Dear Mr. Vaught,
For your information, attached is a copy of the Staffs comments concerning the Webster Farm
O.D.P. and First Phase Preliminary PUD, that was presented before the Conceptual Review
Team on April 20, 1992.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be
made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6750.
Sincerely,
T�
Ted Shepard
Project Planner
Attachment
xc: Tom Peterson, Planning Director
Kerrie .Ashbeck, Civil Engineer
Transportation Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: April 20, 1992
ITEM: Webster Farm O.D.P. and First Phase Preliminary P.U.D.
APPLICANT: Les Kaplan, Kaplan Company c/o Vaught -Frye Architects
and Planners, 1113 Stoney Hill Drive, Fort Collins, CO. 80525
LAND USE DATA: Request for an Overall Development Plan on 91 acres
of the Webster Farm, and First Phase Preliminary P.U.D. for 41
single family lots on 14 acres. The parcel is located.on the north
side of East Horsetooth Road, east of Caribou Drive.
COMMENTS:
1. There is existing electrical conduit at the southwest corner
of the parcel which could be extended across Horsetooth via a
crossing at Kingsley to serve the project. Any water feature must
have sufficient electrical power, three-phase is recommended over
single-phase for reliability. Please be aware that below grade
transformers are not allowed, and must be serviceable by a line
truck.
2. There is a 16 inch diameter water main and a 24 inch sewer
main -in Horsetooth Road. There is a developer repay due on the
water line at approximately $16 per linear foot. There is a sewer
line on the north also. The O.D.P. should be accompanied by a
master utility plan so it can be demonstrated that all phases can
be served.
3. There is a 24 inch diameter water line in County Road #9 that
will have to be extended to the north property line of the O.D.P.
at the time the adjacent. phases develop. The developer's portion
of this extension is for only 12 inches. The City will repay the
developer for the oversized portion.
4. The Poudre Fire Authority will allow a 28 foot wide local
street to serve the patio home area provided that there is
sufficient off-street parking. A 28 foot street may be allowed on
the small cul-de-sacs subject a variance request made to the
Engineering Department. The variance request will be evaluated on
the number of lots served, the size of the lots, the width of the
lots, and the amount of available off-street parking.
5. It is estimated that three fire hydrants may be needed to
serve the project.
6. Webster Farm is located in the Foothills Drainage Basin. The
fees are $5,024 per acre subject to the amount of impervious
surface and the amount of stormwater detention. If more stormwater
is detained than is required, there is a possibility of credit on
a portion of the fees. The fees are payable at the time of
building permit issuance.
7. The entire 91 acres should be subject of an overall drainage
plan. The Foothills Basin Master Plan has identified a stormwater
release rate that must be adhered to. The outlet of the basin is
the Fossil Creek Reservoir inlet ditch. Each subsequent phase
would have to conform to the overall plan and be verified by
submittal of a Drainage Report, Drainage. and Grading Plan, and
Erosion Control Plan.
8. The existing pond must meet the City's criteria for accepting
drainage. Also, please check with the Office of the State Engineer
to see if they have any jurisdiction.
9. There is a 36 inch diameter storm sewer planned for County
Road #9 which is considered a basin -wide improvement. If this
storm sewer is built ahead of improvement of County Road #9, by the
developer, it is eligible for reimbursement by the Stormwater
Utility.
10. The Stormwater Utility does not maintain on -site drainage
facilities.
11. Street trees are encouraged along Horsetooth Road. The City
Forester will accept maintenance after the project is completed and
the developer is no longer involved with the project. Street. trees
should be selected from list provided by the City Forester. Please
refer to the.landscape plan for English Ranch for ideas on species
selection, location, and spacing.
12. Staff applauds the use of common open space along the arterial
street. This will be well matched across the street as English
Ranch benefits from detention ponds along the arterial. The open
space provided by both projects has the potential of creating an
attractive arterial that is not constrained by six foot privacy
fences.
13. It is assumed that the H.O.A. will maintain the common open
space adjacent to Horsetooth. Otherwise, the Parks and Rec
Department would be obligated and the level of maintenance dictates
that drought -tolerant, native seed mix be planted without shrub
beds: If you plan on not having H.O.A. maintenance, please let us
know as early -as possible so Parks and Rec can plan accordingly.
14. The Parkland Development Fee is $625 per acre.
15. The City Forester is available to make an inspection of the
existing cottonwood trees around the Webster home. The Engineering
Department is willing to allow the sidewalk of the widened
Horsetooth Road to be shifted to save the cottonwoods but this
would be very difficult with the actual roadway. Please feel free
to call Tim Buchanan, 221-6640, to schedule a time to inspect the
trees.
16. The development will be required to dedicate the north half of
Horsetooth Road so there is 50 feet from centerline. An additional
15 feet is required to dedicated for utility easements. Please be
aware that English Ranch and the New F.C.H.S. are developing in the
area. The developer is responsible for the local street portion of
the arterial improvement. Anything constructed over the local
portion is repaid by the Street Oversizing Fund.
17. The Street Oversizing Fee is $584 per unit payable at the time
of building permit issuance.
18. The traffic impact study will be based on the scope outlined
by Rick Ensdorff, Transportation Director, at our meeting on
Tuesday, April 21, 1992.
19. The bicycle/pedestrian connection from Caribou Road into
Webster Farm, and onto Pine Cone Farm is a critical segment to.
promote non -vehicular access from Fox Meadows, Sunstone Village,
and English Ranch to the New F.C.H.S. As we discussed, this
connection works best if located off-street and is approximately
eight feet wide. Staff appreciates the effort to promote this path
so it becomes an viable alternative transportation link as well as
a recreational amenity.
20. Please coordinate with Poudre Fire Authority on providing
temporary fire access to any home beyond 660 feet from a single
point of access.
21. Please do not use "Minor Road" on the O.D.P. This name is not
on the approved list from which to choose names for arterial
streets. Although the City of Fort Collins installed a street sign
at the corner of County Road #9 and Harmony Road, this is
considered to be a mistake based on a misinterpretation. The City
Planning Department is working with the landowners in the area to
find an appropriate name on the approved list, or to approach City.
Council with an alternative based on local history and
significance. For O.D.P. purposes, please refer to this future