Loading...
HomeMy WebLinkAboutMOSAIC CONDOS - PDP200003 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSEast Larimer County Water District 232 South Link Lane, P.O. Box 2044 • Fort Collins, Colorado 80522 Phone (970) 493-2044 • Fax (970) 493-1801 • www.elcowater.org S:\_Project_Files\Development\_Active Projects\East Ridge 5th Filing\Docs\PDP\2020-2-13 1st Round\2020-2-25 East Ridge 5th Filing PDP 1st Review.doc 25 February 2020 Via Email: bbethuremharras@fcgov.com Brandy Bethurem Harras City of Ft. Collins Planning and Development Review P.O. Box 580 Ft. Collins, CO 80522-0580 RE: Project: PDP 200003 East Ridge Fifth Filing (Mosaic Condos) – First Round Review The East Larimer County Water District (District) staff has reviewed the material delivered to the District for the proposed project referenced above and has the following comments: 1. Utility Plans: Redlines concerning the proposed waterlines are attached. 2. Easements: Where water lines are located within private drives easements must be dedicated to the District, minimum width of 30-ft. 3. Dry Utility Locations: No dry utilities are shown on the current plans. The District requests these be shown on future plans to verify there is adequate space in the private roads to provide minimum 10-ft horizontal separation between District water lines and parallel dry utilities. 4. Water Service Line Sizing: The developer’s engineer is responsible for properly sizing the water service lines and meters and noting those sizes on the final development plans. 5. Fireline Sizing: The developer’s engineer is responsible for properly sizing firelines, as required by the fire authority to serve the buildings, and noting those sizes on the final development plans. 6. Water Line Drawing on Final Development Plans (FDP): For the FDP submittal all water lines must have plan and profile drawings at plan scale 1 inch = 40 feet. 7. Water Rights: The developer is encouraged to contact the District General Manager to begin discussions on raw water dedication for the project. Any written agreements required to complete waterline connections to the property must be completed prior to final approval of the project construction drawings. Sincerely, Randy Siddens, P.E. District Engineer Attachments: Utility Plan Redlines