HomeMy WebLinkAboutSTONERIDGE PUD OVERALL DEVELOPMENT PLAN JUNE 22 1992 P AND Z BOARD HEARING - 21 92B - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 17
MEETING DATE 6/22/92
6gi
STAFF Ted Shepard
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Stone Ridge P.U.D., Overall Development Plan -
#21-92B
APPLICANT: Les Kaplan
The Kaplan Company
1060 Sailors Reef
Fort Collins, CO. 80525
OWNER: Harold Webster
1742 Waterford Lane
Fort Collins, CO. 80525
PROJECT DESCRIPTION:
This is a request for an Overall Development Plan consisting of
mixed residential densities with an estimated total of 299 dwelling
units. The site is 92 acres and is located at the northwest corner
of Horsetooth Road and County Road #9. The zoning is r-1-p, Low
Density Planned Residential.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
Stone Ridge O.D.P. is considered sequential development along East
Horsetooth Road which is classified as an arterial street. It is
contiguous to two approved 0.D.P.Is, Spring Creek Farm and Pine
Cone. The mix of residential densities is supported by the Land
Use Policies Plan. The residential character is considered
compatible with the surrounding area. The site will be served by
the extensions of two collector streets which will be downgraded to
local streets based on low volume projections. A bicycle and
pedestrian path will run north -south through the site to link
residential areas to the south to activity points to the north.
The project is feasible from a transportation perspective.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
Ted Sheperd
Page 4
The rectangular configuration of the property and the existing and
approved curbcuts on the south side of Horsetooth Road have largely
dictated the public and private street configuration of the
project. Aligning the west entry to the project with Caribou Drive
to the south creates an awkward, approximately 200 feet wide area
along the west property line. This area is best accessed by a
narrower private street, in order to avoid repeated curbcut
interruptions to the north -south bike/pedestrian way, shown
detached and west of the public street extending north from Caribou
Drive. This looped private street arrangement does, however,
inhibit a design emphasis on north -south lot orientations in this
patio home area.
The extensive amount of right -of way dedication for Horsetooth
Road, approximately, 4 acres, plus the approximately 8.2 acre
Parcel G shown as open space contribute to the appearance of a
lower overall density than actually exists. Excluding these areas,
the overall density increases from 3:25 units/acre to 3.74
units/acre.
The recreation complex, Parcel F, is currently envisioned as a pool
facility with parking, exclusively for the residence of the
StoneRidge P.U.D. The construction of this facility is contingent
upon there being sufficient development in the project
(approximately 200 units) to economically support the construction
and maintenance of such a facility.
O.D.P. PHASING
The StoneRidge O.D.P. is envisioned as a 5 to 7 phase project,
spanning 3 to 5 years to complete, depending largely upon market
conditions. The First Phase, consisting of 22.58 gross acres,
roughly comprises the west half of Parcel A and all of Parcel B,
resulting in 41 single-family lots and 25 patio home lots, all with
greenbelts and open space. This First Phase is intended to begin
in August 1992. At this time, we anticipate final plan submission
for the single-family area by June 1, 1992, and final plan
submission for the patio home area by July 6, 1992.
FIRST PHASE PRELIMINARY PLANNING OBJECTIVES
The 22.58 acres First Phase consists of 41 single family lots,
basically the west half of Parcel A, and 25 patio homes, all of
Parcel B, to be complete in (2) phases and intended to commence in
August 1992.
The design emphasis in the single-family area is to create a sense
of privacy and openness to mid -size lots averaging approximately
8500 s.f. in size. This is accomplished primarily by:
T. Sheperd
Page 5
1. placing 80 percent (33 of 41) of the lots on cul-de-sacs,
2. abutting 98 percent (40 of 41) of these lots to greenbelt,
3. having a generous, average lot size of 8,500 s.f.,
4. providing an aesthetic and effective landscape fencing buffer
with Horsetooth.Road,
5. providing two, independent points of access from Horsetooth
Road, and
6. limiting rear lot fencing through design covenants.
The patio home area is subject to significant design restraints due
to its narrow width, the placement of a 6 to 8 feet bike/pedestrian
way traversing it north -south, and the.need to direct storm water
into a swale to be located near the north border of the overall
property. The proposed design overcomes these restraints and
serves to provide an attractive greenbelt area, both as an amenity
to the bike way and as an entry feature to the project.
The City Land Use Policies achieved by the Preliminary Plan are
essentially the same as those accomplished by the O.D.P., which are
herein incorporated by reference. Generally, these policies deal
with promoting alternative transportation modes; encouraging
development in close proximity to employment, recreation, and
shopping facilities; encouraging pleasant and functioned inter-
relationships between land uses; promoting green areas; providing
a mix of ,housing densities; and encouraging easy access to
shopping, employment and schools.
The design team for the First Phase of the StoneRidge P.U.D.
believes that the proposed design is substantial superior to the
proliferation of standard, unimaginative, single-family
subdivisions appearing in Fort Collins. Additionally, the intended
design provides an attractive streetscape to Horsetooth Road
adjoining this First Phase.
SOLAR ORIENTATION VARIANCE
Due to significant design restraints in Parcel B, which is the
patio home area of First Phase, the 65 percent solar orientation
requirement for the First Phase cannot be technically met. Of the
41 lots in the single-family portion of the First Phase, 27 of
these, or 66 percent comply with the solar orientation requirement
for lots. However, of the 25 patio home lots, only 10 can comply
with this requirement, resulting in an overall percentage of 56
percent for the First Phase.
The unavoidable configuration of Parcel B creates obstacles in
achieving the technically required percentage of solar orientation
in this area. From a traffic standpoint, the west entry to the
First Phase must align with Caribou Drive to the south. This
creates. only a 200 foot wide parcel on the west end of this
T. Sheperd
Page 6
project. While it could be argued that a design may be possible
for Parcel B which includes a procession of short east -west cul-
de-sac streets, attempting this -would have negative ramifications
on other public considerations. First, doing this would introduce
multiple interruptions to the bike way, adversely affecting safe,
uninterrupted movement along this detached lane. Secondly, such
a series of cul-de-sacs, while possibly helping to increase the
number of north -south lots, would result in the elimination of
extensive greenbelt area, a desireable feature to both the bike
way and main entry to the project.
It should be added as part of this variance request that six (6)
of the patio home lots which do not technically qualify for solar
credit do.facilitate a south -oriented building placement.
The applicant believes that the alignment of the main entry with
Caribou Drive, in close proximity to the west property line,
creates a site configuration problem in technically complying with
the 1165 percent rule" for north -south lot orientation. Attempting
to force more north -south orientation would only result in poor
design with regards to the bike/pedestrian way and the provision
of attractive green space.
THREE (3) D.U. PER ACRE REQUIREMENT
The First Phase does not technically comply with the LGS criteria
for a minimum of 3 units/acre; although the O.D.P. clearly exceeds
this criteria. The gross area of the First Phase is 22.58 acres
and contains 66 units, for an average density of 2.92 units/acre.
Despite the extensive area of greenbelt and open space in this
First Phase, 3.1 acre for the single_family area and 1.9 acres for
the patio home area, the 3 unit/acre criteria could be met if
consideration were given to the atypical requirement for 50 feet
of right-of-way dedication along Horsetooth Road. The gross area
of the First Phase, if deducting for this off -site improvement, is
actually 21.14 acres, thus yielding, over a 3 unit/acre density.
The applicant has not completed the City's "Density Chart" for this
First Phase, in that higher density justifications are not an
objective of this project. Rather, the project seeks to accomplish
a high quality, lower level urban density through mixed residential
uses and a'thoughtful integration of green spaces.
Should you require.additional information regarding the O.D.P. and
First Phase Preliminary Plan submissions of the StoneRidge P.U.D.
for the June 22, 1992 meeting of the Planning and Zoning Board ,
T. Sheperd
Page 7
please contact me directly. Again, the design team appreciates
your assistance in coordinating the City's review of this project.
Very Truly
Lester M.
Yours,
Kaplan
Stone Ridge Overall
June 22, 1992 P & Z
Page 2
COMMENTS
1. Background•
Development Plan, #21-92B
Meeting
The surrounding zoning and land uses are as follows:
N: T; Vacant (C.S.U. Agronomy Research Facility)
S: R-L-P; Vacant (English Ranch Subdivision and Spring Creek
Farms Overall Development Plan)
E: FA-1; (County); Vacant (Poudre River Bluff)
W: R-P; Vacant (Dakota Ridge Preliminary P.U.D.)
The annexation of the Webster Farm was approved by the Planning and
Zoning Board on April 27, 1992, and passed on First Reading by City
Council on June 2, 1992. Since the City Council has canceled its
June 16, 1992 regular meeting, the Second Reading will be on July
7, 1992.
2. Context Within the Section:
Stone Ridge O.D.P. lies in the southeast quarter of a section
bounded by Drake, Timberline, Horsetooth, and County Road #9. The
eastern portion of the section is characterized by a steep slope
known as the Poudre River Bluff. Pine Cone O.D.P., covering 238
acres, was approved on April 27, 1992. This area includes the new
Fort Collins High School, neighborhood service center, City
neighborhood park, multi -family and low density residential. The
planning activity on this parcel reflects the pattern of growth to
the east along the established arterial streets. Directly south is
the Spring Creek Farms Overall Development Plan and English Ranch
Subdivision which also reflect the residential growth along the
East Horsetooth corridor. While Stone Ridge is located on the
urban fringe, it is contiguous to two Overall Development Plans and
is considered sequential development.
3. Plans and Policies:
The Stone Ridge Overall Development Plan has been reviewed against
the criteria of the Land Use Policies Plan and other elements of
the Comprehensive Plan. The O.D.P. is supported by the following
policies of the Land Use Policies Plan:
113b: The City shall promote alternative transportation modes."
Staff Finding: An offstreet bicycle/pedestrian path is provided
from north to south to connect Fox Meadows (Linton School) to Pine
Cone Farm (City Park and F.C.H.S.) This path may also serve a
commuting function from areas north and west to Hewlett-Packard.
Stone Ridge Overall Development Plan, #21-92B
June 22, 1992 P & Z Meeting
Page 3
113d: The City shall promote the location of residential development
which is close to employment, recreation, and shopping facilities."
Staff Finding: Stone Ridge is within one-half mile Platte River
Power Authority and Horsetooth Business Park, and one mile of
Hewlett-Packard. The location is also within one-fourth mile of an
approved City neighborhood park. Finally, Stone Ridge is within
one half mile of the Pine Cone neighborhood service center.
1122: Preferential consideration shall be given to urban development
proposals which are contiguous to existing development within the
city limits or consistent with the phasing plan of the City's urban
growth area."
Staff Finding: Stone Ridge O.D.P. is adjacent to two arterial
streets, and will be served by the extension of two existing
streets (Caribou Drive and Kingsley Drive). In addition, the
O.D.P. is directly across the street from two platted subdivisions,
Fox Meadows and English Ranch.
1164: Alternative transportation modes such as pedestrian and bike
access shall be planned for as primary modes of transportation to
neighborhood service centers from adjoining residential areas."
Staff Finding: A bike path will be provided to link with the bike
path network established on the adjacent Pine Cone O.D.P. The
destinations of this network are the Pine Cone neighborhood service
center, new F.C.H.S., and City neighborhood park.
1175: Residential areas should provide for a mix of housing
densities."
Staff Finding: The O.D.P. contains a mix of single family housing
densities ranging from 2.6 dwelling units per acre to 8.0 dwelling
units per acre.
"79a: Low density residential uses should locate in areas which
have easy access to planned neighborhood shopping centers."
Staff Finding: Stone Ridge access (Caribou extended) is 2,000 feet
from the Horsetooth access to the Pine Cone neighborhood service
center.
1179b: Low density residential uses should locate in areas which
have easy access to major employment centers."
Staff Finding: Stone Ridge is located within one-half mile of
South Collins Tech Center and Horsetooth Business Park. The O.D.P.
is also located within one mile of Hewlett-Packard.
Stone Ridge Overall Development Plan, #21-92B
June 22, 1992 P & Z Meeting
Page 4
1179d: Low density residential areas should locate within walking
distance to a planned neighborhood park."
Staff Finding: The Pine Cone neighborhood park is within one -
quarter mile of the intersection of two local streets within Stone
Ridge O.D.P. The linkage between the park and Stone Ridge is
planned to be by a detached, eight foot wide, bicycle/pedestrian
path. One -quarter mile distance is considered a reasonable walking
distance to an activity area.
4. Neighborhood Compatibility:
The O.D.P. is a mix of residential densities. As a residential
project, it is similar to the adjacent land uses to the south and
west. Because of the residential character of the O.D.P., the
proposal is considered compatible with the surrounding area and no
neighborhood meeting was held.
5. Transportation:
The extension of Caribou Drive (collector street serving Fox
Meadows and Sunstone Village) will be constructed to a local street
standard due to the low volume of anticipated traffic generated by
the O.D.P. The Horsetooth/Caribou intersection will be signalized
when warranted. Similarly, the extension of Kingsley Drive
(collector street serving English Ranch and Spring Creek Farms)
will also be classified as a local street as it crosses Horsetooth
Road.
A local street connection is planned to link the approved City
neighborhood park located to the north in Pine Cone O.D.P. An
offstreet, eight foot wide bicycle/pedestrian path will provide a
north -south link between points south (Fox Meadows, Sunstone
Village and Linton Elementary School) and points north (F.C.H.S.
and City Park).
The traffic impacts related to the proposed O.D.P. have been
reviewed by the Transportation Department and found acceptable.
RECOMMENDATION:
Staff finds that the request for Stone Ridge Overall Development is
in conformance with the adopted Land Use Policies Plan and other
elements of the City's Comprehensive Plan. Staff, therefore,
recommends approval of Stone Ridge Overall Development Plan, #21-
92B.
T
s,
.414T" "LEE
r ..
.i •••x i ..5�::
r Elm
11rM cfAA��■■4 e
terry - ..,, e��_ •
■
■
■
ITEMS: STONERIDGE PUD
Overall Development Plan
NUMBER: 21-9 2 B
No Text
cn,, KA PLA N COMPANY
May 4, 1992
Mr. Ted Shepherd, Project Planner
Planning Department
City of Fort Collins
281 North College Avenue
Fort Collins, Co 80522-0580
Re: Overall Development Plan and
First Phase Preliminary Plan Submission for
the StoneRidge P.U.D.
Dear.Mr. Shepherd:
As purchaser of the 92+/- acre remaining portion of the Webster
Farm located at the northwest corner of County Road 9 and
Horsetooth Road, I am pleased to submit for the June 22, 1992
Planning and Zoning Board review the proposed Overall Development
Plan (O.D.P.) and First Phase Preliminary Plan for the StoneRidge
P.U.D..
On behalf of the project architect, Frank Vaught, and project
engineer, Stan Myers with RBD Engineering, Inc., who along with
myself form the design team for the StoneRidge P.U.D., we
appreciate the opportunity for our April 10 pre -Conceptual Review
meeting with staff and then our April 20 Conceptual Review meeting.
The comments and information from those and subsequent meetings and
discussions with staff have been helpful in designing this project
and preparing the submissions.
The project site is rectangular, measuring approximately 3000 feet
along Horsetooth Road and 1325 feet in depth. Essentially flat
with minimum contour, the property drains to its northeast corner
into an existing 1 +/- acre pond. There is no existing development
on any side; although, improvements for a single-family subdivision
are currently being installed on the south side of Horsetooth Road
in the English Ranch Subdivision, and another single-family
subdivision is under design contiguous to the west property line
and in the Pine Cone Farm P.U.D. Utilities are readily available,
with a sewer line along the north property line and a water main
in Horsetooth Road.
The property is currently central to major employment, education,
recreational and shopping facilities. These locational advantages
will increase through the eventual development of the new Fort
Collins High School, a supermarket -based neighborhood shopping
center and a neighborhood public park, all approved by the City and
located within a quarter mile west of the property. Furthermore,
the property is only one mile from Hewlett-Packard which sets the
1060 Sa11ors 1Zcc1 • Furl Collins, Colorado h0525 • 303/226-6819
T. Sheperd
Page 2
standard of quality for expanding commercial development along the
Harmony Road entry corridor and is approximately one-half mile from
the Timberline Road commercial thoroughfare. Easy accessibility
to Interstate 25 only 2.5 miles to the east contributes further to
the developability of this property.
O.D.P. PLANNING OBJECTIVES
The O.D.P. consists of 92 +/- ac
mixed residential uses in a
maintained open spaces for each
a recreational complex common
number of residential units i
overall density of 3.25 unites
which includes Horsetooth Road
res of predominately lower density,
P.U.D. configuration, featuring
of the six (6) potential phases and
:o the overall project. The total
; projected at 299 for an average
per acre, based upon gross acreage
R.O.W. dedication,.
The O.D.P. in design and location is consistent with the general
direction of the City Land Use Policies, and appears to be
inconsistent with none of them. Specifically, the O.D.P.
contributes to achieving the following approximate policies:
1. Alternative transportation modes vis-a-vis the 6 to 8 foot
off-street bike/pedestrian trail running north -south from the
bike lane in Caribou Drive to the proposed east -west trail
along the north property line in the Pine Cone -Farm P.U.D.
(Policy 3b).
2. Close proximity to employment, recreation and stropping
facilities (Policy 3d).
3. Proposed at urban density of approximately 3.25 units/acre for
overall project (Policy 12).
4. Urban development standards shall be applied (Policy 14).
5. Promotes logical growth pattern of the City consistent with
annexation criteria (Policy 12).
6. Proposed residential land uses and specific site planning
promote a pleasant, functional and understandable inter-
relationships both between land uses within the project and
among the project and existing and potential neighboring land
uses (Policy 20).
7. Contiguous to developing property to the south, approved as
the English Ranch Subdivision (Policy 22).
8. Existence of City provided services and facilities has served
as a tool in directing development interest to this property
(Policy 29).
T. Sheperd
Page 3
9. Inclusive of attractively developed green areas to provide a
balanced and pleasing cityscape (Policy 43f).
10. Minimizes the use of automobile through the inclusion of bike/
pedestrian way (Policy 49).
11. Alternative transportation mode of pedestrian and bike access
is provided for as primary mode of transportation to both the
high school, city park, neighborhood service center and
adjoining residential areas (Policy 64).
12. Green belts used to provide transitions and enhance mixture
of land uses with project (Policy 74).
13. Mix of housing densities provided (Policy 75)..
14. Does not undermine phasing plan of the urban growth area but
promotes it (Policy 77).
15. As a predominately lower density residential project, the
O.D.P. has:
a. easy access to existing and planned neighborhood shopping
centers (79a),
b. easy access to major employment centers (79b),
C. within walking distances to existing and planned schools
(79c), and
d. within walking distance to planned neighborhood park
(79d) .
The applicant believes that the O.D.P., both in terms of its site
plan design and the locational characteristics of the property,
achieves all of the City Land Use Policies for a lower density,
mixed residential project. The inclusion of open spaces integrated ,
between and through the various phases of the plan is a major
design feature. Such open space areas will be designated as tracts
and maintained initially by the developer and eventually by a
homeowners' association. Green belts and other forms of open space
will provide the major means of buffering between and within the
various areas of the project. Rear lot fencing resulting in a
"stockade" appearance will be prevented through covenants. Along
Horsetooth Road buffering from the arterial with be achieved by a
broad landscape strip consisting of landscaped berms, decorative
fencing, open space, and deeper lots. Substantial design attention
by the architect and Grant Reid Landscape Design has been given to
creating an aesthetic and effective streetscape along Horsetooth
Road.