Loading...
HomeMy WebLinkAboutSUMMITVIEW CHURCH WTF MOBILITIE - FDP190022 - SUBMITTAL DOCUMENTS - ROUND 4 - RESPONSE TO STAFF REVIEW COMMENTSFort of Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview February 26, 2020 Tom Johnson 31878 Del Obispo St # 118-454 San Juan Capistrano, CA 92675 RE: Summitview Church - Wireless Telecommunication Facility, FDP190022, Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Summitview Church - Wireless Telecommunication Facility you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com Topic: General Comment Number: 1 11 /13/2019: INFORMATION: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! Comment Number: 2 11 /13/2019: INFORMATION: As part of your next submittal you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide reference to specific project plans or explanations of why comments have not been addressed, when applicable. Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number: 2 02/24/2020: See Landscape Plan Redlines Response: Please see revised plans that respond to the L-Sheet redlines and reduce the new tree count. 12/31/2019: FOR FINAL APPROVAL - UPDATED: Planning staff acknowledges that the ash trees will be removed as recommended by City Forestry. Please plant the proposed Southwestern White Pine in the location of the removed ash trees. The remaining tree should be placed in front of the monopine in between the sidewalk and the proposed structure. 11/11/2019: FOR FINAL APPROVAL: On sheet Al there are some inconsistencies with the Landscape Plan. Please update table to reflect that no trees will be removed. Since the ash trees will remain, please locate the three Southwestern White Pine trees in front of existing ash trees - between the property line and the proposed facility. This will require updates to Landscape and Site Plan. Department: Engineering Development Review Contact: Morgan Stroud, 970-4164344, mstroud@fcqov.com Topic: General Comment Number: 2 11 /06/2019: INFORMATION: A sidewalk permit will be needed for the ramp construction. Please see the following website for application and more information: https://www.fcgov.com/engineering/inspection.php Comment Number: 1 02/25/2020: FOR FINAL APPROVAL - UPDATED: Thank you for submitting the legal exhibits. They are still under review because the City is unsure what Tract A is and what uses are established on it. I will update the applicant on further steps for getting this easement dedicated. 11/06/2019: FOR FINAL APPROVAL -UNRESOLVED: Please submit deeds and legal exhibits along with review fees for all easements to be dedicated - the exhibits will be reviewed by City Staff prior to approval. Deed templates and more information on the dedication process can be found at: https://www.fcgov.com/engineering/devrev.php. Please note that the deeds need to be certified by a Colorado attorney and that recording fees will be required at the time of recording. Comment Number: 3 02/25/2020: FOR FINAL APPROVAL - UPDATED: Please label the drawings that were put into the plan set with the LCUASS labels. 2 Response: Please see revised plans that address this comment with the requested labels. 12/31/2019: FOR FINAL APPROVAL: Please use LCUASS drawing 1606 for the handicap ramp replacement in the right-of-way. Here is a link to that detail: https://www.larimer.org/sites/defaulVfiles/apdxa_1601 _2501.pdf Department: Forestry Contact: Molly Roche, 224-616-1992, mroche@fcqov.com Topic: General Comment Number: 8 2/25/2020: FOR FINAL APPROVAL — UPDATED Please review Forestry redlines and make the following changes. These changes must be made in order for Forestry to sign off and approve the landscape plans. - On sheet Al and ZD1.3 please update the plant list to show Kentucky Coffeetrees as 2"caliper B&B. Canopy shade trees should not be listed in height form. - On sheet A2 — edit the spelling of mitigated and add a note by the 15.5" Ash that it is to be removed and mitigated. Response: These items have been addressed. 12/31/2019: FOR FINAL APPROVAL — UNRESOLVED Some redline comments from round 1 are yet to be addressed. 11/6/2019: INFORMATION ONLY Forestry redlines provided. Comment Number: 9 2/25/2020: FOR FINAL APPROVAL: Please note that only 3 mitigation trees are required. The plan currently shows 5 mitigation trees, which is okay, but I just want the applicant to be aware that only 3 mitigation trees — at 8'-ht — are technically required. Department: Technical Services Contact: Jeff County, 970-221-6588, *county@fcgov.com Topic: Easements Comment Number: 6 02/24/2020: FOR FINAL APPROVAL: There is a potential issue with the Fire Access Easement, that may prevent PFA from crossing Tract A of the Faith Evangelical Free Church North Parking Lot plat. We are still researching the use of Tract A, to see if it has an Emergency Access or Access use. Topic: General Comment Number: 1 02/24/2020: FOR FINAL APPROVAL -UNRESOLVED: The plan set provided for review is sized to 11 "xl7". Plans are required to be 24"06". Response: This is in 2436 format. Comment Number: 5 .i7 02/24/2020: FOR FINAL APPROVAL -UNRESOLVED: There are line over text issues. See redlines. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 4 02/25/2020: INFORMATION: Prior to construction this project will be responsible for paying their capacity charge for their new electric service. Department: Environmental Services Contact: Linda Hardin, Ihardin@fcgov.com Topic: General Comment Number: 1 02/21 /2020: INFORMATION: A construction waste management plan will be required with building permit applications. A final CWMP with documentation will be required at the end of the project before issuing the final CO. Please contact Linda Hardin with questions - 970416-2701, Ihardin@fcgov.com. 4