HomeMy WebLinkAboutAPEX HAVEN APARTMENTS - PDP190017 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSSHIELDS ST
WHITCOMB ST
LAKE ST PROJECT SITE
PROSPECT RD
PITKIN ST
HOBBIT ST
SHEELY DR
BIRKY PL
WALLENBERG DR
BALSAM LN
JUNIPER LN
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = 400'
1" = N/A
APEX-HAVEN APARTMENTS
3/10/2020 3:13:00 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C0.00 - COVER.DWG
C0.00 - COVER
KRB CDB
C0.00
8
COVER SHEET
UTILITY PLANS FOR
APEX-HAVEN APARTMENTS
BEING A REPLAT OF LOTS 1 AND 2, THE SLAB PROPERTY, SITUATED IN THE SOUTHWEST QUARTER OF
SECTION 14, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN,
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
MARCH 2020
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY
FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY
RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE
LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR
ACCURACY AND CORRECTNESS OF THE CALCULATIONS.
FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT
QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL
QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE
CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL
RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL
QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED
DURING THE CONSTRUCTION PHASE.
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS
WERE PREPARED UNDER MY DIRECT SUPERVISION, IN
ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS
AND STATE OF COLORADO STANDARDS AND STATUTES,
RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR
THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD
CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
KEVIN BRAZELTON, PE #38837 DATE
SCALE: 1"=400'
CERTIFICATION STATEMENT
DISCLAIMER STATEMENT
VICINITY MAP
OWNER / APPLICANT
MAXIIIMO DEVELOPMENT GROUP
706 SOUTH COLLEGE AVENUE, SUITE 207
FORT COLLINS, CO 80524
PHONE: 970-566-2948
CONTACT: CHRISTIAN BACHELET
CIVIL ENGINEER
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = ###'
1" = N/A
APEX-HAVEN APARTMENTS
3/10/2020 3:13:01 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C0.00 - COVER.DWG
C0.00 - COVER
KRB CDB
C0.01
8
GENERAL NOTES
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
LARIMER COUNTY URBAN AREA STREET STANDARDS - REPEALED AND REENACTED OCTOBER 1, 2002
GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the Standards and Specifications set forth in the Larimer County Urban Area
Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most
restrictive standard shall apply. All work shall be inspected and approved by the local entity.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the local entity engineer. Use of these plans after the
expiration date will require a new review and approval process by the local entity prior to commencement of any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the local entity, as beneficiary of said engineer's work,
for any errors and omissions contained in these plans, and approval of these plans by the local entity engineer shall not relieve the engineer who has prepared these
plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the local entity, and its officers and
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = ###'
1" = N/A
APEX-HAVEN APARTMENTS
3/10/2020 3:13:02 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C0.00 - COVER.DWG
C0.00 - COVER
KRB CDB
C0.02
8
GENERAL NOTES
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
General Erosion Control Requirements
These notes are a summary for the legal requirements, that are set forth in the Fort Collins Stormwater Criteria Manual (FCSCM), and that any conflict is resolved
by the more stringent requirement controlling.
1) The Property Owner, Owner's Representative, Developer, Design Engineer, General Contractor, Sub-contractors, or similar title for the developing entity
(here after referred to as the Developer) has provided these Erosion Control Materials in accordance with Erosion Control Criteria set forth in the Manual as
an attempt to identify erosion, sediment, and other potential pollutant sources associated with these Construction Activities and preventing those pollutants
from leaving the project site as an illicit discharge. Full City requirements and are outlined and clarified in the Manual under Chapter 4: Construction Control
Measures and should be used to identify and define what is needed on a project.
2) The Developer shall make themselves thoroughly familiar with the provisions and the content of the specifications laid out in the Manual, the Development
Agreement, the Erosion Control Materials compiled for this project, and the following notes as all these materials are applicable to this project.
H
Y
D
W
C
S
S
E
G
LOT 2
52,006 SF
8' UTILITY &
DRAINAGE EASEMENT
TO BE VACATED
PROPERTY CORNER
N:124065.44
E:191087.95
PROPERTY CORNER
N:124064.42
E:191315.86
PROPERTY CORNER
N:123835.74
E:191314.26
15' UTILITY &
DRAINAGE EASEMENT
5' UTILITY &
DRAINAGE EASEMENT
10' PUBLIC
ACCESS EASEMENT
30' EMERGENCY
VEHICLE, PUBLIC
ACCESS, UTILITY
& DRAINAGE
EASEMENT
WEST PROSPECT ROAD
(RIGHT-OF-WAY VARIES)
EXISTING HOUSE
TO REMAIN
EXISTING HOUSE
TO REMAIN
EXISTING
DRAINAGE
EASEMENT
NON-VEHICULAR
ACCESS PUBLIC
EASEMENT
EXISTING ELECTRICAL
VAULT TO BE RELOCATED
EXISTING GRAVEL
TO BE REMOVED
RETAINING WALL ADJACENT TO EXISTING
SIDEWALK TO BE REMOVED & RECONSTRUCTED
WITH SITE IMPROVEMENTS
EXISTING CONCRETE
PAN TO BE REMOVED
& REPLACED
RIGHT-OF-WAY
EXISTING
UNDERGROUND
ELECTRICAL
UP
UP UP
UP
UP UP
UP
DN DN
UP
8"
DELIVERY
RIDE
SHARE
PARKING
ONLY
PERMIT
1
PERMIT
2
PERMIT
3
PERMIT
5
PERMIT
4
PROPERTY CORNER
N:124065.44
E:191087.95
PROPERTY CORNER
N:124064.42
E:191315.86
PROPERTY CORNER
N:123835.74
E:191314.26
17' (TYP)
9'
(TYP)
15' (TYP)
8'
(TYP)
3.5' SIDEWALK
BUILDING CORNER
N:123938.08
E:191253.67
BUILDING CORNER
N:123937.72
E:191304.41
BUILDING CORNER
N:124056.90
E:191303.41
BUILDING CORNER
N:124056.90
E:191122.30
BUILDING CORNER
N:124001.80
E:191121.30
10' SIDEWALK
12' 14'
2' CURB CHANNEL
2' SIDEWALK CHASE
5' UTILITY &
DRAINAGE EASEMENT
UP
UP UP
UP
UP UP
UP
DN DN
UP
8"
H
Y
D
W
S
E
G
EXISTING
RESIDENCE
(BUILDING 2)
EXISTING
RESIDENCE
(BUILDING 3)
PROPOSED
APARTMENTS
(BUILDING 1)
15' UTILITY &
DRAINAGE EASEMENT
5' UTILITY &
DRAINAGE EASEMENT
WEST PROSPECT ROAD
(RIGHT-OF-WAY VARIES)
EXISTING APEX
BUILDING
EXISTING 30' EMERGENCY
ACCESS, PUBLIC ACCESS,
UTILITY & DRAINAGE EASEMENT
BIORETENTION
POND
EXISTING
DRAINAGE
EASEMENT
NON-VEHICULAR
ACCESS PUBLIC
EASEMENT
PROPOSED
RETAINING WALL
ROOF
DRAIN
SYSTEM
UNDERGROUND WATER
QUALITY CHAMBERS
POND OUTLET STRUCTURE
DRAIN BASIN
5' TYPE R INLET
POND OUTLET
STRUCTURE
OUTLET PIPE TO WEST
PROSPECT CURB CHANNEL
EXISTING
UNDERGROUND
ELECTRICAL
UP
UP UP
UP
UP UP
UP
DN DN
UP
8"
E
G
15' UTILITY &
DRAINAGE EASEMENT
5' UTILITY &
DRAINAGE EASEMENT
30' EMERGENCY
VEHICLE, PUBLIC
ACCESS, UTILITY
AND DRAINAGE
EASEMENT
WEST PROSPECT ROAD
(RIGHT-OF-WAY VARIES)
EXISTING
DRAINAGE
EASEMENT
NON-VEHICULAR
ACCESS PUBLIC
EASEMENT
EXISTING 30' EMERGENCY
ACCESS, PUBLIC ACCESS,
UTILITY & DRAINAGE EASEMENT
GRADE BREAK
0.8%
5.6%
5.9%
BIORETENTION
POND
EXISTING APEX
BUILDING
28.16 FG
27.00
25.67 FG
25.42
25.56 FG
27.50
25.65 FG
26.40 HP
26.15 FL
26.42
26.35
22.74 LP
23.70 LP
20.19 FL
20.24 FL
22.50 LP
22.68 FL
25.00 FG
27.14
28.00 FG
26.78 FG
25.38 FG
E
262.50'
S00°37'46"W (M)
227.20'
S00°00'00"E (R)
A1
0.02 0.95
1.00
A2
0.03 0.60
0.75
A3
0.01 0.95
1.00
C1
0.06 0.48
0.60
D2
0.06 0.25
0.31
B1
0.19 0.37
0.46
B2
0.27 0.76
0.96
E1
0.06 0.41
0.51
ON1
0.06 0.58
0.72
S1
0.04 0.62
0.78
D1
0.11 0.48
0.60
WEST PROSPECT ROAD
(RIGHT-OF-WAY VARIES)
EXISTING
RESIDENCE
(BUILDING 2)
EXISTING
RESIDENCE
(BUILDING 3)
PROPOSED
APARTMENTS
(BUILDING 1)
EXISTING APEX
BUILDING
BIORETENTION
POND
POND B
POND A
UNDERGROUND
WATER QUALITY
C2
0.14 0.95
1.00
1
B3
0.14 0.95
1.00
DETENTION
POND
POND C
EXISTING
PARKING LOT
POND B OUTLET PIPE
POND OUTLET PIPE
FOREBAY
POND OUTLET
STRUCTURE
POND OUTLET
STRUCTURE
ROOF DRAIN SYSTEM
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = 20'
1" = N/A
APEX-HAVEN APARTMENTS
NORTH
3/10/2020 3:14:14 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C5.00 - DRAINAGE PLAN.DWG
C5.00 - DRAINAGE PLAN
KRB CDB
C5.00
8
DRAINAGE PLAN
0 20' 40'
SCALE: 1" = 20'
10'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
8
X.XX
XX.X X.XX
X BASIN DESIGNATION
BASIN AREA (ACRE)
2 - YR RUNOFF COEFF.
100 - YR RUNOFF COEFF.
DESIGN POINT
FLOW DIRECTION
DP
D1
LEGEND
DRAINAGE SUMMARY
Basin Design Point
Area
%I C2 C
100
Q2 Q
100
(acre) (cfs) (cfs)
Existing Basins
EX1 EX1 0.64 15.9% 0.35 0.44 0.50 2.29
EX2 EX2 0.55 11.6% 0.32 0.40 0.38 1.64
TOTAL 1.19 13.9%
Proposed Basins
A1 A1 0.02 90% 0.95 1.00 0.05 0.19
A2 A2 0.03 46% 0.60 0.75 0.05 0.24
A3 A3 0.01 90% 0.95 1.00 0.03 0.12
B1 B1 0.19 17% 0.37 0.46 0.17 0.76
B2 B2 0.27 67% 0.76 0.96 0.59 2.55
B3 B3 0.14 90% 0.95 1.00 0.39 1.42
C1 C1 0.06 31% 0.48 0.60 0.08 0.33
C2 C2 0.14 90% 0.95 1.00 0.38 1.41
D1 D1 0.11 32% 0.49 0.61 0.15 0.66
D2 D2 0.06 2% 0.25 0.31 0.04 0.17
E1 E1 0.06 22% 0.41 0.51 0.07 0.31
S1 S1 0.04 49% 0.62 0.78 0.07 0.31
ON1 ON1 0.06 44% 0.58 0.72 0.10 0.43
TOTAL 1.19 52.1%
26.20 FG
23.80 FG
EXISTING
RESIDENCE
(BUILDING 2)
EXISTING
RESIDENCE
(BUILDING 3)
PROPOSED
APARTMENTS
(BUILDING 1)
FFE=5027.00
27.12
26.51
26.17
26.54
26.63
27.36
26.91
22.80 FG
OVERFLOW WEIR
ELEV. 5026.00
TOP OF POND
ELEV. 5026.60
2' SIDEWALK & CURB CHASE
FINISHED GRADES ABOVE FFE
(SEE NOTE 6)
27.24
23.00
23.04
0.5%
27.75 FG
27.00
27.50 FG
28.00
27.98
27.76 FG
27.50
27.48
27.00 FG
27.00 FG
27.00 FG
27.43
27.80
27.62
27.45
28.00
26.95
FINISHED GRADES ABOVE FFE
(SEE NOTE 6)
FFE=5027.75
27.69 FG
FFE=5028.00
FFE=5027.50
25.42
24.67
24.67
28.00
28.00
25.87 FG
27.50
27.36
27.10
27.24
27.14
26.55
0.1%
0.6%
1.3%
24.62
25.24
24.80
24.80
22.92
23.10
25.50
26.34
26.22
2.0%
26.73
26.91
27.80
27.87
27.91
28.43
28.21 FL
27.09 FL
28.00
27.58
27.46
27.37
27.25
22.61 FL
26.20
26.26
27.28
27.31
28.00 FG
24.22
23.83
23.31
23.11
22.89
22.79
23.00
23.12
23.00
22.69
22.14
22.34
21.32
21.12
22.89
23.09
24.34
23.94 FG
23.70 FG
23.80 FG
24.12 FG
22.55
22.34
UNDERGROUND WATER
QUALITY CHAMBERS
FINISHED GRADES
EQUAL TO & ABOVE FFE
(SEE NOTE 6)
25.31 FG
EXPOSE FFE AS SHOWN
(SEE NOTE 6)
FINISHED GRADES EQUAL
TO FINISHED FLOOR
(SEE NOTE 6)
EXPOSE FFE AS SHOWN
(SEE NOTE 6)
PROPOSED RAILIING
STEPS REQUIRED
(28" TO FFE)
STEPS REQUIRED
(28" TO FFE)
EXISTING
PARKING LOT
PROPERTY BOUNDARY
22.44 FL
22.24 LP
0.5%
10.1%
0.4%
0.4%
0.4%
0.6%
11.3%
6.7%
15.9%
0.5%
22.48 FL
22.51 FL
22.63 FL
2.5%
GRADE BREAK
PROPOSED
RAILIING
28.57
2.2%
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = 20'
1" = N/A
APEX-HAVEN APARTMENTS
NORTH
3/10/2020 3:13:59 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C4.00 - OVERALL GRADING AND EROSION CONTROL PLAN.DWG
C4.00 - OVERALL GRADING AND EROSION CONTROL PLAN
KRB CDB
C4.00
8
OVERALL GRADING AND EROSION CONTROL PLAN
0 20' 40'
SCALE: 1" = 20'
10'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
7
SWALE FLOWLINE
WALL
INLET PROTECTION
ROCK SOCK
SEDIMENT CONTROL LOG
RIPRAP
PERMANENT SEEDING
CONCRETE WASHOUT AREA
SILT FENCE
VEHICLE TRACKING
CONTROL
SLOPE PROTECTION
90.30
PROPOSED SPOT ELEVATION
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE AT EXTERIOR
WALL
EOP = EDGE OF PAVEMENT
LP = LOW POINT
HP = HIGH POINT
TOW = TOP OF WALL
BOW = BOTTOM OF WALL
3.13
EXISTING GRADE
10.0%
4.0:1
(10.0%)
(4.0:1)
PROPOSED SLOPE
EXISTING SLOPE
GRADE BREAK
PROPOSED MAJOR
CONTOUR
PROPOSED MINOR
CONTOUR
LEGEND
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES
NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION.
EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT
LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR
SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC
AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT
UTILITY LOCATIONS.
2. SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK
UNLESS OTHERWISE NOTED.
3. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER
THE LANDSCAPE PLANS.
4. NOTE THAT THE FINISHED FLOOR ELEVATION AS SHOWN ON THIS
DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON
THE ARCHITECTURAL PLANS.
5. THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM
ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR
STORM.
6. FOR FINISHED GRADES ADJACENT TO BUILDING 1 THAT ARE ABOVE
THE FINISHED FLOOR ELEVATION OR BELOW THE FINISHED FLOOR
ELEVATION BY MORE THAN 6-INCHES, REFER TO AND COORDINATE
WITH THE ARCHITECTURAL PLANS FOR FOUNDATION
REQUIREMENTS.
7. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING
ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING
TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND
AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN
PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED
WITH LANDSCAPING
EROSION CONTROL NOTES
1. TOTAL DISTURBED AREA = 52,800 SF (1.21 ACRES).
2. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL
LANDSCAPE PLAN FOR DETAILS.
3. REFER TO SHEET C0.02 FOR STANDARD EROSION AND SEDIMENT
CONTROL CONSTRUCTION PLAN NOTES.
4. EROSION CONTROL PRACTICES, SITE PROTECTION, AND
REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO
HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY.
THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM
DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO
VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE,
CONCRETE WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE
AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000
SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO
THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY
OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A
GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL
BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION
METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE
USED:
9. DOWNSPOUTS DESIGNED TO DISCHARGE RUNOFF AT GROUND
SURFACE ARE TO BE PROVIDED WITH A SPLASH GUARD.
INGREDIENT % AVAILABLE
BY WEIGHT
APPLICATION
RATE IN
LBS/ACRE
NITROGEN 13 65
POTASSIUM 16 80
POTASSIUM M 120
PROJECT: HAVEN APARTMENTS
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS (if applicable)
CONSTRUCTION FENCE (if applicable)
ROCK SOCKS
CONCRETE WASHOUT AREA
(if applicable)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
EXISTING UNDERGROUND ELECTRICAL
RECONSTRUCTED 3
4"
WATER SERVICE
EXISTING GAS SERVICE
EXISTING 3
4" WATER SERVICE
51' ROW
EXISTING STORM SEWER
EXISTING 8" SANITARY
SEWER MAIN
EXISTING 6" SANITARY
SEWER SERVICE
3" WATER
METER VAULT
FIRE HYDRANT
FIRE DEPARTMENT
CONNECTION (FDC)
(SEE ARCH. PLANS)
3" DOMESTIC SERVICE
6" FIRE SERVICE
FORT COLLINS
LANDMARK
ORDINANCE
APPROXIMATE LOCATION OF
EXISTING 8" DIP WATER MAIN
PROPERTY CORNER
N:124065.44
E:191087.95
PROPERTY CORNER
N:124064.42
E:191315.86
PROPERTY CORNER
N:123835.74
E:191314.26
EXISTING STORM SEWER
LIGHT POLE (TYP.)
(SEE ELEC. PLANS)
APPROXIMATE LOCATION OF EXISTING 3
4"
WATER STUB TO BE USED FOR IRRIGATION
PROPOSED
TRANSFORMER
PROPOSED 4"
SEWER SERVICE
RELINE EXISTING 4"
SANITARY SERVICE
RELOCATED CURB STOP
STORM SEWER
TO BE BORED
THROUGH TREES
CONNECT TO EXISTING
WATER MAIN
PROPOSED
ROOF DRAIN
DETENTION POND
EXISTING INLET
FORE-BAY
PROPERTY CORNER
N:123841.14
E:190822.93
PROPERTY CORNER
N:124079.38
E:190825.55
PROPERTY CORNER
N:124076.59
E:191088.08
ROOF DRAIN SYSTEM
PROPERTY BOUNDARY
EXISTING
RESIDENCE
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = 20'
1" = N/A
APEX-HAVEN APARTMENTS
NORTH
3/10/2020 3:13:36 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C3.00 - OVERALL UTILITY PLAN.DWG
C3.00 - OVERALL UTILITY PLAN
KRB CDB
C3.00
8
OVERALL UTILITY PLAN
0 20' 40'
SCALE: 1" = 20'
10'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
6
CABLE TV LINE
ELECTRIC LINE
OVERHEAD ELECTRIC LINE
FIBER OPTIC LINE
GAS LINE
ABANDONED GAS LINE
G GAS METER
IRRIGATION LINE
SANITARY MANHOLE
SANITARY MAIN
SANITARY SERVICE
SANITARY SERVICE
CLEANOUT
DOWNSPOUT
FLARED END SECTION
STORM INLET
STORM MANHOLE
STORM OUTLET
STRUCTURE
STORM PIPE
RIP RAP
TELEPHONE LINE
OVERHEAD
TELEPHONE LINE
UTILITY POLE AND
GUY WIRES
FIRE DEPARTMENT
CONNECTION
FIRE HYDRANT
FIRELINE
WATER FITTINGS
WATER MAIN
WATER SERVICE
WATER METER
DRY UTILITY CONDUIT
DS
THRUST BLOCK
GATE VALVE
FIBER, GAS, ELECTRIC, OR
TELEPHONE PEDESTAL
LEGEND
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES
NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING
UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS
INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND
PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY
LOCATIONS.
2. THE PROPOSED CONSTRUCTION WILL BE IN CLOSE PROXIMITY TO
SEVERAL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL
COORDINATE WITH ALL UTILITY PROVIDERS PRIOR TO AND DURING
CONSTRUCTION TO MINIMIZE SERVICE INTERRUPTIONS TO
SURROUNDING BUILDINGS OR PROPERTIES.
3. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS
5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT
LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY
CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE
COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS.
4. REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS
AND POWER LINE ROUTING FOR SITE LIGHTING.
5. WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT
COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER
THE CITY OF FORT COLLINS STANDARD CONSTRUCTION
SPECIFICATIONS, LATEST EDITION.
6. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'.
MAXIMUM COVER SHALL BE 5.5'.
7. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION
BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES.
8. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY
REPRESENTED AND ARE NOT TO SCALE.
9. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC.
10. FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES
LARGER THAN 1-1/2" MAY BE EITHER TYPE K COPPER, SDR 9 HDPE
PIPE WITH A PRESSURE RATING OF 200 PSI OR DUCTILE IRON PIPE
WITH A PRESSURE RATING OF 200 PSI.
11. THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS
DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND
ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE
PERFORMED BY THE APPROPRIATE UTILITY COMPANY.
16' FL-EOP
26' FL-FL
EMERGENCY ACCESS, PUBLIC
ACCESS, UTILITY & DRAINAGE
EASEMENT
2' CURB
CHANNEL
6' CONCRETE
WALK
LANDSCAPE WALL
(SEE GRADING &
LANDSCAPE PLANS)
DRAINAGE
EASEMENT
NON-VEHICULAR
PUBLIC ACCESS
EASEMENT
6" VERTICAL
CURB
6" VERTICAL CURB
ADA
SIDEWALK
RAMPS
PROPOSED RETAINING WALL
EXISTING SIDEWALK
EMERGENCY ACCESS
EASEMENT
DRAINAGE
EASEMENT
FLUSH CURB
6" VERTICAL CURB
16' EOP-EOP
FORT COLLINS
LANDMARK
ORDINANCE
12.4'
7.58'
10.57'
51' ROW
2' SIDEWALK CHASE
5' SIDEWALK
CONNECT TO
EXISTING SIDEWALK
15' UTILITY
& DRAINAGE
EASEMENT
7' ACCESS
EASEMENT
'EMERGENCY VEHICLES ONLY' SIGN
PAVEMENT PATCH
PROPOSED CEDAR
FENCE (SEE
LANDSCAPE PLANS)
PROPOSED CEDAR FENCE
(SEE LANDSCAPE PLANS)
TRASH ENCLOSURE
(SEE ARCH. PLANS)
4.5' SIDEWALK
'DELIVERY PARKING ONLY' SIGN
6' SIDEWALK
CONNECT TO EXISTING SIDEWALK 6' SIDEWALK
PROPOSED RAILING
(SEE ARCH. PLANS)
30' EMERGENCY ACCESS,
NON-VEHICULAR PUBLIC ACCESS,
UTILITY & DRAINAGE EASEMENT
REMOVABLE BOLLARD
EXISTING MULTI-MODAL PUBLIC
ACCESS EASEMENT (SEE PLAT)
PROPERTY CORNER
N:123841.14
E:190822.98
PROPERTY CORNER
N:124079.38
E:190825.59
PROPERTY CORNER
N:124076.59
E:191088.08
EXISTING
RESIDENCE
(BUILDING 2)
EXISTING
RESIDENCE
(BUILDING 3)
PROPOSED
APARTMENTS
(BUILDING 1)
WEST PROSPECT ROAD
(RIGHT-OF-WAY VARIES)
EXISTING APEX
BUILDING
EXISTING
PARKING
AREA
BIORETENTION
POND
DOG
POCKET
PARK
BICYCLE
PARKING
PROPOSED
DETENTION
POND
6" CURB HEAD
PROPOSED 3'
CONCRETE PAN
N0° 37' 45.81"E 238.26'
S89° 23' 22.76"E 262.50'
S0°37'45.81"W
11.15'
S89° 44' 36.63"E 227.90'
S0° 23' 59.38"W 228.68'
N89° 22' 14.19"W 491.32'
BUILDING CORNER
N:124001.80
E:191222.83
11.25'
PROPERTY BOUNDARY
PROPOSED
RAILIING
EXISTING
RESIDENCE
INFILL CENTER MEDIAN W/ CONCRETE
EXTEND CONCRETE PAVEMENT
4'
RECONSTRUCT EXISTING CURB
ADA RAMP
ADA 'RESERVED PARKING' SIGN
ADA RAMP
DRAINAGE SWALE
DETENTION POND WALLS
WITH IMPERMEABLE LINER
(SEE DETAIL-THIS SHEET)
EMERGENCY OVERFLOW
8' UTILITY
& DRAINAGE
EASEMENT
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = 20'
1" = N/A
APEX-HAVEN APARTMENTS
NORTH
3/10/2020 3:13:22 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C2.00 - HORIZONTAL CONTROL PLAN.DWG
C2.00 - HORIZONTAL CONTROL PLAN
KRB CDB
C2.00
8
HORIZONTAL CONTROL PLAN
0 20' 40'
SCALE: 1" = 20'
10'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
INFLOW CURB & GUTTER
OUTFLOW CURB & GUTTER
CURB CHASE
SIDEWALK CHASE
SIDEWALK/TRAIL
FENCE
PARKING BLOCK
CONCRETE PAN
SIGN
ROAD STRIPING
PARKING STALL STRIPING
HANDICAP PARKING STALL
DETECTABLE WARNING
BOLLARDS
ASPHALT PAVEMENT
CONCRETE PAVEMENT
LIGHT POLE
TC TRANSITION CURB FROM
INFLOW TO OUTFLOW CURB
LEGEND
NOTES
1. FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS.
LAYOUT AND DIMENSION INFORMATION SHOWN REPRESENTS
OUTSIDE FACE OF WALL AND IS SHOWN FOR INFORMATION ONLY.
2. ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE
MEASURED TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE
APPROVED LANDSCAPE DRAWINGS FOR ALL LANDSCAPE AND
SITE FEATURES SUCH AS BIKE RACKS, TRASH RECEPTACLES,
LANDSCAPE WALL CONSTRUCTION DETAILS, COLORED AND
SCORED CONCRETE, LANDSCAPE ROCK AND MULCH, ETC.
4. ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE
INSTALLED WITH TRUNCATED DOME WARNING DETECTION
SYSTEMS PER LARIMER COUNTY URBAN AREA STREET
STANDARD DETAILS.
5. CONCRETE SIDEWALKS SHALL BE 6-INCH MINIMUM THICKNESS
UNLESS NOTED OTHERWISE.
6. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY
CONSTRUCTION ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN
ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
7. CURB AND GUTTER ALONG WEST PROSPECT TO BE
RECONSTRUCTED SHALL BE RECONSTRUCTED USING THE
EXISTING CURB SECTION INCLUDING EDGE OF PAVEMENT
LOCATION, DEPTH OF GUTTER AND HEIGHT OF CURB.
5
DETENTION POND C LANDSCAPE WALL DETAIL
NOT TO SCALE
EXPOSED WALL HEIGHT
(VARIES, 30" MAX.)
FINISHED GRADE
(SEE GRADING PLAN)
COMPACTED SUBGRADE
LANDSCAPE WALL
(SEE LANDSCAPE PLANS)
POND OUTLET PIPE
W/ ORIFICE PLATE
MIN. 30-MIL PVC LINER
WALL DRAIN TO BE
CONNECTED DOWNSTREAM
OF POND OUTLET STRUCTURE
EXISTING
UNDERGROUND
ELECTRICAL
EXISTING TV/CABLE
VAULT TO BE RELOCATED
EXISTING CURB STOP
TO BE RELOCATED
EXISTING WATER SERVICE
TO BE RELOCATED
EXISTING RETAINING WALL
TO BE REMOVED & REPLACED
EXITING TREE TO BE REMOVED (TYP.)
(SEE NOTE 7)
EXISTING DRY UTILITIES
EXISTING GAS
SERVICE TO REMAIN
EXISTING 3
4" WATER
SERVICE TO REMAIN
EMERGENCY ACCESS, PUBLIC
ACCESS, UTILITY & DRAINAGE
EASEMENT
EXISTING OUTLET
PIPE TO BE REMOVED
EXISTING STORM
SEWER TO REMAIN
FORT COLLINS
LANDMARK
ORDINANCE
EXISTING POWER
POLE TO REMAIN
EXISTING
TREE TO
REMAIN
10' DRAINAGE
EASEMENT
EXISTING SANITARY SEWER
EXISTING STORM
SEWER TO REMAIN
REMOVE EXISTING GRAVEL
AND GRASS PAVER MATERIAL
REMOVE 180 LF
EXISTING FENCE
EXISTING CURB CHASE
TO BE REMOVED
PROPERTY BOUNDARY
EXISTING APEX
BUILDING
SAWCUT AND REMOVE
EXISTING PAVEMENT WITH
UTILITY CONSTRUCTION
EXISTING FENCE TO BE
REMOVED/REPLACED
(SEE LANDSCAPE PLANS)
APPROXIMATE
SEWER SERVICE
CAPPED AT HOUSE
(SEE NOTE 10)
APPROXIMATE LOCATION OF
EXISTING 3
4" WATER STUB
SALVAGE AND REPLACE
EXISTING FENCE AROUND
DETENTION POND
ABANDON EXISTING
WATER SERVICE AT MAIN
PER CITY STANDARDS
EXISTING SEWER
SERVICE TO BE RELINED
EXISTING TREE
TO REMAIN
LIMITS OF DISTURBANCE
PROPERTY BOUNDARY
N0° 37' 45.81"E 238.26'
S89° 23' 22.76"E 262.50'
S0° 37' 45.81"W 11.15'
S89° 44' 36.63"E 227.90'
S0° 23' 59.38"W 228.68'
N89° 22' 14.19"W 491.32'
PROPERTY CORNER
N:124076.59
E:191088.08
PROPERTY CORNER
N:124079.38
E:190825.59
PROPERTY CORNER
N:123841.14
E:190822.98
EXISTING
PARKING LOT
EXISTING
HOUSE
EXISTING CURB
TO BE REMOVED
EXISTING LOT LINE TO BE
REMOVED WITH PLAT
MAXIIIMO DEVELOPMENT GROUP 3/4/2020
U19031
1" = 20'
1" = N/A
APEX-HAVEN APARTMENTS
NORTH
3/10/2020 3:13:16 PM
P:\U19031 - HAVEN APARTMENTS\CADD\CP\C1.00 - EXISTING CONDITIONS AND REMOVALS PLAN.DWG
C1.00 - EXISTING CONDITIONS AND REMOVALS PLAN
KRB CDB
C1.00
8
EXISTING CONDITIONS & REMOVALS PLAN
0 20' 40'
SCALE: 1" = 20'
10'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
4
LOT LINE
PROPERTY BOUNDARY
RIGHT OF WAY
EASEMENT
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
LIMITS OF DISTURBANCE
REMOVE EXISTING CURB &
GUTTER
REMOVE EXISTING FENCE
SAWCUT LINE
REMOVE EXISTING
UTILITY LINE
REMOVE & PATCH
EXISTING ASPHALT
REMOVE EXISTING
BUILDING
REMOVE & REPLACE
EXISTING CONCRETE
REMOVE EXISTING TREE
(SEE NOTE 7)
REMOVE EXISTING
UTILITY STRUCTURE
LEGEND
EXISTING EASEMENT
TO BE VACATED
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES
NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION.
EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT
LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR
SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC
AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT
UTILITY LOCATIONS.
2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT
ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA
INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES,
ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND
UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY
ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A
RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT.
3. ALL REPAIRS RELATED TO OAKRIDGE DRIVE IMPROVEMENST SHALL
BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
4. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE
NEAREST JOINT.
5. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS
IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS
PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES.
6. CONTRACTOR SHALL COORDINATE REMOVALS ASSOCIATED WITH
THE EXISTING BUILDING WITH THE ARCHITECTURAL DRAWINGS.
7. COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING
TREES AND OTHER PLANTINGS SHOWN ON THIS DEMOLITION PLAN
WITH THE LANDSCAPE DRAWINGS. TREE REMOVAL SHALL BE BY A
BUSINESS HOLDING A CURRENT CITY OF FORT COLLINS ARBORIST
LICENSE AND ON THE CITY BID LIST. A FREE PERMIT MUST BE
OBTAINED FROM THE CITY FORESTER BEFORE TREES ARE
REMOVED.
8. CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION
AND/OR RELOCATION ITEMS WITH THE APPROPRIATE UTILITY
PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION.
9. CONTRACTOR SHALL NOTE THAT AN EXISTING GROUNDWATER
WELL MAY BE PRESENT ONSITE. THE EXACT LOCATION OF THE
EXISTING WELL IS UNKNOWN BUT IS ANTICIPATED TO BE LOCATED
NORTH OF BUILDING 3. IF FOUND, THE CONTRACTOR SHALL
REMOVE AND ABANDON THE EXISTING WELL PER STATE
REQUIREMENTS.
10. THE EXISTING SANITARY SEWER TO THE WESTERN EXISTING HOUSE
WAS REMOVED ON THE SITE, CAPPED AT THE HOUSE AND
ABANDONED AT THE MAIN DURING THE CONSTRUCTION OF THE
EXISTING DETENTION POND.
3) The Developer shall implement and maintain Control Measures for all potential pollutants from the start of land disturbing activities until final stabilization of the
construction site.
4) The City Erosion Control Inspector shall be notified at least twenty-four (24) hours prior to the desired start of any construction activities on this site to allow
adequate time for on-site confirmation (initial inspection which can take up to two business days after receiving the request) that the site is in fact protected
from sediment and pollutants discharges off site. Please contact erosion@fcgov.com early to schedule those Initial Erosion Control Inspections well in
advance so that demolition, clearing, grubbing, tree removal, and scraping may begin without delay. Failure to receive an on-site confirmation before
construction activities commence is an automatic “Notice of Violation” and can result in further enforcement actions.
5) The Developer shall proactively provide all appropriate Control Measures to prevent damage to adjacent downstream and leeward properties. This includes
but is not limited to: trees, shrubs, lawns, walks, pavements, roadways, structures, creeks, wetlands, streams, rivers, and utilities that are not designed for
removal, relocation, or replacement in the course of construction.
6) At all times the Developer shall be responsible to ensure adequate Control Measures are designed, selected, installed, maintain, repaired, replaced, and
ultimately removed in order to prevent and control erosion suspension, sediment transportation, and pollutant discharge as a result of construction activities
associated with this project.
7) All applicable Control Measures based upon the sequencing and/or phasing of the project shall be installed prior to those construction activities commencing.
8) As dynamic conditions (due to the nature, timing, sequence, and phasing of construction) in the field may warrant Control Measures in addition, or different, to
what is shown on these plans, the Developer shall at all times be responsible to implement the Control Measures that are most effective with the current state
and progress of construction. The Developer shall implement whatever measures are determined necessary, and/or as directed by the City Erosion Control
Inspector. The Developer shall insure that all Erosion Control Plans (Maps) or SWMP documents are updated to reflect the current site conditions, with
updates being initialed and dated. These site inspections and site condition updates shall be made available upon request by the City.
9) All listings, provisions, materials, procedures, activities, site work and the like articulated in this or other written site-specific documents (Including but not
limited to the erosion control reports, development agreements, landscape, and drainage materials) shall meet or exceed the most restrictive language for City,
County, State, and Federal regulations with regards to erosion, sediment, pollutant, and other pollution source Control Measures. The Developer shall be
responsible to comply with all of these aforementioned laws and regulations.
10) The Developer shall ensure that all appropriate permits (CDPS General Permit Stormwater Discharges Associated with Construction Activity, Dewatering,
Clean Water Act, Army Corps of Engineers' 404 Wetlands Mitigation Permit, etc.) have been attained prior to the relevant activity has begun. These permits or
copies shall be made available upon request by the City.
11) The Developer shall furnish all conveniences and assistances to aid the Erosion Control Inspectors of materials, workmanship, records, and self-inspections,
etc. of the Control Measures involved in the construction activities.
12) The Developer shall request clarification of all apparent site construction issues that may arise due to inconsistencies in construction plans for the site or site
conditions around the selected Control Measures by contacting the Erosion Control Inspector. The Erosion Control Inspector will not be responsible for any
explanations, interpretations, or supplementary data provided by others.
13) All Control Measures shall be installed in accordance with the Manual.
14) The City reserves the right to require additional Control Measures as site conditions warrant, to the extent authorized by relevant legal authority.
15) As with any construction standards, occasions may arise where the minimum erosion control standards are either inappropriate or cannot be justified. In these
cases, a variance to these standards may be applied for pursuant to the terms, conditions, and procedures of the Manual.
16) Inspection. The contractor shall inspect site pollutant sources and implement Control Measures at a minimum of once every two weeks during construction
and within 24 hours following a precipitation event. Documentation of each inspection shall be recorded and retained by the contractor.
17) All temporary Control Measures shall be cleaned, repaired, or reconstructed as necessary in order to assure continual performance of their intended function.
All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their
release into any drainage way.
18) Any Control Measure may be substituted for another standard Control Measure so long as that Control Measure is equal to, or of greater protection than the
original Control Measure that was to be used in that location. (ex. silt fence, for wattles, or for compact berms) Wattle alone on commercial construction sites
have shown to be an ineffective substitute for silt fence or compact berms unless it is accompanied by a construction fence to prevent vehicle traffic.
19) Any implementation or replacement of existing Control Measures for a non-standard control, or alternative Control Measure, shall require the review and
acceptance by the City erosion control staff before the measure will be allowed to be used on this project. These Control Measures' details shall be submitted,
reviewed and accepted to be in accordance with the Erosion Control Criteria based upon the functionality and effectiveness in accordance with sound
engineering and hydrological practices
Land disturbance, Stockpiles, and Storage of Soils
20) There shall be no earth-disturbing activity outside the limits designated on the accepted plans. Off road staging areas or stockpiles must be preapproved by
the City. Disturbances beyond these limits will be restored to original condition.
21) Pre-disturbance vegetation shall be identified, protected, and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the
area required for immediate construction operations, and for the shortest practical period of time. This should include sequencing and phasing construction
activities in a way so that the soil is not exposed for long periods of time by schedule or limit grading to small areas. This should also include when practical
advancing the schedule on stabilization activities such that landscaping takes place shortly if not immediately after grading has occurred. Vegetation efforts
shall start as soon as possible to return the site to a stabilized condition. Sensitive areas should avoid clearing and grading activities as much possible.
22) All exposed soils or disturbed areas are considered a potential pollutant and shall have Control Measures implemented on the site to prevent materials from
leaving the site.
23) All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition at all times
by equipment tracking, scarifying or disking the surface on a contour with a 2 to 4 inch minimum variation in soil surface until mulch, vegetation, and/or other
permanent erosion control is installed.
24) No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport through the use of surface roughening,
watering, and down gradient perimeter controls. All soil stockpiles shall be protected from sediment transport by wind in accordance with Municipal Code
§12-150. All stockpiles shall be flattened to meet grade or removed from site as soon as practical, and no later than the completion of construction activities or
abandonment of the project. All off-site stockpile storage locations in City limits shall have a stockpile permit from the City Engineering Department prior to
using the area to store material. If frequent access from hardscape to the stockpile is needed a structural tracking Control Measure shall be implemented.
25) All required Control Measures shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of the required erosion Control
Measures must be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and
erosion control report.
26) All inlets, curb-cuts, culverts, and other storm sewer infrastructure which could be potentially impacted by construction activities shall be protected with Control
Measures. Material accumulated from this Control Measure shall be promptly removed and in cases where the protection has failed, the pipes shall be
thoroughly cleaned out.
27) All streams, stream corridors, buffers, woodlands, wetlands, or other sensitive areas shall be protected from impact by any construction activity through the
use of Control Measures.
28) All exposed dirt shall have perimeter control. Any perimeter controls that drain off or has the ability to be tracked onto the nearby hardscape shall have some
form of effective sediment control as the, or as part of the, perimeter control.
29) All exposed slopes should be protected. All exposed steep slopes (Steeper than 3:1 H:V) shall be protected from erosion and sediment transport through use
of Control Measures.
30) No soils shall remain exposed by land disturbing activity for more than thirty (30) days after activity has ceased before required temporary seeding or
permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. This is not just limited to projects that are abandoned; this includes any project that
is temporarily halted and no immediate activity is to resume within the next thirty (30) days, unless otherwise approved by the City Erosion Control Inspector.
During a season when seeding does not produce vegetative cover, anothertemporary erosion control shall be implemented with or until temporary seeding or
permanent erosion control can be performed.
31) All individual lots shall have effective sediment controls located on the street side and any down gradient side. Typically most lots drain to the front yet on
those cases where houses are along a pond or drainage swale have the lot drain in a different direction than the street, those individual lots will need
protection on that down gradient side to prevent sediment from leaving the lot. See the Individual Lot Details for further clarification.
Vehicle Tracking
32) At all points where vehicles exit or leave the exposed dirt area on to a hardscape or semi hardscape (concrete, asphalt, road base, etc.) shall have installed at
least one structural tracking Control Measure to prevent vehicle tracking. All areas not protected by an adequate perimeter control shall be considered a point
where vehicles exit the site. Access points should be limited to as few entrances as possible (All perimeter areas shall be protected from tracking activities).
33) In all areas that the structural tracking Control Measures fail to prevent vehicle tracking, collection and proper disposal of that material is required. All inlets
located near access points and affected by tracking activities shall be prevented from the introduction of sediment into the drainage system.
34) City Municipal Code §20-62, among other things, prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any
source. City Municipal Code, §26-498, among other things, prohibits the discharge of pollutants on public or private property if there is a significant potential
for migration of such pollutant. Therefore, all tracked or deposited materials (intentional or inadvertent) are not permitted to remain on the street or gutter and
shall be removed and legally disposed of by the Developer in a timely and immediate manner. Dirt ramps installed in the curb-lines are not exempt to these
sections of code and shall not be permitted in the street right of way (public or private).
35) If repeated deposit of material occurs on a site, additional structural tracking controls may be required of the Developer by the City Erosion Control Inspector.
Loading and Unloading Operations
36) The Developer shall apply Control Measure to limit traffic (site worker or public) impacts and proactively locate material delivered to the site in close proximity
to the work area or immediately incorporated in the construction to limit operational impacts to disturbed areas, vehicle tracking, and sediment deposition that
could impact water quality.
Outdoor Storage or Construction Site Materials, Building Materials, Ferilizers, and Chemicals
37) Any materials of a non-polluting nature (steel, rock, brick, lumber, etc.) shall be inspected for any residue coming off the material during routine inspection and
will generally be located where practical at least fifty (50) feet from any permanent or interim drainage ways.
38) Any high environmental impact pollutant materials that have a high likelihood to result in discharge when in contact with stormwater (lubricants, fuels, paints,
solvents, detergents, fertilizers, chemical sprays, bags of cement mix, etc.) should not be kept on site where practical. When not practical, they should be
stored inside (vehicle, trailer, connex, building, etc.) and out of contact with stormwater or stormwater runoff. Where not available, they shall be stored outside
in a raised (high spots or on pallets), covered (plastic or tarped), and sealed (leak proof container) in secondary containment location. The secondary
containment or other Control Measure shall be adequately sized, located, where practical, at least fifty (50) feet from any permanent or interim stormwater
structures or drainage ways and shall be monitored as part of the routine inspections.
Vehicle and equipment maintenance and fueling
39) Parking, refueling, and maintenance of vehicles and equipment should be limited in one area of the site to minimize possible spills and fuel storage areas. This
area shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as
part of the routine inspections. All areas shall keep spill kits and supplies close.
Significant Dust or Particulate generating Process
40) The property must be actively preventing the emission of fugitive dust at all times during construction and vegetation activities. All land disturbing activities that
result in fugitive dust shall be in accordance with Municipal Code §12-150 to reduce the impacts to adjacent properties and community health. All required
practices shall be implemented and additional ones shall be followed. These practices include watering the sites and discontinuing construction activities until
the wind subsides as determined by any City Inspectors.
Concrete truck / equipment washing, including the concrete truck chute and associated fixtures and equipment
41) All concrete and equipment washing shall use structural Control Measures appropriate to the volume of wash and frequency of use. These Control Measures
shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part
of the routine inspections. These areas shall be clearly identified and protected from any wash from leaving the Control Measure. If frequent access from
hardscape to the Control Measure is to occur, a structural tracking Control Measure shall be implemented. These Control Measures shall be frequently
cleaned out.
42) The Developer is responsible for ensuring washing activity is taking place at the appropriate Control Measure and site workers are not washing or dumping
wash water on to the dirt or other uncontrolled locations.
Dedicated Asphalt and concrete batch plants
43) Dedicated asphalt and concrete batch plants are not acceptable on construction sites within the City of Fort Collins without an expressed written request and
plan to reduce pollutants associated with that type of activity and approval by the City of Fort Collins specifically the Erosion Control Inspector. The Developer
shall inform the erosion control inspection staff of any dedicated asphalt, or concrete batch plants that is to be used on site.
Concrete Saw Cutting Materials
44) Saw cutting material shall be in accordance with Municipal Code §12-150 for air emissions and all water applications to the saw cutting shall prevent material
from leaving the immediate site and collected. These cutting locations, once dried, shall be swept and scraped of all material and shall have proper and legal
disposal.
Waste Materials Storage and Sanitary Facilities
45) Trash, debris, material salvage, and/or recycling areas shall be, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or
drainage ways and shall be monitored as part of the routine inspections. These facilities should be located out of the wind and covered as able. Where not
able to cover, locating said areas on the side of other structures to reduce exposure to winds, and follow maximum loading guidelines as marked on the
container. The Developer is required to practice good housekeeping to keep the construction site free of litter, construction debris, and leaking containers.
46) Sanitary facilities shall be prevented from tipping through the use of anchoring to the ground or lashing to a stabilized structure. These facilities shall also be
located as far as practical from an inlet, curb cut, drainage swale or other drainage conveyances to prevent material transport from leaving the local area. This
consists of the facility being located, where practical, at least fifty (50) feet from any permanent or interim drainage ways.
Other Site Operations and Potential Spill Areas
47) Spills: For those minor spills that; are less than the State's reportable quantity for spills, stay within the permitted area, and in no way threaten any stormwater
conveyance, notify theCity of Fort Collins Utilities by email at erosion@fcgov.com or phone (970) 817-4770. For any significant, major, or hazardous spills,
notify the City of Fort Collins Utilities by phone only after Emergency Response (911) has been notified and is on route, County Health Department (LCDHE)
has been notified through Larimer County Sheriff Dispatch (970) 416-1985, and the State Spill Hotline Incident Reporting have been contacted
1-877-518-5608. Written documentation shall be provided to the City within 5 days of the event. All spills shall be cleaned up immediately.
48) Selection of “plastic welded” erosion control blankets shall not be used in areas that wildlife, such as snakes, are likely to be located as these have proven to
cause entrapment issues.
Final stabilization and project completion
49) Any stormwater facilities used as a temporary Control Measure will be restored and storm sewer lines will be cleaned upon completion of the project and
before turning the maintenance over to the Owner, Homeowners Association (HOA), or other party responsible for long term maintenance of those facility.
50) All final stabilization specifications shall be done in accordance with the Manual, Chapter 4: Construction Control Measures.
51) All disturbed areas designed to be vegetated shall be amended, seeded & mulched, or landscaped as specified in the landscape plans within 14 working days
of final grading.
52) Soil in all vegetated (landscaped or seeded) areas, including parkways and medians shall comply with all requirements set forth in Sections 12-130 through
12-132 of the City Municipal Code, as well as Section 3.8.21 for the City Land Use Code.
53) All seeding shall refer to landscaping plans for species mixture and application rates and depths requirements.
54) All seed shall be drilled where practical to a depth based upon the seed type. Broadcast seeding shall be applied at double the rate as prescribed for drill
seeding and shall be lightly hand raked after application. Hydroseeding may be substituted for drill seeding on slopes steeper than 3(H):1(V) or on other areas
not practical to drill seed and crimp and mulch. All hydroseeding must be conducted as two separate processes of seeding and tackification.
55) All seeded areas must be mulched within twenty-four (24) after planting. All mulch shall be mechanically crimped and or adequately applied tackifier. The use
of crimped mulch or tackifier may require multiple re-applications if not properly installed or have weathered or degraded before vegetation has been
established. Areas of embankments having slopes greater than or equal to 3H:1V shall be stabilized with an erosion mat or approved equal to ensure seed will
be able to germinate on the steep slopes. During a season when seeding doesnot produce vegetative cover, another temporary erosion control shall be
implemented along
with, or until, temporary seeding or permanent erosion control can be performed.
56) The Developer shall warranty and maintain all vegetative measures for two growing seasons after installation or until seventy percent (70%) vegetative cover
has been established, whichever is longer and meets all the Criteria outlined in the Fort Collins Stormwater Criteria Manual Chapter 4: Construction Control
Measures.
57) The Developer shall maintain, monitor, repair, and replace any and all applicable Control Measures until final stabilization has been obtained. All Control
Measures must remain until such time as all upstream contributing pollutant sources have been vegetated or removed from the site. When any Control
Measure is removed, the Developer shall be responsible for the cleanup and removal of all sediment and debris from that Control Measure. At the point at
which the site has been deemed stabilized and verified by City Erosion Control Inspector, all temporary Control Measures can then be fully removed. All
measures shall be removed within 30 days after final stabilization is achieved.
58) The responsible party shall maintain and keep current all payments or related forms of security for the Erosion Control Escrow until 1) stabilization has been
reached and 2) all Control Measures and/or BMPs have sediment materials collected and the Control Measure removed from the site. At that time the site will
be considered completed and any remaining Erosion Control Escrow shall be returned to the appropriate parties.
3
employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans.
5. All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the local entity standards and
specifications current at the date of approval of the plans by the local entity engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the developer to
verify the existence and location of all underground utilities along the route of the work before commencing new construction. The developer shall be responsible for
unknown underground utilities.
7. The developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to
have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative.
Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the developer to relocate all existing utilities that
conflict with the proposed improvements shown on these plans.
8. The developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the developer shall coordinate with the engineer to modify the design.
Design modification(s) must be approved by the local entity prior to beginning construction.
10. The developer shall coordinate and cooperate with the local entity, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with
a minimum disruption of service. The developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the
utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the developer notifies the utility provider. Notification shall be a
minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to
commencement of any work.
12. The developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be
constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is4.5 feet and the maximum is 5.5 fee unless otherwise noted in the plans and approved by the Water Utility.
14. A state construction dewatering wastewater discharge permit is required if dewatering is required in order to install utilities or water is discharged into a storm sewer,
channel, irrigation ditch or any waters of the united states.
15. The developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (contact Colorado Department of Health, Water Quality
Control Division, (303) 692-3590), the storm water management plan, and the erosion control plan.
16. The local entity shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the
responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the local entity, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the
storm water utility department. Certification shall be submitted to the storm water utility department at least two weeks prior to the release of a certificate of occupancy for
single family units. For commercial properties, certification shall be submitted to the Storm Water Utility Department at least two weeks prior to the release of any building
permits in excess of those allowed prior to certification per the development agreement.
18. The local entity including but not limited to City of Fort Collins, South Fort Collins Sanitation District and Fort Collins-Loveland Water District shall not be responsible for
any damages or injuries sustained in this development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other
damage unless such damage or injuries are sustained as a result of the local entity failure to properly maintain its water, wastewater, and/or storm drainage facilities in
the development.
19. All recommendations of the preliminary drainage and erosion control study entitled "Haven Apartments" prepared by United Civil Design Group LLC, and dated October
16, 2019, shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the erosion control plan. All erosion control measures shall be maintained in good repair by
the developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24
hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the local entity street inspector.
22. No work may commence within any improved or unimproved public right-of-way until a right-of-way permit or development construction permit is obtained, if applicable.
23. The developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The developer shall notify the
local entity engineering inspector (Fort Collins - 221-6605) and the local entity erosion control inspector (Fort Collins - 221-6700) at least 2 working days prior to the start
of any earth disturbing activity, or construction on any and all public improvements. If the local entity engineer is not available after proper notice of construction activity
has been provided, the developer may commence work in the engineers absence. However, the local entity reserves the right not to accept the improvement if
subsequent testing reveals an improper installation.
24. The developer shall be responsible for obtaining soils tests within the public right-of-way after right-of-way grading and all utility trench work is complete and prior to the
placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the
developer shall be responsible for a re-design of the subject pavement section or, the developer may use the local entity's default pavement thickness section(s).
Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed professional engineer. The final report shall be submitted to the
inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the local entity
engineer approves the final report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets,
and other locations requested by the local entity inspector. The engineer or surveyor must certify in a letter to the local entity that these elevations conform to the
approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the local entity before installation of base course or asphalt will be
allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these
standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the
excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County floodplain resolution should be referred to for additional criteria for roads within these districts.
28. All road construction in areas designated as wild fire hazard areas shall be done in accordance with the construction criteria as established in the wild fire hazard area
mitigation regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the local entity forester to schedule a site inspection for any tree removal requiring a permit.
30. The developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA
Publication 2226, Excavating and Trenching.
31. The developer shall submit a construction traffic control plan, in accordance with MUTCD, to the appropriate right-of-way authority. (local entity, county or state), for
approval, prior to any construction activities within, or affecting, the right-of-way. The developer shall be responsible for providing any and all traffic control devices as
may be required by the construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact local entity traffic operations department, who will
temporarily remove or relocate the sign at no cost to the contractor; however, if the contractor moves the traffic sign then the contractor will be charged for the labor,
materials and equipment to reinstall the sign as needed.
33. The developer is responsible for all costs for the initial installation of traffic signing and striping for the development related to the development's local street operations.
In
addition, the developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the local entity engineer, and no site construction activities on Sundays or
holidays, unless there is prior written approval by the local entity.
35. The developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to
be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the designer for clarification, and annotate
the dimension on the as-built record drawings.
37. The developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any
permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the developer shall
contact the designer and the local entity engineer immediately.
39. The developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the local entity's inspector
at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the local entity engineer.
GENERAL NOTES (CONTINUED)
40. The designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings.
The information shall be as follows:
PROJECT DATUM: NAVD 88
BENCHMARK #1: CITY OF FORT COLLINS 28-92
SOUTHWEST CORNER OF WEST PROSPECT ROAD AND CENTRE AVENUE, ON A WATER VALVE PIT.
ELEVATION=5010.65
BENCHMARK #1: CITY OF FORT COLLINS 29-92
APPROXIMATE 300-FEET SOUTH OF WEST PROSPECT ROAD AND SHIELDS STREET, ON THE NORTH END OF THE WEST BRIDGE PARAPET WALL.
ELEVATION=5025.67
BASIS OF BEARINGS:
BASIS OF BEARINGS IS THE SOUTH LINE OF LOT 2 AS BEARING NORTH 89° 22' 14" WEST (ASSUMED BEARING)
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and
improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the developer's expense, unless otherwise
indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first certificate of occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be
documented by the local entity construction inspector before any cuts are made. Patching shall be done in accordance with the local entity street repair standards. The
finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is
made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the local
entity engineer and/or the local entity inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades
and condition as required by these plans.
45. Standard handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the local entity, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum
period of two years from the date of acceptance.
47. The local entity shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following
private streets: none.
48. Approved variances are listed as follows:
STREET IMPROVEMENTS NOTES
1. All street construction is subject to the General Notes on the Cover Sheet of these plans as well as the street improvements notes listed here.
2. A paving section design, signed and stamped by a Colorado licensed engineer, must be submitted to the local entity engineer for approval, prior to any street
construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to
placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean
construction joint. The developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be
allowed unless approved by the local entity engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been
inspected and approved by the local entity engineer.
5. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be
documented by the inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, reconstruction and repair. The finished
patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the local entity engineer. All overlay work shall
be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in MUTCD (including Colorado supplement) and as per the right-of-way
work permit traffic control plan.
8. The developer is required to perform a gutter water flow test in the presence of the local entity inspector and prior to installation of asphalt. Gutters that hold more than
inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is
proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base
material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. And a single axle weight of at least 18,000 lbs. With pneumatic tires
inflated to not less than 90 P.S.I.G. "proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. any portion of the subgrade or base material which exhibits
excessive pumping or deformation, as determined by the local entity engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding
surface. The local entity engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be performed in the presence of an inspector.
STORM DRAINAGE NOTES
1. All street, sanitary sewer, storm sewer and water construction shall conform to City Standards and Specifications current at date of execution of the Development
Agreement pertaining to this development. Any construction occurring three years after the execution of the development agreement shall require re-examination of the
plans by the Director who may require that they be made to conform to standards and specifications current at that time.
2. The type, size, location, and number of all known underground utilities are approximate as shown on the drawings. It shall be the responsibility of the contractor to verify
the existence and location of all underground utilities along the route of the work. Before commencing new construction, the contractor shall be responsible for locating
unknown underground utilities.
3. These plans have been reviewed by the City for concept only. The review does not imply responsibility by the reviewing department, the City Engineer, or the City for
accuracy or correctness of the calculations. Furthermore, the review does not imply that the quantities of the items on the plans are the final quantities required. The
review shall not be construed in any reason as acceptance of financial responsibility by the City for additional quantities of items shown that may be required during the
construction phase.
4. Prior to the commencement of any construction, the contractor must give the City Engineering Department (970-221-6605) and the Erosion Control Inspector
(970-221-6700) twenty-four (24) hours advance. Initial erosion control measures must be installed and a site inspection by the Erosion Control Inspector is required
before commencing construction activities.
5. Maintenance of onsite drainage facilities shall be the responsibility of the property owners.
6. All recommendations of the preliminary drainage and erosion control study entitled "Haven Apartments" prepared by United Civil Design Group LLC, and dated October
16, 2019, shall be followed and implemented.
7. Prior to final inspection and acceptance by the City, certification of the drainage facilities by a Colorado registered professional engineer must be submitted to and
approved by the City Stormwater Department. (including the applicable note as set forth below)
For commercial and multi-family developments, certification of all drainage facilities shall be submitted to the City Stormwater Department at least two weeks prior to the
release of a certificate of occupancy. Individual lot certification, elevation certification, or floodproofing certification, as specified in the development agreement, must be
submitted to the City Stormwater Department at least two weeks prior to the release of a certificate of occupancy for such lot.
For single family developments, certification of all drainage facilities must be submitted to the City Stormwater Department in accordance with all conditions as
prescribed by the development agreement associated with this development. Individual lot certification, elevation certification, or floodproofing certification, as specified
in the development agreement, must be submitted to the City Stormwater Department at least one week prior to the release of a certificate of occupancy for such lot.
8. If dewatering is used to install utilities, and discharge will be into the street, gutter, storm sewer, channel, irrigation ditch, or any waters of the State a State Construction
Dewatering Industrial Wastewater Discharge Permit is required.
9. All land disturbing activities greater than or equal to one acre must comply with the State of Colorado permitting process for Stormwater Discharges Associated with
Construction Activity. For more information contact the Colorado Department of Public Health and Environment, Water Quality Control Division, at 303-692-3500 or refer
to the web site at http://www.cdphe.state.co.us/wq/PermitsUnit/.
10. Benchmark: See General Note Number 40.
11. If fill or dredged material is discharged into waters of the United States, a USACE 404 permit is required.
12. If construction affects any Colorado Highway, a Colorado Department of Transportation right-of-way permit is required.
CITY OF FORT COLLINS WATERLINE NOTES
1. Water mains shall be DIP with polywrap or PVC with tracer wire.
2. Water mains shall be installed with 4.5 to 5.5 feet of cover unless otherwise approved.
3. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The
HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with
the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25.
TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes
listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per Local Entity Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the
same. Their placement shall be approved by the Local Entity Engineer prior to permanent installation of striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the Local Entity Engineer. All discrepancies identified during the field
inspection must be corrected before the 2-year warranty period will begin.
12. The developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period, the City of Fort Collins
Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen
condition warrants such signage according to the MUTCD or the CDOT M and S standards. All signage and striping shall fall under the requirements of
the two year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
2
UNITED CIVIL DESIGN GROUP, LLC
1501 ACADEMY CT., STE 203
FORT COLLINS, CO 80524
PHONE: 970-530-4044
CONTACT: KEVIN BRAZELTON
PLANNER/LANDSCAPE
ARCHITECT
RUSSELL+MILLS STUDIOS
141 SOUTH COLLEGE AVENUE, SUITE 104
FORT COLLINS, CO 80524
PHONE: 970-484-8855
CONTACT: SHELLEY LAMASTRA
ARCHITECT
alm2s
712 WHALERS WAY, B-100
FORT COLLINS, CO 80525
PHONE: 970-223-1820
CONTACT: IAN SHUFF
PROJECT TEAM
UTILITY PROVIDER CONTACT PHONE
Water/Wastewater City of Fort Collins Utilities Wes Lamarque (970) 416-2418
Stormwater City of Fort Collins Utilities Wes Lamarque (970) 416-2418
Power City of Fort Collins Light & Power Cody Snowdon (970) 416-2306
Natural Gas Xcel Energy Stephanie Rich (970) 225-7828
Telecom Centurylink Robert Ruli (970) 490-7503
Cable Comcast Don Kapperman (970) 567-0245
Note: All utility providers listed hereon is provided as a courtesy. It is the responsibility of the recipient to verify the accuracy and
completeness of the information shown.
UTILITY PROVIDERS
C0.00 COVER SHEET
C0.01-C01.02 GENERAL NOTES
C1.00 EXISTING CONDITIONS & REMOVALS PLAN
C2.00 HORIZONTAL CONTROL PLAN
C3.00 OVERALL UTILITY PLAN
C4.00 OVERALL GRADING AND EROSION CONTROL PLAN
C5.00 DRAINAGE PLAN
C6.00-C6.0X CONSTRUCTION DETAILS (RESERVED FOR FUTURE SUBMITTALS)
SHEET INDEX
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
PROJECT COORDINATES
PROJECT DATUM: NAVD 88.
BENCHMARK #1: CITY OF FORT COLLINS 28-92
SOUTHWEST CORNER OF WEST PROSPECT ROAD AND CENTRE AVENUE, ON A WATER VALVE
PIT.
ELEVATION=5010.65
BENCHMARK #1: CITY OF FORT COLLINS 29-92
APPROXIMATE 300-FEET SOUTH OF WEST PROSPECT ROAD AND SHIELDS STREET, ON THE
NORTH END OF THE WEST BRIDGE PARAPET WALL.
ELEVATION=5025.67
BASIS OF BEARINGS:
BASIS OF BEARINGS IS TEH SOUTH LINE OF LOT 2 AS BEARING NORTH 89° 22' 14" WEST
(ASSUMED BEARING)
NOTE:
1. ALL PROJECT CONTROL LISTED HEREON IS PROVIDED AS A COURTESY. IT IS THE
RESPONSIBILITY OF THE RECIPIENT TO VERIFY THE ACCURACY OF THE COORDINATES
AND ELEVATIONS SHOWN PRIOR TO USING THEM FOR ANY PURPOSES.
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
1