0.00 15,591 18,575 0.358 0.426
5.00 5088.60 0.00 0.00 18,733 28,872 0.430 0.663 100-YR
5.50 5089.10 0.00 0.00 21,373 38,899 0.491 0.893
6.00 5089.60 0.00 0.00 30,400 51,842 0.698 1.190
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, Basin 2/17/2020, 2:48 PM
Project:
Basin ID:
WQCV Design Volume (Input):
Catchment Imperviousness, Ia = 70.0 percent
Catchment Area, A = 0.53 acres Diameter of holes, D = 1.000 inches
Depth at WQCV outlet above lowest perforation, H = 1 feet Number of holes per row, N = 1
Vertical distance between rows, h = 12.00 inches OR
Number of rows, NL = 1.00
Orifice discharge coefficient, Co = 0.60 Height of slot, H = inches
Slope of Basin Trickle Channel, S = 0.010 ft / ft Width of slot, W = inches
Time to Drain the Pond = 40 hours
Watershed Design Information (Input): 1
Percent Soil Type A = 0 %
Percent Soil Type B = 100 %
Percent Soil Type C/D = 0 %
Outlet Design Information (Output):
Water Quality Capture Volume, WQCV = 0.311 watershed inches
Water Quality Capture Volume (WQCV) = 0.014 acre-feet 0.00
Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.016 acre-feet
Outlet area per row, Ao = 0.17 square inches
Total opening area at each row based on user-input above, Ao = 0.79 square inches
Total opening area at each row based on user-input above, Ao = 0.005 square feet
3
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 ΣΣΣΣ
5083.60 Flow
5083.60 0.0000 0.00
5084.00 0.0166 0.02
5084.50 0.0249 0.02
5085.00 0.0362 0.04
5085.50 0.0407 0.04
5086.00 0.0407 0.04
5086.50 0.0447 0.04
5087.00 0.0484 0.05
5087.50 0.0519 0.05
5088.00 0.0551 0.06
5088.60 0.0587 0.06
5089.60 0.0643 0.06
Central Elevations of Rows of Holes in feet
Collection Capacity for Each Row of Holes in cfs
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET
Fort Collins Montessori School
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, WQCV 2/17/2020, 2:48 PM
Project:
Basin ID:
X
1
#1 Vertical #2 Vertical
Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice
Water Surface Elevation at Design Depth Elev: WS = 5,088.60 feet
Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 5,083.60 feet
Required Peak Flow through Orifice at Design Depth Q = 1.36 cfs
Pipe/Vertical Orifice Diameter (inches) Dia = 12.0 inches
Orifice Coefficient Co = 0.60
Full-flow Capacity (Calculated)
Full-flow area Af = 0.79 sq ft
Half Central Angle in Radians Theta = 3.14 rad
Full-flow capacity Qf = 8.0 cfs
Percent of Design Flow = 590%
Calculation of Orifice Flow Condition
Half Central Angle (0<Theta<3.1416) Theta = 0.98 rad
Flow area Ao = 0.13 sq ft
Top width of Orifice (inches) To = 9.94 inches
Height from Invert of Orifice to Bottom of Plate (feet) Yo = 0.22 feet
Elevation of Bottom of Plate Elev Plate Bottom Edge = 5,083.82 feet
Resultant Peak Flow Through Orifice at Design Depth Qo = 1.4 cfs
Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.59 feet
Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = 5,083.71 feet
Fort Collins Montessori School
Detention Pond System
RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES
Detention Pond Outlet Design File_v2.35.xls, Restrictor Plate 2/17/2020, 2:49 PM
Project:
Basin ID:
Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert.
Circular Opening: Diameter in Inches Dia. = inches
OR
Rectangular Opening: Width in Feet W = 3.00 0.68 ft.
Length (Height for Vertical) L or H = 3.00 0.19 ft.
Percentage of Open Area After Trash Rack Reduction % open = 50 100 %
Orifice Coefficient Co
= 0.67 0.60
Weir Coefficient Cw
= 3.00
Orifice Elevation (Bottom for Vertical) Eo
= 5086.00 5,083.60 ft.
Calculation of Collection Capacity:
Net Opening Area (after Trash Rack Reduction) Ao
= 4.50 0.13 sq. ft.
OPTIONAL: User-Overide Net Opening Area Ao
= sq. ft.
Perimeter as Weir Length Lw
= 9.00 ft.
OPTIONAL: User-Overide Weir Length Lw
= ft.
Top Elevation of Vertical Orifice Opening, Top = 5083.79 ft.
Center Elevation of Vertical Orifice Opening, Cen = 5083.70 ft.
Horizontal Orifices Vertical Orifices
Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes
for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor,
& Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage
W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes
(input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek)
5083.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5084.00 0.02 0.00 0.00 0.00 0.00 0.35 0.00 0.02
5084.50 0.02 0.00 0.00 0.00 0.00 0.56 0.00 0.02
5085.00 0.04 0.00 0.00 0.00 0.00 0.72 0.00 0.04 WQCV
5085.50 0.04 0.00 0.00 0.00 0.00 0.84 0.00 0.04
5086.00 0.04 0.00 0.00 0.00 0.00 0.95 0.00 0.04
5086.50 0.04 9.55 17.11 0.00 0.00 1.05 0.00 1.05
5087.00 0.05 27.00 24.20 0.00 0.00 1.14 0.00 1.14
5087.50 0.05 49.60 29.63 0.00 0.00 1.22 0.00 1.22
5088.00 0.06 76.37 34.22 0.00 0.00 1.30 0.00 1.30
5088.60 0.06 113.19 39.01 0.00 0.00 1.39 0.00 1.39 100-Year
5089.10 0.06 147.37 42.60 0.00 0.00 1.46 0.00 1.46
5089.60 #N/A 184.42 45.91 0.00 0.00 1.52 0.00 #N/A
Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be
applied to culvert sheet (#2 vertical & horizontal openings is not used).
STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Fort Collins Montessori School
Detention Pond System
Current Routing Order is #3
W.S. EL. WQ
W.S. EL. Minor
W.S. EL. Major
WQ
H1
H2
V1 V2
Routing Order #1 (Standard)
V1
W.S. EL. WQ
Project:
Basin ID:
Design Information (input):
Bottom Length of Weir L = 27.00 feet
Angle of Side Slope Weir Angle = 45.00 degrees
Elev. for Weir Crest EL. Crest = 5,088.60 feet
Coef. for Rectangular Weir Cw = 2.60
Coef. for Trapezoidal Weir Ct = 2.20
Calculation of Spillway Capacity (output):
Water Rect. Triangle Total Total
Surface Weir Weir Spillway Pond
Elevation Flowrate Flowrate Release Release
ft. cfs cfs cfs cfs
(linked) (output) (output) (output) (output)
5083.60 0.00 0.00 0.00 0.00
5084.00 0.00 0.00 0.00 0.00
5084.50 0.00 0.00 0.00 0.00
5085.00 0.00 0.00 0.00 0.00
5085.50 0.00 0.00 0.00 0.00
5086.00 0.00 0.00 0.00 0.00
5086.50 0.00 0.00 0.00 0.00
5087.00 0.00 0.00 0.00 0.00
5087.50 0.00 0.00 0.00 0.00
5088.00 0.00 0.00 0.00 0.00
5088.60 0.00 0.00 0.00 0.00
5089.10 24.82 0.39 25.21 25.21
5089.60 70.20 2.20 72.40 72.40
STAGE-DISCHARGE SIZING OF THE SPILLWAY
Fort Collins Montessori School
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, Spillway 3/5/2020, 1:54 PM
LID REQUIREMENTS
TOTAL IMPERVIOUS AREA ON SITE 93,654 SQ FT
REQUIRED TREATMENT AREA (75%) 70,240 SQ FT
TOTAL IMPERVIOUS AREA TREATED BY
LID
75,358 SQ FT
(80%)
BASIN SUMMARY
BASIN
1
BASIN
2
BASIN
3
BASIN
4
AREA (ACRES) 0.72 1.95 0.59 0.64
IMPERVIOUS AREA (ACRES) 0.54 0.78 0.42 0.41
PERCENT IMPERVIOUS (%) 74 41 71 62
PERCENT OF IMPERVIOUS AREA (%) 25.1 36.3 19.5 19.1
REQUIRED WQCV (INCHES) 0.235 0.146 - 0.194
LID VOLUME REQUIRED (CU. FT.) 738 1,240 697 542
LID VOLUME PROVIDED (CU. FT.) 774 1,332 892 704
REQUIRED FLAT AREA (SQ. FT) 464 697 - 346
PROVIDED FLAT AREA (SQ. FT) 508 1,190 - 350
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5088.30 (input) 470 0.011 0.000
5088.50 0.00 0.00 630 110 0.014 0.003
5088.75 0.00 0.00 837 293 0.019 0.007
5089.00 0.00 0.00 1,052 529 0.024 0.012
5089.30 0.00 0.00 1,320 885 0.030 0.020 Grate
5089.50 0.00 0.00 1,504 1,168 0.035 0.027
5089.75 0.00 0.00 1,742 1,573 0.040 0.036
5090.00 0.00 0.00 1,987 2,040 0.046 0.047
5090.30 0.00 0.00 2,291 2,681 0.053 0.062 Top of RG
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Rain Garden 1
Rain Garden 1_v2.35.xls, Basin 2/17/2020, 2:52 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5090.25 (input) 1,038 0.024 0.000
5090.50 0.00 0.00 1,306 293 0.030 0.007
5090.75 0.00 0.00 1,623 659 0.037 0.015
5091.00 0.00 0.00 2,002 1,112 0.046 0.026
5091.25 0.00 0.00 2,101 1,625 0.048 0.037 Spillway
5091.50 0.00 0.00 2,196 2,162 0.050 0.050
5091.75 0.00 0.00 2,312 2,726 0.053 0.063 Top of RG
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Rain Garden 2
Rain Garden 2_v2.35.xls, Basin 2/17/2020, 2:53 PM
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.09 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
5088.25 (input) 350 0.008 0.000
5088.50 0.00 0.00 528 110 0.012 0.003
5088.75 0.00 0.00 706 264 0.016 0.006
5089.00 0.00 0.00 880 462 0.020 0.011
5089.25 0.00 0.00 1,053 704 0.024 0.016 Grate
5089.50 0.00 0.00 1,223 988 0.028 0.023
5089.75 0.00 0.00 1,391 1,315 0.032 0.030
5090.00 0.00 0.00 1,558 1,684 0.036 0.039
5090.25 0.00 0.00 1,661 2,086 0.038 0.048 Top of RG
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Rain Garden 3
Rain Garden 3_v2.35.xls, Basin 3/5/2020, 2:05 PM
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Mar 4 2020
Rain Garden 1-18 Inch PCV
Circular
Diameter (ft) = 1.50
Invert Elev (ft) = 5084.63
Slope (%) = 1.20
N-Value = 0.013
Calculations
Compute by: Known Q
Known Q (cfs) = 6.42
Highlighted
Depth (ft) = 0.80
Q (cfs) = 6.420
Area (sqft) = 0.96
Velocity (ft/s) = 6.68
Wetted Perim (ft) = 2.46
Crit Depth, Yc (ft) = 0.98
Top Width (ft) = 1.50
EGL (ft) = 1.49
0 1 2 3 4
Elev (ft) D
Section
5084.00 -0.
5084.50 -0.
5085.00 0.3
5085.50 0.8
5086.00 1.3
5086.50 1.8
5087.00 2.3
Reach (ft)
Project:
Basin ID:
Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert.
Circular Opening: Diameter in Inches Dia. = inches
OR
Rectangular Opening: Width in Feet W = 3.00 1.23 ft.
Length (Height for Vertical) L or H = 3.00 1.40 ft.
Percentage of Open Area After Trash Rack Reduction % open = 50 100 %
Orifice Coefficient Co
= 0.67 0.60
Weir Coefficient Cw
= 3.00
Orifice Elevation (Bottom for Vertical) Eo
= 5089.30 5,087.04 ft.
Calculation of Collection Capacity:
Net Opening Area (after Trash Rack Reduction) Ao
= 4.50 1.72 sq. ft.
OPTIONAL: User-Overide Net Opening Area Ao
= sq. ft.
Perimeter as Weir Length Lw
= 9.00 ft.
OPTIONAL: User-Overide Weir Length Lw
= ft.
Top Elevation of Vertical Orifice Opening, Top = 5088.44 ft.
Center Elevation of Vertical Orifice Opening, Cen = 5087.74 ft.
Horizontal Orifices Vertical Orifices
Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes
for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor,
& Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage
W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes
(input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek)
5088.30 0.00 0.00 0.00 0.00 0.00 5.92 0.00 0.00
5088.50 0.00 0.00 0.00 0.00 0.00 7.22 0.00 0.00
5088.75 0.00 0.00 0.00 0.00 0.00 8.32 0.00 0.00
5089.00 0.00 0.00 0.00 0.00 0.00 9.30 0.00 0.00
5089.30 0.00 0.00 0.00 0.00 0.00 10.34 0.00 0.00 WQCV
5089.50 0.00 2.41 10.82 0.00 0.00 10.99 0.00 2.41
5089.75 0.00 8.15 16.23 0.00 0.00 11.74 0.00 8.15
5090.00 0.00 15.81 20.24 0.00 0.00 12.45 0.00 12.45
5090.30 0.00 27.00 24.20 0.00 0.00 13.25 0.00 13.25 Top of RG
Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be
applied to culvert sheet (#2 vertical & horizontal openings is not used).
STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Fort Collins Montessori School
Rain Garden 1
Current Routing Order is #3
W.S. EL. WQ
W.S. EL. Minor
W.S. EL. Major
WQ
H1
H2
V1 V2
Routing Order #1 (Standard)
V1
W.S. EL. WQ
W.S. EL. Design Storm
WQ
H1
Routing Order #3 (Single Stage) Routing Order #4
Project:
Basin ID:
Design Information (input):
Bottom Length of Weir L = 20.00 feet
Angle of Side Slope Weir Angle = 45.00 degrees
Elev. for Weir Crest EL. Crest = 5,091.25 feet
Coef. for Rectangular Weir Cw = 2.50
Coef. for Trapezoidal Weir Ct = 2.20
Calculation of Spillway Capacity (output):
Water Rect. Triangle Total Total
Surface Weir Weir Spillway Pond
Elevation Flowrate Flowrate Release Release
ft. cfs cfs cfs cfs
(linked) (output) (output) (output) (output)
5090.25 0.00 0.00 0.00 0.00
5090.50 0.00 0.00 0.00 0.00
5090.75 0.00 0.00 0.00 0.00
5091.00 0.00 0.00 0.00 0.00
5091.25 0.00 0.00 0.00 0.00
5091.50 6.25 0.07 6.32 6.32
5091.75 17.68 0.39 18.07 18.07
STAGE-DISCHARGE SIZING OF THE SPILLWAY
Fort Collins Montessori School
Rain Garden 2
Rain Garden 2_v2.35.xls, Spillway 2/17/2020, 2:54 PM
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Feb 17 2020
Rain Garden 3-18 Inch PCV
Circular
Diameter (ft) = 1.50
Invert Elev (ft) = 5085.74
Slope (%) = 0.40
N-Value = 0.013
Calculations
Compute by: Known Q
Known Q (cfs) = 5.13
Highlighted
Depth (ft) = 0.99
Q (cfs) = 5.130
Area (sqft) = 1.24
Velocity (ft/s) = 4.13
Wetted Perim (ft) = 2.85
Crit Depth, Yc (ft) = 0.87
Top Width (ft) = 1.42
EGL (ft) = 1.26
0 1 2 3 4
Elev (ft) D
Section
5085.00 -0.
5085.50 -0.
5086.00 0.2
5086.50 0.7
5087.00 1.2
5087.50 1.7
5088.00 2.2
Reach (ft)
Project:
Basin ID:
Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert.
Circular Opening: Diameter in Inches Dia. = inches
OR
Rectangular Opening: Width in Feet W = 3.00 1.19 ft.
Length (Height for Vertical) L or H = 3.00 1.48 ft.
Percentage of Open Area After Trash Rack Reduction % open = 50 100 %
Orifice Coefficient Co
= 0.67 0.60
Weir Coefficient Cw
= 3.00
Orifice Elevation (Bottom for Vertical) Eo
= 5089.25 5,085.91 ft.
Calculation of Collection Capacity:
Net Opening Area (after Trash Rack Reduction) Ao
= 4.50 1.76 sq. ft.
OPTIONAL: User-Overide Net Opening Area Ao
= sq. ft.
Perimeter as Weir Length Lw
= 9.00 ft.
OPTIONAL: User-Overide Weir Length Lw
= ft.
Top Elevation of Vertical Orifice Opening, Top = 5087.39 ft.
Center Elevation of Vertical Orifice Opening, Cen = 5086.65 ft.
Horizontal Orifices Vertical Orifices
Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes
for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor,
& Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage
W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes
(input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek)
5088.25 0.00 0.00 0.00 0.00 0.00 10.72 0.00 0.00
5088.50 0.00 0.00 0.00 0.00 0.00 11.53 0.00 0.00
5088.75 0.00 0.00 0.00 0.00 0.00 12.28 0.00 0.00
5089.00 0.00 0.00 0.00 0.00 0.00 12.99 0.00 0.00
5089.25 0.00 0.00 0.00 0.00 0.00 13.66 0.00 0.00 Grate
5089.50 0.00 3.38 12.10 0.00 0.00 14.31 0.00 3.38
5089.75 0.00 9.55 17.11 0.00 0.00 14.92 0.00 9.55
5090.00 0.00 17.54 20.95 0.00 0.00 15.51 0.00 15.51
5090.25 0.00 27.00 24.20 0.00 0.00 16.08 0.00 16.08 Top of RG
Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be
applied to culvert sheet (#2 vertical & horizontal openings is not used).
STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Fort Collins Montessori School
Rain Garden 3
Current Routing Order is #3
W.S. EL. WQ
W.S. EL. Minor
W.S. EL. Major
WQ
H1
H2
V1 V2
Routing Order #1 (Standard)
V1
W.S. EL. WQ
W.S. EL. Design Storm
WQ
H1
Routing Order #3 (Single Stage) Routing Order #4
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Feb 12 2020
Equalizer Pipe-Dentention Pond 2 to Detention Pond 1
Invert Elev Dn (ft) = 5083.62
Pipe Length (ft) = 66.00
Slope (%) = 3.91
Invert Elev Up (ft) = 5086.20
Rise (in) = 24.0
Shape = Circular
Span (in) = 24.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5090.10
Top Width (ft) = 24.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 6.42
Qmax (cfs) = 6.42
Tailwater Elev (ft) = 5088.6
Highlighted
Qtotal (cfs) = 6.42
Qpipe (cfs) = 6.42
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 2.04
Veloc Up (ft/s) = 2.04
HGL Dn (ft) = 5088.60
HGL Up (ft) = 5088.65
Hw Elev (ft) = 5088.73
Hw/D (ft) = 1.27
Flow Regime = Outlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Feb 12 2020
Equalizer Pipe-Detention Pond 3 to Detnetion Pond 1
Invert Elev Dn (ft) = 5084.60
Pipe Length (ft) = 83.00
Slope (%) = 0.40
Invert Elev Up (ft) = 5084.93
Rise (in) = 18.0
Shape = Circular
Span (in) = 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5090.86
Top Width (ft) = 25.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 2.52
Qmax (cfs) = 2.52
Tailwater Elev (ft) = 5088.6
Highlighted
Qtotal (cfs) = 2.52
Qpipe (cfs) = 2.52
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 1.43
Veloc Up (ft/s) = 1.43
HGL Dn (ft) = 5088.60
HGL Up (ft) = 5088.65
Hw Elev (ft) = 5088.69
Hw/D (ft) = 2.50
Flow Regime = Outlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Feb 12 2020
Equalizer Pipe-Detention Pond 4 to Detention Pond 1
Invert Elev Dn (ft) = 5084.61
Pipe Length (ft) = 440.00
Slope (%) = 0.40
Invert Elev Up (ft) = 5086.36
Rise (in) = 18.0
Shape = Circular
Span (in) = 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5089.60
Top Width (ft) = 100.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 4.09
Qmax (cfs) = 4.09
Tailwater Elev (ft) = 5088.6
Highlighted
Qtotal (cfs) = 4.09
Qpipe (cfs) = 4.09
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 2.31
Veloc Up (ft/s) = 2.31
HGL Dn (ft) = 5088.60
HGL Up (ft) = 5089.27
Hw Elev (ft) = 5089.37
Hw/D (ft) = 2.01
Flow Regime = Outlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Feb 18 2020
Equalizer Pipe-Dentention Pond 1 to Spillway
Invert Elev Dn (ft) = 5086.20
Pipe Length (ft) = 66.00
Slope (%) = -3.91
Invert Elev Up (ft) = 5083.62
Rise (in) = 24.0
Shape = Circular
Span (in) = 24.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5090.10
Top Width (ft) = 40.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 18.65
Qmax (cfs) = 18.65
Tailwater Elev (ft) = 5088.6
Highlighted
Qtotal (cfs) = 18.65
Qpipe (cfs) = 18.65
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 5.94
Veloc Up (ft/s) = 5.94
HGL Dn (ft) = 5088.60
HGL Up (ft) = 5089.05
Hw Elev (ft) = 5089.71
Hw/D (ft) = 3.04
Flow Regime = Outlet Control
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Dec 12 2019
Western Swale Cross Section A-A
Triangular
Side Slopes (z:1) = 12.00, 6.00
Total Depth (ft) = 1.50
Invert Elev (ft) = 5090.72
Slope (%) = 1.00
N-Value = 0.030
Calculations
Compute by: Known Q
Known Q (cfs) = 4.28
Highlighted
Depth (ft) = 0.50
Q (cfs) = 4.280
Area (sqft) = 2.25
Velocity (ft/s) = 1.90
Wetted Perim (ft) = 9.06
Crit Depth, Yc (ft) = 0.43
Top Width (ft) = 9.00
EGL (ft) = 0.56
0 5 10 15 20 25 30 35 40
Elev (ft) Depth (ft)
Section
5090.00 -0.72
5090.50 -0.22
5091.00 0.28
5091.50 0.78
5092.00 1.28
5092.50 1.78
5093.00 2.28
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Feb 17 2020
2 Foot Curb Cut
Rectangular
Bottom Width (ft) = 2.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 5090.38
Slope (%) = 3.00
N-Value = 0.013
Calculations
Compute by: Known Q
Known Q (cfs) = 2.52
Highlighted
Depth (ft) = 0.21
Q (cfs) = 2.520
Area (sqft) = 0.42
Velocity (ft/s) = 6.00
Wetted Perim (ft) = 2.42
Crit Depth, Yc (ft) = 0.37
Top Width (ft) = 2.00
EGL (ft) = 0.77
0 .5 1 1.5 2 2.5 3
Elev (ft) Depth (ft)
Section
5090.00 -0.38
5090.25 -0.13
5090.50 0.12
5090.75 0.37
5091.00 0.62
Reach (ft)
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope = 0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]
Watershed Length = 500 ft 0.00 0 0.00 0.00
Watershed Area = 4.29 acres 0.40 263 0.40 0.02
Watershed Imperviousness = 50.0% percent 0.90 856 0.90 0.02
Percentage Hydrologic Soil Group A = 0.0% percent 1.40 1,384 1.40 0.06
Percentage Hydrologic Soil Group B = 100.0% percent 1.90 2,211 1.90 0.07
Percentage Hydrologic Soil Groups C/D = 0.0% percent 2.40 3,163 2.40 0.07
2.90 4,227 2.90 1.05
User Input 17 3.40 6,749 3.40 1.14
3.90 10,528 3.90 1.22
4.40 15,591 4.40 1.30
5.00 18,733 5.00 1.39
WQCV Treatment Method = 40.00 hours 5.50 21,373 5.50 1.46
6.00 30,400 6.00 1.46
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period = WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth = 0.75 0.87 1.14 1.44 2.44 3.00 in
Calculated Runoff Volume = 0.074 0.135 0.192 0.281 0.618 0.824 acre-ft
OPTIONAL Override Runoff Volume = acre-ft
Inflow Hydrograph Volume = 0.073 0.135 0.191 0.281 0.617 0.823 acre-ft
Time to Drain 97% of Inflow Volume = 17.2 18.0 17.3 16.5 16.3 16.8 hours
Time to Drain 99% of Inflow Volume = 18.0 19.7 19.6 19.8 20.8 21.4 hours
Maximum Ponding Depth = 2.29 2.73 3.01 3.49 4.55 5.01 ft
Maximum Ponded Area = 0.07 0.09 0.11 0.17 0.38 0.43 acres
Maximum Volume Stored = 0.064 0.098 0.125 0.191 0.479 0.667 acre-ft
Stormwater Detention and Infiltration Design Data Sheet
Fort Collins Montessori School
1109 West Harmony Road, Fort Collins Colorado, 80526
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
SDI_Design_Data_v1.08.xlsm, Design Data 12/17/2019, 11:27 AM
WQCV_Trigger = 1
RunOnce= 1
CountA= 1
Draintime Coeff= 1.0
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Stormwater Detention and Infiltration Design Data Sheet
Area
Discharge
0
2
4
6
8
10
12
14
16
18
0.1 1 10
FLOW [cfs]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
0.1 1 10 100
PONDING DEPTH [ft]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
SDI_Design_Data_v1.08.xlsm, Design Data 12/17/2019, 11:27 AM
C. Map Pocket
Drainage Plan
LID Plan
Outlet Structure Detail
DROP THRU
DROP
THRU OFF
OFF
THRU
N
UTILITY PLANS FOR
FORT COLLINS MONTESSORI SCHOOL
ENGINEERING & SURVEYING
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
[P] 970-622-2095 [F] 970-461-4469 LOT 1, MONTESSORI SUBDIVSION
NE1
4 OF SECTION 3, T6N, R69W, 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
DWG. NAME
17
NO. REVISION DATE
SHEET NO.
OF
PROJECT:
DATE:
DESIGNER:
DRAFTER:
CHECKED BY:
APPROVED BY:
2259.03
12/13/2019
RJP
RJP
TGR
TGR
NOT FOR CONSTRUCTION
PRELIMINARY
Know what's below.
Call before you dig.
R
BENCHMARK STATEMENT
LEGEND:
DRAINAGE & EROSION CONTROL PLAN
C-12
12
PROPOSED BASIN FLOWS
EROSION BMP LEGEND
DETENTION SUMMARY
& REMOVAL OF BMP'S
SEQUENCE FOR INSTALLATION
EXISTING BASIN FLOWS
NOTE
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
DROP THRU
DROP
THRU OFF
OFF
THRU
N
UTILITY PLANS FOR
FORT COLLINS MONTESSORI SCHOOL
ENGINEERING & SURVEYING
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
[P] 970-622-2095 [F] 970-461-4469 LOT 1, MONTESSORI SUBDIVSION
NE1
4 OF SECTION 3, T6N, R69W, 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
DWG. NAME
17
NO. REVISION DATE
SHEET NO.
OF
PROJECT:
DATE:
DESIGNER:
DRAFTER:
CHECKED BY:
APPROVED BY:
2259.03
12/13/2019
RJP
RJP
TGR
TGR
NOT FOR CONSTRUCTION
PRELIMINARY
Know what's below.
Call before you dig.
R
BENCHMARK STATEMENT
LEGEND:
LID PLAN
C-13
13
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
C C
A
A
B
B
SECTION C-C
SECTION A-A SECTION B-B
WELL SCREEN FLOW CONTROL PLATE
PLAN
GENERAL NOTES
SECTION D-D
D
D
A A
ABBREVIATIONS
LEGEND
UTILITY PLANS FOR
FORT COLLINS MONTESSORI SCHOOL
ENGINEERING & SURVEYING
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
[P] 970-622-2095 [F] 970-461-4469 LOT 1, MONTESSORI SUBDIVSION
NE1
4 OF SECTION 3, T6N, R69W, 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
DWG. NAME
17
NO. REVISION DATE
SHEET NO.
OF
PROJECT:
DATE:
DESIGNER:
DRAFTER:
CHECKED BY:
APPROVED BY:
2259.03
12/13/2019
RJP
RJP
TGR
TGR
NOT FOR CONSTRUCTION
PRELIMINARY
DETAIL SHEET 4
C-17
17
FLOW
PROFILE VIEW
PLAN VIEW
FOREBAY RAIN GARDEN
FLOW
NOTES:
1) DEPTH IN SEDIMENT FOREBAY/PRETREATMENT BASIN SHALL BE A MINIMUM OF 0.1' FEET AND A
MAXIMUM OF 0.5' FEET.
2) SIDE SLOPES OF OF FACILITY SHALL NOT EXCEED 4:1.
3) 6" CONCRETE WALL TO EXTEND AROUND THE ENTIRE PERIMETER OF THE FOREBAY.
V2
V1
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ
W.S. EL. Emergency Spillway
Emergency Overflow into Pipe- H2
V2
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ V1
Routing Order #2
Rain Garden 3_v2.35.xls, Outlet 2/17/2020, 2:59 PM
V2
V1
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ
W.S. EL. Emergency Spillway
Emergency Overflow into Pipe- H2
V2
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ V1
Routing Order #2
Rain Garden 1_v2.35.xls, Outlet 2/17/2020, 2:51 PM
W.S. EL. Design Storm
WQ
H1
Routing Order #3 (Single Stage) Routing Order #4
V2
V1
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ
W.S. EL. Emergency Spillway
Emergency Overflow into Pipe- H2
V2
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ V1
Routing Order #2
Detention Pond Outlet Design File_v2.35.xls, Outlet 2/17/2020, 2:49 PM
55 0.87 1.48 3.03
22 1.53 2.61 5.32
56 0.86 1.47 2.99
23 1.49 2.55 5.20
57 0.85 1.45 2.96
24 1.46 2.49 5.09
58 0.84 1.43 2.92
25 1.43 2.44 4.98
59 0.83 1.42 2.89
26 1.4 2.39 4.87
60 0.82 1.4 2.86
27 1.37 2.34 4.78
65 0.78 1.32 2.71
28 1.34 2.29 4.69
70 0.73 1.25 2.59
29 1.32 2.25 4.60
75 0.70 1.19 2.48
30 1.30 2.21 4.52
80 0.66 1.14 2.38
31 1.27 2.16 4.42
85 0.64 1.09 2.29
32 1.24 2.12 4.33
90 0.61 1.05 2.21
33 1.22 2.08 4.24
95 0.58 1.01 2.13
34 1.19 2.04 4.16
100 0.56 0.97 2.06
35 1.17 2.00 4.08
105 0.54 0.94 2.00
36 1.15 1.96 4.01
110 0.52 0.91 1.94
37 1.16 1.93 3.93
115 0.51 0.88 1.88
38 1.11 1.89 3.87
120 0.49 0.86 1.84
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 13, Sep 10, 2018
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/28/2019
Page 2 of 3