Loading...
HomeMy WebLinkAboutAPEX HAVEN APARTMENTS - PDP190017 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYHAVEN APARTMENTS – SUPPLEMENTAL TRAFFIC STUDY CITY OF FORT COLLINS M E M O R A N D U M To: Martina Wilkinson, City of Fort Collins From: Ruth Rollins Date: March 6, 2020 Subject: Supplemental Traffic Study – Proposed Haven Apartments The following memorandum provides a supplemental transportation analysis of the proposed Haven Apartments located at 730 W Prospect Road in Fort Collins. The original study was documented in a memorandum to Martina Wilkinson dated August 28, 2019. The original study concluded that the additional 54 apartments would not have significant transportation impacts. The project has been modified. The parking for the 54 units was originally proposed to be housed on-site. This design has been changed, parking for 50 units will be provided at the existing Apex Apartments located directly west of the proposed project. This revision is illustrated on Figure 1. Figure 1 – Revised Site Plan HAVEN APARTMENTS – SUPPLEMENTAL TRAFFIC STUDY CITY OF FORT COLLINS ROLLINS CONSULT LLC MARCH 5, 2020 2 Primary vehicular access to the project site will now be from the Apex Apartments driveway located at 808 W Prospect Road. This driveway is designed as a right-in/right-out only. The City requested that this driveway be analyzed to look at peak hour operations and determine the need for auxiliary lanes. EXISTING CONDITIONS AT APEX DRIVEWAY Peak hour turning movement counts were performed at the Apex Driveway on March 3, 2020 during both the morning (7:00 to 9:00 AM) and evening (4:00 to 6:00 PM) peak hours. The results of this data collection are provided in the Appendix A and shown below on Figure 2. The owner of the Apex Apartments indicated that 60 of the 61 units are rented, and therefore these counts represent an essentially fully occupied building. It should be noted that there was construction directly west of the driveway and one of the westbound lanes on Prospect was closed. These counts were compared to the volumes originally documented in the August 28, 2019 memo. It does not appear that the closure of the lane on Prospect had a significant impact on traffic volumes. Figure 2 – Existing Peak Hour Traffic AM/PM Peak Hour Turning Movements TRAFFIC OPERATIONS AT APEX DRIVEWAY The existing operations at the access drive were evaluated for the peak hours. Transportation professionals evaluate intersections to determine how they are currently operating and will operate in the future. The methods employed can be found in the Transportation Research Board’s, 6th Edition, 2016 Highway Capacity Manual (HCM). Level of service (LOS) is based on a “graded” system from LOS A, very little to no delays to LOS F which represents excessive delays and congestion. A description of the level of service values is provided in Table 1. The intersection operations thresholds for acceptable level of service are provided in the Larimer County, Urban Area Street Standards (LCUASS), most recently updated September 19, 2016. For an Arterial/Local unsignalized intersection, the overall threshold is LOS D and for an approach leg is LOS F. HAVEN APARTMENTS – SUPPLEMENTAL TRAFFIC STUDY CITY OF FORT COLLINS ROLLINS CONSULT LLC MARCH 5, 2020 3 Table 1 - Unsignalized Intersection Level of Service Definitions (HCM Method) Level of Service Average Control Delay Per Vehicle (Seconds) Description A £10.0 No delay for stop-controlled approaches. B 10.0 and £15.0 Operations with minor delay. C >15.0 and £25.0 Operations with moderate delays. D >25.0 and £35.0 Operations with increasingly unacceptable delays. E >35.0 and £50.0 Operations with high delays, and long queues. F >50.0 Operations with extreme congestion, and with very high delays and long queues unacceptable to most drivers. Source: Transportation Research Board, Highway Capacity Manual, 2016. The results of the intersection operations analysis at the Apex driveway, are provided in Table 2. As shown, all movements and the overall intersection, operate acceptably. It should be noted that some left-turns (that are prohibited) were observed during both the morning and evening peak hours and were included in this analysis. The detailed worksheets are provided in Appendix B. Table 2 – Existing Levels of Service # Intersection Movement AM Peak Hr PM Peak Hr Delay LOS Delay LOS 1 Apex Driveway & Prospect T-Stop Overall 0.1 A 0.1 A EB LT (Not Permitted) 8.7 A 11.9 B SB LT/RT (LT Not Permitted) 11.2 B 18.7 C HAVEN APARTMENTS – SUPPLEMENTAL TRAFFIC STUDY CITY OF FORT COLLINS ROLLINS CONSULT LLC MARCH 5, 2020 4 RELOCATED PROJECT TRIPS The trip generation of the proposed project was determined based on rates that were developed by the City of Fort Collins for student housing. The rates and associated trips are provided in Table 3. The trips were estimated for 50 apartment units (the units that will have parking in the Apex lot). As shown the 50 units will generate approximately 135 daily, 10 morning and 21 evening peak hour trips. The resulting peak hour trips at the Apex driveway are illustrated on Figure 3. Table 3 – Trip Generation Rates & Associated Relocated Trips Figure 3 – Project Traffic at Apex Driveway AM/PM Peak Hour Turning Movements SHORT RANGE TRAFFIC The future traffic on Prospect Road at the Apex driveway was determined for the Year 2021, the anticipated completion for the Haven Apartments. The background traffic for 2021 was based on the following three elements: • The 2020 counts were factored upward by one percent to account for overall growth. IN Out Total IN Out Total 2.65 0.04 0.15 0.19 0.27 0.15 0.42 Project IN Out Total IN Out Total 50 133 2 8 10 14 7 21 Note: These Trip Generation Rates are based on special rates determined by the City of Fort Collins Trip Generation Rates Daily Land Use AM PM Student Apartments Student Apartments Project Trips Dwelling Units Daily Land Use AM PM HAVEN APARTMENTS – SUPPLEMENTAL TRAFFIC STUDY CITY OF FORT COLLINS ROLLINS CONSULT LLC MARCH 5, 2020 5 • Traffic from two nearby projects was added to the base traffic volumes. These projects are: 821 W Lake Street Apartments, and The Standard. Trips associated with these projects were obtained from their respective Traffic Impact Studies. The resulting Background Short Range Traffic (without the Project) are provided on Figure 4. Figure 4 – Background Short Range Traffic AM/PM Peak Hour Turning Movements The Total Short Range traffic projections were developed by adding the project traffic depicted on Figure 3 to the Background traffic shown on Figure 4. The Total Short Range traffic is shown on Figure 5. Figure 5 – Total Short Range Traffic AM/PM Peak Hour Turning Movements SHORT RANGE TRAFFIC OPERATIONS AT APEX DRIVEWAY The results of the intersection operations analysis at the existing Apex driveway for both Short Range background and total traffic conditions are shown in Table 4. As shown in the table, the intersections movements and overall operations are projected to operate at acceptable levels. It should be noted that the SB left-turn/right-turn improves under Total traffic conditions. This is due to an increased number of right-turns which have better operations than the prohibited left-turns HAVEN APARTMENTS – SUPPLEMENTAL TRAFFIC STUDY CITY OF FORT COLLINS ROLLINS CONSULT LLC MARCH 5, 2020 6 Table 4 – Short Range Traffic Operations # Intersection Movement AM Peak Hr PM Peak Hr Background Total Background Total Delay LOS Delay LOS Delay LOS Delay LOS 1 Apex Driveway & Prospect T-Stop Overall 0.1 A 0.1 A 0.1 A 1.2 A EB LT (Not Permitted) 7.8 A 8.7 A 12.6 B 12.7 B SB LT/RT (LT Not Permitted) 14 B 12.4 B 20.9 C 18.6 C The detailed worksheets are provided in Appendix B. AUXILIARY LANE ANALYSIS An analysis was conducted to determine the need for an auxiliary right-turn lane on Prospect Road at the Apex driveway. The right-turns depicted on Figure 5 were analyzed based on the guidelines set forth in the Larimer County Urban Area Street Standards, in Chapter 8. The speed limit on Prospect Road is 35 mph. The guidelines are provided in Appendix C. As shown earlier on Figure 5, under total traffic conditions, the highest westbound right-turn volume is 22 vehicles, during the PM peak hour, with both the Apex and proposed Haven Apartments traffic accounted for. The minimum threshold for a right-turn lane at 35 mph and an approach volume of 1,322 vehicles is 40 vehicles per hour. Based on the standards, a westbound right-turn lane is not warranted. CONCLUSIONS The relocation of parking for the proposed Haven Apartments to the Apex Apartments parking lot will not have any significant impacts to the transportation system. A westbound right-turn lane from Prospect Road to the Apex driveway is not warranted. APPENDIX A – TRAFFIC COUNTS APEX DRIVEWAY/PROSPECT www.idaxdata.com TMC1 to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 1 0 3 0 2 4 1 11 5 WB 3.4% 0.90 NB - - Peak Hour: 7:30 AM 8:30 AM HV %: PHF EB 0.7% 0.78 Date: Tue, Mar 03, 2020 Peak Hour Count Period: 7:00 AM 9:00 AM SB 0.0% 0.38 TOTAL 1.6% 0.83 UT LT TH RT UT LT TH RT Rolling Eastbound Westbound Northbound Southbound One Hour UT LT TH RT Interval Start W PROSPECT RD W PROSPECT RD 0 DRIVEWAY 15-min Total UT LT TH RT 0 0 69 0 0 0 1 0 1 219 0 7:15 AM 4 0 200 0 7:00 AM 0 0 167 0 0 0 50 0 0 0 0 0 0 0 0 3 451 0 7:45 AM 0 1 344 0 1 0 0 0 0 0 274 0 7:30 AM 1 0 297 0 0 0 149 0 0 0 0 0 1 491 1,435 8:00 AM 0 0 239 0 0 0 133 0 0 139 1 0 0 0 0 0 2 0 4 0 0 114 0 0 0 0 0 0 372 1,588 8:15 AM 0 0 199 0 0 0 0 0 0 0 0 0 3 389 1,565 8:45 AM 0 0 278 0 2 0 0 0 0 0 313 1,627 8:30 AM 0 0 256 0 0 0 128 0 0 0 0 0 0 0 0 119 1 0 0 0 0 0 1 0 1 400 1,474 4 0 13 2,909 0 www.idaxdata.com TMC1 to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 3 0 3 0 1 1 1 0 9 5 WB 0.5% 0.97 NB - - Peak Hour: 4:30 PM 5:30 PM HV %: PHF EB 0.8% 0.90 Date: Tue, Mar 03, 2020 Peak Hour Count Period: 4:00 PM 6:00 PM SB 0.0% 0.50 TOTAL 0.6% 0.94 UT LT TH RT UT LT TH RT Rolling Eastbound Westbound Northbound Southbound One Hour UT LT TH RT Interval Start W PROSPECT RD W PROSPECT RD 0 DRIVEWAY 15-min Total UT LT TH RT 0 0 273 1 0 0 0 0 0 421 0 4:15 PM 0 1 196 0 4:00 PM 0 0 166 0 0 0 253 2 0 0 0 0 0 0 0 1 472 0 4:45 PM 0 1 204 0 4 0 0 0 0 0 474 0 4:30 PM 0 0 176 0 0 0 291 0 0 0 1 0 2 518 1,885 5:00 PM 0 0 180 0 0 0 289 0 0 312 0 0 0 0 0 0 0 0 1 0 0 306 2 0 0 1 0 1 473 1,937 5:15 PM 0 1 174 0 2 0 0 0 0 0 1 0 2 468 1,946 5:45 PM 0 1 155 0 2 0 0 0 0 0 487 1,950 5:30 PM 0 1 163 0 0 0 299 0 0 0 0 0 4 0 0 253 3 0 0 0 0 0 1 0 1 414 1,842 4 0 12 3,727 0 APPENDIX B – LEVEL OF SERVICE WORKSHEETS HCM 6 TWSC 1: P Ra & A Da 03/05/2020 Haven Apratments at Apex Driveway 03/03/2020 Existing AM Synchro 10 Light Report RR Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 179 535 2 2 7 Future Vol, veh/h 1 179 535 2 2 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 195 582 2 2 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 584 0 - 0 683 292 Stage 1 - - - - 583 - Stage 2 - - - - 100 - Critical Hdwy 4.14 - - - 6.84 6.94 Critical Hdwy Stg 1 - - - - 5.84 - Critical Hdwy Stg 2 - - - - 5.84 - Follow-up Hdwy 2.22 - - - 3.52 3.32 Pot Cap-1 Maneuver 987 - - - 383 704 Stage 1 - - - - 521 - Stage 2 - - - - 913 - Platoon blocked, % - - - Mov Cap-1 Maneuver 987 - - - 383 704 Mov Cap-2 Maneuver - - - - 383 - Stage 1 - - - - 520 - Stage 2 - - - - 913 - Approach EB WB SB HCM Control Delay, s 0 0 11.2 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 987 - - - 593 HCM Lane V/C Ratio 0.001 - - - 0.016 HCM Control Delay (s) 8.7 0 - - 11.2 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 HCM 6 TWSC 1: P Ra & A Da 03/05/2020 Haven Apratments at Apex Driveway 03/03/2020 Existing PM Synchro 10 Light Report RR Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 736 1198 8 1 7 Future Vol, veh/h 2 736 1198 8 1 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 800 1302 9 1 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1311 0 - 0 1711 656 Stage 1 - - - - 1307 - Stage 2 - - - - 404 - Critical Hdwy 4.14 - - - 6.84 6.94 Critical Hdwy Stg 1 - - - - 5.84 - Critical Hdwy Stg 2 - - - - 5.84 - Follow-up Hdwy 2.22 - - - 3.52 3.32 Pot Cap-1 Maneuver 524 - - - 82 408 Stage 1 - - - - 217 - Stage 2 - - - - 643 - Platoon blocked, % - - - Mov Cap-1 Maneuver 524 - - - 81 408 Mov Cap-2 Maneuver - - - - 81 - Stage 1 - - - - 215 - Stage 2 - - - - 643 - Approach EB WB SB HCM Control Delay, s 0 0 18.7 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 524 - - - 271 HCM Lane V/C Ratio 0.004 - - - 0.032 HCM Control Delay (s) 11.9 0 - - 18.7 HCM Lane LOS B A - - C HCM 95th %tile Q(veh) 0 - - - 0.1 HCM 6 TWSC 1: P Ra & A Da 03/05/2020 Haven Apratments at Apex Driveway 03/03/2020 Background 2010 AM Synchro 10 Light Report RR Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 1140 555 2 2 7 Future Vol, veh/h 1 1140 555 2 2 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 1239 603 2 2 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 605 0 - 0 1226 303 Stage 1 - - - - 604 - Stage 2 - - - - 622 - Critical Hdwy 4.14 - - - 6.84 6.94 Critical Hdwy Stg 1 - - - - 5.84 - Critical Hdwy Stg 2 - - - - 5.84 - Follow-up Hdwy 2.22 - - - 3.52 3.32 Pot Cap-1 Maneuver 969 - - - 171 693 Stage 1 - - - - 508 - Stage 2 - - - - 498 - Platoon blocked, % - - - Mov Cap-1 Maneuver 969 - - - 170 693 Mov Cap-2 Maneuver - - - - 170 - Stage 1 - - - - 506 - Stage 2 - - - - 498 - Approach EB WB SB HCM Control Delay, s 0 0 14 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 969 - - - 412 HCM Lane V/C Ratio 0.001 - - - 0.024 HCM Control Delay (s) 8.7 0 - - 14 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 HCM 6 TWSC 1: P Ra & A Da 03/05/2020 Haven Apratments at Apex Driveway 03/03/2020 Background PM Synchro 10 Light Report RR Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 790 1300 8 1 7 Future Vol, veh/h 2 790 1300 8 1 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 859 1413 9 1 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1422 0 - 0 1852 711 Stage 1 - - - - 1418 - Stage 2 - - - - 434 - Critical Hdwy 4.14 - - - 6.84 6.94 Critical Hdwy Stg 1 - - - - 5.84 - Critical Hdwy Stg 2 - - - - 5.84 - Follow-up Hdwy 2.22 - - - 3.52 3.32 Pot Cap-1 Maneuver 475 - - - 66 375 Stage 1 - - - - 189 - Stage 2 - - - - 621 - Platoon blocked, % - - - Mov Cap-1 Maneuver 475 - - - 65 375 Mov Cap-2 Maneuver - - - - 65 - Stage 1 - - - - 187 - Stage 2 - - - - 621 - Approach EB WB SB HCM Control Delay, s 0.1 0 20.9 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 475 - - - 235 HCM Lane V/C Ratio 0.005 - - - 0.037 HCM Control Delay (s) 12.6 0.1 - - 20.9 HCM Lane LOS B A - - C HCM 95th %tile Q(veh) 0 - - - 0.1 HCM 6 TWSC 1: P Ra & A Da 03/05/2020 Haven Apratments at Apex Driveway 03/03/2020 Total AM Synchro 10 Light Report RR Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 1140 555 4 2 15 Future Vol, veh/h 1 1140 555 4 2 15 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 1239 603 4 2 16 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 607 0 - 0 1227 304 Stage 1 - - - - 605 - Stage 2 - - - - 622 - Critical Hdwy 4.14 - - - 6.84 6.94 Critical Hdwy Stg 1 - - - - 5.84 - Critical Hdwy Stg 2 - - - - 5.84 - Follow-up Hdwy 2.22 - - - 3.52 3.32 Pot Cap-1 Maneuver 967 - - - 171 692 Stage 1 - - - - 508 - Stage 2 - - - - 498 - Platoon blocked, % - - - Mov Cap-1 Maneuver 967 - - - 170 692 Mov Cap-2 Maneuver - - - - 170 - Stage 1 - - - - 506 - Stage 2 - - - - 498 - Approach EB WB SB HCM Control Delay, s 0 0 12.4 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 967 - - - 508 HCM Lane V/C Ratio 0.001 - - - 0.036 HCM Control Delay (s) 8.7 0 - - 12.4 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 HCM 6 TWSC 1: P Ra & A Da 03/05/2020 Haven Apratments at Apex Driveway 03/03/2020 Total PM Synchro 10 Light Report RR Page 1 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 790 1300 22 1 14 Future Vol, veh/h 2 790 1300 22 1 14 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 859 1413 24 1 15 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1437 0 - 0 1859 719 Stage 1 - - - - 1425 - Stage 2 - - - - 434 - Critical Hdwy 4.14 - - - 6.84 6.94 Critical Hdwy Stg 1 - - - - 5.84 - Critical Hdwy Stg 2 - - - - 5.84 - Follow-up Hdwy 2.22 - - - 3.52 3.32 Pot Cap-1 Maneuver 468 - - - 65 371 Stage 1 - - - - 188 - Stage 2 - - - - 621 - Platoon blocked, % - - - Mov Cap-1 Maneuver 468 - - - 64 371 Mov Cap-2 Maneuver - - - - 64 - Stage 1 - - - - 186 - Stage 2 - - - - 621 - Approach EB WB SB HCM Control Delay, s 0.1 0 18.6 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 468 - - - 281 HCM Lane V/C Ratio 0.005 - - - 0.058 HCM Control Delay (s) 12.7 0.1 - - 18.6 HCM Lane LOS B A - - C HCM 95th %tile Q(veh) 0 - - - 0.2 APPENDIX C – GUIDELINES FOR RIGHT-TURN LANE Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 0 2 734 16 0 0 0 0 0 Peak Hour 0 0 0 0 0 0 1 0 7 1,950 0 Count Total 0 0 2 4:15 PM 0 2 0 0 2 0 0 0 0 0 0 0 1 West North South 4:00 PM 4 2 0 0 6 0 EB WB NB SB Total East 4:45 PM 2 3 0 0 5 0 0 0 1 2 0 0 4:30 PM 2 1 0 0 3 0 0 0 0 0 0 0 0 0 1 0 5:15 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 2 0 0 0 2 0 0 1 0 0 1 0 5:45 PM 0 2 0 0 2 0 0 0 0 1 0 0 5:30 PM 2 0 0 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 5 2 Peak Hr 6 6 0 0 12 0 1 Count Total 12 12 0 0 24 0 1 0 0 1 0 2 0 0 1 0 1 4 0 0 1,198 8 0 5 1,414 0 0 0 2,276 0 0 4 1 0 1 0 N DRIVEWAY W PROSPECT RD W PROSPECT RD DRIVEWAY W PROSPECT RD TEV: 1,950 PHF: 0.94 7 1 8 10 0 8 1,198 1206 735 0 734 736 2 1,205 0 Mark Skaggs: (425) 250-0777 mark.skaggs@idaxdata.com Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 1 1 1,079 5 0 0 0 0 0 Peak Hour 0 0 0 0 0 0 2 0 7 1,627 0 Count Total 5 0 0 7:15 AM 2 5 0 0 7 0 0 0 0 0 0 0 0 West North South 7:00 AM 1 1 0 0 2 0 EB WB NB SB Total East 7:45 AM 1 2 0 0 3 0 0 0 0 0 0 0 7:30 AM 1 3 0 0 4 0 0 0 0 0 0 0 0 1 0 0 8:15 AM 3 7 0 0 10 3 0 0 0 0 0 0 0 1 1 0 8:00 AM 3 6 0 0 9 0 0 0 0 0 0 1 8:45 AM 1 2 0 0 3 0 0 0 2 2 0 0 8:30 AM 5 3 0 0 8 0 0 0 0 0 3 0 1 1 0 0 0 0 0 1 0 0 0 5 0 Peak Hr 8 18 0 0 26 3 0 Count Total 17 29 0 0 46 3 0 0 0 3 2 4 0 0 3 1 2 2 0 0 535 2 0 1 1,980 0 0 0 901 3 0 2 0 0 2 1 N DRIVEWAY W PROSPECT RD W PROSPECT RD DRIVEWAY W PROSPECT RD TEV: 1,627 PHF: 0.83 7 2 9 3 0 2 535 537 1,081 0 1,079 1081 1 543 1 Mark Skaggs: (425) 250-0777 mark.skaggs@idaxdata.com