Loading...
HomeMy WebLinkAboutAPEX HAVEN APARTMENTS PREVIOUSLY HAVEN APTS - PDP190017 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSFort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134-tax lcgov. com/developmen treview November 22, 2019 Shelley La Mastra Russell + Mills Studios 506 S College Ave Unit A Fort Collins, CO 80524 RE: Haven Apartments, PDP190017, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Haven Apartments. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcqov.com Topic: General Comment Number: 1 11/19/2019: INFORMATION ONLY: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! RMS Response: Thanks Brandy Comment Number: 2 11/19/2019: INFORMATION ONLY: As part of your resubmittal you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide Sign detail added to utility plans. United Civil Group Response: Noted, fire lane signs will be indicated on the Utility Plans during final compliance. Comment Number: 3 11/18/2019: FOR FINAL PLAN: ADDRESS POSTING - Unless a monument sign is located at the drive entry at Prospect, address numerals shall be posted relative to building setback so as to be visible from the street fronting the property (Prospect). Building 1 requires a minimum of 10-inch numerals on a contrasting background. Buildings 2 & 3 require a minimum of 8-inch numerals on a contrasting background. ALM2s Response: It is not known at this time whether a monument sign at the entry drive will be utilized so we have indicated location and size of address numerals on the building elevations included with this submittal. Comment Number: 4 11/18/2019: FOR FINAL PLAN: FIRE PITS & GRILLS - Fire pits & grills fueled by natural gas may be allowed in association with multi -family buildings with prior approval of the fire marshal. Wood burning or smoke producing fire pits & grills are strictly prohibited. Fire pits & grills shall be located in a permanent/fixed location, such as a built-in kitchen or fireplace with UL fixtures as appropriate; or as otherwise limited by manufacturer's installation guidelines. Connections shall have hard pipe, not flex pipe and be equipped with an emergency shut off. Fire pits and grills fueled by natural gas shall have a 10' separation to combustible construction and/or vegetation. This distance is measured both horizontally and vertically from the fire source and may be relevant to the pergola design. RMS Response. No new grills are proposed. Existing grills on Apex shall remain in use for all residents. Department: Environmental Services Contact: Jonathon Nagel, 970-416-2701, inagel@fcqov.com Topic: General Comment Number: 1 11/19/2019: INFORMATION ONLY: The Community Recycling Ordinance (No. 109 2016) requires that all new business and multifamily complexes subscribe to recycling service that is at minimum 1/3 of their overall service capacity (total bin capacity x number of weekly pickups, include both trash and recycling when calculating overall service capacity). In general recycling containers must be at least 50% the size of proposed trash containers to meet this requirement. Please make sure proposed containers meet this requirement and that adequate space is provided in all enclosures. RMS Response: A new trash/recycling enclosure with (2) 4 CY bins has been shown as well as upsizing of the existing enclosure in the NW from 3 cy bins to 4 cy bins. Please see multi -family excel spreadsheet submitted as well. Comment Number: 2 11/19/2019: FOR FINAL PLAN: Please label the capacity and usage of the proposed dumpsters on the plan enlargement of the trash and recycling enclosure. RMS Response: Detail with information is provided on site detail sheets. 10 Comment Number: 3 11/19/2019: BY HEARING: How many total bedrooms are proposed? I counted 57 during my review, but wanted to verify this. With 57 bedrooms you are likely to need -7.75 yards of trash serviced per week and -5.1 yards of recycle which would be easily accomplished with the proposed bin sizes with twice a week pickup RMS Response: With the new plan including the Apex Apartments there are now a total of 118 bedrooms. The excel spreadsheet provided by City staff has been used to calculate trash/recycling pick up. The existing enclosure will convert the (5) 3 CY bins to (4) 4 CY bins (3 for trash, 1 for recycling) and a new enclosure will be added west of Building 2 that will have (1) 4 CY trash and (1) 4 CY recycling. Trash service will come to the site 4 days per week. Comment Number: 4 11/19/2019: BY HEARING: Any path that will be used to roll dumpsters between their storage location and the truck access point needs to be concrete cement and may not exceed 5 percent slope in the direction of travel and 2 percent cross slope. Please label this path, surface material and slopes on the site plan. RMS Response: The new enclosure west of Building 2 has concrete in front of the enclosure as required. United Civil Group Response: The enclosure grading does not exceed the slopes mentioned and are now noted on the Grading Plan at the new location. Comment Number: 5 11/19/2019: BY HEARING: Generally rolling dumpsters are -4'x7' has a hauler been selected for this project that gave you the dimensions used in the drawings (--5'6" x 6')? Measuring between the curbs inside the enclosure -156" is available, it is recommended to increase the width of the enclosure to more comfortably fit a 4'x7' container. This could be accomplished by expanding the width to the west and moving the pedestrian entrance to the north side, additionally a 4' deep container will allow more room for removing the rear container in front of the first container. RMS Response: Please see above for response to new trash approach. Discussions and plans have been sent to trash service representative to verify they meet their requirements. Comment Number: 6 11/19/2019: BY HEARING: Are residents responsible for bringing their trash and recycling from their units to the dumpsters themselves or is any type of valet or chute system proposed? Either a valet system or chutes will require advanced approval from PFA and the City. RMS Response: The current residents at Apex bring their own trash/recycling out to the dumpsters. It is planned to continue this approach. Comment Number: 7 11/19/2019: FOR FINAL PLAN: Enclosure service gates and associated latches and hinges are required to be constructed of metal or other durable material. Please label this on the plan enlargement for the trash and recycling enclosure. RMS Response: A note has been added to the detail plan. Department: Building Services Contact: Katy Hand, khand@fcqov.com 11 Topic: Building Insp Plan Review Comment Number: 8 11/19/2019: BUILDING PERMIT: Please visit our website for a list of current adopted building codes and local amendments for building permit submittal: https://www.fcgov.com/building/codes.php ALM2s Response: Tnank you. Our oesrgn is baser) on the 2018 IBC and other current adopted code diersions Comment Number: 9 11/19/2019: BUILDING PERMIT / SITE CONSIDERATIONS: Buildings walls located less than 10ft from property lines (that do not front a public way) must be 1 hr fire rated with limited openings. ALM2s Response: Thank you for this comment. Our code analysis will include the rated assembly for the north wall of Building 1 and the supporting calculations for the allowed openings at this north wall. Comment Number: 10 11/19/2019: INFORMATIONAL: Buildings walls located within 250ft of a 4 lane road must provide exterior composite sound transmission of 39 STC min. ALM2s Response: Thank you for this comment. Our exterior wall assembly for Building I facing Prospect Road will meet a minimum of 39 STC. Buildings 2 and 3 are existing, historic buildings which will make it likely not possible to meet this local amendment given that we are required to retain the original windows and exterior ,end wall ,assembly. Comment Number: 11 11/19/2019: INFORMATIONAL: Buildings 15,000 sf or larger require commissioning ALM2s Response: Thank you for this comment. We will plan on providing commissioning for this building. Department: Technical Services Contact: Jeff County, 970-221-6588, *county@fcgov.com Topic: General Comment Number: 3 11/15/2019: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. RMS Response: Noted, thank you. Topic: Plat Comment Number: 2 11/15/2019: FOR FINAL PLAN: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Washburn Response: Revised. On Sheet 1 our note 8 we did not change since the intention was to only vacate all easements, dedicated on The Slab Property Plat. with Lot 2. Since Zoning is a transitory feature it should not be shown on a permanent document. Adjacent Zoning is not show on the plat but is show on planning documents. 12 reference to specific project plans or explanations of why comments have not been addressed, when applicable. RMS Response: All Comments have been addressed or explanation provided on why they no longer are applicable with the new design/approach. Comment Number: 3 11/19/2019: INFORMATION ONLY: When you are ready to re -submit, please let me know. Submittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the same week. RMS Response: Phone call on 211912020 to discuss resubmittal on 26h as well as requirements and checklist needed. Brandy confirmed we would process as round 2 submittal with same PDP number, however to resubmit all material on round 1 checklist. Comment Number: 4 11/22/2019: INFORMATION ONLY: the proposed project would process as a Type 2 Project Development Plan. The decision maker for Type 2 is the Planning and Zoning Board. Staff would need to be in agreement the project is ready for Hearing approximately 3-5 weeks prior to the hearing. I have attached the P&Z hearing schedule with due dates. Everyone is able to prepare their presentations for the hearing during this time, and we do send out notices as it is a public hearing. RMS Response: Noted, thank you. AS soon as we have staff support and approval we would like to schedule the next available P&Z meeting. Department: Planning Services Contact: Pete Wray, 970-221-6754, pwray@fcgov.com Topic: General Comment Number: 2 11/16/2019: BY HEARING: Since Building 1 is over 40' in height, please provide shadow analysis per Section 3.5.1 (G) (1). ALP42s Response: A shadow analysis has been included with this submittal. Comment Number: 4 11/20/2019: BY HEARING: In review of the Request for modification of standards, staff finds that the Modification #1 (Section 3.8.30), and Modification #2 (Section 4.10) are complete and in compliance with Section 2.8., as submitted. RMS Response: With the new redesign only modification 1 will be applicable, new revised summary has been submitted. Comment Number: 5 11/20/2019: BY HEARING: In review of the submitted Request for Alternative Compliance for Section 3.2.2 (K) (1) (a) (1), to include three additional parking spaces on adjacent Apex site, staff accepts this request. Please revise site plan cover page that shows providing 40 spaces on site and adding 2 from adjacent Apex lot. this should show providing 39 spaces on site and adding 3 additional spaces off -site. RMS Response: The Apex Multi -family development is now part of this submittal. Both Apex and Haven buildings are now on 1 lot and will share the existing parking lot on Apex. The parking quantities meet the TOD standards. The 9 spaces that are provided on the Haven side will include 5 permitted spaces for residents in Building 2 and 3 as well as a guest parking space, ADA parking space and a space reserved for delivery/ride share temporary parking. K Department: Forestry Contact: Nils Saha, nsaha@fcgov.com Topic: Landscape Plans Comment Number: 1 11/18/2019: FOR HEARING: Thank you for including the tree inventory and the Tree Removal Feasibility Letter. Forestry has some concerns regarding the proposal to remove tree #4 to accommodate an expanded detention area. This is a significant spruce in fair condition. Are there other alternatives for added detention that does not impact the existing tree? RMS Response: The new site protects and retains this tree. Additional detention space required as been moved to the back of building 3. Comment Number: 2 11/18/2019: FOR HEARING: The total required mitigation trees should be 16, as proposed, not 15. Please refer to comment #1 and update accordingly. RMS Response: Tree mitigation quantities have been updated for retaining/protecting tree #4. Comment Number: 3 11/18/2019: FOR HEARING: The proposed wall on the southeast corner of the building is approximately 7 feet from the trunk of the 18" honeylocust. Please provide additional details on how impact will be minimized during construction. RMS Response: The following note has been added to the plans. "DO NOT OVER EXCAVATE NEAR DRIP LINE OF TREE FOR DETENTION POND AND BUILDING. CUT AND PULL AWAY FROM TREE, NOT TOWARD TREE." Comment Number: 4 11/18/2019: FOR HEARING: The detention block wall is approximately 15' from the closest spruce. Please provide additional details on how impact will be minimized during construction. RMS Response: The existing detention pond wall extents will not be changed and therefore will not affect the spruce tree roots. Comment Number: 5 11/18/2019: FOR HEARING: Please show the diversity percentages for the proposed species. RMS Response: Species required maximum species shown at bottom of tree list. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 2 11/18/2019: FOR HEARING: More discussion is needed on the best design options for the bio-retention pond to ensure proper function and maintenance. United Civii Group Response: The bio-retention pond design has been discussed with City personnel and revised accordingly. Comment Number: 3 3 11/18/2019: FOR FINAL PLAN: Please provide a fore -bay to the entrance into the bio-retention pond from the channel taking flows from Basin B-2. This should include sediment collection and energy dissipation. United Civil Group Response: A fore -bay has been added to the plans and will be during final compliance. Comment Number: 4 11/19/2019: FOR HEARING: Please provide a drainage easement for the StormTech system and the outfall pipe from Pond B to the right-of-way. United Civil Group Response: The easement has been added. Comment Number: 5 11/19/2019: FOR HEARING: The outfall pipe of pond B may be impossible to build with the existing tree. United Civil Group Response: Per communication with City personnel, this pipe will be bored between the trees to limit damage to the root system of the existing tree. This has been noted in the Utility Plans. Comment Number: 6 11/19/2019: FOR HEARING: The plans propose removing a water quality feature for the Slab. This would require mitigation. United Civil Group Response: Per communication with City personnel, the underlying water quality feature is being maintained. Although concrete is being placed over a small section of the infiltration system per PFA requirements, stormwater will continue to enter the system downstream of the new concrete; therefore, not impacting the function of the water quality system. Contact: Basil Harridan, 970-222-1801, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 1 11/13/2019: FOR FINAL PLAN: The proposed site work will disturb more than an acre, therefore it is subject to the State Discharge permit requirements. At FDP a detailed Erosion and Sediment Control Report will be required. Thank you for submitting a preliminary Erosion and Sediment Control Plan. At final please add all appropriate Erosion and Sediment Control notes including a note stating that all LID and infiltration practices will be built as part of the final construction sequence to minimize the potential for these to be clogged with sediment due to construction activities on the site. Please locate dpwnstream inlets for this site and make sure they are adequately protected. United Civil Group Response: Noted, a full Erosion and Sediment Control Report will be provided during FDP and will include the notes and inlet protection requirements noted. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970.416-2418, wlamarque@fcgov.com Topic: General Comment Number: 1 11/18/2019: FOR HEARING: Please relocate the fire hydrant to an area in the parkway that is not conflicting with trees or existing utilities. Options may be 12 feet west of the storm outlet pipe or west of the access drive. This may allow the fire line to move where the fire hydrant is being proposed. Please contact City Utilities for a discussion on options. United Civil Group Response: Per communication with City personnel, the hydrant has been relocated. Comment Number: 2 11/19/2019: FOR HEARING: All existing sewer and water services that are to not remain in service need to be abandoned at the main. It appears one sewer service and one water service stub are not shown to be abandoned or used. United Civil Group Response: Currently all water and sewer services are planned to be used onsite and are noted on the Utility Plan. Comment Number: 3 11/19/2019: FOR HEARING: The meter pit for the 3-inch water service needs to be on private property. United Civil Group Response: The meter pit has been relocated. Comment Number: 4 11/19/2019: FOR HEARING: The sewer line that is shown serving the property to the west is private and is not a public main. The two services tying into this line will need to be relocated to a public main. United Civil Group Response: Per communication with City personnel, the two sewer services will be allowed to be connected to this private main. Department: Engineering Development Review Contact: Spencer Smith, 970-221-6603, smsmith@fcpov.com Topic: General Comment Number: 1 11/18/2019: FOR HEARING: There are some inconsistencies with the legal descriptions on the plat. In some cases it refers to lots 1 and 2 and some cases just lot 2. Also, the plat cover calls this a replat of the Observatory Park Subdivision, rather than The Slab Property. Please see additional comments from the City Surveying and Technical Services staff. Washburn Response: Has been revised. Comment Number: 2 11/18/2019: FOR HEARING: There are several inconsistencies on the plat and plans regarding which easements are existing, dedicated per The Slab Property plat, and proposed or rededicated with this plat. Also, if you could call out and depict easements similarly to how they are on The Slab Property plat, it may help make the plat more clear (see redlines). Washburn Response: Has been revised. Comment Number: 3 11/18/2019: FOR HEARING: There are some areas where emergency vehicle drive paths may extend outside of the proposed emergency access easement(s). Please ensure that all emergency vehicle turning movements are contained within an easement. United Civil Group Response: Per the review meeting, the easements do contain the wheel paths (not the vehicle overhang). However, the exhibits have been revised for clarity and resubmitted. Comment Number: 4 5 11/18/2019: FOR HEARING: The proposed emergency access easement through the site is intended for service vehicle and public access as well, correct? The plat needs to indicate all proposed uses for the easement and be consistent with the site and utility plans. Also, please add dimensions on the two different widths for reference (see redlines). Washburn Response: RMS Response: Site plans reference names of easements on plat. New site plan only provides resident's vehicular access to existing parking lot on Apex side from existing, most western entry point off of Prospect. The new parking lot (9 spaces) on the Haven side are permitted for Buildings 2 and 3, 1 delivery/ride share space, 1 guest and 1 ADA space — no vehicular traffic is allowed between the two lots other than for PFA. A collapsible/drive over is located within the 16' drive to prevent vehicles from using this area. It is anticipated that the delivery/ride share area or ADA van aisle (8' width) can be used as a turn around space for vehicles coming in and leaving the new Haven parking lot if the other spaces are all full. United Civil Group Response: The Utility Plans have been coordinated with the Subdivision Plat. Comment Number: 5 11/18/2019: FOR HEARING: I think we need to get some clarity on how the access (public access, non -vehicular public access, emergency access, etc.) is intended to function between lots 1 and 2. 1 believe the intent is for residents to be able to drive between lots 1 and 2 for parking purposes, as well as service vehicles and emergency vehicles. We do not want to allow or imply that it is allowed for public vehicles to use the existing "emergency access, non -vehicular public access, utility and drainage easement". You will need to define the proposed easements in a way that accommodates all proposed uses in the correct locations. RMS Response: Please see above comment response for clarification. Existing signs on the Apex side are located at the entry point of the EAE next to the parking lot that call out drive is for Emergency vehicles only. Comment Number: 6 11/18/2019: FOR HEARING: Please see redlines for comments on sheets LS101, LI101 and LP101 of the site plan. RMS Response: Comments addressed. Comment Number: 7 11/18/2019: FOR HEARING: Please show and call out all easements consistently between the plat, site and utility plans. Washburn Response: Plat shows names of easements. RMS Response: Site plans reference names of easements on plat. United Civil Group Response: Utility plans reference names of easements on plat. Comment Number: 8 11/18/2019: FOR FINAL PLAN: Please ensure that all improvements are either out of the drive path of emergency vehicles or able to withstand that kind of loading. According to the PFA turning template exhibits, it looks like a proposed fire hydrant and water meter pit are potentially in the drive path an emergency vehicle. Also, since it is a pretty tight fit for larger vehicles to navigate the site, you may see if you can adjust the location of the proposed transformer so that it sits a bit further back from the drive aisle (see redlines). United Civil Group Response: The wheel paths of the vehicles are within the drive lane. Additionally, with the site revisions, aerial access is no longer required by PFA; therefore, the exhibits have been revised accordingly and do not conflict with surface features (hydrant, transformer, etc.). The revised exhibits have been included with this resubmittal. Comment Number: 9 11/18/2019: FOR HEARING: Please see utility plan and plat redlines for additional comments. United Civil Group Response: Utility Plan redlines have been addressed. Washburn Response: Revised. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcqov.com Topic: General Comment Number: 1 11/19/2019: FOR INFORMATION: The submitted traffic impact study memo has been received and reviewed. The conclusions are accepted. RMS Response: Noted, thank you for reviewing. Comment Number: 2 11/19/2019: FOR HEARING: The comment from the concept review regarding the ability for vehicles to turn around is noted again. The preference would be to create inter -connectivity with the property to the west. Or at a very minimum some type of pick-up/drop off area, turnaround or hammerhead is important for functionality. Especially for student housing complexes, we see a lot of food delivery, UBER use etc. that don't intend to park, and just come and go. RMS Response: New site plan only provides resident's vehicular access to existing parking lot on Apex side from existing, most western entry point off of Prospect. The new parking lot (9 spaces) on the Haven side are permitted for Buildings 2 and 3 residents ONLY,1 delivery/ride share space, 1 guest and 1 ADA space — no vehicular traffic is allowed between the two lots other than for PFA. A bollard with PFA knox lock is located within the 16' drive to prevent vehicles from using this area. It is anticipated that the delivery/ride share area or ADA van aisle (8' width) can be used as a turn around space for vehicles coming in and leaving the new Haven parking lot if the other spaces are all full. Comment Number: 3 11/19/2019: FOR FINAL PLAN: We'll need a signing and striping plan (or it can be included in the utility plans). United Civil Group Response: Noted, signing and striping will be included in the Utility Plans during final compliance. Department: Light And Power Contact: Cody Snowdon, 970-416-2306, csnowdon@fcqov.com Topic: General Comment Number: 1 11/19/2019: FOR HEARING: Please show the routing of the primary power to the proposed transformer location to ensure adequate separation from other utilities. 7 United Civil Group Response: Per communication with City personnel, the transformer location has been revised and is now located adjacent to the transformer for Apex Apartments. Therefore, it is our current understanding that the primary will be provided from the existing primary. If additional primary needs to be located on the Utility Plan Comment Number: 2 11/19/2019: FOR HEARING: Please ensure that the proposed transformer location has adequate separation from all opens and combustible surfaces on the existing residence. From looking at the elevations, it seems like there is a window close to the proposed transformer locations, so please show dimension to ensure this location will work. RMS Response: Transformer has been relocated to be adjacent existing transformer along EAE drive. Comment Number: 3 11/19/2019: FOR FINAL PLAN: Meter location will need to be coordinated with Light and Power. Please show proposed meter location on the Utility Plan. The current location seems to conflict with the proposed entrance. United Civil Group Response: Noted, the meter locations will be shown on the Utility Plan during final compliance. Comment Number: 4 11/19/2019: FOR FINAL PLAN: A commercial service information form (C-1 form) and a one line diagram for all commercial meters will need to be completed and submitted to Light & Power Engineering for review prior to Final Plan. A link to the C-1 form is below: http://zeus.fcgov.com/utils-procedures/files/EngWikVWikiPdfs/C/C-1 Form.pdf ALM2s Response: The C-I form will be submittal for at final plan if this is required prior to the building permit submittal. Comment Number: 5 11/19/2019: FOR FINAL PLAN: Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees RMS Response: Noted. Department: Environmental Planning Contact: Kelly Smith, ksmith@fcgov.com Topic: General Comment Number: 1 11/05/2019: FOR HEARING: Ensure wall mounted light fixtures are fully shielded and down directional. RMS Response: Noted. Notes are on lighting plan that fixtures meet all dark sky regulations and are full cut off. Comment Number: 2 11/05/2019: FOR HEARING: Does the photometric plan calculate existing fixtures on the western side of the property? If not, there is too much light spillage onto the properties to the north and west. RMS Response: The Apex and Haven lots have been replatted as one lot so light spillage is no longer a concern. Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com Topic: General Comment Number: 3 11/19/2019: FOR HEARING: Clarify specific turf variety and species proposed - essentially exactly which blend is proposed. This is important to ensure the project can remain in its assigned water allotment. RMS Response: A drought resistant blend will be used, legend calls out a 3 type bluegrass hybrid blend wl 20% texas bluegrass a local sod farm is preferred. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General Comment Number: 1 11/21/2019: FOR HEARING: Please define and identify supplier of Kentucky Bluegrass blend for turf grass applications. Water budgets are prescribed for types of turf, identify exact blend and species breakdown of bluegrass hybrid. Please identify supplier of hybrid grass to verify water demand. If you have questions, contact Eric Olson at eolson@fcgov.com or 970-221-6704. RMS Response: A drought resistant blend will be used, legend calls out a 3 type bluegrass hybrid blend wl 20% texas bluegrass a local sod farm is preferred. Exact supplier cannot be determined at preliminary level drawings, general contractor and landscape contractor will determine supplier at time of construction. Department: PFA Contact: Jim Lynxwiler, 970-416-2869,Llynxwiler@poudre-fire.org Topic: General Comment Number: 1 11 /18/2019: INFORMATION: The fire marshal has approved the "Request for Alternative Compliance" as proposed by the applicant in the submittal documents dated Oct. 24, 2019. All prior site plan comments from PFA have been resolved. ALM2s Response: Per communication with PFA, building 1 is now reduced in building area, unit count and is now a 3-story building with walk-up style apartments that include exterior breezeways/stairs and no elevator or enclosed stairs. The maximum eave height along the west side of the east wing and the south and west sides of the west wing is also now less than 30' in height. Based on these changes to the Building 1, many of the items previously approved in the Request for Alternative Compliance are no longer applicable. Please see exhibit included with submittal that illustrate the points of roof access via a ladder for reference. Comment Number: 2 11/18/2019: FOR FINAL PLAN: FIRE LANE POSTING - Fire lane sign locations should be indicated on plan sets with the FDP. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate directional arrows required on all signs. E