HomeMy WebLinkAboutRENNAT SUBDIVISION - FDP200006 - DOCUMENT MARKUPS - ROUND 2 - EROSION CONTROL LETTER/REPORTUD
UD UD
UD
UD UD UD UD UD
UD
UD UD
UD
UD UD
UD
UD UD
UD
VAULT
TELE
T
VAULT
TELE
W
S
O
H
Y
D
W
TELE
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
H
Y
D
S S
S
ELEC
E
ELEC
BRKR
X
X
X
X
X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
Sheet
RENNAT SUBDIVISION These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 66
EC2
EROSION CONTROL DETAILS
56
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
VEHICLE TRACKING CONTROL PAD SHALL BE LOCATED AT EVERY ACCESS POINT TO THE CONSTRUCTION SITE.
A SIGN SHALL BE PLACED NEXT TO THE VEHICLE TRACKING CONTROL PAD TO DESIGNATE THE LOCATION AS THE CONSTRUCTION ENTRANCE/EXIT.
VEHICLE TRACKING CONTROL PADS SHALL CONSIST OF HARD, DENSE, DURABLE STONE, ANGULAR IN SHAPE AND RESISTANT TO WEATHERING. ROUNDED STONE (i.e.
RIVER ROCK AND COBBLES) SHALL NOT BE USED. THE STONES SHALL BE A MINIMUM OF 3" AND A MAXIMUM OF 6" DIAMETER. THE STONES SHALL HAVE A SPECIFIC
GRAVITY OF AT LEAST 2.6. CONTROL OF GRADATION WILL BE BY VISUAL INSPECTION.
ANY CRACKED OR DAMAGED CURB AND GUTTER AND SIDEWALK SHALL BE REPLACED BY CONTRACTOR.
INSTALLATION NOTES:
1.
2.
3.
4.
CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL PAD DAILY. ROCK SURFACE SHALL BE CLEAN AND LOOSE ENOUGH TO RUT SLIGHTLY UNDER WHEEL
LOADS AND CAUSE LOOSE ROCK TO DISLODGE MUD FROM TIRES. WHEN ROCK BECOMES COMPACTED OR FILLED WITH SEDIMENT SO THAT THE EFFECTIVENESS OF
THE PAD IS DIMINISHED, CONTRACTOR SHALL RIP, TURN OVER, OR OTHERWISE LOOSEN ROCK, PLACE ADDITIONAL NEW ROCK, OR REPLACE WITH NEW ROCK AS
NECESSARY TO RESTORE EFFECTIVENESS.
SEDIMENT AND OTHER MATERIAL SPILLED, DROPPED OR TRACKED ONTO PAVED SURFACES SHALL BE REMOVED IMMEDIATELY OR BY THE END OF EACH WORKING
DAY.
VEHICLE TRACKING CONTROL PAD SHALL BE REMOVED AT THE END OF CONSTRUCTION. THE AREA SHOULD BE TOPSOILED, SEEDED, CRIMPED, AND MULCHED OR
OTHERWISE STABILIZED.
MAINTENANCE NOTES:
1.
2.
3.
CONSTRUCTION FENCE, TYP., TO DISCOURAGE
VEHICLE ACCESS EXCEPT AT VTC
SIGN "CONSTRUCTION ENTRANCE"
R=5'
20' MIN.
3" - 6" ROCK
NO MATERIALS INCLUDING 2x4'S, PIPES,
DIRT, GRAVEL OR ASPHALT, SHALL BE
PLACED IN GUTTER TO FACILITATE
Sheet
RENNAT SUBDIVISION These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 66
EC3
EROSION CONTROL DETAILS
57
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
007
EROSION CONTROL FOR CONSTRUCTION
ON INDIVIDUAL RESIDENTIAL LOTS
PLANTED RIPRAP INSTALLATION
RR
008
009 RIPRAP SCHEDULE
Storm Line Pipe
Diameter
(ft)
Riprap
Type
Length
of Riprap
(ft)
Width
of Riprap
(ft)
2*d50,
Depth of Riprap
(ft)
Storm Line 1 2.00 Type L 12.00 10.00 1.5
Storm Line 2 1.25 Type L 5.00 5.00 1.5
Storm Line 3 1.25 Type L 5.00 5.00 1.5
Storm Line 4 1.00 Type L 5.00 5.00 1.5
Storm Line 5 1.00 Type M 5.00 5.00 2.0
Storm Line 6 2.00 Type L 14.00 12.00 1.5
Storm Line 7 2.00 Type L 8.00 8.00 1.5
MOUNTING CURB; HOWEVER, CURB MAY BE
CUT DOWN TO A HEIGHT OF 2" OR HIGHER
FOR EASIER ACCESS AND REPLACED AT
PROJECT COMPLETION. OTHER ACCESS
DEVICES MAY BE USED AS ACCEPTED BY
THE CITY.
CURB CUT
50' MIN.
2" MIN. 6" MIN.
6" MIN.
ALTHOUGH NOT NORMALLY USED, THE CITY RESERVES THE RIGHT TO REQUIRE VEHICLE TRACKING CONTROL WITH A TEMPORARY CATTLE GUARD
AND/OR WHEEL WASH FACILITIES AT SITES WHERE TRACKING ONTO PAVED AREAS BECOMES A SIGNIFICANT PROBLEM AS DETERMINED BY THE CITY
INSPECTOR.
IF VEHICLE TRACKING CONTROL WITH WHEEL WASH FACILITIES ARE REQUIRED, ALL WHEELS ON EVERY VEHICLE LEAVING THE SITE SHALL BE
CLEANED OF MUD USING A PRESSURE-WASHER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A WATER SOURCE AND CONSTRUCTING
A WASHWATER SEDIMENT TRAP.
5.
6.
IF VEHICLE WHEEL WASH FACILITIES ARE REQUIRED, CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL AND WHEEL WASH FACILITIES DAILY.
ACCUMULATED SEDIMENTS SHALL BE REMOVED FROM THE PAD SURFACE.
ACCUMULATED SEDIMENT IN THE WASHWATER/SEDIMENT TRAP SHALL BE REMOVED WHEN THE SEDIMENT REACHES AN AVERAGE DEPTH OF 12-INCHES.
4.
5.
VTC
000 CONCRETE WASHOUT AREA
002 ROCK SOCK DETAIL 003 VEHICLE TRACKING CONTROL PAD
ROCK SOCK SECTION ROCK SOCK PLAN
ROCK SOCK JOINTING
ROCK SOCK INSTALLATION NOTES
1. SEE PLAN VIEW FOR:
- LOCATION (S) OF ROCK SOCKS.
2. CRUSHED ROCK SHALL BE 11
2" (MINUS) IN SIZE WITH A FRACTURED FACE (ALL SIDES) AND SHALL COMPLY WITH
GRADATION SHOWN ON THIS SHEET (11
2" MINUS).
3. WIRE MESH SHALL BE FABRICATED OF 10 GAGE POULTRY MESH, OR EQUIVALENT, WITH A MAXIMUM OPENING OF
1
2", RECOMMENDED MINIMUM ROLL WIDTH OF 48".
4. WIRE MESH SHALL BE SECURED USING "HOG RINGS" OR WIRE TIES AT 6" CENTERS ALONG ALL JOINTS AND AT 2"
CENTERS ON ENDS OF SOCKS.
5. SOME MUNICIPALITIES MAY ALLOW THE USE OF FILTER FABRIC AS AN ALTERNATIVE TO WIRE MESH FOR THE
ROCK ENCLOSURE.
GRADATION TABLE
SIEVE SIZE
MASS PERCENT
PASSING SQUARE
MESH SIEVES
NO. 4
2" 100
1-1/2" 90-100
1" 20-55
3/4" 0-15
3/8" 0-5
MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR
CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE,
ALL SIDES
WIRE ENCLOSED 1 1/2"
WASHED ROCK
2'
RS
004 SILT FENCE/PERIMETER PROTECTION
POSTS
PREASSEMBLED SILT FENCE POSTS SHALL OVERLAP
AT JOINTS SO THAT NO
GAPS EXIST IN SILT FENCE.
NOTE:
THICKNESS OF GEOTEXTILE
POST SHALL BE JOINED AS SHOWN, THEN HAS BEEN EXAGGERATED.
ROTATED 180° IN DIRECTION SHOWN AND
DRIVEN INTO THE GROUND.
SILT FENCE JOINTS
DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18".
EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 4" DEEP ALONG THE
LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
ANCHOR TRENCH SHALL BE EXCAVATED BY HAND, WITH TRENCHER, OR
WITH SILT FENCE INSTALLATION MACHINE. NO ROAD GRADERS, BACKHOES,
ETC. SHALL BE USED.
NOT LESS THAN THE BOTTOM 1' OF THE SILT FENCE FABRIC SHALL BE
BURIED IN THE TRENCH.
THE TRENCH SHALL BE COMPACTED BY HAND, WITH "JUMPING JACK" OR BY
WHEEL ROLLING. COMPACTION SHALL BE SUCH THAT THE SILT FENCE
RESISTS BEING PULLED OUT OF ANCHOR TRENCH BY HAND.
SILT FENCE INDICATED IN THE PLANS SHALL BE INSTALLED PRIOR TO ANY
LAND-DISTURBING ACTIVITIES.
USE WOOD POSTS OR OTHER MATERIAL AS ACCEPTED BY THE CITY.
INSTALLATION NOTES:
1.
2.
3.
4.
5.
6.
7.
THE CONTRACTOR SHALL INSPECT SILT FENCE EVERY TWO WEEKS AND
AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT
UPSTREAM SEDIMENT AS NECESSARY.
SEDIMENT ACCUMULATED UPSTREAM OF SILT FENCE SHALL BE REMOVED
WHEN THE UPSTREAM SEDIMENT REACHES A DEPTH OF 6".
SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM DISTURBED AREA IS
STABILIZED AND GRASS COVER IS ACCEPTED BY THE CITY. IF ANY
DISTURBED AREA EXISTS AFTER REMOVAL, IT SHALL BE SEEDED AND
MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY.
MAINTENANCE NOTES:
1.
2.
3.
4" MIN.
4" MIN.
1
1
2" x 1
1
2" WOODEN FENCE POSTS
SF
SF SF
001 SWALE WATTLE DIKE
NOTES
1. CONCRETE WASHOUT AREA SHALL BE
INSTALLED PRIOR TO ANY CONCRETE
PLACEMENT ON SITE.
2. VEHICLE TRACKING CONTROL IS REQUIRED IF
ACCESS TO CONCRETE WASHOUT AREA IS OFF
PAVEMENT.
3. SIGNS SHALL BE PLACED AT THE
CONSTRUCTION ENTRANCE, AT THE WASHOUT
AREA, AND ELSEWHERE AS NECESSARY TO
CLEARLY INDICATE THE LOCATION OF THE
CONCRETE WASHOUT AREA TO OPERATORS
OF CONCRETE TRUCKS AND PUMP RIGS.
4. THE CONCRETE WASHOUT AREA SHALL BE
REPAIRED AND ENLARGED OR CLEANED OUT
AS NECESSARY TO MAINTAIN CAPACITY FOR
WASTED CONCRETE.
5. THE CONCRETE WASHOUT SHOULD BE
EMPTIED WHEN HALF OF TOTAL HOLDING
CAPACITY HAS BEEN REACHED.
6. AT THE END OF CONSTRUCTION, ALL
CONCRETE SHALL BE REMOVED FROM THE
SITE AND DISPOSED OF AT AN ACCEPTED
WASTE SITE.
7. WHEN THE CONCRETE WASHOUT AREA IS
REMOVED, THE DISTURBED AREA SHALL BE
SEEDED AND MULCHED OR OTHERWISE
STABILIZED IN A MANNER ACCEPTED BY THE
CITY.
8. LOCATION OF CONCRETE WASHOUT AREA IS
CONCEPTUAL ONLY. FINAL LOCATION TO BE
DETERMINED IN THE FIELD AT CONTRACTOR'S
DISCRETION.
3H:1V OR FLATTER
SIDE SLOPES
12" MIN
8'x 8' MIN
OR AS REQUIRED TO
CONTAIN WASTE CONCRETE
12" 2'-0" MIN.
COMPACTED EMBANKMENT
MATERIAL, TYP.
BERM AROUND PERIMETER
GROUND SURFACE
SIGN TO INDICATE THE
LOCATION OF THE
CONCRETE WASHOUT AREA
*IMPERMEABLE LINER MAY BE NEEDED
IF GROUND WATER IS ENCOUNTERED.
IP
006 CURB INLET PROTECTION
A A
PLAN VIEW
SECTION A-A
2:1
OP
WQCV
005 OUTLET PROTECTION
X
X
X
X
X X
X
X
X
X X X X X
X
X
X
SS
SS
SS SS
SS
SS
LID
VAULT
F.O.
W W W
FO
FO
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO
FO
E
E
E
E
E
E
E
E
E
T
T
T T
T T
T T
T
T
T
G
G
G
G
G
G
T
T
T
W
W
W
W W
W
W
12" W
X
SS
V
AULT
ELEC
X
X
X
X
X
X
IRR
WM WM WM WM
WM
WM WM WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM WM
WM
WM WM WM
WM
WM
WM
WM WM
WM
WM
WM
WM
WM
WM
WM
WM WM
WM
WM
WM
WM
WM
WM
WM
WM
UD
UD
UD
VTC VTC
VTC
VTC
VTC
RS
RS
RS
RS
RS
RS
RS
RS RS
RS
RS
RS
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF
SF
WD
WD
WD
WD
WD IP
IP
IP
IP
IP
WD
OP
OP
BLOCK 2 BLOCK 3
BLOCK 2 BLOCK 3
BLOCK 8
BLOCK 6
BLOCK 5 BLOCK 4
BLOCK 12
BLOCK 10
BLOCK 11
BLOCK 7
BLOCK 9
BLOCK 1
BLOCK 13
BLOCK 15
BLOCK 16
BLOCK 14
STORM DRAIN 7
SEE SHEET ST5
STORM DRAIN 4
SEE SHEET ST3
STORM DRAIN 1
SEE SHEET ST1
STORM DRAIN 5
SEE SHEET ST4
STORM DRAIN 2
SEE SHEET ST2
STORM DRAIN 1
SEE SHEET ST1
STORM DRAIN 6
SEE SHEET ST4
STORM DRAIN 2
SEE SHEET ST2
STORM DRAIN 3
SEE SHEET ST3
STORM DRAIN 8
SEE SHEET ST5
TRACT A
DRAINAGE & PEDESTRIAN
ACCESS EASEMENT
TRACT I
TRACT H
TRACT J
TRACT F
TRACT G
TRACT C
FUTURE PUBLIC PARK
PEDESTRIAN ACCESS
EASEMENT
TRACT N
DU&PAE
TRACT E
DG&PAE
TRACT L
DU&PAE
TRACT K
DUA&EAE
TRACT M
IP
SF SF SF SF
SF
ECB
TRACT T
DUE
TRACT R
DU&AE
ECB
SF
SF
ECB
ECB
RR
RR
RR
RR
X
X
X
X
X
X
X
Sheet
RENNAT SUBDIVISION These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 66
EC1
EROSION CONTROL PLAN
55
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
LEGEND:
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
PROPOSED UNDERDRAIN UD
WATTLE DIKE
INLET PROTECTION IP
VEHICLE TRACKING CONTROL PAD
VTC
SILT FENCE SF SF SF
ROCK SOCK RS
RIP RAP RR
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY
CRIMP MULCHING OR SIMILAR METHODS. CONTRACTOR TO USE CDOT STRAW
MULCH SPECS UNLESS OTHERWISE DIRECTED.
2. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone ________________________________
3. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
4. DRYWELLS AND BIORETENTION MEDIA TO BE INSTALLED AFTER STABILIZATION
OF OVERLOT GRADING.
5. ALL DISTURBED SOILS SHALL BE RESEEDED WITH A COVER CROP UPON
COMPLETION OF THE INFRASTRUCTURE IMPROVEMENTS. THE RECOMMENDED
SPECIES AND APPLICATION RATES OF PURE LIVE SEED FOR COVER CROPS
ARE AS FOLLOWS:
GREAT BASIN WILRYE 3LBS/ACRE
GREEN NEEDLEGRASS2LBS/ACRE
INDIAN RICEGRASS 1LBS/ACRE
SLENDER WHEATGRASS 2LBS/ACRE
THICKSPIKE WHEATGRASS 3LBS/ACRE
WESTERN WHEATGRASS 4LBS/ACRE
TRITICALE 10LBS/ACRE
WINTER WHEAT 5LBS/ACRE
6. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR
RENNAT SUBDIVISION DATED: FEBRUARU 12, 2020 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES:
WD
TRAFFIC CONTROL BARRICADE TCB
CONCRETE WASH AREA CWA
OUTLET PROTECTION OP
CONSTRUCTION FENCE CF CF CF
LIMITS OF DISTURBANCE LOD
MULCH MU
MATCHLINE-THIS SHEET
MATCHLINE-THIS SHEET
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY
AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF
BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR
DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY
DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS
REQUIRED BY LOCAL AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH,
GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY
NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY,
STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING
AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR
PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE
PROPERLY MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL
MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL
OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR
ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS
FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR
DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL
CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE
SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
WATTLES FOR BARE SOIL OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES,
PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO
MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL
WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH
VEGETATIVE COVER AND STABILIZE THE SLOPE.
9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM
UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING
THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS
ARE FULLY STABILIZED.
10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE
NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED
THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE
ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION
FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION
SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE
TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR
SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR
PAVEMENT, ETC.)
12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100)
FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE
WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA
MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL
SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF
WATER, WETLAND OR DRAINAGE WAY.
13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE
SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT
LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR
DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA
THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF,
OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY.
DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND
CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH
THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN
WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH,
IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND
WELFARE.
15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER
MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS
WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER
MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT
EROSION.
16. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING,
REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION
METHODS.
17. INDIVIDUAL RESIDENTIAL LOT CONSTRUCTION SHALL IMPLEMENT EROSION
CONTROL MEASURES SHOWN IN DETAIL 011 ON SHEET EC4
18. CONTRACTOR SHALL KEEP ALL PUBLIC STREETS SURROUNDING THE
PROJECT CLEAN FROM ANY CONSTRUCTION TRACK OUT AND WILL CLEAN
IT WITHIN 24 HOURS, SHOULD ANY TRACK OUT OCCUR.
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION SEQUENCE
AND BMP APPLICATION
CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING
BEST MANAGEMENT PRACTICES (BMPS)
STRUCTURAL "INSTALLATION"
Construction & Silt Fence Barriers *
Flow Barriers (Wattles) *
Inlet Filter Bags *
Rip Rap
Vegetative
Temporary Seeding Planting
Mulching / Sealant
Permanent Seeding Planting
Sod Installation
Rolled Products : Netting / Blankets / Mats
Contour Furrows (Ripping / Disking)
Sediment Basin
Rock Bags *
UTILITIES
INSTALLATION
FLAT WORK
INSTALLATION
VERTICAL
INSTALLATION LANDSCAPE DEMOBILIZATION
Vehicle Tracking Pad *
* All Temporary BMPs to be Removed once Construction is Complete
Other:
Any prior inlets that could use protecting
Any prior inlets that could use protecting
Anytime the site will sit dormant longer than 30 Days
Anytime the site will sit dormant longer than 30 Days
Anytime the site will sit dormant longer than 30 Days
Under slope stabilization rolled products. Reseeding may be required.