HomeMy WebLinkAbout609 S COLLEGE AVE MIXED USE - BDR200004 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDrainage Memo February 5, 2020 Project: 609 South College Avenue Project No. 564-005 Attn: Stormwater Staff City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 Stormwater Staff: This letter serves to document the proposed drainage impacts of the addition to the existing building proposed at 609 South College Avenue in Fort Collins, Colorado. Project Overview The project proposes to add an addition to the rear (west side) of the existing building adding ~800 sf. Construction activities will also include the removal of the existing garage. A concrete patio area, concrete walks, and alley parking will also be added as a part of these improvements, as well as planters to provide LID treatment to the site. A dedicated fire service will also be added as part of this project. Existing Site The existing site is relatively flat (0% - 1%) in the front and rear yards, and functions as an “A” Lot, with drainage generally draining from back to front along the side lot lines. In addition to the existing home, the lot consists of a garage, a concrete driveway, concrete entry walk, and concrete walks around the entire home. The remainder of the site is Kentucky Bluegrass lawn, with small landscaping beds and mature trees. The total existing impervious area for the lot is 2,781 sf. Proposed Site The proposed site will generally maintain the existing site drainage. Drainage from the rear yard and proposed planters directed overland via concrete pan along the southern lot line to College Avenue. The parking area will maintain the existing drainage pattern and flow west to Dalzell Alley. Existing grades outside of our improvements will remain unchanged, including along the north side of the existing house where no improvements are proposed. The total proposed impervious area for the lot is 4,731 sf. The proposed change in imperviousness will add an estimated 0.46 cfs to College Avenue and 0.1 cfs to Dalzell Alley in a 100-yr event. We do not foresee the additional runoff causing any issues with the existing inlets intercepting the flow at Myrtle Street and College Avenue, but additional information regarding the inlet’s capacity will need to be obtained from the City and verified. No adverse effects to adjacent properties are anticipated due to the increased imperviousness of the site. Detention Since the impervious area increase is than the 5,000 sf allowed in the Old Town Master Drainage Basin, no detention is required for the site. Floodplain A portion of the property is currently located in the City of Fort Collins 100-yr Old Town floodplain. Northern Engineering is currently working on a LOMA remove the building from the floodplain. Water Quality Water Quality for the site is being provided by releasing the concentrated flows from the roof into two planters in the front and rear of the house. The planters will contain Bioretention Soil and landscape. Water will infiltrate the soil, removing stormwater contaminates, and exit the planters through knockouts at the base of the planters into sidewalk chases. Flows will then travel, via concrete pan to a proposed sidewalk chase onto College Avenue. An exhibit has been provided to illustrate the existing and proposed impervious areas. Please feel free to contact us if you have any questions. Northern Engineering Services, Inc. Benjamin Ruch, PE Project Engineer Project: 609 S. College Avenue Calculations By: Date: Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Up Stream Elevation Down Stream Elevation Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Up Stream Elevation Down Stream Elevation Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Project: Calculations By: Date: Existing A Existing A 0.14 22 22 21 0.25 0.25 0.31 1.53 2.61 5.53 0.05 0.09 0.24 Existing B Existing B 0.01 6 6 5 0.25 0.25 0.31 2.76 4.72 9.95 0.01 0.01 0.03 Existing OS Existing OS 0.04 5 5 5 0.25 0.25 0.31 2.85 4.87 9.95 0.03 0.04 0.11 Flow, Q100 (cfs) Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Design Point Sub-Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) C2 C10 C100 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Flow, Q2 (cfs) Flow, Q10 (cfs) Rainfall Intensity: EXISTING RUNOFF COMPUTATIONS Rational Method Equation: 609 S. College Avenue B. Ruch February 5, 2020 Q = C f ( C )( i )( A ) Project: Calculations By: Date: Proposed A Proposed A 0.14 13 13 12 0.55 0.55 0.69 1.98 3.39 7.16 0.16 0.27 0.70 Proposed B Proposed B 0.02 6 6 5 0.55 0.55 0.69 2.67 4.56 9.95 0.03 0.05 0.13 Proposed OS1 Proposed OS1 0.03 5 5 5 0.60 0.60 0.75 2.85 4.87 9.95 0.04 0.08 0.20 B. Ruch 609 S. College Avenue PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) Rational Method Equation: Rainfall Intensity: Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 February 5, 2020 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) CHARACTER OF SURFACE: Runoff Coefficient 1 Percentage Impervious 1 Project: Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: Asphalt …………………......................... ............................................................................... 0.95 100% Date: Concrete ………………. ......................... ............................................................................... 0.95 100% Gravel (packed) ………. ......................... ............................................................................... 0.50 40% Roofs………………….. ......................... ............................................................................... 0.95 90% Pavers…………………. ......................... ............................................................................... 0.50 40% Recycled Asphalt ......................... ............................................................................... 0.80 80% Lawns and Landscaping Playgrounds 25% Sandy Soil Flat <2% ………….. ......................... ............................................................................... 0.10 2% Average 2% to 7% ......................... ............................................................................... 0.15 2% Steep >7% ………… ......................... ............................................................................... 0.20 2% Clayey Soil Flat <2% ………….. ......................... ............................................................................... 0.20 2% Average 2% to 7% ......................... ............................................................................... 0.25 2% Steep >7% ………… ......................... ............................................................................... 0.35 2% 2-year Cf = 1.00 10-year Cf = 1.00 USDA SOIL TYPE: C Sub-Basin ID Sub-Basin Area (sq. ft.) Sub-Basin Area (ac.) Area of Asphalt & Concrete (ac.) Area of Roofs (ac.) Area of Gravel (ac.) Area of Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Existing A 6,085 0.140 0.014 0.025 0.000 0.101 0.25 0.25 0.31 28% Existing B 488 0.011 0.002 0.000 0.000 0.009 0.25 0.25 0.31 20% CHARACTER OF SURFACE: Runoff Coefficient 1 Percentage Impervious 1 Project: Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: Asphalt ………………… ......................... ............................................................................. 0.95 100% Date: Concrete ………………. ......................... ............................................................................. 0.95 100% Gravel (packed) ………. ......................... ............................................................................. 0.50 40% Roofs………………….. ......................... ............................................................................. 0.95 90% Pavers…………………. ......................... ............................................................................. 0.50 40% Recycled Asphalt ......................... ............................................................................. 0.80 80% Lawns and Landscaping Playgrounds 25% Sandy Soil Flat <2% ………….. ......................... ............................................................................. 0.10 2% Average 2% to 7% ......................... ............................................................................. 0.15 2% Steep >7% ………… ......................... ............................................................................. 0.20 2% Clayey Soil Flat <2% ………….. ......................... ............................................................................. 0.20 2% Average 2% to 7% ......................... ............................................................................. 0.25 2% Steep >7% ………… ......................... ............................................................................. 0.35 2% 2-year Cf = 1.00 10-year Cf = 1.00 USDA SOIL TYPE: C Sub-Basin ID Sub-Basin Area (sq. ft.) Sub-Basin Area (ac.) Area of Asphalt & Concrete (ac.) Area of Roofs (ac.) Area of Pavers (ac.) Area of Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Proposed A 6,206 0.14 0.039 0.038 0.005 0.060 0.55 0.55 0.69 54% Proposed B 824 0.02 0.016 0.000 0.000 0.003 0.55 0.55 0.69 84% Proposed OS1 1,139 0.03 0.002 0.012 0.000 0.013 0.60 0.60 0.75 47% PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 609 S. College Avenue B. Ruch Project: 609 S. College Avenue Calculations By: Date: Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Existing A Existing A No 0.25 0.25 0.31 22.1 22.1 20.5 N/A N/A 22.1 22.1 20.5 Existing B Existing B No 0.25 0.25 0.31 5.9 5.9 5.5 N/A N/A 5.9 5.9 5.5 Existing OS Existing OS No 0.25 0.25 0.31 1.9 1.9 1.8 N/A N/A 5.0 5.0 5.0 EXISTING TIMES OF CONCENTRATION COMPUTATIONS B. Ruch February 5, 2020 Design Point Sub-Basin Overland Flow Gutter/Swale Flow Time of Concentration Velocity (Gutter Flow), V = 20·S½ Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Overland Flow, Time of Concentration: Gutter/Swale Flow, Time of Concentration: (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C.O. G W C S E VAULT ELEC TELE T VAULT ELEC CONTROL IRR VAULT ELEC / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X 605 COLLEGE LTD 605 S COLLEGE AVE FORT COLLINS, CO 805243003 GATON III INC DBA CANINOS ITALIAN RESTAURANT 613 S COLLEGE AVE FORT COLLINS, CO 805243003 SOUTH COLLEGE AVENUE DALZELL ALLEY EXISTING 100-YR FLOODPLAIN (CITY OF FORT COLLINS) EX A 0.140 ac EX A EX B EX OS EX OS 0.037 ac EX B 0.011 ac HISTORIC DRAINAGE EXHIBIT FORT COLLINS, CO 609 S. COLLEGE E NGINEER ING N O R T H E RN FEBRUARY 5, 2020 P:\564-005\DWG\DRNG\564-005_EXST DRNG.DWG ( IN FEET ) 0 1 INCH = 20 FEET 20 20 DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc C.O. G W C S E VAULT ELEC TELE T VAULT ELEC VAULT ELEC / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / E E E X X X X X X X X X X X X A 0.142 ac A OS B OS 0.026 ac B 0.019 ac 605 COLLEGE LTD 605 S COLLEGE AVE FORT COLLINS, CO 805243003 GATON III INC DBA CANINOS ITALIAN RESTAURANT 613 S COLLEGE AVE FORT COLLINS, CO 805243003 SOUTH COLLEGE AVENUE DALZELL ALLEY EXISTING 100-YR FLOODPLAIN (CITY OF FORT COLLINS) PROPOSED DRAINAGE EXHIBIT FORT COLLINS, CO 609 S. COLLEGE E NGINEER ING N O R T H E RN FEBRUARY 5, 2020 P:\564-005\DWG\DRNG\564-005_DRNG.DWG ( IN FEET ) 0 1 INCH = 20 FEET 20 20 DRAINAGE SUMMARY TABLE C.O. G W C S C E VAULT ELEC TELE T VAULT ELEC CONTROL IRR VAULT ELEC / / / / / / / / / / / / / / / / / / / / / / / / G G SOUTH COLLEGE AVENUE DALZELL ALLEY X X X X X X X C.O. G W C S E VAULT ELEC TELE T VAULT ELEC VAULT ELEC / / / / / / / / / / / / / / / / / / / / / / / / SOUTH COLLEGE AVENUE DALZELL ALLEY ROOFTOP CONCRETE ASPHALT PAVERS SURFACE AREA (SF) % IMPERV. IMPERV. AREA (SF) 1,928 853 0 0 100% Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 100.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 1.000 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 1,463 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 49 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 3 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 29 sq ft D) Actual Flat Surface Area AActual = 237 sq ft E) Area at Design Depth (Top Surface Area) ATop = 237 sq ft F) Rain Garden Total Volume VT= 59 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Benjamin Ruch Northern Engineering February 4, 2020 609 S. College Fort Collins, CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO RG_UD-BMP_v3.06.xlsm, RG 2/4/2020, 4:16 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW THE LINER IF THE SUBGRADE IS ANGULAR 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Benjamin Ruch Northern Engineering February 4, 2020 609 S. College Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO RG_UD-BMP_v3.06.xlsm, RG 2/4/2020, 4:16 PM 100% 100% 40% 86 TOTALS 2,781 TOTAL= 2,781 ROOFTOP CONCRETE ASPHALT PAVERS SURFACE AREA (SF) % IMPERV. IMPERV. AREA (SF) 2,164 2,488 0 198 100% 100% 100% 40% TOTALS 4,850 TOTAL= 4,731 EXISTING PROPOSED 2,164 79 1,928 853 0 2,488 0 P:\564-005\DWG\DRNG\564-005_IMPERVIOUS.DWG 609 S. COLLEGE AVE. FORT COLLINS COLORADO 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DESCRIPTION EXISTING VS. PROPOSED IMPERVIOUS AREA DRAWN BY B. Ruch DATE February 5, 2020 PROJECT 564-005 SK-C1 SCALE DRAWING 1"=30' DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) Existing A Existing A 0.14 0.25 0.31 22.1 20.5 0.05 0.24 Existing B Existing B 0.01 0.25 0.31 5.9 5.5 0.01 0.03 Existing OS Existing OS 0.04 0.25 0.31 5.0 5.0 0.03 0.11 Proposed A Proposed A 0.14 0.55 0.69 13.2 12.3 0.16 0.70 Proposed B Proposed B 0.02 0.55 0.69 6.1 5.4 0.03 0.13 Proposed OS1 Proposed OS1 0.03 0.60 0.75 5.0 5.0 0.04 0.20 (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) Existing A Existing A 0.14 0.25 0.31 22.1 20.5 0.05 0.24 Existing B Existing B 0.01 0.25 0.31 5.9 5.5 0.01 0.03 Existing OS Existing OS 0.04 0.25 0.31 5.0 5.0 0.03 0.11 Proposed A Proposed A 0.14 0.55 0.69 13.2 12.3 0.16 0.70 Proposed B Proposed B 0.02 0.55 0.69 6.1 5.4 0.03 0.13 Proposed OS1 Proposed OS1 0.03 0.60 0.75 5.0 5.0 0.04 0.20 C Cf L Ti = − February 5, 2020 1) Runoff coefficients are taken from the Fort Collins Stormwater Criteria Manaual, Table 4.1-3and Table 3.2-2. 100-year Cf = 1.25 Composite Runoff Coefficient with Adjustment Existing OS 1,594 0.037 0.003 0.019 0.000 0.014 0.25 0.25 0.31 57% 1) Runoff coefficients are taken from the Fort Collins Stormwater Criteria Manaual, Table 4.1-3and Table 3.2-2. EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 609 S. College Avenue B. Ruch February 5, 2020 100-year Cf = 1.25 Composite Runoff Coefficient with Adjustment Proposed A Proposed A No 0.25 0.25 0.31 67 96.96 96.11 1.27% 12.0 12.0 11.1 136 96.11 94.92 0.87% 1.87 1.2 13.2 13.2 12.3 Proposed B Proposed B No 0.35 0.35 0.44 27 97.25 96.79 1.70% 6.1 6.1 5.4 0 96.79 84.93 N/A N/A N/A 6.1 6.1 5.4 Proposed OS1 Proposed OS1 No 0.00 0.00 0.00 7 96.40 95.76 9.14% 2.6 2.6 2.6 0 0.00 0.00 N/A N/A N/A 5.0 5.0 5.0 Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Design Point Sub-Basin Overland Flow Gutter Flow Time of Concentration Tt = L / 60V PROPOSED TIME OF CONCENTRATION COMPUTATIONS Overland Flow, Time of Concentration: B. Ruch February 5, 2020 Gutter/Swale Flow, Time of Concentration: (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = −