MEMORANDUM
c
O
0
o
To: Tony Fonte, Little Caesars
r
Al Hauser, Architecture One
o10
Eric Bracke, Fort Collins Transportation Division
o
"
From: Matt Delich
z
g
w
Date: August 31, 1992
O
Subject: Amendment to Little Caesars Pizza Site Access Study
j
(File: 9226MEM2)
z
W
a
Due to circumstances regarding the dedication of right-
of-way by the property owner to the west of the proposed
a
Little Caesars Pizza, Mitchell Drive cannot be built in the
m
short range future as indicated on previous site plans and as
analyzed in the site access study. Therefore, a temporary
M
access scheme has been proposed sharing the existing driveway
to the bank/office building to the east of the proposed Little
Caesars Pizza. Access will also be available to JFK Parkway
through the parking lot that currently exists to the south of
the bank/office building. Currently, the bank/office building
has full -turn access to Horsetooth Road at their driveway and
alternative full -turn access to Horsetooth Road via JFK
Parkway. The Horsetooth/JFK Parkway intersection is
signalized.
Current peak hour traffic counts (April 1992) at the
Horsetooth/Square and Horsetooth/bank-office driveway are
shown in Figure 1. Operation at these stop sign controlled
z
intersections is shown in Table 1. Calculation forms are
provided in Appendix A. Left turns out of the Square and the
W
Z
bank/office driveways are at level of service D during the
CD
noon peak hour and at level of service E during the afternoon
LLi
z
W
peak hour, based upon the unsignalized intersection analysis
technique from the 1985 Highway Capacity Manual. Recent
research (cited in the Little Caesars Pizza Site Access Study)
=
Z
indicates that this technique overstates the level of service.
c2
O
Based upon this research, the actual level of service is more
F
appropriately defined at C/D and D. This is also indicated
W
o
in Table 1.
o
a
.
a
Another consideration pertaining to the operation of this
°C
stop sign controlled intersection is the geometry of the
•
center lane on Horsetooth Road. This center lane is 21 feet
3
wide. During traffic counts, it was observed that exiting
W
=
a
left turns from both the Square and the bank/office driveway
F—
cc
utilize this lane as a refuge area in order to execute the
Q
desired left turn. Considering this, the level of service
rE
could be divided into two parts, the first considering traffic
approaching from the right and the second considering traffic
APPENDIX B
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
:Y.K<Y.YVY#:tY:KVKKK.KYX<YYY:KY.t<KY#VYYf:Y#!'YY.K�'.�:K�:�YX #[Y#K#X##X�K##Y#"K .K i):C#Y
IDENTIFYING INFORMATION
------- ------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
horsetooth
NAME OF THE NORTH/SOUTH STREET.......
square
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
8/28/92
TIME PERIOD ANALYZED .................
noon pm 1992
short
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
--- -------------- -- ---- ---- --------
--- ---------
-- ---- ----------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------
EB WE,
LEFT --45 ---0
THRU 660 703
RIGHT 0 11
NUMBER OF LANES
---------------
LANES
NE SE,
-- 0
-- 36
----------------------------------
EB WB NE. SE•
____ _______ _______ -------
CAPACITY AND LEVEL -OF -SERVICE Page-3
--------------------------- ---------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c p M SH R SH (pcph) c (pcph) c (pcph) c = c - v LOS
------------------------------------------------ ---
MINOR STREET o3-23,) C''
SB LEFT 10 111 104 104 94 E
- RIGHT 40 707 707 707 667 A
MAJOR STREET
EB LEFT 50 468 468 468 418 A
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... horsetooth
NAME OF THE NORTH/SOUTH STREET.... square
DATE AND TIME OF THE ANALYSIS..... 8/28/92 noon pm 1992 short
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
Ff.#FYFFYJKYFFiY#FYFFF#FYFFYFFYYY#KFFF'KF#Y'Y.CFFIRt](YFFFFY.tFYYF#YYFF.F F##A
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET.. 35
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
horsetooth
NAME OF THE NORTH/SOUTH STREET.......
square
NAME OF THE ANALYST ..................
mJd
DATE OF THE ANALYSIS (mm/dd/yy)......
8/28/92
TIME PERIOD ANALYZED .................
noon pm 1992 GD
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIREC71ON: EAST/WEST
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SE;
---- ---- ---- ----
LEFT 31 0 -- 9
THRU 801 1128 -- 0
RIGHT 0 31 -- 47
NUMBER OF LANES
------------------------------------------
-----------------------
EB WE, NE;
SO
------- ------- -------
LANES --
-------
2
CAPACITY AND LEVEL -OF -SERVICE Page-3
-------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- - ------- ------------ ------------- ---
MINOR STREET 17-Z/ " C
SB LEFT 10 83 76 76 66 E
RIGHT 52 540 540 540 468 A
MAJOR STREET
EB LEFT 34 260 260 260 226 C
IDENTIFYING INFORMATION
-- ------------------- ---------------------------
NAME OF THE EAST/WEST STREET...... horsetooth
NAME OF THE NORTH/SOUTH STREET.... square
DATE AND TIME OF THE ANALYSIS..... 8/28/92 ; noon a992 short
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
:e rex��>z�:Kxxr.r sxxxxa:r.r.r:r.xWxrx��:rxsx><zx�<��<xxv:>»:x zxrxxtxcrx x.�xxr. vwr r:x>
IDENTIFYING INFORMATION
------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR ..................... i
AREA. POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... hor•srtooth
NAME OF THE NORTH/SOUTH STREET....... bank/office
NAME OF THE ANALYST_ ............... mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 8/28/92
TIME PERIOD ANALYZED ................ Gn pm 1992 short
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
----------------- ------- —
EB WB NB SF
---- ---- ---- ----
LEFT 0 12 52 --
THRU 633 662 0 --
RIGHT 36 0 10 --
NUMBER OF LANES
------------------------------------------------------------
EB WB N6 SE,
-------------- ------- -------
LANES 2 _ --
0
CAPACITY AND LEVEL -OF -SERVICE Page-3
— ----- --- ------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c p M SH R SH (pcph) c (pcph) c (pcoh) c = c - v LOS
------ ------- ----------- ---
MINOR STREET
NB LEFT 57 128 126 126 68 E
RIGHT 11 727 727 727 - 716 A
MAJOR STREET
WB LEFT 13 496 496 496 483 A
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... horsrtooth
NAME OF THE NORTH/SOUTH STREET.... bank/offi
DATE AND TIME OF THE ANALYSIS..... 8/28192 ; c noon pm 1992 'hort
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION -
--------- --------------- ----------------------------- ------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR ..................... i
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... horsrtooth
NAME OF THE NORTH/SOUTH STREET....... bank/office
NAME OF THE ANALYST .................. mjd
DATE OF THE ANALYSIS (mm/dd/yy)...... 8/28/92
TIME PERIOD ANALYZED ................. noon pm 1992 short
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
----- ------------------------ -----------------------------------
ES WB Ng SB
---- ---- ---- ----
LEFT 0 18 65 --
THRU 757 1094 0 -
-
FIGHT 53 0 18 --
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SE..
------ ------- ------- -----
LANES 2 _ 2 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) C= C t V LOS
p M SH R SH
_______ _____________________________------------ ---
MINOR STREET LZ5-3S, 1
NB LEFT 72 83 81 81 9 E
RIGHT 20 664 664 664 645 A
MAJOR STREET
WB LEFT 20 408 408 408 383 8
IDENTIFYING INFORMATION
------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... horsrtooth
NAME OF THE NORTH/SOUTH STREET.... bank/office
DATE AND TIME OF THE ANALYSIS..... 8/28/92 ; noon 1992 short
OTHER INFORMATION....
approaching from the left. When considering this two step
maneuver, the noon peak level of service is B/B and the
afternoon peak level of service is C/D.
With the limitation on access caused by the elimination
of Mitchell Drive, Little Caesars traffic was assigned to the
bank/office driveway as shown in Figure 2. This assignment
indicates a worst case situation, since no traffic is assigned
through the bank/office parking lot to JFK Parkway. The
operation at the two key stop sign controlled intersections
is shown in Table 2. Calculation forms are provided in
Appendix B. Also shown in Table 2 is the peak hour operation
when considering the research cited earlier. While the level
of service will deteriorate due to the increase in background
traffic on Horsetooth Road and the additional traffic
generated by the proposed Little Caesars Pizza, the operation
will not be significantly different from that which occurs
today. If delays become unacceptable for the left -turns exits
from the bank/office driveway, a logical motorist will seek
an alternative which serves the same desire in less time.
This route currently exists through the bank/office parking
lot to JFK Parkway. Currently, the Horsetooth/JFK Parkway
signalized intersection operates acceptably with much excess
capacity. The additional traffic that might be added to this
intersection due to the Little Caesars Pizza and the diversion
of bank/office traffic will not significantly impact this
intersection.
It is recommended that the proposed temporary access
scheme be implemented. When right-of-way is available to
build Mitchell Drive, traffic should be redistributed as
indicated in the Little Caesar Pizza Site Access Study.
THE SQUARE
9/28
45/31
633/763
NOON / PM
HORSETOOTH
ROAD
627/750 —�
13/19 —�
+ 655/1083
,r— 2/0
r
C4
N
BANK / OFFICE
N
1992 PEAK HOUR TRAFFIC Figure 1
THE SQUARE
1 N
-11/31 HORSETOOTH --662/1094
703 1128 ROAD fit— 12/18
633/757
45 31 —1 36/53
:�J)
660/801%n co
o
BANK / OFFICE
NOON / PM
PEAK HOUR TRAFFIC
WITH LITTLE CAESARS PIZZA
Figure 2
Table 1
1992 Peak Hour Operation
Intersection
Horsetooth/Square
SB LT
SB RT
EB LT
Horsetooth/bank-office
NB LT
NB RT
WB LT
Level of Service
Noon PM
D (C/D) E (C/D)
A A
A C
D (C/D) E (D)
A A
A A
( ) Level of service based upon delay criteria.
Table 2
Peak Hour Operation With Little Caesars Pizza
Level of Service
Intersection Noon PM
Horsetooth/Square
SB LT E (C/D) E (C/D)
SB RT A A
EB LT A C
Horsetooth/bank-office
NB LT E (C/D) E (D)
NB RT A A
WB LT A B
( ) Level of service based upon delay criteria.
APPENDIX A
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
T FYXYXXXfiCXYYCX:tCYYYCCX CX CYYCXX%XZCYCiXCXCYYCXXXCCXYYXZCCCYYYY.0 KX'C XY•
IDENTIFYING INFORMATION
------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
horsetooth
NAME OF THE NORTH/SOUTH STREET.......
square
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
8/28/92
TIME PERIOD ANALYZED .................
noon pm
1992 -port
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
----------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE SOUTHBOUNO: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NE; SS
---- ---- ---- ----
LEFT 45 0 --
THRU 633 673 -- 0
RIGHT 0 9 -- 36
NUMBER OF LANES
---------------------------------------------------------------------
ES WE NS
Sc
---------------------
LANES 2 2 --
-----
2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------ ------------------------ ---
MINOR STREET C,I-$1-) C'/p
SB LEFT 8 122 114 114 l� 107 D
RIGHT 40 721 721 721 682 A
MAJOR STREET
E8 LEFT 50 488 488 488 438 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... horsetooth
NAME OF THE NORTH/SOUTH STREET.... square
DATE AND TIME OF THE ANALYSIS..... 6/28/92 nocn pm 1992 short
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Pace-1
YY..W.KX.KYV:k:k KYYkYRYYYt<kY.KYY Y.RYFYYYK Y:YXkLKRRYYKKY Y:'✓.<Y:Y YKY*tKX'.M.Y.Y Y. )K K<V:<A. '
IDENTIFYING INFORMATION
-------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR ...................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... horsetooth
NAME OF THE NORTH/SOUTH STREET....... square
I
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 8/28/92
i
TIME PERIOD ANALYZED ................. noon pm 1992 short
OTHER INFORMATION.... -
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
• ---- ---- ---- ---
LEFT 31 0 -- 6
THRU 763 1033 -- 0
RIGHT 0 28 -- 47
NUMBER OF LANES
---------------------------------------------------------------------
ES WB NB SB
-------------- ------- -------
LANES 2 2 -- 2
a
CAPACITY AND
---------------------------------------------------------------------
LEVEL -OF -SERVICE
Page-3
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
r_ (pcph)
c = c - v LOS
p
M
------------
SH
R SH
------------ ---
-------
--------
---------
0, -2() C
MINOR STREET
SB LEFT
7
83
77
77
70 E
RIGHT
52
557
557
557
505 A
MAJOR STREET
EB LEFT
34
277
277
277
243 C
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... horsetooth
NAME OF THE NORTH/SOUTH STREET.... square
DATE AND TIME OF THE ANALYSIS..... 6/28/92 ; noon a 1.992 hort
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
1XZZZZXX\'ZZZZZXZZZZXZZZZZZZXXZZZXZXXXZYZZXZZYZZXXZZt X.ZZ>. Y't ZXXXMZZXKZX
IDENTIFYING INFORMATION
-- --------------- ----------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
horsrtooth
NAME OF THE NORTH/SOUTH STREET......
bank/office
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
8/28/92
TIME PERIOD ANALYZED ................
noon pm 0 short
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
------------------------------------------------------------------
EB Wb NE SB
----
---- ---- ----
LEFT 0 2 27 --
THRU 627 655 0 --
RIGHT 13 0 3 --
NUMBER OF LANES
---------------------------------------------------------------------
E6 WB
NS SS
---------------------
L=.iJES 2 2
-------
_ --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- .ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c p M SH R SH (pcph) c (pcph) c (pcph) c = c - v LOS
MINOR STREET C1'21J C/I
NB LEFT 30 134 134 134 104 0
RIGHT 3 740 740 740 737 A
MAJOR STREET
WS LEFT 2 515 515 515 512 A
IDENTIFYING INFORMATION
------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... horsrtooth
NAME OF THE NORTH/SOUTH STREET.... bank/offic-
DATE AND TIME OF THE ANALYSIS..... 8/28/92 : noon om 1992 short
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Paae-1
Z I:LXYYt {'A XKYKF.V'.<>..... : .....1.'.ASM:1.....tt<Y.S YYYY:A:f. Y'K«X�KY'K :KXYMtY. Y.Y \'W !1"K 1.
IDENTIFYING INFORMATION
----------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... horsrtooth
NAME OF THE NORTH/SOUTH STREET....... bank/office
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 8/28/92
TIME PERIOD ANALYZED ................. noon om 1992 hort
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------
E8 WB NE, S5
---- ---- ---- ----
LEFT 0 0 28 --
THRU 750 1083 0 --
RIGHT 19 0 4 --
NUMBER OF LANES
---------------------------------------------------------------------
EP, WB NE, S
------- -------------- -------
LANES z 2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
i
---
MINOR STREET CIq�28 '
NB LEFT 31 83 83 83 52 E
RIGHT 4 682 682 682 678 A
MAJOR STREET
i
WB LEFT 0 433 433 433 433 A
IDENTIFYING INFORMATION
------------------------------------------------------------ -------
NAME OF THE EAST/WEST STREET...... horsrtooth
NAME OF THE NORTH/SOUTH STREET.... bank/office
DATE AND TIME OF THE ANALYSIS..... 8/28/92 ; noon(pm 19?% short
OTHER INFORMATION....